Purpose of Presentation
Provide an update on Street and Alley conditions(satisfaction ratings)
Outline impact of historical and future fundinglevels on satisfaction ratings
Introduce options regarding changes in policy thatmay impact satisfaction ratings
Provide options for funding to improve street andalley satisfaction ratings
Outline a 10 year model or decision tool to reachsatisfaction rating goals
2
8/9/2019 Dallas Streets and Alleys Conditions
4/51
2014 Citizen SurveyHighest Priority
3
8/9/2019 Dallas Streets and Alleys Conditions
5/51
2015 City Council RetreatWhere to Place Priority
4
8/9/2019 Dallas Streets and Alleys Conditions
6/51
Street ConditionsSatisfactory vs Unsatisfactory
Note: A letter grade rating is assigned based on conditionA – ExcellentB – GoodC – Fair
D – Poor E – Very Poor Satisfactory Unsatisfactory
5
8/9/2019 Dallas Streets and Alleys Conditions
7/51
Former Street Condition Goals
1995 - Council adopted a street satisfaction goal of75% to be completed by 2015
1996 - Council accelerated the street satisfaction goal of75% to be completed by 2010
2006 - Street condition goals revised and adopted byCity Council:• 87% satisfactory Citywide• Minimum 80% satisfactory in each Council
District• Goals were to be achieved by completion of 2006
Bond Program in conjunction with an enhanced O&Mprogram (projected in FY2019-20 )
6
8/9/2019 Dallas Streets and Alleys Conditions
8/51
Total Lane Miles= 11,700
D&E Lane Miles= 3,221
Dallas toFairbanks,Alaska, then toPortland, Maineand back toDallas =11,526
Magnitude of Street Inventory
7
8/9/2019 Dallas Streets and Alleys Conditions
9/51
Street Degradation Curve, in Lane-miles
P a v e
m e n
t C o n
d i t i o n I n d e x
Mid-to-Low “C” streets receiveproact iv e care by Street Services
“D” streets require resurfacing byPublic Works.Street Services can provide onlytemporary relief.
Streets degrade at varying rates over their life of up to 50 years, from aslittle as 0.3% to over 10% annually
A-streets:mild deterioration
“E” streets requirer econs t ruc t ion by Public Works.Street Services can provide
only temporary relief.
0
10
20
40
50
30
60
70
80
90
100
B-streets:moderate deterioration
C-streets:rapidly-increasingdeterioration
D-streets:severe deterioration
E-streets:severe deteriorationtapering off with time
Typical Pavement Life (in years)0 50
210
1,590
6,750
1,7641,457
A B C D E
L a n e - M
i l e s
8
8/9/2019 Dallas Streets and Alleys Conditions
10/51
Streets:Historical & Current Funding Levels
9
8/9/2019 Dallas Streets and Alleys Conditions
11/51
83.2 83.2 82.5 81.876.1 74.0 71.9 69.8
0
10
20
30
40
50
60
70
80
90
100
2010 2011 2012 2013 2014 2015 2016 2017
% S
a t i s
f a c
t o r y
R a t i n g
Ratings are for September of Each Calendar Year
Streets:Projected Results of Status Quo Funding
NOTE: Projections of future conditions assume that annual O&M expenditures remain the sameand no new capital funds are added, over what is included in the existing bond programs.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 87% Goal
10
8/9/2019 Dallas Streets and Alleys Conditions
12/51
Street Condition Summary
An estimated 27% of our streets are in unsatisfactory (D&E) condition
Given continuation of current spending, it will require an additional$90M/Yr in funding for paving and maintenance to halt degradation andimprove streets by 1%
281 Lane miles that degrade annually = 2.4% ($121M)117 Plus: Additional lane miles to improve 1% ($51M)398 Total number to be improved for 1% gain ($172M)189 Less: Average annual lane miles improved ($82M)209 Net lane miles needed to improve rating 1% ($90M)
11
8/9/2019 Dallas Streets and Alleys Conditions
13/51
0
50
100
150
200
250
300
350
400
450
500
Streets:Funding Current Needs & Improving 1%
L a n e
M i l e s
Additional Lane Milesto Improve 1%
117 Lane Miles =$51M
Impact of Current Funding
189 Lane Miles =$82M
2.4% AnnualDegradation
281 Lane Miles =$121M
Gap to Improve 1%
209 Lane Miles =$90M
12
8/9/2019 Dallas Streets and Alleys Conditions
14/51
Alleys
13
8/9/2019 Dallas Streets and Alleys Conditions
15/51
Alley Conditions
Alley conditions have been rated since 1993
In 2009 , the City began rating one half of the alleys
each year using the new Pavement ManagementSystem and equipment, replacing the old method of “windshield” observations
Note: Same letter grade rating system used for streets.A – ExcellentB – GoodC – Fair
D – Poor E – Very Poor UnsatisfactorySatisfactory
14
8/9/2019 Dallas Streets and Alleys Conditions
16/51
Alleys:Historical & Current Funding Levels
15
8/9/2019 Dallas Streets and Alleys Conditions
17/51
0
10
20
30
40
50
60
70
80
90
100
1999 2002 2003 2006 2008 2009 2011 2012 2014 2015 2016 2017 2018 2019 2020
% o
f A l l e y s
i n S a t i s f a c
t o r y
C o n d
i t i o n
Year
Assumes current O&M investment and no additionalcapital investment (beyond 2012 bond program)
32.8%
2 0 0 3 B o n
d P r o g r a m
2 0 0 6 B o n
d P r o g r a m
2 0 1 2 B o n
d P r o r a m
Alleys:Projected Results of Status Quo Funding
16
8/9/2019 Dallas Streets and Alleys Conditions
18/51
Alley Condition Summary
An estimated 55% of all alleys are in unsatisfactory (D&E) conditionrequiring over $750M to improve to a 100% satisfactory level
Given continuation of current spending, it will require an additional$51M/Yr in funding for paving and maintenance to halt degradation andimprove alleys by 1%
35 Miles that degrade annually = 2.4% ($41M)15 Plus: Additional miles to improve satisfaction rating 1% ($18M)50 Total number of miles that must be improved for 1% gain ($59M)
7 Less: Average annual lane miles currently being improved ($8M)43 Net lane miles needed to improve satisfaction rating 1% ($51M)
17
8/9/2019 Dallas Streets and Alleys Conditions
19/51
0
10
20
30
40
50
60
70
Alleys:Funding Current Needs & Improving 1%
M i l e s
Impact of Current Funding
7 Miles = $8M
2.4% AnnualDegradation
35 Miles = $41M
Gap to Improve 1%
43 Miles = $51M
Additional Lane Milesto Improve 1%
15 Miles = $18M
18
8/9/2019 Dallas Streets and Alleys Conditions
20/51
Policy Considerations forStreets and Alleys
19
8/9/2019 Dallas Streets and Alleys Conditions
21/51
Policy & ImplementationFor Further Consideration
Adjust satisfaction rating/goal for streets and/or timeline tomeet 87% given reality of funding constraints
Establish a realistic satisfaction rating/goal for alleys
Assess feasibility of more pay-as-you-go funding in operatingbudgets
Examine ratio of C to D/E streets prioritized for repair
Determine appropriate size of bond programs and amountsdedicated to street and alley improvements and focus onprojects that improve street conditions ( 55% of the Street andThoroughfare Proposition in the 2012 Bond Program improved street conditions)
20
8/9/2019 Dallas Streets and Alleys Conditions
22/51
Policy & Implementation (Continued)For Further Consideration
Continue to assess potential abandonment or alternativerepair methods for some E-rated streets and alleys on a caseby case basis
Since alley nuisances and obstructions contribute todegradation, consider implementing a dedicated alley nuisanceabatement program
Where appropriate, consider some shifts in location of garbagecollection and/or examine alternative equipment/trucks forcollection in narrow alleys
Consider an 50% matching fund program for residentsinterested in making alley improvements
21
8/9/2019 Dallas Streets and Alleys Conditions
23/51
8/9/2019 Dallas Streets and Alleys Conditions
24/51
Funding OptionsFor Further Consideration
Bond Funding: Continue funding within capacity of currenttax rate (65% of total $1B bond issue in 2017, followed by65% of projected $1B dedicated funding in potential 2023bond issue)
125267
390261
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
1998 2003 2006 2012 B o n
d P r o p o s i
t i o n s
A m o u n t s
M i l l i o n s
Trinity River Corridor
Eco Dev / HousingCity Facilities (other)Parks and RecsFlood / DrainageStreets / Thoroughfares
23
8/9/2019 Dallas Streets and Alleys Conditions
25/51
Funding Options (Continued)For Further Consideration
“Pay -As-You- Go” Funding :Collaborate for funding assistance from benefiting partnerssuch as DART and Dallas County
Establish a Sanitation residential collection street rental orfranchise fee (new, $3.9M/Yr @ 6%)
Increase Water Utilities street rental fee on retail salesfrom 5% to 6% ($5.1M/Yr)
Contingent upon funding available, increase General Fundoperating budget for:
Streets by 20%/YrAlleys by 30%/Yr
24
8/9/2019 Dallas Streets and Alleys Conditions
26/51
Other Funding Options Examinedin Review of All Potential Options
Enhanced bond or operational funding: 1 cent on tax rate =$9.1M/Yr, or $115M in additional capacity for 2017 bondprogram
Implementation of a street/alley maintenance/user fee(currently at maximum tax rate allowed by law)
Legislative changes to enhance transportation funding
Further use of storm water funding related to gutters andintegration of drainage into street system
25
8/9/2019 Dallas Streets and Alleys Conditions
27/51
10 Year Model:A Decision Tool for Financing Options
26
d l d
8/9/2019 Dallas Streets and Alleys Conditions
28/51
10 Year Model – Funding(“All - In” Scenario)*
FY2014-15 FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2019-20 FY2020-21 FY2021-22 FY2022-23 FY2023-24 FY2024-25Water-Capital $16, 100,000 $18, 100,000 $18, 800,000 $20, 600,000 $21, 424,000 $22,280,960 $23, 172,198 $24, 099,086 $25, 063,050 $26, 065,572 $27, 108,195Bond Funding $43,095,000 $43,095,000 $43,095,000 $78,845,000 $150,345,000 $173 ,095,000 $97,500,000 $136 ,500,000 $143 ,000,000 $162 ,500,000 $162 ,500,000Other $0 $11,500,000 $11,845,000 $12,200,350 $12,566,361 $12,943,351 $13,331,652 $13,731,601 $14,143,549 $14,567,856 $15,004,892
Alleys-GF $1,600,000 $2,080,000 $2,704,000 $3,515,200 $4,569,760 $5,940,688 $7,722,894 $10,039,763 $13,051,692 $16,967,199 $22,057,359Streets-GF $36,000,000 $43,200,000 $51,840,000 $62,208,000 $74,649 ,600 $89,579,520 $107 ,495,424 $128 ,994,509 $154 ,793,411 $185 ,752,093 $222 ,902,511
$0
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
$300,000,000
$350,000,000
$400,000,000
$450,000,000
$500,000,000
Streets-GF Alleys-GF Other Bond Funding Water-Capital
*Only assumes options from slides 23 & 24.27
8/9/2019 Dallas Streets and Alleys Conditions
29/51
10 Year Model – Street Expenditures& Impact on Satisfaction Rating (“All - In” Scenario)*
76.0% 75.7% 75.5%76.1%
76.9%78.2% 78.6%
79.9%
81.6%
84.1%
87.0%
68.00%
70.00%
72.00%
74.00%
76.00%
78.00%
80.00%
82.00%
84.00%
86.00%
88.00%
$0
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
$300,000,000
$350,000,000
$400,000,000
Streets Streets Satisfaction Rating
*Only assumes options from slides 23 & 24.28
8/9/2019 Dallas Streets and Alleys Conditions
30/51
10 Year Model – Alley Expenditures& Impact on Satisfaction Rating (“All - In” Scenario)*
45.0%43.4%
41.8%40.2%
42.2%44.0%
45.5%46.8%
48.1%49.2%
50.2%
20.00%
25.00%
30.00%
35.00%
40.00%
45.00%
50.00%
55.00%
$0
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
$70,000,000
$80,000,000
$90,000,000
Alleys Alleys Satisfaction Rating
*Only assumes options from slides 24 & 25.29
8/9/2019 Dallas Streets and Alleys Conditions
31/51
Next Steps
Gain feedback and develop a consensus aroundpotential funding options and scenario outlined (today)
Examine possible impacts of policy changes and presentto the City Council for consideration as appropriate(over the next year)
Complete needs assessment and proposals forconsideration as part of an 2017 bond election (over thenext 18 months)
30
8/9/2019 Dallas Streets and Alleys Conditions
32/51
Questions & Comments
31
8/9/2019 Dallas Streets and Alleys Conditions
33/51
Appendix
32
8/9/2019 Dallas Streets and Alleys Conditions
34/51
83% 86%
81%
88%84%
80%
75%
87%
83% 86% 82%
88%
83% 81%
76%
87%84%
88%
86%
90%87%
81% 80%
88%
82%
85%82%
90%
84%
77%79%
85%
76%
79% 78%
86%
80%
66%
74% 79%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
CW 1 2 3 4 5 6 7
2011
2012
2013
2014
2015
87% Goal
Historical and CurrentStreet Conditions Ratings
Council District
80% Goal
33
8/9/2019 Dallas Streets and Alleys Conditions
35/51
83% 82%79%
87%85%
93%
79%81%
83%81% 81%
89% 87%
94%
79% 79%
84%81%
78%
89%
83%
91%
79%
84%82%
80%
75%
85%
80%
91%
76%79%
76%78%
64%
79%
71%
86%
71%73%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
CW 8 9 10 11 12 13 14
2011
2012
2013
2014
2015
87% Goal
Historical and CurrentStreet Conditions Ratings
Council District
80% Goal
34
8/9/2019 Dallas Streets and Alleys Conditions
36/51
Street ConditionsHow Dallas Compares (2013)
82%
98%
78%
48% 47%
80%
0%
10%20%
30%
40%
50%
60%
70%
80%
90%
100%
Dallas Phoenix Austin Portland OklahomaCity
Kansas City
% S
a t i s f a c t o r y
Source: ICMA FY13 Data35
Street Condition Ratings
8/9/2019 Dallas Streets and Alleys Conditions
37/51
Street Condition RatingsDescription
Excellent
Pavements that have no distress(mostly new or newly rehabilitated surfaces)
GoodVery good ride quality -
Can benefit from preventive maintenance(slurry seal or similar)
Fair Acceptable ride quality, though road surfaces are becoming worn
– slurry, microsurfacing, partial reconstruction or similar willprevent rapid deterioration
Poor Marginally acceptable ride quality
– microsurfacing, chip sealing, or partial reconstruction, resurfacing orrehabilitation is needed to slow further deterioration
Very Poor Pavement has extensive distress
and requires partial or full reconstruction or restoration
A
B
C
D
E
S a t i s f a c t o r y
U n s a
t i s
f a c
t o r y
PCI
100-85
85-70
70-45
45-35
< 35
Rating
36
8/9/2019 Dallas Streets and Alleys Conditions
38/51
Slurry Seal/MicroSurfacing for“B” and “C” rated streets
Micro Surfacing – A treatment for CONCRETE STREETS WITH ASPHALT SURFACE which places a ¼-inch layer ofcrushed stone mixed with asphalt emulsion. This seals and smooths the surface and conceals scars from previous repairs. It isused predominately for higher-traffic-volume streets with curb and gutter. It is more expensive than slurry seal, but cures morequickly. This work is outsourced to a specialized contractor – after Streets Services prepares the site (doing minor base repairand crack sealing, curb & gutter repair) .Cost: $19K per lane-mile. Life: 5-7 years.
Slurry Seal - This treatment for CONCRETE STREETS WITH ASPHALT SURFACE consists of a ¼-inch layer of sand andfine stone mixed with asphalt emulsion. This seals and smooths the surface and conceals scars from previous repairs. It is usedpredominately for residential roads with curb and gutter. The work is outsourced to a specialized contractor – after StreetServices performs preparation work (such as minor base repair and crack sealing).Cost: $13K per lane-mile. Life: 5-7 years.
Full-Depth Asphalt Repairfor “C” rated streets
Full-depth Asphalt Repair - A treatment for ASPHALT STREETS to repair the surface and base failures. Repairs aretypically larger than a pothole, but smaller than either Street Resurfacing or Street Rehabilitation projects. After the failed area iscut square and removed, a new base is placed and compacted and an asphalt surface is put in place.
Cost: $20.50 per square yard. Life: 5-7 years.37
8/9/2019 Dallas Streets and Alleys Conditions
39/51
Partial Reconstruction for“C” rated (and some “D” rated) streets
Partial Reconstruction - This is a method used on CONCRETE STREETS. It is removal and replacement of large, failed sections , including breakout and removal of old pavement, repair of any base failures, and placingnew concrete. To be a candidate for this repair, residential and thoroughfare streets must have less than 25% of failed area.Cost: $67.50 per square yard with curb-and-gutter repair. Life: 10-12 years.
38
8/9/2019 Dallas Streets and Alleys Conditions
40/51
StreetRehabilitation for
“D” rated streets
StreetRestoration for
“E” rated streets
Rehabilitation - A treatment for ASPHALT STREETS when a large portion of the surface and the base have deteriorated toan unsatisfactory level. It includes the full-depth repair of base failures, followed by a chip seal, and a new two-inch layer ofhot mix asphalt placed over the entire treated segment. Candidate streets are predominately residential asphalt surfacedstreets without curb and gutter. Cost: $160K per lane-mile. Life: 10-12 years.
Restoration - A treatment for ASPHALT STREETS when the entire surface and the base have deteriorated to anunsatisfactory level. It includes rebuilding the entire base by recycling the old base and surface materials into a new base,followed by a chip seal, and new two-inch layer of hot mix asphalt placed over the entire treated segment. Candidate streetsare predominately residential asphalt surfaced streets without curb and gutter. Cost: $180K per lane-mile. Life: 18-20 years.
39
Public Works
8/9/2019 Dallas Streets and Alleys Conditions
41/51
Resurfacing of Pavement for “D” ratedstreets
Re-Surfacing – This treatment removes the entire asphalt surface, and pulverizes and recycles the old material withnew asphalt binder. The new asphalt surface is then placed over the entire surface, compacted, and smoothed to aproper finish. Curb and gutter repair, if needed, is accomplished with the re-surfacing efforts.Cost: $200K per lane-mile. Life: 15-20 years (with maintenance).
40
Public Works
8/9/2019 Dallas Streets and Alleys Conditions
42/51
Full Reconstruction for “E” ratedstreets
Reconstruction - This process is the removal of an existing street with extensive failures and/or badlydeteriorated condition. In the process, the pavement is broken and removed (and often recycled), as isthe base. Drainage concerns are addressed with this process. The sub-base may be reconditioned asneeded, then a new base is placed and compacted. The new concrete surface pavement is thenplaced, as shown above. The construction work is outsourced under bond-issued funding.Cost: $1 M per lane-mile. Life: 20-50 years (with maintenance).
41
8/9/2019 Dallas Streets and Alleys Conditions
43/51
Street Treatments Managed by Dallas Water Utilities
Street and alley repairs by the Dallas Water Utilities are associated with pipeline replacement.For asphalt streets the City policy requires that an entire lane be reconstructed at the locationfor where the pipeline is replaced. From joint to joint for concrete streets. 42
8/9/2019 Dallas Streets and Alleys Conditions
44/51
Alley History
Construction of alleys in Dallas began in 1920
The standard alley pavement width has variedVarying widths pavement prior to 1964 – 120 miles8-foot pavement (1964 to 1980) - 705 miles9-foot pavement (1980 to 1990) - 45 miles10-foot pavement (1990 to present) - 345 miles
Alleys have been constructed within varyingwidths of right-of-way (ROW)Prior to 1964, there was no standard ROW width
Since 1964, the City has had a 15-foot ROW
Note: Only 24.7% of all alleys have 10-foot pavement in a 15 foot ROW43
8/9/2019 Dallas Streets and Alleys Conditions
45/51
Alley Types and Size of System
Alleys have been constructed using severaldifferent materials including:
Concrete (1,106 miles)Asphalt (109 miles)Dirt/Gravel/Flexbase (187 miles)
Amount of alleys1,402 miles of alleys citywide
1,215 miles paved (86% of all alleys)187 miles unpaved (124 miles used for sanitationcollection)
44
8/9/2019 Dallas Streets and Alleys Conditions
46/51
8/9/2019 Dallas Streets and Alleys Conditions
47/51
Alley FundingRoutine maintenance and reconstruction are fundedthrough three primary sources :
Street Services - general fund budgetPavement repairs
Alley widening & clipsPublic Works - capital bond program (approx. 2.0miles per year)
Petition new alleysReconstruction of alleys
Dallas Water Utilities - pipeline replacementprogram
Alley reconstruction after replacement of old waterand/or wastewater lines (approx. 3.4 miles per year)
46
8/9/2019 Dallas Streets and Alleys Conditions
48/51
Alley Maintenance
Since 1995 the Dept. of Street Services hasconcentrated its resources on addressing street issuesas opposed to alleys
1,700 is the average annual number of service requestsreceived by the Dept. of Street Services in the past 8years
Dept. of Street Services average operating funds foralleys in the past 8 years has been $1.8M annually
47
8/9/2019 Dallas Streets and Alleys Conditions
49/51
Alley Capital Bond Program
Two types of capital projects related to alleys:
Petition – Paving unimproved alleysProperty owners are assessed on the construction of
pavement or increase to property valueAssessment costs are the lowest between pavement
construction cost (approx. $50 per foot for the width ofproperty) or the enhancement value to the propertyCDBG funding for assessment cost are available to
qualifying property owners
Reconstruction – existing alley pavement isreplaced and/or widenedProperty owners are not assessed for up to a 10-foot
pavement replacement
48
8/9/2019 Dallas Streets and Alleys Conditions
50/51
8/9/2019 Dallas Streets and Alleys Conditions
51/51
Ideal Alley Pavement and ROW
15 Foot R.O.W
10’ Concrete Alley
No plants or otherobstructions in theROW hinderinggarbage collection
50