NIELS-E. WERGIN-CHEEK
SELECTION OF WORK 1/2
PART II ARCHITECTURAL ASSISTANT
PART NUMBER ONE
M.ARCH. ● MA ● MSC ● BA (HONS) ● FRSA
UNIVERSITY WORK
DEGREE YEAR TWO (ABOVE) AND YEAR THREE (BELOW)EXAMPLES FROM MY PART ONE PORTFOLIOS
YEAR TWO DEGREE PROJECT (ABOVE): ‘A SPACE FOR ART’ - PROPOSAL FOR THE CONVERSION AND EXTENSION OF A 1960S OFFICE BLOCK FOR USE AS ART STUDIOS AND GALLERY SPACE.LEFT: CARDBOARD SKETCH MODEL, RIGHT: PLAN (HAND DRAWN, SCALED DOWN TO 1:500)
YEAR THREE DEGREE PROJECT (BELOW): ‘ARTSPACE COLLECTIVE - PROPOSAL FOR A BUILDING WITH SMALL STUDIO FLATS FOR ARTISTS, SHARED STUDIO SPACES, AND A COMMON GALLERY. LEFT: RENDERS OF 3D MODEL, RIGHT: PLAN OF TWO STUDIO FLATS, SECTION OF BUILDING
A
A JUNCTION CEILING - EXTERNAL WALL (1:20)
Detail section A-A, cutting through the external wall (with window) and flat roof of the public building. Drainage of the flat roof is via pipes in the pilotis. Win-dows have blinds to reduce solar gain.
DIPLOMA PART II PORTFOLIOSAMPLES FROM MY YEAR ONE DIPLOMA PROJECT - ‘THE EUROPEAN COURT FOR
MARITIME LAW’: A PROPOSAL FOR TWO LAW COURT BUILDINGS
YEAR ONE DIPLOMA PROJECT - ‘EUROPEAN COURT FOR MARITIME LAW’: A PROPOSAL FOR A LAW COURT BLDG.DIPLOMA PART II PORTFOLIO
SAMPLES FROM MY
3D SECTION B-B CUTTING THROUGH PAVILIONS I & II
B
B
YEAR TWO DIPLOMA PROJECT - ‘LE CORBUSIER SCULPTURE GALLERIES’: A PROPOSAL FOR THREE GALLERY PAVILIONS ON THE ROOF OF AN EXISTING DEPARTMENT STORE DIPLOMA PART II PORTFOLIO
SAMPLES FROM MY
Top Related