Surge Arresters
1
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 2
Gap
Silicon Carbide
(MCOV & MOV)
Metal Oxide
Shunt Resistor
Valve Element
Newer DesignsOlder Designs
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
2/25
Surge Arresters
2
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 3
Normal Condition ==> Insulator
Instant of Disturbance ==> Conductor
Passing of Disturbance ==> Insulator
Non-Linear Volt-Ampere Characteristic
Dielectric-Loss Test - Not a Test of The Arresters
Protective Characteristics
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 4
Over design ratings itdissipates the impulse
Drops down to zeroGenerates its ownimpulse
Over design ratings itdissipates the impulse
Clamps the voltageDoesnt drop to zero
Doesnt generate itsown impulse
100KV
69KV
Silicon Carbide
100KV
69KV
Metal Oxide
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
3/25
Surge Arresters
3
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 5
To make comparisons meaningful, arresters must be
tested at the same voltage levels
For recommended test voltages:
M2H Manual, page 4-118
M4K Manual, page 8-138
Clean all porcelain surfaces to minimize surface
leakage
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 6
Refer to Tabulation in the Doble Test Data-Reference Book
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
4/25
Surge Arresters
4
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
High Voltage Lead
GND LeadI&W Meter
A
Guard
Single Arrester:
LVL
CKT SW CKT SW
Test SetStep-Up
XFMR
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 8
1. Bus must be disconnected from
top of unit.
2. Place HV test lead as shown.
3. If discharge counter present,
place jumper from bottom of
arrester to ground, bypassing the
counter.
4. Connect test set ground to
grounded structure supportingarrester stack.
5. Use a GST-Ground test circuit.
Test Set
Ground Lead
HV Cable
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
5/25
Surge Arresters
5
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 9
Two Arresters:
High Voltage Lead
LVL
GND Lead
I&W Meter
Test Set
Step-UpXFMR
A
B
Guard
CKT SW CKT SW
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 10
1. Place test leads as shown. Colors
may be interchanged. Bus must be
disconnected from top unit.
2. If discharge counter present, place
jumper from bottom of B to ground,
bypassing the counter.
3. Connect test set ground to groundedstructure supporting arrester stack.
A
B
1
2
3
Red/Blue LV Lead
Test Set
Ground Lead
High Voltage Lead
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
6/25
Surge Arresters
6
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 11
A
B
1
2
3
Red/Blue LV Lead
Test SetGround Lead
High Voltage Lead
4. A and B must be measured one at
a time as follows:Choose This Circuit To Measure
UST Measure Red A
GST Guard Red B
5. Use the multiple test choice to
speed testing
6. This example uses the Red lead.
The blue lead could have been used
instead, and all test circuit choiceswould then have the red replaced by
blue.
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 12
No. Mode Energize Ground Measure
1 GST 1 2 A
Test #1
A
B
1
2
3
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
7/25
Surge Arresters
7
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 13
A
B
1
2
3
Test #2
No. Mode Energize Ground Measure
2 GST 2 3 B
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 14
A
B
1
2
3
Test #1A
No. Mode Energize Ground Guard UST Measure
1A UST 2 3 ---- 1 A
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
8/25
Surge Arresters
8
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 15
A
B
1
2
3
Test #2A
No. Mode Energize Ground Guard UST Measure
2A GST 2 3 1 ---- B
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 16
A
B
C
Three Arresters:
Test SetStep-UpXFMR
High Voltage Lead
LVL
GND LeadI&W Meter
Guard
CKT SW CKT SW
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
9/25
Surge Arresters
9
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 17
1. Place test leads as shown. Colors may be
interchanged.
2. If discharge counter present, place jumper
from bottom of
C to ground, bypassing the counter.
3. Connect test set ground to grounded structure
supporting arrester stack.
A
B
CRed/Blue
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 18
A
B
CRed/Blue
4. A, B, and C must be measured one at a time
as follows:
Choose This Circuit To Measure
GST Guard Red A
UST Measure Red B
5. Use the multiple test choice to speed testing.
6. To measure C, remove HV cable and LV
leads. Replace HV cable between B and C.
Replace Red LV lead between A and B. Use
GST-Guard Red circuit. Blue lead may be used
instead of red lead. If blue lead used, test circuit
would then be GST-Guard Blue.
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
10/25
Surge Arresters
10
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 19
Test TestNo. Mode Energize Ground Guard UST Measure
1 GST 2 1,6 3 ---- A
2 GST 3 1,2,6 4 ---- B3 UST 3 1,2,6 ---- 4 C
4 UST 5 1,6 ---- 4 D5 GST 5 1,6 4 ---- E
Guard
Ground
HV Lead
A
B
C
D
E
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 20
A
B
C
D
E
1
2
3
4
5
GuardI & W Meter
Test Set
IA
IBGST-Guard
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
11/25
Surge Arresters
11
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 21
A
B
C
D
E
1
2
3
4
5
6
GuardI & W Meter
Test Set
IA
IB
UST
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 22
Test Mode Energize Ground Guard UST Measure
3 UST 3 1,6 ---- 4 C
A
B
C
D
E
1
2
3
4
5
6
GuardI & W Meter
Test Set
IAB
IC
UST
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
12/25
Surge Arresters
12
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 23
A
B
C
D
E
1
2
3
4
5
6
Guard
I & W Meter
Test Set
IE
ID
UST
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 24
A
B
C
D
E
1
2
3
4
5
6
Guard
Test Set
I & W Meter
IE
IDGST-Guard
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
13/25
Surge Arresters
13
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 25
Refer to Published Tabulations Compare Losses Obtained for Similar Units
Tested Under Same Conditions
Any Deviation, Either Higher or Lower, ShouldBe Investigated
Rating Are Based On Watts-Loss Values % PF Not Calculated Temperature Correction Unnecessary
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
Metal OxideHigher Than Normal Losses
Contamination by Moisture, Dirt or Dust
Corroded Gaps in Early Designs (newer
designs gapless)
Lower Than Normal Losses
Discontinuities in Internal Electrical
Configuration
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
14/25
Surge Arresters
14
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
Silicon CarbideHigher Than Normal Losses
Contamination by Moisture, Dirt or DustCorroded Gaps
Lower than Normal LossesBroken Shunting ResistorsPoor Contact and Open Circuits Between
ElementsChange in Currents
Mechanical Damages
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 28
A damaged seal-gapped arrester should behandled with care. Due to the increasedpressure caused by the destruction of internalelements, a defective arrester may be anexplosive hazard.
If the decision is made to disassemble asuspect unit, ensure that the chamber isproperly vented.
Do not simply throw away defective arresters.
Any suspect arrester should be vented anddischarged before disposal.
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
15/25
Surge Arresters
15
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 29
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 30
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
16/25
Surge Arresters
16
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 31
From the Serial Number Column Press F2
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 32
Press Change Selections Button
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
17/25
Surge Arresters
17
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 33
Press Subset Button
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 34
Type In All or Some of Unit or Overall Catalog Number
Press the Continue Button
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
18/25
Surge Arresters
18
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 35
Click on the Item needed (P054XA042A)
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 36
Press Save Selection Button
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
19/25
Surge Arresters
19
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 37
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 38
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
20/25
Surge Arresters
20
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 39
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 40
Entering SurgeArrester Type In
DTA (Review)
1. Enter arrester location,
manufacturer, and serial number.
2. From S/N column, press F2.
3. From blank Arrester Detail
window, click Change
Selection.
4. From Limit Table Subset
window, click Subset.
5. From Search Limits window,
type in arrester type.
6. With data selected, click Save
Selection in Arrester Detail
window.
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
21/25
Surge Arresters
21
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 41
Cloning SurgeArresters
1. With cursor on row
containing arrester to clone,
press F10. In Copy
Nameplate Data window,
type the number of the row
you wish the clone to appear
in.
2. On new cloned row, addthe Arrester Location and
update the Serial Number.
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 42
Surge ArresterTest DataExamples
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
22/25
Surge Arresters
22
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
mA WattsArrester
TypeRating
The middle phase OB arrester, type 217598 is rated Good by thetechnician
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
Original bad data flagged by DTA: This arrester wasleft in service and subsequently failed.
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
23/25
Surge Arresters
23
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 45
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 46
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
24/25
Surge Arresters
24
Doble Engineering Company 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 47
"OB|211345|||MPR300|SINGLE|300|10|NO|0.005|0.05
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 48
"OB|211345|||MPR300|SINGLE|300|10|NO|0.005|0.05
8/2/2019 Des Car Gad Ores de Sob Re Tension Doble
25/25
Surge Arresters
D bl E i i C 7/7/09
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 49
Arresters could not be replaced. The H1 arresterfailed hours after being energized.