Elements of a Good Concrete Pipe Specification
David JP Matocha Technical Resource Manager
Hanson Pipe & Precast
2
A buried pipeline is a Structural System
This structural system must consider both the Properties of the Pipe and the Properties of the Soil…
3
“READERS DIGEST Version” Model “Outline” Specification (Handout) based
upon AASHTO Section 27 – Concrete Pipe
• 27.1 – General (Design) • 27.2 – Working Drawings
• 27.3 – Materials• 27.4 – Assembly
• 27.5 – Installation• 27.6 – Inspection• 27.7 – Measurement• 27.8 - Payment
4
AASHTO Section 27 – 27.1 General
5
Section 12 Bridge design…
• Sets forth all LRFD (Load and Resistance Factor Design) design criteria for RCP Allows Indirect Design and or Direct
Design for RCP Recommend using direct design for
deep fills not listed in ACPA Fill Height Charts
6
Indirect Design Calculate LRFD live load, dead load, fluid load Takes soil/installation contribution into
consideration Calculate load on pipe in lbs/ dia (ft) / length(ft) Determines strength class of pipe required
(ASTM C-76) Steel areas and concrete compressive strength
set forth in AASHTO M 170/ASTM C-76
7
Tools for Structural Pipe Design
8
AASHTO Section 27 – 27.3 MATERIALS
• Pipe Manufacturing Materials• Joint Materials
9
27.3 Pipe Manufacturing Material Specifications
10
Joint Materials in 27.3
Cement Mortar – soil tight Other Joint Materials (Mastic) – soil or
silt tight (horizontal) leak resistant (vertical)
Flexible watertight (Rubber Gasket) – silt tight or leak resistant
11
AASHTO Joint Selection Criteria = performance parameters divided into a hierarchy with 4 main sub-groups:• Special Design (Water Tight)• Leak Resistant
• Silt Tight• Soil Tight
***AASHTO PP 63-09*** Pipe Joint Performance Parameters
12
13
AASHTO Section 27 – 27.5Installation
27.5 Installation – Contents…..• Bedding & Backfill Materials• Compaction Requirements• Type I – Type IV Standard Installations
14
15
16
$ $$ $$ $
High Quality Fill
High Compaction Levels
Inspection
Lower Pipe Strengths
Type 1 Installation
17
Type 1 Installation
18
19
$
$
$$
$
$
$
$
$
$
$ $
Type 4 Installation
Native Soils
Limited Compaction Required
No Inspection
High Pipe Strengths
20
Type 4 Installation
21
22
AASHTO Section 27 – 27.6Field Inspection
27.6 Inspection – Contents…..• Misalignment• Cracks• Spalls & Slabing