22/11/2013 Stakeholders' Day

European Network Codes

Pascale Fonck - ELIAFrank Wellens - ELIAWim Michiels - ELIAEmeline Spire - ELIA

Page 2: Elia's Stakeholders' day 2013 morning-part2

Quote

« First and foremost in the extremely technical work of draftingnetwork codes. This is very much work in progress, but it is

very simple: without the TSOs no network codes, and withoutnetwork codes, no functioning wholesale markets”.

(Günther Oettinger, European Commissioner for Energy at theFlorence Forum on 24 September 2013)

22/11/2013 Stakeholders' Day 2

Page 3: Elia's Stakeholders' day 2013 morning-part2

Connection codesFrank Wellens

• Requirements for Generators

• Demand Connection Code

• High Voltage Direct Current

Further explanations onhttp://networkcodes.entsoe.eu

22/11/2013 Stakeholders' Day 3

Page 4: Elia's Stakeholders' day 2013 morning-part2

Operational CodesWim Michiels

• Operational security

• Operational planning & scheduling

• Load Frequency Control and Reserves

Further explanations onhttp://networkcodes.entsoe.eu

More info on : http://networkcodes.entsoe.eu

22/11/2013 Stakeholders' Day 4

Page 5: Elia's Stakeholders' day 2013 morning-part2

Market-related codesEmeline Spire

• Electricity Balancing

• Capacity Allocation and Congestion Management

• Forward Capacity Allocation

Further explanations onhttp://networkcodes.entsoe.eu

22/11/2013 Stakeholders' Day 5

Page 6: Elia's Stakeholders' day 2013 morning-part2

22/11/2013 Stakeholders' Day

European Market Evolution

Pascale FonckEuropean Market Integration - ELIA

Page 7: Elia's Stakeholders' day 2013 morning-part2

NWE Day-Ahead Price Coupling

AS IS- Two separate Market Couplings (CWE & Nordic) linked by

a volume coupling (ITVC organised by EMCC)

- Sequential calculation approach

- No common algorithm applied

22/11/2013 Stakeholders' Day 7

TO BE- Full coupling with GB

- One single price coupling based on a single calculation

- One single common algorithm EUPHEMIA

- First implementation of PCR solution(PCR = Price Coupling of Regions)

Page 8: Elia's Stakeholders' day 2013 morning-part2

NWE Day-Ahead Price Coupling – Status- All NWE procedures were established in close cooperation with the PCR project

and the regional projects.

- Partial coupling scenarios were introduced to allow as many as possible bordersand interconnectors to remain coupled in case an issue occurs in NWE.

- The Day-ahead Operational Contract between all the parties was agreed uponand the signing process is ongoing. Regional and local agreements are about tobe finished and signed

- Market participants were informed and prepared via 2 fora and through the NWEmember test, which was successfully performed in October.

- The project is now in the last stages and final versions of IT- systems aredelivered requesting one more round of testing to assure stability.

22/11/2013 Stakeholders' Day 8

Target launch date NWE DA Market Coupling:February 4, 2014

(to be confirmed before Christmas)

Page 9: Elia's Stakeholders' day 2013 morning-part2

9

CWE Flow Based Market Coupling - Project StatusParallel run results

- Parallel run (more than 10 months): increased welfare and improved priceconvergence

- Approval package sent to regulators- Engagement with Market Parties based on the outcomes of the Public

Consultation- Go Live foreseen end of June 2014 subject to external dependencies

Page 10: Elia's Stakeholders' day 2013 morning-part2

CWE Flow-Based market Coupling - Project StatusNext steps

22/11/2013 Stakeholders' Day 10

- Moving from ATC to Flow Based is a paradigm shiftboth for market parties and TSO operators whichmust be carefully managed

- Project Partners’ objective for the coming months is to progress on thefollowing key topics:– Robustness: shift to the industrialized IT tool, improve operators’ experience– Transparency: provide MPs with appropriate capacity calculation inputs for price

predictability => Bilateral meetings with MPs in order to better understand their concreteneeds– FB vs. FB Intuitive: in cooperation with NRAs, the Project aims at a clear proposal to MPs– Operational process and timings: Fallback and Rollback decisions and procedures;

timing for daily publications– Smooth transition between ATC based processes (yearly/monthly auctions, Intraday) and

FB daily process

Page 11: Elia's Stakeholders' day 2013 morning-part2

CWE Flow-Based Market Coupling

22/11/2013 Stakeholders' Day 11

Please consult the poster session at lunch time

Elia and Belpex experts on flow-based market couplingwill be happy to answer your questions

Page 12: Elia's Stakeholders' day 2013 morning-part2

22/11/2013 Stakeholders' Day

Intraday capacity allocation

Page 13: Elia's Stakeholders' day 2013 morning-part2

SCOPETarget Model for intraday timeframe= a continuous implicit cross-border trading mechanism

22/11/2013 Stakeholders' Day 13

Page 14: Elia's Stakeholders' day 2013 morning-part2

Geographical scope

22/11/2013 Stakeholders' Day 14

Page 15: Elia's Stakeholders' day 2013 morning-part2

22/11/2013 Stakeholders' Day

Innovation@Elia

Hubert LemmensInnovation & Knowledge Management - ELIA

Page 16: Elia's Stakeholders' day 2013 morning-part2

22/11/2013 Stakeholders' Day

Lunch