8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 1/34
ENTREPRENEUR
DEVELOPMENT
Being in right place in right time
A workshop at J.J College of Engineering, Trichy
10th Feb 2010
by
K . Jothi shankar
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 2/34
Who is an Entrepreneur
Anyone who think, start and develop his/her
methodology to earn a definite profit and also provide jo bs for few is identified as
E ntrepreneur
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 3/34
Anybody can become an entrepreneur on one¶s well
Provided
He/she has the following qualities
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 4/34
Qualities required to become
an Entrepreneur
1. Vision ± what he/she is going to be in say five years2. Mission ± way of getting the ideas put into work
3. Resource augmentation ± Mo bilization of the fund needed
4. Patience to work with a team
5. Endurance to sustain the pit falls
6. Further development - may be small but definite growth all
around
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 5/34
Identification of project
1. Depending on the idea, the project area can be shifted
2. Depending on the place the project can be correctly chosen
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 6/34
Flourishing projects - areawise in
TamilNadu
2. Salem - Yarn, spinning mills, textiles, export
quality cloth, garments. Hu b for school
education
1. Trichy ± Best welding industr y hu b in Asia,
mother industries like BHEL
3. Namakkal ± Lorr y, bus body building, transport
operation, cattle fields, breeding of
layers & broiler chicken. Of late
developing as school education hu b
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 7/34
4. Erode ± Agri based products like turmeric,
textile center, textile processing like
dying and printing, paper boards
5. Tiruchenchengodu ± Bore well drilling machines and
allied industries
6. Coimbatore ± Spinning mill, foundr y, pump
industr y, centre for higher educationin engineering and medicine
7. Sivakasi ± Fire works, match boxes,
finest offset printing
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 8/34
8. K arur ± Export quality house hold furnishing
9. K adalur - Boat building
10. Nagapattinam - Ice plants, aqua culture, fish processing
11. Tutucorin ± Salt production, chemical fertilizer,
rare earth (Thorium, Titanium)
8. Nagarcovil &
kanyakumari ± Raw ru bber products, rare earths(Thorium)13. Thiruvarur &
Thanjavur - Modern rice mill
14. Ariyalur - Cement industr y
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 9/34
15. Vilupuram &
Neyveli ± Porcelain, ceramic, vitrified tiles,
refractories16. Dharmapuri ± silk reeling, fruit pul b procesing,
granite quarries
16. South arcot ± Cashew processing
17. North arcot ± Tanneries, shoe upper
18. Chengalpattu ± Automo biles
19. K anchevaram ± Silk sarees, zari production,
higher education
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 10/34
21. Chennai ± Software, automo biles, electronic industries,
pharmaceutical,
centre of excellence in higher education
22. Ooty ± Tea processing industries
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 11/34
To develop an industr y1. Idea on product development
2. Land ± own/lease hold industrial estate best suited
3. Power4. Machineries
5. Raw materials
6. Skilled labour
7. Skilled supervisors
8. Pollution control
9. Bank
10. Marketability of finished products
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 12/34
ENERGY AND FI NANCE:REASON FOR THE TWO TOPICS HAND I N HAND:
Energy conservation leads to finance earnings toorganisation(eg. Usage of CFL bulbs reduce the cost)
ENERGY FOCUS:By 2030 energy demand in power sector is 6,25,000MW
Our fullfilment till date is 1,30,000MW,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 13/34
REASON FOR SUDDEN OUTBURST IN
POWER DEMAND:
y Lack of planning is prime, more mechanisationin all fileds using current, availability of financial support for mechanisation at all levels
y
BRIM countries and china has growingeconomy, more investments in all fieldsdemands more power,
y Growing population, changing lifestyles(
inclusions of more machines in home),y Increased recreational facilities( development of
huge multiplexes, malls)
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 14/34
REASON FOR SUDDEN OUTBURST IN POWER DEMAND:
y Exploration of fuels like asias largest coal mines in
uttar pradesh and uttaranchal brings developments asin neyveli,
y Offshore exploration of natural gas and oil throughNELP block tenders has to be used and one answer is
to produce power,y Wastage of produced power by theft, long
transmission lines, purposeless wastage(leaving lightsand fan switched on in social areas),
y Production of power by wind energy at one place, caneither be sold to EB or compensated to yourorganisations demand located in the same state,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 15/34
RECENT TRENDS IN POWER SECTOR:
y Till 2007 125MW, 250MW, 500MW were
the commercial boilers available, for1200MW more units need to beconstructed,
y Recently BHEL has come up with
600MW Barh and tuticorin units,y BHEL tied up with Siemens for 800MW
technology( Super critical boiler ),
y 600MW are now competed by even
L&T, hence faster completion requiredas projects carried out under highinterest rates, hence earning out fromthem earlier books profit,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 16/34
ANSWER TO BR IDGE THE GAP:More power generation units at reduced cost by
thermal,
Wind farms,
Hydroelectricity,
Nuclear plants,
Cogeneration units
Local generation by diesel generation sets,
Power generation by alternative fuels like LSHS,biogas, biomass,
Transmission lines can be made by DC system usingDC transformers as in developed countries,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 17/34
COGENERATION UNITS: Company might require high temp. heat for its productivity like heat to
dry klinkers in cement industry, heat to dry wet sugar in sugar industry,steam to dry processed textile material,
Waste heat after productive application is recovered and reheated toproduce steam to drive generator coupled turbines,
Planning is done to satisfy the plants demand,
REASON:
Most of the times the waste from the plant is the fuel, min. fuel cost,
Power unit is of lower capacity hence waste heat posses more than
50% energy to drive it, Plant becomes self sufficient,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 18/34
ALTERNATIVE FUELS: A lways combustion by coal raises cost,
Burners capable to burn saw dust, dried crops,sugarcane bagasses, biomass, biogas are used,
In sugar factories after crane crushing bagasses areused for heating,
In villages long transmission lines post a problem of wastage, biogas is the good alternative. Produced fromemulsification of animal and human dung, themethane gas produced runs the gas turbines,
Biomass fuel is a mixture of saw dust, dried crops,sugarcane bagasses and items like these. Calorific
value we get is high from this,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 19/34
ALTERNATIVE FUELS:
REASON:Cheap fuel,
min. pollution, clean fuel, cheaper cost of production
Perennial supply of some form of fuel caters the need,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 20/34
WI ND ENERGY: A fter the copenhagen meet, PM wants to establish
20000MW in india by 2022, In developed countries, wind mills are set inside the
shallow sea few kms from shore,
Non polluting fuel,
NUCLEAR PLANTS:Companies like GE-Hitachi, A reva, Toshiba are planning to
set up light water reactors in gujarat and andhra pradesh,
High calorific value from small fuel,
Compact size plant,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 21/34
THREATS TO POWER SECTOR :Strict emmission norms as in developed countries,
Lack of supply fuels like coal to thermal units, lack of wind, water due to seasonal changes might upset the generation,
Frequent wear and tear of parts especially in thermal unitsas more mechanical components,
SOLUTIONS:Our country is carbon trading, hence strict emmission
norms wouldnt affect us,
Energy is being derived from non-renewable sources,
hence almost equal distribution is present,
Our countrys major component contributor BHEL is anexpert, any time availability of spares can be done, moredifferent alloy and stainless steel items are used to reduce
the wear and tear,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 22/34
OPPORTUNITIES I N ENERGY:Orders getting delayed but power demand on
steep rise,
Companies already producing power arestepping up additional facilities at reduced
time,Neighboring country china has more cheaper
power equipments at reduced interest ratesthrough chinese banks,
Faster completion of projects through speedy supply of quality components is the key andcan be achieved by increased number of
vendors,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 23/34
OPPORTUNITIES I N TR ICHY: BHEL is main source to many companies,
Job works to be done as per their design using their material,
Jobs weight vary from 50Tons to 50 gms,
Choose the jobs according to the design understandability, inhousefacilities, rate and volume of the order,
BHEL, trichy concentrates on boiler drum and its mechanicalreinforcements ranging from foundation columns, bracings, crossmember beams, pressure part panels, hangers and tie rods, alloy andstainless steel structures,
Thermax, L&T, have setup offices in trichy to cater their project withcomponents from us,
Windmill supporting tower orders by suzlon, Vestas are in surplus where large handling facilities are required,
Railways machining orders to supply engine cranks, shafts and dieselloco engine internals,
BHEL valves ranging from 2 to 16 are worldwide famous, longpending orders for machining, assembling and testing are present,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 24/34
FI NANCE: A ny organisations finance is key role,
Loans from banks should be analyzed for interest rates,repayment period and repayment terms and conditions,
Chinese banks offer more money at reduced rates butequipments should be purchased from them,
A financial magazine providing solutions to families in debts,
suggest that funds to be invested in mutual funds, shares andshare related assets as growth is at 16% average against yourdebt interest rate at 14%-15%,
Discussions with financial experts and institutions necessary,
Experts from barclays say that developing countries like india
may face a market downfall, as some companies here trying forterritorial expansion may sell off their reserve shares and assetsto gain funds for the acquisition, if decent number of companies does like this their shares may be available atcheaper rates bringing the share market index down,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 25/34
FI NANCE: To be an enterprenur, first undertake all the basic works in
your organisation without dignity, Present yourself even to basic activities initially to learn how it
gets done,
Pay attention to all govt activities and papers, learn thesubsidies available and try to benefit for your organisation,
Understand all the areas from finance, purchase, stocks toproduction,
Strict in your payments, keep always a check to crossconfirm your payments and decissions,
Keep track of your banks transactions, to see whether any
computer errors or wrong debits are done, See that even in worst conditions your organisation should
stand financially for the next 2-3 months,
Many organisations not strict in their finance have lost theirbusiness even when the market demand is good,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 26/34
FI NANCE: Think innovatively and cost effectively for all the problems,
In case of soap industry in japan, QC want to check any empty cartoon box moves in assembly line, suggested: x ray machine,cost effective:fan with speed to blow away empty box,
For space expeditions, source for writing notes, suggested: nongravity flowing ink pen by US, cost effective:pencils by russians,
In case of electronic goods dealers bulk discounts are given atfestive season to increase volume sales thereby demanding bulkdiscount from their manufacturers, hence they gain what they have lost,
In the mobile chain group, univercell, company has tied up with
small software firms, to sell anti theft softwares and softwares toreceive emails as sms even in cheaper non GPRS handsets, hencesolutions under one roof is the key for their volume,
Keep track of your companys monthly expenses, analyze the area where more expenditure occurs, try to minimize it, calculate whether you gain from the business,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 27/34
FI NANCE: Everyone must learn to do investments in shares, mutual funds, share
related assets, atleast as paper works at college levels,Understand the market behaviour, peoples trend nowadays is to buy
and not to save,
Mentality should change to save, invest in market so that this goodpractice would help at any times,
Careful investments in gold, shares, land, mutual funds, dollars shouldbe planned as according to market conditions and predictions,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 28/34
TO BE AN ENTERPRENUR : Vission, Mission, resource augmentation required,
Identification of the correct order after several analysis necessary, A few years experience in any business under an effective leadership
necessary,
Exposure at all level functioning in your organisation necessary,
Constant monitoring and sudden cross checks at all levels in your
organisation necessary, Read more, collective different ideas, attend more seminars and
meetings,
Keep weekly updates of your activities, take decissions collectively,
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 29/34
ASSEMBLING A DUCT OF ALLOY STEEL GR 12:
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 30/34
ASSEMBLING DUCT OF ALLOY STEEL 7M:
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 31/34
DUCT ASSEMBLED AT SITE:
DUCT
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 32/34
PLUS COLUMN ASSEMBLED AT SITE:
bracings
Foundation plus column Cross member cut to
suit beams
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 33/34
HOPPER DUCT AT SITE:
Hopper duct
assembled inverted for coal handling system
8/9/2019 Entrepreneur New
http://slidepdf.com/reader/full/entrepreneur-new 34/34
THANK YOU
Top Related