Download - ESA Report on ESA EO missions CEOS Beijing, WGISS Sep. 2004 H. Laur, YL Desnos,

Transcript
Page 1: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 1

ESA Report on ESA EO missionsESA Report on ESA EO missions CEOS CEOS Beijing, Beijing,

WGISSWGISS Sep. 2004Sep. 2004

H. Laur, H. Laur, YL Desnos,YL Desnos,I. PetitevilleI. Petiteville

Page 2: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 2

Topics

ENVISAT

DRAGON NRSCC-ESA Joint Programme

Earth Explorer Missions

3rd Party missions: ALOS

Page 3: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 3

ENVISAT

Observing the Earth from space:

the ENVISAT Mission

Henri LAUREnvisat Mission Manager

“Big Science” in Geology, 32nd Int. Geological Congress, August 2004

Page 4: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 4

DRAGON Programme

Dragon Programmeand Organisation

Dragon programme coordinators

Li Zengyuan for NRSCC

Yves-Louis Desnos for ESA

Page 5: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 5

cryosat

smos

adm

goce

EARTH EXPLORERS

Page 6: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 6

Earth Explorer MissionsCore missions:

GOCE: Gravity and Ocean Circulation.

ADM-Aeolus: Measuring the winds at all altitudes.

Opportunity missionsCRYOSAT: Sea-Ice Monitoring

SMOS: Soil Moisture and Ocean Salinity.

Floating sea ice NOAA

Salinity in the Mediterranean

Page 7: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 7

Earth Explorer missions (1/3)

• CRYOSAT: – ESA contract, Prime Contractor ACS (I) – Some delays with satellite. Launch

planned for 1st quarter of 2005– Kiruna Ground Station ready– About 60 Scientific projects accepted in

Category 1 (data provided by ESA for free)

Page 8: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 8

CRYOSAT Ground Station

Kiruna Salmijarvi

CRYOSAT equipment

Page 9: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 9

Earth Explorer missions (2/3)• ADM Aeolus:

– GS PDS development KO in Jul. 2005,

– PDS completed in 2007. – Launch in October 2007.

• SMOS:– Ground Segment Phase B

on-going until end 2004 then C/D phase

Page 10: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 10

Svalbard Ground Station

Page 11: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 11

Earth Explorer missions (3/3)

• GOCE:– ESA contract, Prime Contractor ACS (I) – Ground Segment (PDS) V2 kick-off in Sep. 2003– Launch in summer 2006

Page 12: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 12

3rd Party mission: ALOS

Page 13: ESA Report on ESA EO missions CEOS   Beijing,  WGISS  Sep. 2004 H. Laur,  YL Desnos,

CEOS WGISS 18, Beijing , Sep. 2004 Slide 13

ALOS

• 3 sensors: 1 SAR L-band and 2 optical

• ALOS Data European Node (ADEN): – ESA contract, Prime VEGA (UK). – GS development kicked-off end of July 2002. – Subsystem Factory Acceptance Tests (Sep.

2003 to Jun. 2004)– Launch (summer 2005)– Full deployment by mid 2005