DO ENGINEERING NOTE
No 3740220-EN-452
END CALORIMETER TRANSFER BRIDGE MODIFICATION
July 10 1996
HJ Stredde
APproved~
During the assembly of major components into the DO Detector a transfer bridge was required to move the North-End Calorimeter from the clean roomover the cable bridge and onto the north sidewalk of the assembly hall
This experiment is now at the beginning stages of the next phase namely the upgrade of this Detector for future physics research A major piece of this upgrade is the installation of a solenoid magnet into the Central Calorimeter In order to accomplish this the South End Calorimeter has to be removed from the detector and the North End Calorimeter must be moved an additional 2011 from its nominal open position(total 60 movement
The South End Calorimeter will be removed from the detector using the equipment designed for its installation The calorimeter will be staged on the south sidewalk during the installation of the solenoid magnet and the central tracking systems
The North End Calorimeter is moved 60 to give more space between calorimeters during magnet tracker and cable installation work This movement will allow the calorimeter to remain coupled to the cryo system However this movement requires an extension be added to the center beam This extension will support the rear wheels of the calorimeter and in the case of the end calorimeters carry the majority of the weight The extension is to be a modification of the transfer bridge This modification basically has Tl steel blocks added to one end and legs to the sidewalk supports at the other The Tl steel blocks are notched to fit into the center beam porches and are welded to bridge rails This design is the same as that for the instal1ation bridge(3740312-ME-273456) including the welds and weld procedures which are identical in both cases
Since load testing is impractical the critical welds will be non-destructive tested by ultrasonic means The laboratory through the FESS Department has a contract with MQS Inspection Inc The results of this testing will be submitted to the panel for review before the bridge is put into use
It is noted here that MQS did perform an ultrasonic test on the critical welds of the EC-CC installation bridge on Oct 2 1990 That test demonstrated the weld penetrations between the Tl and A-36 materials Copies were given to the committee at that time A copy of the original North End Cap Calorimeter Installation Note is attached for reference
I
ll----~--------~-__--==~~+~~J~h
7
L
I shy
-
I
--
I IIV
lJ~
dt=
==
=---i
I shy
1 I
shy
1I shy
I
III I
L~
I I_II
I I
I II
1
n
~IIibullbullbullbull
rmJ I
II
Imiddot I I I
middot I bull
II
I I
I
I f
I I
I I
I I
I
I I
IrmiddotmiddotJI
I
I I
~
bull I
bull I
bull bull
I I
I bull
I I
I I
bull I
I I
i i
I
I
I
I I
I
I
bull I
bull I
I I
i
i ~bullbullJ ~~ I
bulli
i bull
II
bull bull
I middot I bull I
bull I
bull
I
I
1 i
bull I
~ I
I I
I
I bull
m- tt
FERMI LAB
ENGINEERING NOTE SEC110N PROJECT SERIAl-CATEGORY
SUBJECT MONGlt t 2e(O~S shy e c- lO1ilroooC
MOt) 1i-eD ~Fet B40~~ l ti - 111 ISS e)
I
ampfSibl f3Si~ ~
1 I I
I I
I A
J~-~e-~--o-~-7-----It-~- z (0 ss --io--~B~~--O-~-7----f
+
~ etlr () L(24Br J laquo~e~i ) -t~cy b1SX e~) taa Cl9 ~ D ( 1lt JO-L Y ()
f 0 u( is 1~1+1ollS) shy li 1(7 0 2s))c
Z) 1 (oZ lt- IN J
~S bull
ISf~
FERMILAB SECTION
ENGINEERING NOTE
Y~etTles S ltt 1-l2l ~eflw$ t-UCbCf)
BoTTl) ~ PtAfES
Jo JS)ICf7 )~ j S Il7o~ ~
k~ ~ L = r- q o~ -) lf2z 7 p 1170 - ~ 0 P $
PROJECT SERIAL-CATEGOAV
SERIAL-CATEGORYSECTIOH PROJECT1M FERMILAB
-y- ENGINEERING NOTE NAME J I
SUBJECI M001 PIa (2fgtilsr-Etl- S~ ee~ - IIJ EO n SneOOE DATE IREVISION DATE~1euroeSS ( T t ~TEEl 0 1middot Be- IlEft) 7-9-91 J
J ~j LoAtgt Z Co - fS - AGEFFi o~ Wee 2Y51g lt1b ~ ) ~LI-O~lt6~~e c~ (wa)ampt1)( ~b l$I 1l4tSI (
IHIPWA8te S~ ~Ttssl Weto) ~)C1Q tS1= ZI IJI
1- -= Z I lD j( ps pound10 kSImiddot lt144 tS I q 6 ~2 C
I -= 1 pound0 I(fs Z S I 0 ~ lt 21 ts I
I q b ~t J( -z
-
July 9 1996
TO Richard Andrews Chair DO Mech Safety Review Panel
FROM H J Stredde DO Mech Group
SUBJECT Non-Destructive We1d Inspection
The critical welds of the modified Transfer Bridge were inspected on June 14 at DO by a technician representing STS Consulting Engineers The method of inspection was an ultrasonic review The critical welds were the single bevel groove welds connecting the T-l steel section to the I-Beam webs The result of this inspection is shown on the attached copy of the field report The report indicates that the welds are acceptable with no voids and are full penetration as specified
I had the technician also check the welds on the original CC installation bridge This weldment was originally checked by a different company MQS and a copy of that test result is included It is obvious that the report by MQS is more detailed than that of the current company the Lab now uses However the overall results of both tests seem to agree ie no voids and good fusion between members
The attached copy of the STS report needs some clarification The weld joint is identified as TC-U4A This joint designation is shown on the attached copy of Figure 24 section 291 page 13 of AWS D 11 Welding Standard Under remarks the tenn NOT VOLUMETRIC is used This means the weld was reviewed from one side only A both side review is not possible The weld locations are noted as member 1 welds 1 amp 2 which are the newly modified bridge and member 2 welds 1 amp 2 which are those of the CC Installation Bridge (previously checked by MQS) The STS report indicates no type of discontinuity
Further in response to the Panel1s request the original calculations of the transfer bridge were reviewed and revised to correct some errors Additionally calculations have been added to detennine the shear stress on the weld connection between the T-l and I-beam web of the modified structure These calculations are included with this memo
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
During the assembly of major components into the DO Detector a transfer bridge was required to move the North-End Calorimeter from the clean roomover the cable bridge and onto the north sidewalk of the assembly hall
This experiment is now at the beginning stages of the next phase namely the upgrade of this Detector for future physics research A major piece of this upgrade is the installation of a solenoid magnet into the Central Calorimeter In order to accomplish this the South End Calorimeter has to be removed from the detector and the North End Calorimeter must be moved an additional 2011 from its nominal open position(total 60 movement
The South End Calorimeter will be removed from the detector using the equipment designed for its installation The calorimeter will be staged on the south sidewalk during the installation of the solenoid magnet and the central tracking systems
The North End Calorimeter is moved 60 to give more space between calorimeters during magnet tracker and cable installation work This movement will allow the calorimeter to remain coupled to the cryo system However this movement requires an extension be added to the center beam This extension will support the rear wheels of the calorimeter and in the case of the end calorimeters carry the majority of the weight The extension is to be a modification of the transfer bridge This modification basically has Tl steel blocks added to one end and legs to the sidewalk supports at the other The Tl steel blocks are notched to fit into the center beam porches and are welded to bridge rails This design is the same as that for the instal1ation bridge(3740312-ME-273456) including the welds and weld procedures which are identical in both cases
Since load testing is impractical the critical welds will be non-destructive tested by ultrasonic means The laboratory through the FESS Department has a contract with MQS Inspection Inc The results of this testing will be submitted to the panel for review before the bridge is put into use
It is noted here that MQS did perform an ultrasonic test on the critical welds of the EC-CC installation bridge on Oct 2 1990 That test demonstrated the weld penetrations between the Tl and A-36 materials Copies were given to the committee at that time A copy of the original North End Cap Calorimeter Installation Note is attached for reference
I
ll----~--------~-__--==~~+~~J~h
7
L
I shy
-
I
--
I IIV
lJ~
dt=
==
=---i
I shy
1 I
shy
1I shy
I
III I
L~
I I_II
I I
I II
1
n
~IIibullbullbullbull
rmJ I
II
Imiddot I I I
middot I bull
II
I I
I
I f
I I
I I
I I
I
I I
IrmiddotmiddotJI
I
I I
~
bull I
bull I
bull bull
I I
I bull
I I
I I
bull I
I I
i i
I
I
I
I I
I
I
bull I
bull I
I I
i
i ~bullbullJ ~~ I
bulli
i bull
II
bull bull
I middot I bull I
bull I
bull
I
I
1 i
bull I
~ I
I I
I
I bull
m- tt
FERMI LAB
ENGINEERING NOTE SEC110N PROJECT SERIAl-CATEGORY
SUBJECT MONGlt t 2e(O~S shy e c- lO1ilroooC
MOt) 1i-eD ~Fet B40~~ l ti - 111 ISS e)
I
ampfSibl f3Si~ ~
1 I I
I I
I A
J~-~e-~--o-~-7-----It-~- z (0 ss --io--~B~~--O-~-7----f
+
~ etlr () L(24Br J laquo~e~i ) -t~cy b1SX e~) taa Cl9 ~ D ( 1lt JO-L Y ()
f 0 u( is 1~1+1ollS) shy li 1(7 0 2s))c
Z) 1 (oZ lt- IN J
~S bull
ISf~
FERMILAB SECTION
ENGINEERING NOTE
Y~etTles S ltt 1-l2l ~eflw$ t-UCbCf)
BoTTl) ~ PtAfES
Jo JS)ICf7 )~ j S Il7o~ ~
k~ ~ L = r- q o~ -) lf2z 7 p 1170 - ~ 0 P $
PROJECT SERIAL-CATEGOAV
SERIAL-CATEGORYSECTIOH PROJECT1M FERMILAB
-y- ENGINEERING NOTE NAME J I
SUBJECI M001 PIa (2fgtilsr-Etl- S~ ee~ - IIJ EO n SneOOE DATE IREVISION DATE~1euroeSS ( T t ~TEEl 0 1middot Be- IlEft) 7-9-91 J
J ~j LoAtgt Z Co - fS - AGEFFi o~ Wee 2Y51g lt1b ~ ) ~LI-O~lt6~~e c~ (wa)ampt1)( ~b l$I 1l4tSI (
IHIPWA8te S~ ~Ttssl Weto) ~)C1Q tS1= ZI IJI
1- -= Z I lD j( ps pound10 kSImiddot lt144 tS I q 6 ~2 C
I -= 1 pound0 I(fs Z S I 0 ~ lt 21 ts I
I q b ~t J( -z
-
July 9 1996
TO Richard Andrews Chair DO Mech Safety Review Panel
FROM H J Stredde DO Mech Group
SUBJECT Non-Destructive We1d Inspection
The critical welds of the modified Transfer Bridge were inspected on June 14 at DO by a technician representing STS Consulting Engineers The method of inspection was an ultrasonic review The critical welds were the single bevel groove welds connecting the T-l steel section to the I-Beam webs The result of this inspection is shown on the attached copy of the field report The report indicates that the welds are acceptable with no voids and are full penetration as specified
I had the technician also check the welds on the original CC installation bridge This weldment was originally checked by a different company MQS and a copy of that test result is included It is obvious that the report by MQS is more detailed than that of the current company the Lab now uses However the overall results of both tests seem to agree ie no voids and good fusion between members
The attached copy of the STS report needs some clarification The weld joint is identified as TC-U4A This joint designation is shown on the attached copy of Figure 24 section 291 page 13 of AWS D 11 Welding Standard Under remarks the tenn NOT VOLUMETRIC is used This means the weld was reviewed from one side only A both side review is not possible The weld locations are noted as member 1 welds 1 amp 2 which are the newly modified bridge and member 2 welds 1 amp 2 which are those of the CC Installation Bridge (previously checked by MQS) The STS report indicates no type of discontinuity
Further in response to the Panel1s request the original calculations of the transfer bridge were reviewed and revised to correct some errors Additionally calculations have been added to detennine the shear stress on the weld connection between the T-l and I-beam web of the modified structure These calculations are included with this memo
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
I
ll----~--------~-__--==~~+~~J~h
7
L
I shy
-
I
--
I IIV
lJ~
dt=
==
=---i
I shy
1 I
shy
1I shy
I
III I
L~
I I_II
I I
I II
1
n
~IIibullbullbullbull
rmJ I
II
Imiddot I I I
middot I bull
II
I I
I
I f
I I
I I
I I
I
I I
IrmiddotmiddotJI
I
I I
~
bull I
bull I
bull bull
I I
I bull
I I
I I
bull I
I I
i i
I
I
I
I I
I
I
bull I
bull I
I I
i
i ~bullbullJ ~~ I
bulli
i bull
II
bull bull
I middot I bull I
bull I
bull
I
I
1 i
bull I
~ I
I I
I
I bull
m- tt
FERMI LAB
ENGINEERING NOTE SEC110N PROJECT SERIAl-CATEGORY
SUBJECT MONGlt t 2e(O~S shy e c- lO1ilroooC
MOt) 1i-eD ~Fet B40~~ l ti - 111 ISS e)
I
ampfSibl f3Si~ ~
1 I I
I I
I A
J~-~e-~--o-~-7-----It-~- z (0 ss --io--~B~~--O-~-7----f
+
~ etlr () L(24Br J laquo~e~i ) -t~cy b1SX e~) taa Cl9 ~ D ( 1lt JO-L Y ()
f 0 u( is 1~1+1ollS) shy li 1(7 0 2s))c
Z) 1 (oZ lt- IN J
~S bull
ISf~
FERMILAB SECTION
ENGINEERING NOTE
Y~etTles S ltt 1-l2l ~eflw$ t-UCbCf)
BoTTl) ~ PtAfES
Jo JS)ICf7 )~ j S Il7o~ ~
k~ ~ L = r- q o~ -) lf2z 7 p 1170 - ~ 0 P $
PROJECT SERIAL-CATEGOAV
SERIAL-CATEGORYSECTIOH PROJECT1M FERMILAB
-y- ENGINEERING NOTE NAME J I
SUBJECI M001 PIa (2fgtilsr-Etl- S~ ee~ - IIJ EO n SneOOE DATE IREVISION DATE~1euroeSS ( T t ~TEEl 0 1middot Be- IlEft) 7-9-91 J
J ~j LoAtgt Z Co - fS - AGEFFi o~ Wee 2Y51g lt1b ~ ) ~LI-O~lt6~~e c~ (wa)ampt1)( ~b l$I 1l4tSI (
IHIPWA8te S~ ~Ttssl Weto) ~)C1Q tS1= ZI IJI
1- -= Z I lD j( ps pound10 kSImiddot lt144 tS I q 6 ~2 C
I -= 1 pound0 I(fs Z S I 0 ~ lt 21 ts I
I q b ~t J( -z
-
July 9 1996
TO Richard Andrews Chair DO Mech Safety Review Panel
FROM H J Stredde DO Mech Group
SUBJECT Non-Destructive We1d Inspection
The critical welds of the modified Transfer Bridge were inspected on June 14 at DO by a technician representing STS Consulting Engineers The method of inspection was an ultrasonic review The critical welds were the single bevel groove welds connecting the T-l steel section to the I-Beam webs The result of this inspection is shown on the attached copy of the field report The report indicates that the welds are acceptable with no voids and are full penetration as specified
I had the technician also check the welds on the original CC installation bridge This weldment was originally checked by a different company MQS and a copy of that test result is included It is obvious that the report by MQS is more detailed than that of the current company the Lab now uses However the overall results of both tests seem to agree ie no voids and good fusion between members
The attached copy of the STS report needs some clarification The weld joint is identified as TC-U4A This joint designation is shown on the attached copy of Figure 24 section 291 page 13 of AWS D 11 Welding Standard Under remarks the tenn NOT VOLUMETRIC is used This means the weld was reviewed from one side only A both side review is not possible The weld locations are noted as member 1 welds 1 amp 2 which are the newly modified bridge and member 2 welds 1 amp 2 which are those of the CC Installation Bridge (previously checked by MQS) The STS report indicates no type of discontinuity
Further in response to the Panel1s request the original calculations of the transfer bridge were reviewed and revised to correct some errors Additionally calculations have been added to detennine the shear stress on the weld connection between the T-l and I-beam web of the modified structure These calculations are included with this memo
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
n
~IIibullbullbullbull
rmJ I
II
Imiddot I I I
middot I bull
II
I I
I
I f
I I
I I
I I
I
I I
IrmiddotmiddotJI
I
I I
~
bull I
bull I
bull bull
I I
I bull
I I
I I
bull I
I I
i i
I
I
I
I I
I
I
bull I
bull I
I I
i
i ~bullbullJ ~~ I
bulli
i bull
II
bull bull
I middot I bull I
bull I
bull
I
I
1 i
bull I
~ I
I I
I
I bull
m- tt
FERMI LAB
ENGINEERING NOTE SEC110N PROJECT SERIAl-CATEGORY
SUBJECT MONGlt t 2e(O~S shy e c- lO1ilroooC
MOt) 1i-eD ~Fet B40~~ l ti - 111 ISS e)
I
ampfSibl f3Si~ ~
1 I I
I I
I A
J~-~e-~--o-~-7-----It-~- z (0 ss --io--~B~~--O-~-7----f
+
~ etlr () L(24Br J laquo~e~i ) -t~cy b1SX e~) taa Cl9 ~ D ( 1lt JO-L Y ()
f 0 u( is 1~1+1ollS) shy li 1(7 0 2s))c
Z) 1 (oZ lt- IN J
~S bull
ISf~
FERMILAB SECTION
ENGINEERING NOTE
Y~etTles S ltt 1-l2l ~eflw$ t-UCbCf)
BoTTl) ~ PtAfES
Jo JS)ICf7 )~ j S Il7o~ ~
k~ ~ L = r- q o~ -) lf2z 7 p 1170 - ~ 0 P $
PROJECT SERIAL-CATEGOAV
SERIAL-CATEGORYSECTIOH PROJECT1M FERMILAB
-y- ENGINEERING NOTE NAME J I
SUBJECI M001 PIa (2fgtilsr-Etl- S~ ee~ - IIJ EO n SneOOE DATE IREVISION DATE~1euroeSS ( T t ~TEEl 0 1middot Be- IlEft) 7-9-91 J
J ~j LoAtgt Z Co - fS - AGEFFi o~ Wee 2Y51g lt1b ~ ) ~LI-O~lt6~~e c~ (wa)ampt1)( ~b l$I 1l4tSI (
IHIPWA8te S~ ~Ttssl Weto) ~)C1Q tS1= ZI IJI
1- -= Z I lD j( ps pound10 kSImiddot lt144 tS I q 6 ~2 C
I -= 1 pound0 I(fs Z S I 0 ~ lt 21 ts I
I q b ~t J( -z
-
July 9 1996
TO Richard Andrews Chair DO Mech Safety Review Panel
FROM H J Stredde DO Mech Group
SUBJECT Non-Destructive We1d Inspection
The critical welds of the modified Transfer Bridge were inspected on June 14 at DO by a technician representing STS Consulting Engineers The method of inspection was an ultrasonic review The critical welds were the single bevel groove welds connecting the T-l steel section to the I-Beam webs The result of this inspection is shown on the attached copy of the field report The report indicates that the welds are acceptable with no voids and are full penetration as specified
I had the technician also check the welds on the original CC installation bridge This weldment was originally checked by a different company MQS and a copy of that test result is included It is obvious that the report by MQS is more detailed than that of the current company the Lab now uses However the overall results of both tests seem to agree ie no voids and good fusion between members
The attached copy of the STS report needs some clarification The weld joint is identified as TC-U4A This joint designation is shown on the attached copy of Figure 24 section 291 page 13 of AWS D 11 Welding Standard Under remarks the tenn NOT VOLUMETRIC is used This means the weld was reviewed from one side only A both side review is not possible The weld locations are noted as member 1 welds 1 amp 2 which are the newly modified bridge and member 2 welds 1 amp 2 which are those of the CC Installation Bridge (previously checked by MQS) The STS report indicates no type of discontinuity
Further in response to the Panel1s request the original calculations of the transfer bridge were reviewed and revised to correct some errors Additionally calculations have been added to detennine the shear stress on the weld connection between the T-l and I-beam web of the modified structure These calculations are included with this memo
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
~IIibullbullbullbull
rmJ I
II
Imiddot I I I
middot I bull
II
I I
I
I f
I I
I I
I I
I
I I
IrmiddotmiddotJI
I
I I
~
bull I
bull I
bull bull
I I
I bull
I I
I I
bull I
I I
i i
I
I
I
I I
I
I
bull I
bull I
I I
i
i ~bullbullJ ~~ I
bulli
i bull
II
bull bull
I middot I bull I
bull I
bull
I
I
1 i
bull I
~ I
I I
I
I bull
m- tt
FERMI LAB
ENGINEERING NOTE SEC110N PROJECT SERIAl-CATEGORY
SUBJECT MONGlt t 2e(O~S shy e c- lO1ilroooC
MOt) 1i-eD ~Fet B40~~ l ti - 111 ISS e)
I
ampfSibl f3Si~ ~
1 I I
I I
I A
J~-~e-~--o-~-7-----It-~- z (0 ss --io--~B~~--O-~-7----f
+
~ etlr () L(24Br J laquo~e~i ) -t~cy b1SX e~) taa Cl9 ~ D ( 1lt JO-L Y ()
f 0 u( is 1~1+1ollS) shy li 1(7 0 2s))c
Z) 1 (oZ lt- IN J
~S bull
ISf~
FERMILAB SECTION
ENGINEERING NOTE
Y~etTles S ltt 1-l2l ~eflw$ t-UCbCf)
BoTTl) ~ PtAfES
Jo JS)ICf7 )~ j S Il7o~ ~
k~ ~ L = r- q o~ -) lf2z 7 p 1170 - ~ 0 P $
PROJECT SERIAL-CATEGOAV
SERIAL-CATEGORYSECTIOH PROJECT1M FERMILAB
-y- ENGINEERING NOTE NAME J I
SUBJECI M001 PIa (2fgtilsr-Etl- S~ ee~ - IIJ EO n SneOOE DATE IREVISION DATE~1euroeSS ( T t ~TEEl 0 1middot Be- IlEft) 7-9-91 J
J ~j LoAtgt Z Co - fS - AGEFFi o~ Wee 2Y51g lt1b ~ ) ~LI-O~lt6~~e c~ (wa)ampt1)( ~b l$I 1l4tSI (
IHIPWA8te S~ ~Ttssl Weto) ~)C1Q tS1= ZI IJI
1- -= Z I lD j( ps pound10 kSImiddot lt144 tS I q 6 ~2 C
I -= 1 pound0 I(fs Z S I 0 ~ lt 21 ts I
I q b ~t J( -z
-
July 9 1996
TO Richard Andrews Chair DO Mech Safety Review Panel
FROM H J Stredde DO Mech Group
SUBJECT Non-Destructive We1d Inspection
The critical welds of the modified Transfer Bridge were inspected on June 14 at DO by a technician representing STS Consulting Engineers The method of inspection was an ultrasonic review The critical welds were the single bevel groove welds connecting the T-l steel section to the I-Beam webs The result of this inspection is shown on the attached copy of the field report The report indicates that the welds are acceptable with no voids and are full penetration as specified
I had the technician also check the welds on the original CC installation bridge This weldment was originally checked by a different company MQS and a copy of that test result is included It is obvious that the report by MQS is more detailed than that of the current company the Lab now uses However the overall results of both tests seem to agree ie no voids and good fusion between members
The attached copy of the STS report needs some clarification The weld joint is identified as TC-U4A This joint designation is shown on the attached copy of Figure 24 section 291 page 13 of AWS D 11 Welding Standard Under remarks the tenn NOT VOLUMETRIC is used This means the weld was reviewed from one side only A both side review is not possible The weld locations are noted as member 1 welds 1 amp 2 which are the newly modified bridge and member 2 welds 1 amp 2 which are those of the CC Installation Bridge (previously checked by MQS) The STS report indicates no type of discontinuity
Further in response to the Panel1s request the original calculations of the transfer bridge were reviewed and revised to correct some errors Additionally calculations have been added to detennine the shear stress on the weld connection between the T-l and I-beam web of the modified structure These calculations are included with this memo
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
FERMI LAB
ENGINEERING NOTE SEC110N PROJECT SERIAl-CATEGORY
SUBJECT MONGlt t 2e(O~S shy e c- lO1ilroooC
MOt) 1i-eD ~Fet B40~~ l ti - 111 ISS e)
I
ampfSibl f3Si~ ~
1 I I
I I
I A
J~-~e-~--o-~-7-----It-~- z (0 ss --io--~B~~--O-~-7----f
+
~ etlr () L(24Br J laquo~e~i ) -t~cy b1SX e~) taa Cl9 ~ D ( 1lt JO-L Y ()
f 0 u( is 1~1+1ollS) shy li 1(7 0 2s))c
Z) 1 (oZ lt- IN J
~S bull
ISf~
FERMILAB SECTION
ENGINEERING NOTE
Y~etTles S ltt 1-l2l ~eflw$ t-UCbCf)
BoTTl) ~ PtAfES
Jo JS)ICf7 )~ j S Il7o~ ~
k~ ~ L = r- q o~ -) lf2z 7 p 1170 - ~ 0 P $
PROJECT SERIAL-CATEGOAV
SERIAL-CATEGORYSECTIOH PROJECT1M FERMILAB
-y- ENGINEERING NOTE NAME J I
SUBJECI M001 PIa (2fgtilsr-Etl- S~ ee~ - IIJ EO n SneOOE DATE IREVISION DATE~1euroeSS ( T t ~TEEl 0 1middot Be- IlEft) 7-9-91 J
J ~j LoAtgt Z Co - fS - AGEFFi o~ Wee 2Y51g lt1b ~ ) ~LI-O~lt6~~e c~ (wa)ampt1)( ~b l$I 1l4tSI (
IHIPWA8te S~ ~Ttssl Weto) ~)C1Q tS1= ZI IJI
1- -= Z I lD j( ps pound10 kSImiddot lt144 tS I q 6 ~2 C
I -= 1 pound0 I(fs Z S I 0 ~ lt 21 ts I
I q b ~t J( -z
-
July 9 1996
TO Richard Andrews Chair DO Mech Safety Review Panel
FROM H J Stredde DO Mech Group
SUBJECT Non-Destructive We1d Inspection
The critical welds of the modified Transfer Bridge were inspected on June 14 at DO by a technician representing STS Consulting Engineers The method of inspection was an ultrasonic review The critical welds were the single bevel groove welds connecting the T-l steel section to the I-Beam webs The result of this inspection is shown on the attached copy of the field report The report indicates that the welds are acceptable with no voids and are full penetration as specified
I had the technician also check the welds on the original CC installation bridge This weldment was originally checked by a different company MQS and a copy of that test result is included It is obvious that the report by MQS is more detailed than that of the current company the Lab now uses However the overall results of both tests seem to agree ie no voids and good fusion between members
The attached copy of the STS report needs some clarification The weld joint is identified as TC-U4A This joint designation is shown on the attached copy of Figure 24 section 291 page 13 of AWS D 11 Welding Standard Under remarks the tenn NOT VOLUMETRIC is used This means the weld was reviewed from one side only A both side review is not possible The weld locations are noted as member 1 welds 1 amp 2 which are the newly modified bridge and member 2 welds 1 amp 2 which are those of the CC Installation Bridge (previously checked by MQS) The STS report indicates no type of discontinuity
Further in response to the Panel1s request the original calculations of the transfer bridge were reviewed and revised to correct some errors Additionally calculations have been added to detennine the shear stress on the weld connection between the T-l and I-beam web of the modified structure These calculations are included with this memo
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
FERMILAB SECTION
ENGINEERING NOTE
Y~etTles S ltt 1-l2l ~eflw$ t-UCbCf)
BoTTl) ~ PtAfES
Jo JS)ICf7 )~ j S Il7o~ ~
k~ ~ L = r- q o~ -) lf2z 7 p 1170 - ~ 0 P $
PROJECT SERIAL-CATEGOAV
SERIAL-CATEGORYSECTIOH PROJECT1M FERMILAB
-y- ENGINEERING NOTE NAME J I
SUBJECI M001 PIa (2fgtilsr-Etl- S~ ee~ - IIJ EO n SneOOE DATE IREVISION DATE~1euroeSS ( T t ~TEEl 0 1middot Be- IlEft) 7-9-91 J
J ~j LoAtgt Z Co - fS - AGEFFi o~ Wee 2Y51g lt1b ~ ) ~LI-O~lt6~~e c~ (wa)ampt1)( ~b l$I 1l4tSI (
IHIPWA8te S~ ~Ttssl Weto) ~)C1Q tS1= ZI IJI
1- -= Z I lD j( ps pound10 kSImiddot lt144 tS I q 6 ~2 C
I -= 1 pound0 I(fs Z S I 0 ~ lt 21 ts I
I q b ~t J( -z
-
July 9 1996
TO Richard Andrews Chair DO Mech Safety Review Panel
FROM H J Stredde DO Mech Group
SUBJECT Non-Destructive We1d Inspection
The critical welds of the modified Transfer Bridge were inspected on June 14 at DO by a technician representing STS Consulting Engineers The method of inspection was an ultrasonic review The critical welds were the single bevel groove welds connecting the T-l steel section to the I-Beam webs The result of this inspection is shown on the attached copy of the field report The report indicates that the welds are acceptable with no voids and are full penetration as specified
I had the technician also check the welds on the original CC installation bridge This weldment was originally checked by a different company MQS and a copy of that test result is included It is obvious that the report by MQS is more detailed than that of the current company the Lab now uses However the overall results of both tests seem to agree ie no voids and good fusion between members
The attached copy of the STS report needs some clarification The weld joint is identified as TC-U4A This joint designation is shown on the attached copy of Figure 24 section 291 page 13 of AWS D 11 Welding Standard Under remarks the tenn NOT VOLUMETRIC is used This means the weld was reviewed from one side only A both side review is not possible The weld locations are noted as member 1 welds 1 amp 2 which are the newly modified bridge and member 2 welds 1 amp 2 which are those of the CC Installation Bridge (previously checked by MQS) The STS report indicates no type of discontinuity
Further in response to the Panel1s request the original calculations of the transfer bridge were reviewed and revised to correct some errors Additionally calculations have been added to detennine the shear stress on the weld connection between the T-l and I-beam web of the modified structure These calculations are included with this memo
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
SERIAL-CATEGORYSECTIOH PROJECT1M FERMILAB
-y- ENGINEERING NOTE NAME J I
SUBJECI M001 PIa (2fgtilsr-Etl- S~ ee~ - IIJ EO n SneOOE DATE IREVISION DATE~1euroeSS ( T t ~TEEl 0 1middot Be- IlEft) 7-9-91 J
J ~j LoAtgt Z Co - fS - AGEFFi o~ Wee 2Y51g lt1b ~ ) ~LI-O~lt6~~e c~ (wa)ampt1)( ~b l$I 1l4tSI (
IHIPWA8te S~ ~Ttssl Weto) ~)C1Q tS1= ZI IJI
1- -= Z I lD j( ps pound10 kSImiddot lt144 tS I q 6 ~2 C
I -= 1 pound0 I(fs Z S I 0 ~ lt 21 ts I
I q b ~t J( -z
-
July 9 1996
TO Richard Andrews Chair DO Mech Safety Review Panel
FROM H J Stredde DO Mech Group
SUBJECT Non-Destructive We1d Inspection
The critical welds of the modified Transfer Bridge were inspected on June 14 at DO by a technician representing STS Consulting Engineers The method of inspection was an ultrasonic review The critical welds were the single bevel groove welds connecting the T-l steel section to the I-Beam webs The result of this inspection is shown on the attached copy of the field report The report indicates that the welds are acceptable with no voids and are full penetration as specified
I had the technician also check the welds on the original CC installation bridge This weldment was originally checked by a different company MQS and a copy of that test result is included It is obvious that the report by MQS is more detailed than that of the current company the Lab now uses However the overall results of both tests seem to agree ie no voids and good fusion between members
The attached copy of the STS report needs some clarification The weld joint is identified as TC-U4A This joint designation is shown on the attached copy of Figure 24 section 291 page 13 of AWS D 11 Welding Standard Under remarks the tenn NOT VOLUMETRIC is used This means the weld was reviewed from one side only A both side review is not possible The weld locations are noted as member 1 welds 1 amp 2 which are the newly modified bridge and member 2 welds 1 amp 2 which are those of the CC Installation Bridge (previously checked by MQS) The STS report indicates no type of discontinuity
Further in response to the Panel1s request the original calculations of the transfer bridge were reviewed and revised to correct some errors Additionally calculations have been added to detennine the shear stress on the weld connection between the T-l and I-beam web of the modified structure These calculations are included with this memo
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
July 9 1996
TO Richard Andrews Chair DO Mech Safety Review Panel
FROM H J Stredde DO Mech Group
SUBJECT Non-Destructive We1d Inspection
The critical welds of the modified Transfer Bridge were inspected on June 14 at DO by a technician representing STS Consulting Engineers The method of inspection was an ultrasonic review The critical welds were the single bevel groove welds connecting the T-l steel section to the I-Beam webs The result of this inspection is shown on the attached copy of the field report The report indicates that the welds are acceptable with no voids and are full penetration as specified
I had the technician also check the welds on the original CC installation bridge This weldment was originally checked by a different company MQS and a copy of that test result is included It is obvious that the report by MQS is more detailed than that of the current company the Lab now uses However the overall results of both tests seem to agree ie no voids and good fusion between members
The attached copy of the STS report needs some clarification The weld joint is identified as TC-U4A This joint designation is shown on the attached copy of Figure 24 section 291 page 13 of AWS D 11 Welding Standard Under remarks the tenn NOT VOLUMETRIC is used This means the weld was reviewed from one side only A both side review is not possible The weld locations are noted as member 1 welds 1 amp 2 which are the newly modified bridge and member 2 welds 1 amp 2 which are those of the CC Installation Bridge (previously checked by MQS) The STS report indicates no type of discontinuity
Further in response to the Panel1s request the original calculations of the transfer bridge were reviewed and revised to correct some errors Additionally calculations have been added to detennine the shear stress on the weld connection between the T-l and I-beam web of the modified structure These calculations are included with this memo
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
TEST REPORT
MODIFIED BRIDGE
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
--______ _
FIELD RE P 0 R T _-~r _~~
Construction T e c h n 0 log jgtG r 0 up
NOTE The responsibilities andauthority of STS and STS Field PenlOMellnclude neither the raeponaibitiea northe authority of the middotCompetent Pel8Of1middot for the Pf1)ject site sa defined by OSHA Regulations 29 CFR 1926 SUbpart P
___ of ___
Ffi Project [eYItn) L~b Report No1-)0 50Project NO-=~~~~-_r_-------___ _ DayDate Fri b - 1laquo-9 k
~D81A D - 0Location _-4J~~~(Jn__=-~----------_-_ WealberITomp) SltY1j~ Contractor fshy
Project Competent Pel8Of1 per29 CFR Part 1926 (Subpart P) NAM~________________
FIRM _____________
ADDRESS ____________
PHONE____________
Present on Site eYES eNO
Client _J)O-I Equipment ~ 00 Rental Arrive Job L TOTAL
CHARGEABLETolls $_---- Depart Job j t ~ HOURS 4 hour minimum
Parking $_____ - Total Hours on Job
Mileage -TravelTime
Project Preparation Time ____________
cmiddot
Summary of technical andor engineering services performed including field test data
-----------------------
----------------------
-----------------------
------------------------- ----------------------
-------------=--------------- - ~ryTestResults
Field Representative-fL1LL~=_=~gte--_ ~osition
Company
White-Office White - Field Yellowmiddot lime Card 1196pp75k
STS Consultants Ltd Consulting Engineers
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
~ bull d lJ1OJ
bull STS Construction Services Group I ~~ Ultrasonic Test Record No ~-~~==~~~~~=-~----~--~~= prOJecti_IfC--=t-ro~L~A~~--___________
LCIOampUOD _--ff1--1J~5T-gtswD--O==---_______ D -~-~
Plan View
Da_ DacnBd m Awa ) 11e6 ~ foampVI~
i Deahls DUlaOntlUu1tr Ia
ltC J it ei bull S I Irtil I i J 8 i J II I=I s =-1 I
i i -I ~
I lit I bull I CI Ii I~ Iij ~ I j a t-OC 110_ ~1IiO I titmiddot
-a ampf 81 st~ D -a B C 1)
c_
td(~qE Jlt_l~ )t-t n Iffn t t ~~ Zl ~f
~~ h M2fQQl Dd ~ I
Me eyQ) - Lf(
hthrJe~~u V L I ~d~ ir ~(
DIi1~ Mem1~r~~efi~ tV f ~d ~ if
I
-lflii
~
~
Kanutaotlftr Of Contnotor
WtldIclen-uon S 9j r~~~10-4~ 14ampt81Jal Th1cknass Itt - r~
~I
Wel4JOUltAWS _LorJC_=--=Ll4i-ampD-=--__------ shy
wtldJnlaquo Process QuaWyAf~ensUO NO A-fI1)-I J ~il~ til ) Bemarks mM ilt -rn ~ A ~ Jlt- JJIIJ~ ot-J-c n
JwJWlJ~ 1 bull
l00l 966l-6l-Nnr
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
Design of Welded ConnectionsI3
~ Single-bevelgroove weld (4) Tolerances
Butt joint (B) AsDelaiIed AsFrt Up
L (see 292) (see 33)
R-+116-O +14-1116
RJ n a-+10~- 0 0 +10~-5deg
I
j T1 L
Base Metal Thickness Groove Preparation Gas
(U bull unlimited) Permitted Shielding
Welding Joint Root Groove Welding for
Process Designation T1 T2 Opening Angle Positions FCAW Notes
R-14 a45 0 All - BrN SMAW B-U4a U - a30 0 BrNR-38 All
R-3I16 a 30 0 All Required ABrN GMAW B-U4a-GF U - R14 a45 Q All Not req ABrN FCAW
R38 a30 0 F Not req ABrN
TolerancesSingle-bevel-groove-weld (4) n As Fit Up As DetailedT-joint (T) I (see 33)(see 292) Corner joint (C) 10_ NOTEJ NOTE V bull +114-116R-+1116-o
a- +10 ~ 5 0 +10~middot5deg T1 ~ J
F-
- [JJ X- R
T2
Base Metal Thickness Gas
Permitted Groove Preparation
Shielding(U bull unlimited) Welding for Process
Joint WeldingGrooveRoot T1 T2 FCAW NotesDesignation Angle PositionsOpening
All JQVR14 a=45deg -USMAW TCmiddotU4a U
JQVFVOHa30degR-38 -a 30 0 RequiredAll AJQV
GMAW R316
AJQVF Not req a30degR38TC-U4a-GF U UFCAW
All Notreq AJQVR14 a45deg
a- 30 0
R-3I8 JQVFSAW TC-U4a-S U -U a45degR14
Note A Not prequalifled for gas metal arc welding using short circuiting trsnsfer Refer to Appendix A
Note Br Dynamic load application limits these jOints to the horizontal position (see 9125) Note C Backgouge root to sound metal before welding second side Note J If fillet welds are used In statically loaded structures to retnforce groove welds In comer and T-jolnts they shall be equal to
114 T1 but need not exceed 38 in Groove welds in comer and T -joInts of dynamically loaded structures shall be reinforced with fillet welds equal to 14 T1 but not more than 38 In
Note N The orientation of the two members in the joints may vary from 135deg to 180deg provided that the basic joint configuration (grpove angle root face root opening) remain the same and that the design weld size is maintained
Note Q For comer and T-joints the member orientation may be changed provided the groove angle is maintained B8 specified Note V For comer joints the outside groove preparetlon may be In either or both members provided the basic groove conflgurstion
Is not changed and adequate edge distance is maintained to support tha welding operatiOns without excessive edge melting
Figure 24 (continued) - Prequalified Complete Joint Penetration Groove Welded Joints (see 291)
$2 tCUQEij5U49Al1tyen4ampl$Qs=sgptAZPZE4= M PiWQga UiiitPUg 4 atd S44IH it AM
Top Related