Export Opportunities in International Water Markets
This seminar will provide information on opportunities for UK water businesses in international markets and practical guidance on how to access them.
The Westminster Conference Centre, 1 Victoria Street, London, SW1H 0ET
OFFICIAL
Brief Introduction of the Market
Name of Country: UAE
Major Market Challenges in Waste and Wastewater Management:
1. Tender driven market where lowest priced tender wins, despite quality requirements
2. Most competitive market in the Middle East
3. No major UK contractor/developer active in the UAE’s water sector
4. Important to develop a business relationship with local stakeholders and to be established locally rather than serving the market remotely
OFFICIAL
Project Details
• Dubai Storm Water Scheme (DWC) – Dubai Municipality
• Dubai Deep Sewer Tunnel (DSST) – Dubai Municipality
• Jebel Ali STP Opportunities – Dubai Municipality
• Jebel Ali Desalination Plant Expansion – DEWA
• Umm Al Quwain Sea Water RO Plant – FEWA
• Various Projects – Sharjah Municipality
• Stormwater Projects – Abu Dhabi Municipality
• Abu Dhabi Sewerage Services Company (ADSSC) Projects
OFFICIAL
4
£1.1bn
• 2 Design & Build (D&B) Packages including 1Pumping Station and 1 Tunnel Sections to betendered in 2017.
• Tunnel Section between Jebel Ali Port and Airportconsidered for dual purpose and D&B packageprocurement delayed
• Storm Links Packages to follow late 2017
In excess of £250 million accessible opportunities in engineering consultancy, construction and supply chain for UK companies
Dubai Storm Water Scheme (DWC)
5
• £2.3 Billion Deep Sewer Tunnel Project in Dubai to reshape the whole sewerage system
• In May 2016, Dubai Municipality appointed Parsons the consultancy contract for DSST scheme.
• More clarity expected on the Procurement strategy by early 2017 however early intelligence indicates that D&B tender documents should be released by end of 2017
• Opportunities are expected to be:
2 Pumping Stations D&B packages (Jebel Ali - 90m deep & Al Warsan - 35m deep)
4 to 5 Tunnel D&B packages
• Deira Tunnel, approx 26 km Deira tunnel will run from Palm Deira to the Al Warsan STP
• Bur Dubai Tunnel, between 50 to 60 km Bur Dubai tunnel will run from the Creek (on Bur Dubai) to the Jebel Ali STP
2 Link Sewer Packages for Consultancy and then Construction (several packages to be expected)
• Approximately 4 years construction period
Dubai Deep Sewer Tunnel (DSST)
6
• £2.3 Billion Deep Sewer Tunnel Project in Dubai to reshape the whole sewerage system
Dubai Deep Sewer Tunnel (DSST)
7
Jebel Ali STP Opportunities
£300 m £70 m 19Total Value of the
contract awarded to the consortium
Besix/Larsen & Toubro
Total Accessible Value to UK companies UK companies in
negotiation with Besix/L&T to supply
services or equipments.
Dubai Municipality has appointed in April 2016 the Besix/Larsen & Toubro consortium for the construction of Jebel Ali STP expansion.Besix/L&T have finalised the design review stage with DM/AECOM and have entered into a more active phase in regards to supply chain engagement.
The Bidding Process
Register yourself with DIT Dubai mentioning which projects you’re interested in.
Visit www.exportingisgreat.gov.uk regularly to find out new opportunities uploaded on the site by DIT and register interest in the ones that are of interest.
Bidding process and timelines differ from Emirate to Emirate and from one government body to another. DIT will provide advice inform UK companies when introductions are made and will provide contact details for direct follow-up.
OFFICIAL
Support
Adil Khan
Trade & Investment Adviser
Department for International Trade (DIT)
British Embassy Dubai
Francois-Xavier Basselot
Specialist, Infrastructure Team
Department for International Trade (DIT)
London
British Centres for Business (BCB) – www.bcbuae.com
UK Export Finance (UKEF) - https://www.gov.uk/government/organisations/uk-export-finance