PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. , ATKADIH STONE
MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE - ATKADIH , P.O.+ P.S.- BAGODER,
THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE- 1
CONSULTANTS
SATHI PLANNERS PVT. LTD.
REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN
PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,
(JHARKHAND).
Table of Contents 1. Executive Summary ............................................................................................................................................................... 4
2. INTRODUCTION OF THE ...................................................................................................................................................... 5
PROJECT/BACKGROUND INFORMATION .............................................................................................................................. 5
2.1 INENTIFICATION OF THE PROJECT & PROJECT PROPONENT. IN CASE OF MINING PROJECT, A COPY
OF MINING LEASE/LETTER OF INTENT SHOULD BE GIVEN. ....................................................................................... 5
22..22 BBRRIIEEFF DDEESSCCRRIIPPTTIIOONN OOFF NNAATTUURREE OOFF PPRROOJJEECCTT:: ....................................................................................................................... 7
22..33 NNEEEEDD FFOORR TTHHEE PPRROOJJEECCTT AANNDD IITTSS IIMMPPOORRTTAANNCCEE TTOO TTHHEE CCOOUUNNTTRRYY AANNDD RREEGGIIOONN ................................................................ 7
22..44 DDEEMMAANNDD AANNDD SSUUPPPPLLYY GGAAPP.......................................................................................................................................................... 7
22..55 DDOOMMEESSTTIICC//EEXXPPOORRTTSS MMAARRKKEETTSS ................................................................................................................................................. 7
22..66 EEMMPPLLOOYYMMEENNTT GGEENNEERRAATTIIOONN ........................................................................................................................................................ 8
3. PROJECT DESCRIPTION ....................................................................................................................................................... 9
33..11 TTYYPPEE OOFF PPRROOJJEECCTT IINNCCLLUUDDIINNGG IINNTTEERRLLIINNKKEEDD AANNDD IINNTTEERRDDEEPPEENNDDEENNTT PPRROOJJEECCTTSS,, IIFF AANNYY .................................................. 9
33..22 LLOOCCAATTIIOONN ((MMAAPP SSHHOOWWIINNGG GGEENNEERRAALL LLOOCCAATTIIOONN,, SSPPEECCIIFFIICC LLOOCCAATTIIOONN,, AANNDD PPRROOJJEECCTT SSIITTEE LLAAYYOOUUTT))
WWIITTHH CCOOOORRDDIINNAATTEESS........................................................................................................................................................................ 9
33..33 DDEETTAAIILLSS OOFF AALLTTEERRNNAATTEE SSIITTEESS CCOONNSSIIDDEERREEDD AANNDD TTHHEE BBAASSIISS OOFF SSEELLEECCTTIINNGG TTHHEE PPRROOPPOOSSEEDD SSIITTEE,,
PPAARRIICCUULLAARRLLYY TTHHEE EENNVVIIRROONNMMEENNTTAALL CCOONNSSIIDDEERRAATTIIOONNSS GGOONNEE IINNTTOO SSHHOOUULLDD BBEE HHIIGGHHTTLLIIGGHHTTEEDD .......... 9
33..44 SSIIZZEE AANNDD MMAAGGNNIITTUUDDEE OOFF OOPPEERRAATTIIOONN ................................................................................................................................... 10
33..55 PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN WWIITTHH PPRROOCCEESSSS DDEETTAAIILLSS ((AA SSCCHHEEMMAATTIICC DDIIGGRRAAMM//FFLLOOWW CCHHAARRTT SSHHOOWWIINNGG TTHHEE
PPRROOJJEECCTT LLAAYYOOUUTT,, CCOOMMPPOONNEENNTTSS OOFF TTHHEE PPRROOJJEECCTT EETTCC.. SSHHOOUULLDD BBEE GGIIVVEENN ....................................................... 10
EEXXTTEENNTT OOFF MMEECCHHAANNIISSMM .................................................................................................................................................................. 11
SSTTAATTUUTTOORRYY PPRROOVVIISSIIOONN PPRREECCAAUUTTIIOONN DDUURRIINNGG BBLLAASSTTIINNGG .......................................................................................................... 11
33..66 RRAAWW MMAATTEERRIIAALL RREEQQUUIIRREEDD AALLOONNGG WWIITTHH EESSTTIIMMAATTEEDD QQUUAANNTTIITTYY,, LLIIKKEELLYY SSOOUURRCCEE,, MMAARRKKEETTIINNGG AARREEAA OOFF FFIINNAALL
PPRROODDUUCCTTSS//SS,, MMOODDEE OOFF TTRRAANNSSPPOORRTT OOFF RRAAWW MMAATTEERRIIAALL AANNDD FFIINNIISSHHEEDD PPRROODDUUCCTT.. ............................................................. 12
33..99 QQUUAANNTTIITTYY OOFF WWAASSTTEESS TTOO BBEE GGEENNEERRAATTEEDD ((LLIIQQUUIIDD AANNDD SSOOLLIIDD )) AANNDD SSCCHHEEMMEE FFOORR TTHHEEIIRR MMAANNAAGGEEMMEENNTT//DDIISSPPOOSSAALL
............................................................................................................................................................................................................... 12
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
3.10 Schematic representations of the feasibility drawing which give information of EIA purpose ......... 13
4. SITE ANALYSIS ...................................................................................................................................................................... 14
44..11 CCOONNNNEECCTTIIVVIITTYY ............................................................................................................................................................................ 14
44..22 LLAANNDD FFOORRMM,, LLAANNDD UUSSEE AANNDD LLAANNDD OOWWNNEERRSSHHIIPP .................................................................................................................. 14
44..33 TTOOPPOOGGRRAAPPHHYY .............................................................................................................................................................................. 14
44..44 EEXXIISSTTIINNGG LLAANNDD UUSSEE PPAATTTTEERRNN ((AAGGRRIICCUULLTTUURREE,, NNOONN--AAGGRRIICCUULLTTUURREE,, FFOORREESSTT,, WWAATTEERR BBOODDIIEESS ((IINNCCLLUUDDIINNGG AARREEAA
UUNNDDEERR CCRRZZ)))),, SSHHOORRTTEESSTT DDIISSTTAANNCCEESS FFRROOMM TTHHEE PPEERRIIPPHHEERRYY OOFF TTHHEE PPRROOJJEECCTT TTOO PPEERRIIPPHHEERRYY OOFF TTHHEE FFOORREESSTTSS,,
NNAATTIIOONNAALL PPAARRKK,, WWIILLDD LLIIFFEE SSAANNCCTTUUAARRYY,, EECCOO SSEENNSSIITTIIVVEE AARREEAASS,, WWAATTEERR BBOODDIIEESS ((DDIISSTTAANNCCEE FFRROOMM TTHHEE HHFFLL OOFF TTHHEE
RRIIVVEERR)),, CCRRZZ.. IINN CCAASSEE OOFF NNOOTTIIFFIIEEDD IINNDDUUSSTTRRIIAALL AARREEAA,, AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE IINNDDUUSSTTRRIIAALL
AARREEAA;; AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE GGIIVVEENN.. ........................................................................................ 14
44..55 EEXXIISSTTIINNGG IINNFFRRAASSTTRRUUCCTTUURREE .................................................................................................................................................... 15
44..77 CCLLIIMMAATTIICC DDAATTAA FFRROOMM SSEECCOONNDDAARRYY SSOOUURRCCEESS ........................................................................................................................ 15
44..88 SSOOCCIIAALL IINNFFRRAASSTTRRUUCCTTUURREE AAVVAAIILLAABBLLEE ................................................................................................................................... 15
5. PLANNING BRIEF ................................................................................................................................................................. 21
55..11 PPLLAANNNNIINNGG CCOONNCCEEPPTT ((TTYYPPEE OOFF IINNDDUUSSTTRRIIEESS,, FFAACCIILLIITTIIEESS,, TTRRAANNSSPPOORRTTAATTIIOONN EETTCC)) TTOOWWNN AANNDD CCOOUUNNTTRRYY
PPLLAANNNNIINNGG//DDEEVVEELLOOPPMMEENNTT AAUUTTHHOORRIITTYY CCLLAASSSSIIFFIICCAATTIIOONN .......................................................................................................... 21
55..22 PPOOPPUULLAATTIIOONN PPRROOJJEECCTTIIOONNSS ...................................................................................................................................................... 21
55..33 LLAANNDD UUSSEE PPLLAANNNNIINNGG ((BBRREEAAKKUUPP AALLOONNGG WWIITTHH GGRREEEENN BBEELLTT EETTCC..)) .................................................................................... 21
55..44 AASSSSEESSSSMMEENNTT OOFF IINNFFRRAASSTTRRUUCCTTUURREE DDEEMMAANNDD ((PPHHYYSSIICCAALL && SSOOCCIIAALL)) .............................................................................. 22
55..55 AAMMEENNIITTIIEESS// FFAACCIILLIITTIIEESS ........................................................................................................................................................... 22
6. PROPOSED INFRASTRUCTURE ...................................................................................................................................... 23
6.1 INDUSTRIAL AREA (PROCESSING AREA ). ......................................................................................................... 23
6.2 RESIDENTIAL AREA (NON PROCESSING AREA). .......................................................................................... 23
6.3 GREEN BELT ........................................................................................................................................................................ 23
Progressive Afforestation during proposal period: ........................................................................................................ 23
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
6.5 CONNECTIV ITY (TRAFFIC AND TRANSPORTATION ROAD/RAIL/METRO/ WATER WAYS
ETC) .................................................................................................................................................................................................... 24
6.6 SOLID WASTE MANAGEMENT ................................................................................................................................. 24
6.7 POWER REQUIREMENT & SUPPLY I SOURCE . ............................................................................................... 24
7. REHABILITATION AND RESETTLEMENT(R&R PLAN) ....................................................................................... 25
77..11 PPOOLLIICCYY TTOO AADDOOPPTTEEDD ((CCEENNTTRRAALL SSTTAATTEE)) IINN RREESSPPEECCTT OOFF TTHHEE PPRROOJJEECCTT AAFFFFEECCTTEEDD PPEERRSSOONN IINNCCLLUUDDIINNGG HHOOMMEE
OOUUTTSSEEEESS,, LLAANNDD OOUUTTSSEEEESS AANNDD LLAANNDDLLEESSSS LLAABBOOUURR ....................................................................................................................... 25
8. PROJECT SCHEDULE AND COST ESTIMATES .......................................................................................................... 26
88..11 LLIIKKEELLYY DDAATTEE OOFF SSTTAARRTT OOFF CCOONNSSTTRRUUCCTTIIOONN AANNDD LLIIKKEELLYY DDAATTEE OOFF CCOOMMPPLLEETTIIOONN ((TTIIMMEE SSCCHHEEDDUULLEE FFOORR TTHHEE PPRROOJJEECCTT
TTOO BBEE GGIIVVEENN)) ...................................................................................................................................................................................... 26
88..22 EESSTTIIMMAATTEEDD PPRROOJJEECCTT CCOOSSTT AANNDD AALLOONNGG WWIITTHH AANNAALLYYSSIISS IINN TTEERRMMSS OOFF EECCOONNOOMMIICC VVIIAABBIILLIITTYY OOFF TTHHEEMM PPRROOJJEECCTT.. ..... 26
CSR Budget: ...................................................................................................................................................................................... 26
EMP (Environment Management Plan) ............................................................................................................................... 27
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION) CONCLUSION ....................................................... 29
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
11.. EEXXEECCUUTTIIVVEE SSUUMMMMAARRYY 1.1 Executive Summary M/s Dilip Buildcon Ltd has applied for Mining Lease of 2.00 acres, who is doing the work of development of
road work (NH & SH) on contract through Government of India. The Company has been allowed to apply the
stone mine for their captive use only. On this ground M/s Dilip Buildcon Ltd has applied the said area in
village –Atkadih, P.O.+P.S.- Bagodar, Dist.- Giridih, Jharkhand, having Lat. 24° 7'25.63"N To 24° 7'19.59"N
and long. 85°43'25.21"E To 85°43'22.79"E Topo sheet no- : 72H/12. Lessee/ Applicant, Sri Sunil Kumar Rai
(Sri Sunil Kumar Rai has been nominated as “Nominated Owner” by M/s Dilip Buildcon Ltd) has applied for
Mining Lease in the Office of D M O Giridih, to DC Giridih.
Applied area for Mining Lease is adjacent/along the village road. 10(Ten) meter width from the road will be left as safety barrier. Accordingly Mine plan has been prepared leaving ten (10) m barrier against the road. The lease area has been divided into two zones, zone ‘A’ & zone ‘B’. In zone ‘A’ mining activities will be carried out and area zone ‘B’ will be used for office, dump yard etc. The Applicant has approached for Mine Plan/ EC. As per recent directives from Director of Mines Jharkhand (Ref. No. 1345 /M dated 08.07.2015) on the basis of Hon’le Jharkhand High Court, Ranchi, (Dated: 29.06.2015), the Lessee has approached for EC and he has been asked to submit the approved mine plan.
The Mine plan has been Prepared considering the “Template for Mine Plan For Minor Mineral” issued from
Special Secretary & Director (Mines), Department of Mines & Geology, Ranchi, Jharkhand vide his letter no -
1653 dated 31-07-2015 addressed to all D.M.O’S & A.M.O’S & also I.B.M. Manual on “Appraisal of Mining
Plan -2014”.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. , ATKADIH STONE
MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE - ATKADIH , P.O.+ P.S.- BAGODER,
THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE- 1
CONSULTANTS
SATHI PLANNERS PVT. LTD.
REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN
PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,
(JHARKHAND).
22.. IINNTTRROODDUUCCTTIIOONN OOFF TTHHEE
PPRROOJJEECCTT// BBAACCKKGGRROOUUNNDD IINNFFOORRMMAATTIIOONN 2.1 IDENTIFICATION OF THE PROJECT & PROJECT PROPONENT. IN CASE OF MINING
PROJECT, A COPY OF MINING LEASE/LETTER OF INTENT SHOULD BE GIVEN.
Sl. No.
Parameters Description
1 Name of the project Atkadih Stone Mine,
2 Nature of the project Stone Mining Project,
3 Project Proponent M/S Dilip Buildcon (Sunil Kumar Rai)
4 Lease Period Applicant has applied for Lease in the Office of DMO Giridih for 03 years.
5 Details of the Lease Area
Mines Area 11.86 Acres (4.80 Ha),
Plot No. 191
Khata No. 313
6 Total Lease area 0.80 Ha/ 2.00 Acre
7 Capacity of the project 114048 TPA/ 380.16 TPD
8 Category of the project B2
9 Location of the project Village - Atkadih, P.O.+ P.S.- Bagoder, NO.-139, District -Giridih, State- Jharkhand.
10.
Lease area Coordinate
Sl.no Latitude longitude
A 24° 7'25.53"N 85°43'25.21"E
B 24° 7'19.59"N 85°43'23.31"E
C 24° 7'20.36"N 85°43'22.79"E
D 24° 7'21.16"N 85°43'23.11"E
E 24° 7'21.56"N 85°43'23.72"E
F 24° 7'21.84"N 85°43'23.06"E
G 24° 7'22.17"N 85°43'23.18"E
H 24° 7'22.33"N 85°43'23.58"E
I 24° 7'23.01"N 85°43'23.42"E
J 24° 7'22.90"N 85°43'22.92"E
K 24° 7'25.63"N 85°43'24.09"E
11 Land Type Raity Land,
12 Method of Mining Mechanized Opencast Mining
13 Operational days/year 300 days
14 Life of Mines 3 Years
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
15
Total Water Requirement
Sl. No.
Purpose Water
requirement (KLD)
1 Drinking & domestic ( Man Power x 45 /1000( 15x45/ 1000)
0.67
2 Afforestation/Greenbelt (Area in ha (0.60/2.47) x 1.09 KLD per Ha)
0.26
3 Dust Suppression( Mining road(1 Acre=
4046 sq. M) (0.03X4046)/4/1000 +
kachha Road X 6.5 KLD per
KM)=(0.03+0.015)x 6.5
0.29
Total 1.22
16
Source of water
The Drinking & Domestic water need will be fulfilled by taking water from nearby village like Atkadih tube well & Nearest Khero Nadi 3.25 km in S-E direction. As soon as mine void is formed water for greenbelt and dust suppression will be met from water accumulated in mine void. For the purpose of Dust Suppression & Afforestation water of nearby Ponds and rain water Harvesting will be used.
17 Man power requirement
15 Persons
18 Nearest Railway Station / Airport along with distance in km.
Birsa Munda Airport, Ranchi at about 98 km away from the lease area in SW direction.
Chaube Railway Station-About 15km from the lease area in NE direction
19 Nearest Town, city, District Headquarters along with distance in kms.
Nearest City- Bagoder situated at a distance of 12 km in SE direction
District Headquarter- Giridih , about 59 km(aerial distance) from the lease area in NE direction.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
20
Ecological Sensitive Areas (Wild life Sanctuaries, National Parks, Biosphere Reserves, Reserve/ Protected Forest etc)
Forest
PF Near Nawadih 3.2 KM East
Jiramo Protected Forest 1.5 KM North
PF near Gandarbera 2 KM S-W
Fairly Dense Mixed Jungle Maily
Sal 2 KM S-E
21 Historical Places None
22 Financial & Social benefit
Employment to local people directly or indirectly
22..22 BBRRIIEEFF DDEESSCCRRIIPPTTIIOONN OOFF NNAATTUURREE OOFF PPRROOJJEECCTT::
The stone mine area located in Atkadih Mouza, Bagoder Post Office, Bagoder Police Station,
Giridih District in Jharkhand. The total mining lease area is 2.00 Acres/0.80 Ha. The mining will be
carried out in the mine lease area by adopting Mechanized Open Cast Mining.
The stone mine shall be developed by Mechanized Open Cast Mining method. The mineral are
hard and compact. So drilling or blasting is required. No blasting in OB is proposed.
22..33 NNEEEEDD FFOORR TTHHEE PPRROOJJEECCTT AANNDD IITTSS IIMMPPOORRTTAANNCCEE TTOO TTHHEE CCOOUUNNTTRRYY AANNDD RREEGGIIOONN
The Project is a mining lease for Stone mine that should be used for infrastructure development. The material is used for building construction and road construction. The impact due to mining on the socio-economic front will be beneficial. About 15 people will directly be benefited by mining through employment. With continuation of mining, other infrastructural developments will increase the socio-economic status of the local inhabitants.
As per EIA notification 2016 the project falls under Below 5 Hectares, comes under Category- B2, the proponent is submitting the proposal to get Clearance for production capacity of 114048 TPA/ 380.16 TPD of Boulder Stone from DEAC, DEIAA, in District for the purpose of grant of quarry lease.
22..44 DDEEMMAANNDD AANNDD SSUUPPPPLLYY GGAAPP
As mentioned above, there is large demand of stone for Building & Road construction of Nearest Market Requirement. It is the essential raw material for construction of House Building, Constructions, road Construction etc. Presently there is a shortage in supply of these materials as Market demand.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
22..55 DDOOMMEESSTTIICC//EEXXPPOORRTTSS MMAARRKKEETTSS
The proposed mining quantity use for Nearest Market for Building & Road Construction . There is no proposal to export the mineral.
22..66 EEMMPPLLOOYYMMEENNTT GGEENNEERRAATTIIOONN
There will be 15 skilled and unskilled workers required for the mines who will be recruited from neighboring villages on contractual basis.
Table 2-6:- Employment Potential
Serial No. Designation Working forces per day ( 2 shift basis)
1 Manager Mines/Geologist Part Time 0
2 Mining Mate/ Blaster 1
3 Mechanic 1
4 Electrician 1
5 Service Vehicle Operator/ water tanker 1
6 Excavator/JCB Operator 1
7 Dozer operator 0
8 Grader operator 0
9 Dumper Operator/ tractor- trailer 3
10 Drill Operators 1
11 Drill Helper 1
12 Compounder 0
13 Clerk 1
14 Trip Man 0
15 Semi Skilled Worker 1
16 Unskilled workers 3
Total 15
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
33.. PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN
33..11 TTYYPPEE OOFF PPRROOJJEECCTT IINNCCLLUUDDIINNGG IINNTTEERRLLIINNKKEEDD AANNDD IINNTTEERRDDEEPPEENNDDEENNTT PPRROOJJEECCTTSS,, IIFF AANNYY
The proposed Boulder Stone mine is of 0.80 Ha. No interlinked projects were associated with this
project.
33..22 LLOOCCAATTIIOONN ((MMAAPP SSHHOOWWIINNGG GGEENNEERRAALL LLOOCCAATTIIOONN,, SSPPEECCIIFFIICC LLOOCCAATTIIOONN,, AANNDD PPRROOJJEECCTT SSIITTEE
LLAAYYOOUUTT)) WWIITTHH CCOOOORRDDIINNAATTEESS..
This is a Mining project and located Atkadih Mouza, Bagoder Post Office, Bagoder Police Station,
Giridih District in Jharkhand over an area of 0.80 Ha. The details of the project co-ordinates are
described below:
Table 3-2:- Project Coordinates
Sl.no Latitude longitude
A 24° 7'25.53"N 85°43'25.21"E
B 24° 7'19.59"N 85°43'23.31"E
C 24° 7'20.36"N 85°43'22.79"E
D 24° 7'21.16"N 85°43'23.11"E
E 24° 7'21.56"N 85°43'23.72"E
F 24° 7'21.84"N 85°43'23.06"E
G 24° 7'22.17"N 85°43'23.18"E
H 24° 7'22.33"N 85°43'23.58"E
I 24° 7'23.01"N 85°43'23.42"E
J 24° 7'22.90"N 85°43'22.92"E
K 24° 7'25.63"N 85°43'24.09"E
33..33 DDEETTAAIILLSS OOFF AALLTTEERRNNAATTEE SSIITTEESS CCOONNSSIIDDEERREEDD AANNDD TTHHEE BBAASSIISS OOFF SSEELLEECCTTIINNGG TTHHEE
PPRROOPPOOSSEEDD SSIITTEE,, PPAARRIICCUULLAARRLLYY TTHHEE EENNVVIIRROONNMMEENNTTAALL CCOONNSSIIDDEERRAATTIIOONNSS GGOONNEE IINNTTOO
SSHHOOUULLDD BBEE HHIIGGHHTTLLIIGGHHTTEEDD::
There is no alternative sites/location are considered as this is a mining project which is site
specific by nature.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
33..44 SSIIZZEE AANNDD MMAAGGNNIITTUUDDEE OOFF OOPPEERRAATTIIOONN
The proposed mine has lease over an area of 0.80 Ha. and the production rate is 114048 TPA/
380.16 TPD. The lessee follows open cast semi mechanized mining.
33..55 PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN WWIITTHH PPRROOCCEESSSS DDEETTAAIILLSS ((AA SSCCHHEEMMAATTIICC DDIIGGRRAAMM//FFLLOOWW CCHHAARRTT
SSHHOOWWIINNGG TTHHEE PPRROOJJEECCTT LLAAYYOOUUTT,, CCOOMMPPOONNEENNTTSS OOFF TTHHEE PPRROOJJEECCTT EETTCC.. SSHHOOUULLDD BBEE
GGIIVVEENN::
METHOD OF MINING:
Strategy of Mining Operation:- Mining operation has been proposed to be mechnised open cast mining, Dumper- Shovel
combination with Wagon drilling and blasting.
No drilling & blasting is proposed during O.B. removal.
Drilling operation will be carried out in zone ‘A’ in stone rock body by compressed air Wagon drill (6 m depth
& 100 mm dia). After control blasting the blasted material will be loaded by 0.9/1.2 cum Excavator into
tippers (25/15Ton) and transported to surface of the M.L area. The O.B. Dump is proposed in south side of
the M.L. area (Zone ‘B’). (Ref plate no – 5 to 9)
The stone rock bench will be kept max.6 m height & 5m, 6m wide alternately to facilitate the movement of
the HEMM. The proposed final bench slope will be restricted to 45o. Due approval from D.G.M.S, The
mining operation will be carried out as per Rule -106 of MMR-1961 is proposed.
Mining operation is proposed in general shift only (8AM to 5 PM).The average number of working days in a year would be 300 days/yr only (excluding holidays), the production will slow down trend during monsoon period. Total 15 unskilled, semi-skilled & high skilled workers will be deployed by the lessee.
RESERVES:-
Mineable Reserve = 52080 cum,
Proposed annual production = 42240 cum/year Av.,
Life of the quarry = 1.23 years.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
PRODUCTION PARAMETERS
The Mineral production target for five years is given in Table 3.5.1
Table 3.5.1
Year wise Boulder Production Programme
EEXXTTEENNTT OOFF MMEECCHHAANNIISSMM Table 3.5.2:- Details of Extent of Mechanism
No. Type Nos. Size/Capacity Mode 0f Operation
1 Wagon Drill 01 100 mm dia Compressed/air
2 Compressor 01 100 L/s Diesel
3 Excavator/JCB 01 1.2 m3 Diesel
4 Tippers 25/10 tons 03 25 tones Diesel
5 Dozer (Optional) 00 65 H.P Diesel
6 Grader (Optional) 00 175 H.P Diesel
5 Water tanker 01 12000 liters Diesel
6 Diesel Pump 01 5/10 HP Diesel
7 D.G.Set 01 60 KVA Diesel
SSTTAATTUUTTOORRYY PPRROOVVIISSIIOONN PPRREECCAAUUTTIIOONN DDUURRIINNGG BBLLAASSTTIINNGG
1. Blasting permission from DGMS will be taken by lessee. 2. Control blasting will be carried out by using delay detonator during multi rows blasting. 3. No secondary blasting will be carried out. 4. Stemming column will be half of the depth of hole with course sand. 5. Only statutory designated blaster will supervise the blasting operation. 6. All persons within the radius of 300 m from the blasting site will be removed by siren. 7. Blasting operation will be carried out during day time only.
SUMMARY OF PRODUCTION DURING PLAN PERIOD
YEAR PROD.
Cu.m in Situ.
DENSITY TON/CUM
TOTAL PROD. Mt in
Situ
PROD. PER DAY mt in
situ.
Total O.B cum in
Situ.
PROD. CUM in Situ /DAY
PROD. Cft in
Situ/DAY
1ST 42240 2.7 114048 380.16 12768 140.80 4972.30
2ND 0 2.7 0 0 0 0.00 0.00
3RD 0 2.7 0 0 0 0.00 0.00
TOTAL 42240 114048 380.16 12768 140.80 4972.30
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
33..66 RRAAWW MMAATTEERRIIAALL RREEQQUUIIRREEDD AALLOONNGG WWIITTHH EESSTTIIMMAATTEEDD QQUUAANNTTIITTYY,, LLIIKKEELLYY SSOOUURRCCEE,, MMAARRKKEETTIINNGG AARREEAA OOFF
FFIINNAALL PPRROODDUUCCTTSS//SS,, MMOODDEE OOFF TTRRAANNSSPPOORRTT OOFF RRAAWW MMAATTEERRIIAALL AANNDD FFIINNIISSHHEEDD PPRROODDUUCCTT..
No raw material will be required for mining of Stone.
33..77 RREESSOOUURRCCEE OOPPTTIIMMIIZZAATTIIOONN// RREECCYYCCLLIINNGG AANNDD RREEUUSSEE EENNVVIISSAAGGEEDD IINN TTHHEE PPRROOJJEECCTT,, IIFF AANNYY,, SSHHOOUULLDD BBEE
BBRRIIEEFFLLYY OOUUTTLLIINNEEDD
Stone mining there is no need mineral processing to the ROM production. The mined out stone is
directly formed ranging from boulder to aggregates. As per the market requirement only crusher is
used to produce the required size of ballast for customer.
3.8 AVAILABILITY OF WATER ITS SOURCE, ENERGY/ POWER REQUIREMENT AND
SOURCE
WATER REQUIREMENT
Total water requirement in the mine will be about 1.22 KLD for drinking & domestic use, dust
suppression and plantation. Required water will be collected from nearby villages like Atkadih
villages Tube well & Khero Nadi.
PPOOWWEERR
By Own D.G. Set Of 60 KVA.
33..99 QQUUAANNTTIITTYY OOFF WWAASSTTEESS TTOO BBEE GGEENNEERRAATTEEDD ((LLIIQQUUIIDD AANNDD SSOOLLIIDD )) AANNDD SSCCHHEEMMEE FFOORR TTHHEEIIRR
MMAANNAAGGEEMMEENNTT//DDIISSPPOOSSAALL
SOLID WASTE GENERATION& ITS DISPOSAL
During the extraction of Stone, from quarry, there will be 12768 cum overburden removed as
waste material dump of the dump inside the lease area.
Liquid Effluent
No liquid effluent will be generated at the mine site. The domestic wastewater generated will be
sent to septic tanks followed by soak pits.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
3.10 Schematic representations of the feasibility drawing which give information of EIA purpose
Schematic representations of B2 category (less than 5 Hect. based on EIA notification is
given below:
Category B1 SEIAA , EIA required
Project Concept and site selection
Form 1 M &Pre-Feasibility Project report with proposed
TOR toMoEF (EAC)
Scoping by DEAC( Site visit by sub group of
DEAC, if necessary
Category B 2 DEIAA , EIA not required
Referred to DEAC under communication to the
project proponent.
Rejected Approved Display on the SPCB/UTPCC websites &
project proponent website.
Post EC
monitoring
Submission of half yearly compliance report to DEIAA
Display of compliance report on DEIAA website
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE- 1
CONSULTANTS
SATHI PLANNERS PVT. LTD.
REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN
PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,
(JHARKHAND).
44.. SSIITTEE AANNAALLYYSSIISS
44..11 CCOONNNNEECCTTIIVVIITTYY
The mine lease area is connected with Road and rail transport. The applied area is connected
with village road 50 m East direction. NH-2 is at 1 Km in South direction.The nearest railway
station is Chaube Railway Station and which is situated at 15 km in NE direction from the mine
lease area. Birsa Munda Airport, Ranchi is the nearest airport in respect of mine lease area
situated at a distance of 98 km in south- West direction.
44..22 LLAANNDD FFOORRMM,, LLAANNDD UUSSEE AANNDD LLAANNDD OOWWNNEERRSSHHIIPP
The mine lease area is 2.00 Acres of Raity land . The details of the land are given in below
Table 4.1:-
Table 4-1:- Details of Land use of the Mine Lease Area
Sl.
No. Plot No. & Village
Area in
hectare Type of land
Ownership /
Occupancy
1 199
Village- Atkadih 0.80 Stone Mine Raity Land
44..33 TTOOPPOOGGRRAAPPHHYY
Based on the topographical map No 72H/12 of Survey of India , hills are widely scattered with
adulatory topography. The general slope of the area is towards east around ML area.
44..44 EEXXIISSTTIINNGG LLAANNDD UUSSEE PPAATTTTEERRNN ((AAGGRRIICCUULLTTUURREE,, NNOONN--AAGGRRIICCUULLTTUURREE,, FFOORREESSTT,, WWAATTEERR BBOODDIIEESS ((IINNCCLLUUDDIINNGG
AARREEAA UUNNDDEERR CCRRZZ)))),, SSHHOORRTTEESSTT DDIISSTTAANNCCEESS FFRROOMM TTHHEE PPEERRIIPPHHEERRYY OOFF TTHHEE PPRROOJJEECCTT TTOO PPEERRIIPPHHEERRYY OOFF TTHHEE
FFOORREESSTTSS,, NNAATTIIOONNAALL PPAARRKK,, WWIILLDD LLIIFFEE SSAANNCCTTUUAARRYY,, EECCOO SSEENNSSIITTIIVVEE AARREEAASS,, WWAATTEERR BBOODDIIEESS ((DDIISSTTAANNCCEE FFRROOMM
TTHHEE HHFFLL OOFF TTHHEE RRIIVVEERR)),, CCRRZZ.. IINN CCAASSEE OOFF NNOOTTIIFFIIEEDD IINNDDUUSSTTRRIIAALL AARREEAA,, AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE
NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE IINNDDUUSSTTRRIIAALL AARREEAA;; AA CCOOPPYY OOFF TTHHEE GGAAZZEETTTTEE NNOOTTIIFFIICCAATTIIOONN SSHHOOUULLDD BBEE GGIIVVEENN..
There are following water body and forest areas are found within study area.
Table 4-4:-Details of Environment Sensitive Area
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
Detail Distance (km) Direction
Wetlands : No wetlands project side area.
Watercourses or other water Body
Khero Nadi (as per toposheet) 3.25 KM S-E
Forest
PF Near Nawadih 3.2 KM East
Jiramo Protected Forest 1.5 KM North
PF near Gandarbera 2 KM S-W
Fairly Dense Mixed Jungle Maily Sal 2 KM S-E
44..55 EEXXIISSTTIINNGG IINNFFRRAASSTTRRUUCCTTUURREE
As such in the stone mining operation there is no approach road from the main connecting road the
proponent developes a private kachha road up the connecting road with the help of waste material
generated from the mine. The distance may vary from 15 m to a few km .
4.6 SOIL CLASSIFICATION
Not Applicable.
44..88 CCLLIIMMAATTIICC DDAATTAA FFRROOMM SSEECCOONNDDAARRYY SSOOUURRCCEESS
The area of operation falling in the western part of the district in Bagodar block experiences
minimum temperature of 10 degree calicoes during winter and maximum temperature is 40 -45
degree Celsius during summer. The average rainfall of the district varies from 1100mm to 1350mm.
44..88 SSOOCCIIAALL IINNFFRRAASSTTRRUUCCTTUURREE AAVVAAIILLAABBLLEE
The mining area is well connected by road to district Headquarter Giridih, which is at 59 km north-
East side from site. All educational, banking, Recreational, Medical facilities and other infrastructure
are available in Shikaripara the nearest town from the mining site.
Medical Facilities
Dispensary and local hospital facilities are available near Bagoder at a distance is 12 km SE
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
direction away from the site and first Aid kit will be available at the site.
Rest Shelter
A temporary Rest shelter is proposed near mine site.
Drinking Water
The Drinking & Domestic water need will be fulfilled by taking water from nearby village like
Atkadih Village & Bore well in Lease Area.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE- 1
CONSULTANTS
SATHI PLANNERS PVT. LTD.
REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN
PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,
(JHARKHAND).
55.. PPLLAANNNNIINNGG BBRRIIEEFF
55..11 PPLLAANNNNIINNGG CCOONNCCEEPPTT ((TTYYPPEE OOFF IINNDDUUSSTTRRIIEESS,, FFAACCIILLIITTIIEESS,, TTRRAANNSSPPOORRTTAATTIIOONN EETTCC)) TTOOWWNN AANNDD CCOOUUNNTTRRYY
PPLLAANNNNIINNGG//DDEEVVEELLOOPPMMEENNTT AAUUTTHHOORRIITTYY CCLLAASSSSIIFFIICCAATTIIOONN
The project falls into the category of “Mining Industry”. The raw materials such as Stone available in
this area are granted lease for mining purpose. The required semi- skilled and unskilled laborers are
locally available. For transportation of material/minerals tractor trolleys/tipper trucks/cart will be
deployed.
55..22 PPOOPPUULLAATTIIOONN PPRROOJJEECCTTIIOONNSS
The project will employ most of the workers from nearby villages. Only supervisory staff will be
hired from outside. There will not be any increase in population due to the project.
55..33 LLAANNDD UUSSEE PPLLAANNNNIINNGG ((BBRREEAAKKUUPP AALLOONNGG WWIITTHH GGRREEEENN BBEELLTT EETTCC..))
Approximate land use is as following for life of mine are given in below Table.
Table 5-3:- Details of land Use breakup
Si. No.
Pattern of Utilization
Present/Existing land use pattern in
(acres)
Proposed Land use
for current plan period
(acres)
Land to be used in remaining period of the
life of the mine (acres)
Land used at the
conceptual stage ie end of
mine life in (acres)
Area to be converted in the conceptual period
1 Mining Activities 0.00 1.20 0.00 1.20 Water Body
2 Offices/ Store/ crusher/ Magazine etc.
0.00 0.04 0.00 0.04 Green Belt
3 Dumping 0.00 0.08 0.00 0.08 Green Belt
4 Mining Road 0.00 0.03 0.00 0.03 Approach Road
5 Garland drain 0.00 0.02 0.00 0.02 Garland Drain
6 Green belt/Safety Zone
0.00 0.60 0.00 0.60 Green Belt
7 Stone Stock yards 0.00 0.03 0.00 0.03
8 Utilized 0.00 2.00 0.00 2.00
9 Unutilized 2.00 0.00 2.00 0.00
10 Total 2.00 2.00 2.00 2.00
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
55..44 AASSSSEESSSSMMEENNTT OOFF IINNFFRRAASSTTRRUUCCTTUURREE DDEEMMAANNDD ((PPHHYYSSIICCAALL && SSOOCCIIAALL))
The road facility is already available which shall be used and properly maintained. Preference will
be given to local labor from nearby villages. Other requisite infrastructure as transport of mine
labours is available by way of jeep, two-wheeler.
55..55 AAMMEENNIITTIIEESS// FFAACCIILLIITTIIEESS
The following activities are proposed for the welfare of labours engaged in the extraction of Stone
mining.
Drinking water,
Tankers will be deployed for the supply of drinking water in the project site.
Organizing of Health Camps,
One health camp after every two months shall be held in each of the mining gate.
First Aid kit and provision of anti-snake venom.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE- 1
CONSULTANTS
SATHI PLANNERS PVT. LTD.
REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN
PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,
(JHARKHAND).
66.. PPRROOPPOOSSEEDD IINNFFRRAASSTTRRUUCCTTUURREE 6.1 INDUSTRIAL AREA (PROCESSING AREA ).
The boulder generated from the mine is generally various size of 1000 mm to 200 mm the bigger size boulders are manually broken to small size of 400 to 200 mm and it is fed to the ball mill crusher to small size of 50 mm to 5mm. in this process lot of dusts are generated and it is being arrested by providing proper water spray arrangement at suitable location.
6.2 RESIDENTIAL AREA (NON PROCESSING AREA).
Not applicable due to small activities.
6.3 GREEN BELT The common native plant species used to develop green belt in safety zone of all around the mine
lease boundary also in the barren area during conceptual plan period will be Sal, Gulmohar, Neem,
Bargad, Amaltas, Pipal, Teak, Arjuna, Kadamb, Ahhatwar etc.
Progressive Afforestation during proposal period: Table 6-3-1: Year Wise Afforestation Program
Sl.
No.
Year of
Plantation
Target of Plantation Area to be covered in Ha Area of Plantation
1 I Yr 480 0.24 Safety/Barrier Zone
TOTAL 2000 plant
per Ha
480 0.24 Safety/Barrier Zone
Proposed Afforestation Program along the transportation route
Zone Length (m) Description Numbers of Trees
Along approach road 15 200 plant per kilometer
3 x2 =6 (Both sides of kachha raod)
Total 6
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
6.4 SOCIAL INFRASTRUCTURE
Already discussed in point no 4.8 in Chapter 4
6.5 CONNECTIV ITY (TRAFFIC AND TRANSPORTATION ROAD/RAIL/METRO/ WATER
WAYS ETC)
All ready discussed in paragraph 4.1. in Chapter 4 .
6.6 SOLID WASTE MANAGEMENT
Not applicable
6.7 POWER REQUIREMENT & SUPPLY I SOURCE .
By Own D.G. Set Of 60 KVA.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
77.. RREEHHAABBIILLIITTAATTIIOONN AANNDD
RREESSEETTTTLLEEMMEENNTT((RR&&RR PPLLAANN))
77..11 PPOOLLIICCYY TTOO AADDOOPPTTEEDD ((CCEENNTTRRAALL SSTTAATTEE)) IINN RREESSPPEECCTT OOFF TTHHEE PPRROOJJEECCTT AAFFFFEECCTTEEDD PPEERRSSOONN IINNCCLLUUDDIINNGG HHOOMMEE
OOUUTTSSEEEESS,, LLAANNDD OOUUTTSSEEEESS AANNDD LLAANNDDLLEESSSS LLAABBOOUURR
The mine lease is Raity land and do not have habitation. Hence the mining activity does not involve
any displacement of human settlement. No public buildings, places, monuments etc exist within the
lease area or in the vicinity of the mine lease area. The mining operation will not disturb/ relocate
any village or need re-settlement. Thus no adverse impact is anticipated.
However, after 5 yrs plan period, backfilling may be started or that may be converted into water
reservoir if required. Estimation of area has not been done now. This will be planned later. Under
water pollution prevention plan, garland drain and retaining wall will be constructed all around the
dump, and pits. Sedimentation pond, unlined settling tank will be constructed near the boundary
area to provide a proper channel for water outflow. And secondary settling pond will be connected
to nearest water bodies.
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE- 1
CONSULTANTS
SATHI PLANNERS PVT. LTD.
REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN
PUBLIC SCHOOL, KANKE ROAD, RANCHI- 834008,
(JHARKHAND).
88.. PPRROOJJEECCTT SSCCHHEEDDUULLEE AANNDD CCOOSSTT EESSTTIIMMAATTEESS
88..11 LLIIKKEELLYY DDAATTEE OOFF SSTTAARRTT OOFF CCOONNSSTTRRUUCCTTIIOONN AANNDD LLIIKKEELLYY DDAATTEE OOFF CCOOMMPPLLEETTIIOONN ((TTIIMMEE SSCCHHEEDDUULLEE FFOORR
TTHHEE PPRROOJJEECCTT TTOO BBEE GGIIVVEENN))
Mining will be started after getting environmental clearance.
88..22 EESSTTIIMMAATTEEDD PPRROOJJEECCTT CCOOSSTT AANNDD AALLOONNGG WWIITTHH AANNAALLYYSSIISS IINN TTEERRMMSS OOFF EECCOONNOOMMIICC VVIIAABBIILLIITTYY OOFF TTHHEEMM
PPRROOJJEECCTT..
SL. NO. HEADS RS (LAKHS) Yearly
1 Equipment Cost on yearly 493.50 lakhs (All equipments are owned M/S Dilip Buildcon Ltd.)
228.50 (avg.)
2 Cost of infrastructure ( Lum-Shum) 05.00
3 Raity Land agreement 1,11,100/acre per year, 2.22
4 Contingency ( 10 % of the Total Cost) , 23.57
TOTAL (Project Cost) 259.29
6 OPERATIONAL COST per Year. Rs.250 / cum x 02.75 lakh cum)=
105.60
8.3 CSR Budget:
@ 5 /- Per cum CSR Activities Spend for nearest village.
Sl. No. Activity Fund Allotted (In Rs.)Yearly
1. Water Supply including Drinking Water:(30 % )
1. Repair of Hand Pumps/Tube Wells nearest
villages 63,310/-
2. Health ( 20 %)
1. Free Medicine & Health Checkup Camp 42,240/-
3. Social Empowerment (30 %)
1. Provide fees for a period of one year or more to
the poor and meritorious, preferably girl students
of the school in the operational area of the
Company to enable them to get uninterrupted
education. 63,310/-
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
4. Sports and Culture (20 %)
1. Donation for festival & other cultural programs. 42,240/-
TOTAL 2,11,200
8.4 EMP (Environment Management Plan)
Sub-project specific Environmental Management Plan (EMP) has been formulated with an intend to
set out action required to avoid or mitigate all impacts and the responsibility for taking each action.
Responsibility is made legally binding when actions are subsequently specified in contracts.
Environmental Monitoring Plan (EMoP) has been prepared to ensure that the intended
environmental mitigations are realized and these results in desired benefits to the target
population causing minimal deterioration to the environmental parameters. All costs for
implementing the mitigation measures and monitoring plan will be included in the Bill of Quantities
(BOQ) by the contractor as implementation of the EMP will be the responsibility of the contractor.
1. Air Pollution Control Measures
2. Water Pollution control Measures
3. Social Welfare Measures
4. Occupational Health Measures
Table 8.4 :- EMP Cost
SI. No.
Measures
Description of work
Annual recurring cost (in Rs.)
Proposed
1 Pollution Control i) Dust Suppression ii) Garland drain & ground dump
Water sprinkling will be done time to time.( @ 700/- per day for pit area village kachha road ) Garland drain and ground dump will be established according to need @ 25/- Sq.ft, 1.00 ha = 107639.10 Sq Ft., ( 0.008 x 107639.10 = 861.11 sq. ft Garland Drain area)
210000/-
21,530/-
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
2 Pollution Monitoring i) Air pollution ii) Water pollution ii)Noise Polution
Yearly at 1 location for air, 1 location for water and 1 locations for noise
60,000/- 50,000/- 50,000/-
3
Occupational Health
To provide medical facility at the site to the employees( 200 per head monthly medical facility ) 15 man power x 200= 3000
36000/-
4
Green Belt
0.98 Ha areas will be used for
greenbelt development.( @ 100/-
per plant of Green Belt/safety zone
area 480x 100=48000/- )
Plantation along kuchha road will
also be done to achieve 33%
plantation. Kachha road per plant
500 rupee ( applied area to village
road distance 15 m ) 3 Both site
plantation 3 x2=6 plant x 500)
18000/-
6 Others (specify) Provided safety equipment to all staff ( Air mask , Helmet Shoes, Ear plug, & Other Safety Eqp.)
30000/-
Total 4,75,530/-
PPRREE--FFEEAASSIIBBIILLIITTYY RREEPPOORRTT ENVIRONMENTAL CLEARANCE FOR 0.80 HECT./ 2.00 ACRE OF M/S DILIP BUILDCON LTD. ,
ATKADIH STONE MINING PROJECT OF NOMINATED OWNER SRI SUNIL KUMAR RAI, VILLAGE -
ATKADIH , P.O.+ P.S.- BAGODER, THANA NO.-139, DISTRICT -GIRIDIH, STATE- JHARKHAND.
BB
22
PROJECT PROPONENT
M/S DILIP BUILDCON LTD
SRI SUNIL KUMAR RAI
AT- HAZARIBAGH ROAD, BAGODAR,
NEAR PUJA GUEST HOUSE, GIRIDIH,
DIST.- GIRIDIH, STATE- JHARKHAND
PAGE-11
CONSULTANTS SATHI PLANNERS PVT. LTD. REG. OFFICE: LAKE AVENUE, BEHIND CAMBRIAN PUBLIC SCHOOL, KANKE ROAD, RANCHI, JHARKHAND
99.. AANNAALLYYSSIISS OOFF PPRROOPPOOSSAALL ((FFIINNAALL
RREECCOOMMMMEENNDDAATTIIOONN)) CCOONNCCLLUUSSIIOONN
The project is of utmost importance to the area/ region for interest of mineral development and
improves the socio-economic conditions of the local habitants. The operation of the proposed
expansion project will bestow various social and economic benefits to the local communities of the
area in addition to the existing benefits due to provide better employment opportunities and
improvement in social infrastructure of the area, apart from increased financial benefits accruing to
state and central agencies by ways of taxes, royalties, etc.