STEP 1
From Spreadsheet 4 Skin Damping
From SI Report
GRL WEAP Default
GRL WEAP Default
From Spreadsheet 2 Pile Make Up, take TOTAL Vertical Length; not True Length
Refer STEP 2
ENSURE IT IS IN "DRIVEABILITY" MODE. NOT OTHERS !
Shaft 1 = 1.0Shaft 2 = 1.2 (Lower Bound)Shaft 3 = 1.7 (Upper Bound)
Toe 1 = 1.0Toe 2 and others = 0.0
Choose "Steel"Biarkan saje! Jgn usik/ubah ape2 !
Refer to SI Report -> "HAMMER and SOIL DATA" chapter
From Spreadsheet XSRD (TOTAL). To key-in the Shaft Resistance value, change "Driveability" to any "Bearing Graph". After key-in then, change back to "Driveability".
By default, GRL WEAP will call from "D". Refer to STEP 3
Refer STEP 4
STEP 2
GRL Weap will key-in automatically. Follow below instructions:
1. Ensure Cursor at Helmet Weight box.
2. Press F3.
3. Click YES.
4. When "Drive System Help" appear (as shown), click "Check All".
5. Press "OK".
STEP 3
"Click "D""
Manually key-in. Tak kisah nak guna berapa pun intevals (eg 5,10,15).
But ade 2 things yg penting:
a) Elevation at pile connection/weldment kena correct. Refer Spreadsheet 2 Pile Make Up (Pile Stoppage Below Mudline)
b) Depth paling bawah kena BAWAH lagi dari Bottomest Pile Stopage Below Mudline in
24 Hr Welding at Seam Connection
Spreadsheet 2 Pile Make Up. In this case, 160m is greater than 136m (Spreadsheet 2 Pile Make Up -> Pile Stoppage Below Mudline)
Vertical Length from Spreadsheet 2 Pile Make-up
STEP 4
GRL Weap will key-in automatically. Follow below instructions:
1. Ensure Cursor at Section Area box.
2. Press F3.
3. When "Area Calculator" appear (as shown), fill in the blanksblanks.
5. Press "OK".
STEP 5
1. Copy from Spreadsheet 6 Preb - Pile.
2. Ensure copy form "to weap" folder.
3. Highlight and copy all Depth (m), Unit Shaft Resist and Toe Resist.
1. From GRL WEAP main page, click "S1".
2. Click "Edit"
3. Click "Paste Special".
4. Click "Soil Distribution".
5. When "Text Separation" appear, click " Convert to Column".
6. Click "Yes".
7. Click "OK".
Copy from
This is how it is looks like after copy and paste activities !
Spreadsheet Preb-Pile (Predicted
Blowcount) and Paste them in GRL
WEAP
STEP 6
First, click "A" to analyze
2nd, click "O" to show Output
STEP 7
1. After click "O", output will appear insyaAllah. Open .gwd file.
2. For reporting, we require 2 types of infos:
a) Blow count at Set-Up factor 1.0 (End), 1.2 and 1.7.
b) Max Stress (usually Comp Stress) at Set-Up Factor 1.7 only.
3. So, to change set-up factor:
i) Click "View".ii) Click "Ranges, Selections".iii) When "Graph Properties" (as shown) appear, click desired set-up factor.
4. The Max Stress shall be re-key-in in Spreadsheet 1 Pile Combined Stress at
Set-Up factor. We can request for:a) 1.0
(aka "End" in RNZ Drivability report)b) 1.2 c) 1.7
Combined Stress at "Driving Stress at GRL WEAP".
STEP 8
1. From GRL WEAP Output, generate Blow Count curve for every Hammer with regards to every Set-up factor.
2. Manual key-in depth (m) and Blow Count from GRL WEAP output to Spreadsheet 6 PREB-PILE for every set-up factor.
This is how the Blow Count graph looks like !
Top Related