REPUBLIC OF KENYA
COUNTY GOVERNMENT OF KIRINYAGA
COUNTY INTEGRATED DEVELOPMENT PLAN
2018-2022
Office of the Governor Kirinyaga County
P.O. Box 260 – 10034
KUTUS, KENYA
ii
KIRINYAGA COUNTY VISION AND MISSION
Vision: To be a county enjoying improved productivity through maximum realization of its potentials for sustained economic, social and political development.
Mission: To foster sustained productivity through effective and efficient use
of available resources by encouraging investment, tourism and agricultural
productivity to improve the living standards of the people in the county in a
clean, secure and sustainable environment
iii
Contents LIST OF TABLES ................................................................................................. vi
LIST OF FIGURES ............................................................................................... vi
FOREWORD ........................................................................................................ vii
ACKNOWLEDGEMENTS ........................................................................................ x
ABBREVIATIONS AND ACRONYMS ..................................................................... xi
CONCEPTS AND TERMINOLOGIES ..................................................................... 14
CHAPTER ONE: COUNTY GENERAL INFORMATION ............................................. 18
1.1 Position and Size of The County ............................................... 18
1.2 Physiographic and Natural Conditions ................................... 21
1.3 Administrative and Political Units ............................................ 22
1.4 Political Units ................................................................................. 22
1.5 Demographic Features ................................................................. 25
1.6 Human Development Approach ................................................ 36
1.7 Infrastructure and Access .......................................................... 37
1.8 Land and Land Use ...................................................... 38
1.9. Employment and Other Sources of Income ................... 39 1.10 Irrigation Infrastructure and Schemes ................................. 39
1.11 Crop, Livestock and Fish Production .................................... 40
1.12 Mineral Resources ...................................................................... 41
1.13 Tourism and Wildlife.................................................................. 41
1.14 Industry and Trade .................................................................... 42
1.15 The Blue Economy ..................................................................... 42
1.16 Forestry, Agro- Forestry and Value Addition ...................... 42
1.17 Financial Institutions ................................................................ 45
1.18 Environment and Climate Change ........................................ 45
1.19 Water and Sanitation................................................................. 46
1.20 Health Access and Nutrition .................................................... 47
1.21 Education Skills, Literacy and Infrastructure .................... 48
iv
1.22 Sports, Culture and Creative Arts ......................................... 50
1.23 Community Organization/Non State Actors ....................... 51
1.24 Security, Law And Order .......................................................... 52
CHAPTER TWO: LINKAGES WITH VISION 2030 AND OTHER PLANS ..................... 55
2.3 Linkages with Sustainable Development Goals (SDG’s) .. 59
CHAPTER THREE: REVIEW OF IMPLEMENTATION OF THE PREVIOUS CIDP ....... 61
3.2 Process of review ......................................................................... 61
3.3.1 Agriculture, Veterinary, Livestock and Fisheries .............. 62
3.3.2 Energy, Infrastructure and ICT .............................................. 65
B. Physical Planning, Land & Housing .......................................... 67
3.3.3 Economics, Commercial and Labour Affairs ..................... 69
The Trade, Tourism, Industrialization and Enterprise Development
Directorate .......................................................................................... 70
3.3.4 Health ............................................................................................ 73
3.3.5 Education ..................................................................................... 77
3.3.6 Social Protection, Culture and recreation ........................... 79
3.3.7 Environmental Protection, Water and Housing ................. 79
CHAPTER FOUR: COUNTY DEVELOPMENT PRIORITIES AND STRATEGIES .......... 84
4.2 Spatial Development Framework .............................................. 84
4.3 Natural Resource Assessment ................................................... 87
4.4.1 Agriculture and Rural Development .................................... 89
4.4.2 Environmental Protection, Water, Natural Resources and
Housing ................................................................................................ 98
4.4.3 General Economics, Commercial and Labour Affairs ... 120
4.4.4 Education and Public Service Sector ................................. 130
4.4.5 Health ......................................................................................... 148
4.4.6 Recreation, Culture and Social Protection ....................... 156
4.4.7 Energy, Infrastructure and ICT ........................................... 166
4.4.8 General Public Services ......................................................... 172
v
4.4.9 County Assembly ..................................................................... 181
CHAPTER FIVE: IMPLEMENTATION FRAMEWORK ............................................. 183
5.1. Mountain Cities Blueprint 2032 Implementation Structure
183
5.2. Organization flow chart .......................................................... 183
5.2.1 Kirinyaga County Executive Committee ........................... 184
5.2.2. Kirinyaga County Assembly ................................................ 186
5.2.3. Kirinyaga County Budget and Economic Forum .......... 186
5.2.4 County Public Service Board................................................ 186
5.2.5 County Chief Officers ............................................................. 187
5.2.6 County Directors and Sub-County Heads of Departments 187
5.3 Resource Requirements by Sector .......................................... 187
5.4: Resource mobilization framework ......................................... 188
5.5 Estimated resource gap and measures of addressing it .. 188
CHAPTER SIX: MONITORING AND EVALUATION FRAMEWORK .......................... 190
6.2 M&E Policy .................................................................................... 190
6.3 Data collection, Analysis, and Reporting ............................. 191
6.4 M&E Outcome Indicators ......................................................... 195
vi
LIST OF TABLES
Table 1: County Constituencies and Administrative Units
Table 2: Distribution of County Assembly Wards
Table 3: Eligible and Registered Voters per Constituency
Table 4: Population Projection by Gender and Age Cohort
Table 5: Population Projections for Selected Age Groups
Table 6: Population Projections for Major Urban Areas
Table 7: Projected Population Distribution and Density by Constituency
Table 8: Population Projections by Constituency
Table 9: Human Development Indicators
Table 10: Time Taken to Nearest Water point by HHs
LIST OF FIGURES
Figure 1: Map of Kenya showing location of the county
Figure 2: Map showing Kirinyaga County's Administrative/political units
vii
FOREWORD In 2013, the actualization of the devolved system of government came into
effect. This meant that there are functions that are to be undertaken by the
national government and others by the county government. The Fourth
Schedule of the Constitution clearly sets out the distribution of functions
between the national government and the County governments. In particular
Part 2 of the Schedule sets out fourteen functions of the County governments.
These functions include, agriculture, County health services, control of air
pollution, noise pollution, other public nuisances, outdoor advertising, cultural
activities, public entertainment, public amenities, County transport, animal
control and welfare; trade development and regulation; County planning and
development, preprimary education, village polytechnics home craft centers ,
childcare facilities, implementation of specific national government policies on
natural resources and environmental conservation, County public works and
services, firefighting services and disaster management; control of drugs and
pornography and lastly ensuring and coordinating the participation of
communities and locations in governance at the local level and assisting
communities and locations to develop the administrative capacities for the
effective exercise of the functions and powers and participation in governance
at the local level. It is important to note that though the Constitution of Kenya
creates two levels of government which are distinct, the two are interdependent
and interrelated as such they leverage on each other thus building synergy.
On the basis of the foregoing, the County Government Act 2012 provides for
the development of County Integrated Development Plan (CIDP) which
stipulates the development agenda and road map for the county for a period of
five years. In this regard then, this is the 2nd County Integrated Development
Plan (CIDP) which commences in 2018 – 2022 following the lapse of the five-
year term of the 1st County Integrated Development Plan (CIDP) which was for
the period 2013 -2017.
This CIDP draws its development agenda from Vision 2030, the county’s
Sessional Paper 2032 and the views of the public gathered during various
public participation forums held in the four constituencies namely Mwea, Ndia,
Gichugu and Kirinyaga Central in December 2017. The basis of the
viii
development of this CIDP is a departure from the previous model where
development planning was done with little or no involvement of the intended
beneficiaries. In essence, the inclusion of the public in development planning
was created through the Constitution of 2010 which rightly recognized the
important role that beneficiaries play in the determination of their destiny. As
a County we have upheld this principle ad will continue to so uphold.
This CIDP further takes cognizance of the fact that not all functions have been
devolved as such there is a strategic need to leverage on the national
government. As such, the county will not only partner with the national
government in the realization of its development agenda as stipulated in this
CIDP, but it will also partner with development partners as well as adapting a
Public Private Partnership (PPP) approach in realizing select projects. The
County will indeed synergize with the National Government to ensure that the
county significantly contributes to the realization of Vision 2030 which is the
priority of Kenya as at this time.
Despite the scare resources due to the competing development needs of the
county as stipulated in this CIDP, the County will endeavor to equitably allocate
the available resources to ensure equitable development and redistribution of
or the implementation of development projects. Through the application of
wisdom, knowledge and the county will put in place effective and efficient
monitoring and evaluation systems that will see to it that projects are
implemented within the given timelines.
The implementation of this CIDP has taken into account the inclusion of the
special groups in the actualization of the development projects and
programmes herein identified. As articulated in our Sessional Paper 2032,
employment creation for our youth and the economic empowerment for our
women is a priority area. We take realize that the youth and the women are key
factors of production in our county economic growth. In this regard the, the
projects identified herein will ensure there is meaningful engagement of our
youth that will translate to their economic empowerment through wealth
creation.
The development projects and programmes stipulated in this CIDP incorporate
the concept of the four mountain cities as articulated in the Sessional Paper
ix
2032. According to the Sessional Paper 2032, Mwea constituency has been
earmarked as the green industrial city; Ndia constituency has been earmarked
as the organic city; Kirinyaga Central has been earmarked as the health and
wellness city and lastly Gichugu has been earmarked as the resort city. The
identification of the projects and programmes in this CIDP has further been
predicated upon the five strategic goals which have been highlighted in
Sessional Paper. These five strategic goals are i) job creation through the
creation of new industries and product diversification; 2) better health through
accessible and affordable health care; 3) increased income from improved and
efficient productivity, market access, product marketing and competitive
market prices; 4) improved urban planning and infrastructure in order to
created state of the art towns and cities and lastly 5) enhance knowledge and
skills development in order to establish demand driven, adaptive, diligent,
talented and unique work force.
For the period 2018 – 2022, the success of the implementation of the county
Sessional Paper 2032 is highly dependent on the efficient and effective
implementation of the projects and programmes articulated in this CIDP. In
this regard then, we call upon the national government, development partners,
all relevant state and non-state agencies, all stakeholders within and without
the county and ultimately the residents of Kirinyaga County to partner with us
and to make good their commitment in realizing our county development goals
and agendas. We strongly believe that the implementation of the projects and
programmes articulated in this CIDP will result to significant economic, social
and governance benefits to the advantage of Kirinyaga County and Kenya as a
whole.
# Kirinyaga Rising H.E. ANNE MUMBI WAIGURU, OGW GOVERNOR: KIRINYAGA COUNTY
x
ACKNOWLEDGEMENTS This County Integrated Development Plan (CIDP) is a result of wide consultations both in the county government and the broad stakeholders within and without the County. Their input in terms of expertise and unwavering effort is highly valuable. I therefore acknowledge the moral and material support provided by the executive office of the Kirinyaga County Government led by H.E. Governor Hon Anne Mumbi Waiguru, OGW; H.E Deputy Governor Hon Peter Ndambiri Njagi the County Executive Committee Members (CECs); all the County Chief Officers; my department team led by the director of economic planning J.N. Mbugua; the County Budget and Economic Forum Members and the Governors’ communication department which organized effective public participation forums; I wish to recognize and specially recognize the invaluable contribution of the Chief Officer, Cooperative Development, Trade, Tourism, Industry and Enterprise Development without which we could not have finalized on this CIDP within the stipulated timelines. We further appreciate the contribution of Kirinyaga County assembly led by the speaker, county assembly clerk, the county assembly budget committee and all the 34 Members of County Assembly (MCAs) who gave their input through various forums. Further, we salute the support of County Administrative Officers, Sub-County and Ward Administrators, Faith Based Organizations, Professionals in the county, schools and social hall workers for their support during mobilization of members of the public, provision of venues and various services and materials to hold meetings. Lastly, special appreciation to the entire community members of Kirinyaga County who attended the Public Participation Consultation Forums with respect to the Sessional Paper 2032 (Mountain Cities Blueprint 2032) and the CIDP which were successfully held in each of the four constituencies in the county. We take this opportunity to thank all of you for the resource, material, moral and prayers support. The County Government will strive to create equity for all in terms of allocation of resources, redistribution of wealth; wealth creation and employment opportunities thereby breaching the gap between those in the top of the economic pyramid and those in the bottom of the economic pyramid. Hon. Moses Migwi Maina County Executive Committee Member Finance, Economic Planning Marketing and ICT
xi
ABBREVIATIONS AND ACRONYMS
ABBREVIATIONS
ANC Antenatal Care
ARD Agriculture & Rural Development
BPO Business Process Outsourcing
CA County Assembly
CBEF County Budget and Economic Forum
CBO Community Based Organization
CCC Comprehensive Care Clinics
CCO County Chief Officer
CDF Constituencies Development Fund
CEC County Executive Committee
CIDP County Integrated Development Plan
CKDAP Central Kenya Dry Area Project
CPSB County Public Service Board
DRR Disaster Risk Reduction
DTC Diagnosis Testing & Counseling
ECD Early Childhood Development
FPE Free Primary Education
GDI Gender Development Index
GDP Gross Domestic Product
HCDA Horticulture Crops Development Authority
HH Household
HPI Human Poverty Index
ICT Information Communication Technology
JKUAT Jomo Kenyatta University of Agriculture& Technology
KARI Kenya Agricultural Research Institute
KENAO Kenya National Audit Office
KeRRA Kenya Rural Roads Authority
xii
KPCU Kenya Planters Cooperative Union
KCB Kenya Commercial Bank
KCPE Kenya Certificate of Primary Education
KFS Kenya Forest Service
KKV Kazi Kwa Vijana
KTI Kirinyaga Technical Institute
LATF Local Authority Trust Fund
LAPSSET Lamu Port South Sudan Ethiopia Project
MCA Member of County Assembly
MDGs Millennium Development Goals
MTEF Medium Term Expenditure Framework
NCPB National Cereals & Produce Board
NEMA National Environmental Management Authority
NIB National Irrigation Board
NIMES National Integrated Monitoring & Evaluation System
NGO Non-Governmental Organization
NALEP National Agricultural & Livestock Extension Programme
PEC Poverty Eradication Commission
PELIS Plantation Establishment & Livelihood Improvement Scheme
PFM Public Finance Management Act
PLWHA People Living With HIV & AIDs
PMTCT Prevention of Mother to Child Transmission
PPP Private Public Partnership
RMLF Roads Maintenance Levy Fund
SRC Salaries and Remuneration Commission
VCT Voluntary Counseling & Testing
WEF Women Enterprise Fund
xiii
WRUA Water Resource User Association
YEF Youth Enterprise Fund
YP Youth Polytechnic
14
CONCEPTS AND TERMINOLOGIES Baseline: Baseline is an analysis describing the initial state of an indicator before the start of a project/programme, against which progress can be assessed or comparisons made Programme: A grouping of similar projects and/or services performed by a Ministry or Department to achieve a specific objective; The Programmes must be mapped to strategic objectives. Project: A project is a set of coordinated activities implemented to meet specific objectives within defined time, cost and performance parameters. Projects aimed at achieving a common goal form a programme. Green Economy: The green economy is defined as an economy that aims at reducing environmental risks and ecological scarcities, and that aims for sustainable development without degrading the environment. Indicator: An indicator is a sign of progress /change that result from your project. It measures a change in a situation or condition and confirms progress towards achievement of a specific result. It is used to measure a project impact, outcomes, outputs and inputs that are monitored during project implementation to assess progress Target: A target refers to planned level of an indicator achievement Outcome: Measures the intermediate results generated relative to the objective of the intervention. It describes the actual change in conditions/situation as a result of an intervention output(s) such as changed practices as a result of a programme or project. Output: Immediate result from conducting an activity i.e. goods and services produced Performance indicator: A measurement that evaluates the success of an organization or of a particular activity (such as projects, programs, products and other initiatives) in which it engages. Outcome Indicator: This is a specific, observable, and measurable characteristic or change that will represent achievement of the outcome. Outcome indicators include quantitative and qualitative measures. Examples: Enrolment rates, transition rates, mortality rates etc. Flagship/Transformative Projects: These are projects with high impact in terms of employment creation, increasing county competitiveness, revenue generation etc. They may be derived from the Kenya Vision 2030 (and its MTPs) or the County Transformative Agenda.
15
Sectors: For the purposes of planning, the CADP sectors shall be based on the following MTEF Sectors – Agriculture, Rural and Urban Development (ARUD); Energy, Infrastructure and ICT; General Economic, and Commercial Affairs; Health; Education; Public Administration & International (or inter-government) Relations; Social Protection, Culture and Recreation; and Guidelines for Preparation of County Integrated Development Plans (Revised) 2017 Environmental protection, Water and Natural Resources. County Governments should however incorporate only the sectors relevant to their respective counties. Demographic Dividend: The demographic dividend is the accelerated economic growth that may result from a decline in a country's mortality and fertility and the subsequent change in the age structure of the population. It is evident in Kenya that demographic transition is taking place at both national and county level creating a demographic window of opportunity to harness the demographic dividend. Demographic window is the period when the population structure is such that those aged below 15 years are less than 30% of the total population and those aged 65 years and above are less than 15% of the population. This period is estimated to last for about 40 years during which a county can achieve the fastest economic growth due to the large workforce relative to dependants. This window opens at different times for each county depending on the current population structure and fertility levels. For the demographic window to open fertility levels must continue to decline. The Sustainable Development and Sustainable Development Goals (SDGs) In September 2015 UN member countries adopted the 2030 Agenda for Sustainable Development and its 17 Sustainable Development Goals. As part of implementing the SDGs, the government of Kenya published and launched its Road Map to achieving SDGs. The Road Map envisages a partnership with all stakeholders as well as building capacity for devolved governments to implement the SDGs. The domestication and integration of the SDGs will be imbedded in Medium Term Plans and County Integrated Development Plans. The policies, programmes and projects outlined in the CIDP should integrate and be aligned with the objectives of all of the 17 SGDs which include: Goal 1: End poverty in all its forms everywhere Goal 2: End hunger, achieve food security and improved nutrition and promote sustainable agriculture
16
Goal 3: Ensure healthy lives and promote well-being for all ages Goal 4: Ensure inclusive and equitable quality education and promote lifelong learning opportunities for all Goal 5: Gender equality and empower all women and girls Goal 6: Ensure availability and sustainable management of water and sanitation for all Goal 7: Ensure access to affordable, reliable, sustainable and modern energy for all Goal 8: Promote sustainable economic growth, full and productive employment and decent work for all Goal 9: Build resilient infrastructure, promote inclusive and sustainable industrialization and foster innovation Goal 10: Reduce inequality within and among countries Goal 11: Make cities and human settlements inclusive, safe, resilient and sustainable Guidelines for Preparation of County Integrated Development Plans (Revised) 2017 Goal 12: Ensure sustainable consumption and production patterns Goal 13: Take urgent action to combat climate change and its impacts Goal 14: Conserve and sustainably use the oceans, seas and marine resources for sustainable development Goal 15: Protect, restore and promote sustainable use of terrestrial ecosystems, sustainably manage forests, combat desertification and halt and reverse land degradation and halt biodiversity loss Goal 16:
17
Promote peaceful and inclusive societies for sustainable development, provide access to justice for all and build effective, accountable and inclusive institutions at all levels Goal 17: Strengthen the means of implementation and revitalize the global partnership for sustainable development
The Blue Economy Blue Economy means the use of the sea and its resources for sustainable economic
development. The Blue Economy covers both aquatic and marine spaces including
oceans, seas, coasts, lakes, rivers, and underground water. It encompasses a range of
productive sectors, including fisheries, aquaculture, tourism, transport, shipbuilding
and repair, energy, bio prospecting, bunkering, sport fishing, port services, marine
insurance, freight forwarding and underwater mining and related activities. Kenya is
endowed with rich coastal and maritime resources which has a huge potential for
development of the Blue Economy.
Kenya has great potential in achieving sustainable development through a Blue
Economy approach. Key to achieving the above is ensuring that proper policies and
strategies are put in place for the Blue Economy, adopting the agenda at the highest
level both at the National and County level, and investing in the sector. In addition,
public awareness on Blue Economy must be created, and capacity built to harness
the benefits of the sector. For purposes of this CIDP, the blue economy refers to the
main fishing activities in the county
18
CHAPTER ONE: COUNTY GENERAL INFORMATION
Introduction
This the background information on the socio-economic and infrastructural information
that has a bearing on the development of the county. The chapter provides description of
the county in terms of the location, size, physiographic and natural conditions,
demographic profiles as well as the administrative and political units. In addition, it
provides information on infrastructure and access; land and land use; community
organizations/non-state actors; crop, livestock and fish production; forestry, environment
and climate change; mining; tourism; employment and other sources of income; water and
sanitation; health access and nutrition, education and literacy, trade, energy, housing,
transport and communication, community development and Social Welfare.
1.1 Position and Size of The County Kirinyaga County is located between latitudes 001’ and 00 40’ South and longitudes 370 and
380 East. The county borders Nyeri County to the North West, Murang’a County to the
West and Embu County to the East and South and also boarder small part of Machakos
County. It covers an area of 1,478.1 square kilometers
19
20
21
1.2 Physiographic and Natural Conditions 1.2.1. Physical and Topographic Features
The county lies between 1,158 metres and 5,380 metres above sea level in the South and
at the Peak of Mt. Kenya respectively. Mt. Kenya which lies on the northern side greatly
influences the landscape of the county as well as other topographical features.
The mountain area is characterized by prominent features from the peak, hanging and V-
shaped valleys. The snow melting from the mountain forms the water tower for the rivers
that drain in the county and other areas that lie south and west of the county. The Snow
flows in natural streams that form a radial drainage system and drop to rivers with large
water volumes downstream
1.2.2. Ecological Conditions
The county has three ecological zones; the lowland areas that fall between 1158 metres to
2000 metres above sea level, the midland areas that lie between 2000 metres to 3400
metres above sea level and the highland comprising areas of falling between 3400 metres
to 5380 metres above sea level. The lowland area is characterized by gentle rolling plains
that cover most of Mwea constituency. The midland area includes Ndia, Gichugu and
Kirinyaga Central constituencies. The highland area covers the upper areas of Ndia,
Gichugu and Central constituencies and the whole of the mountain area.
The county is well endowed with a thick, indigenous forest with unique types of trees
covering Mt. Kenya. Mt. Kenya Forest covers 350.7 Km2 and is inhabited by a variety of
wildlife including elephants, buffaloes, monkeys, bushbucks and colorful birds while the
lower parts of the forest zone provide grazing land for livestock. The rich flora and fauna
within the forest coupled with mountain climbing are great potential for tourist activities.
The county has six major rivers namely; Sagana, Nyamindi, Rupingazi, Thiba,
Rwamuthambi and Ragati, all of which drain into the Tana River. These rivers are the
principal source of water in the county. The water from these rivers has been harnessed
through canals to support irrigation at the lower zones of the county especially in Mwea
sub-county. The rivers are also important sources of domestic water through various water
supply schemes. The rapid populating increase is however constraining many of the
schemes since the designs were meant to cater for a smaller population. There is therefore
a dam being constructed in the county at Gichugu Constituency as well as rehabilitation
and expansion of Mwea irrigation scheme which will address some of these problems. The
22
water resources, if optimally harnessed, will boost agricultural production in the county
and contribute to sustained economic development and poverty reduction.
The geology of the county consists of volcanic rocks, which influence formation of
magnificent natural features such as “Ndarasa ya Ngai’ (God’s bridge)” along Nyamindi
River, and the seven spectacular water falls within the county.
1.2.3. Climatic Conditions
The county has a tropical climate and an equatorial rainfall pattern. The climatic condition
is influenced by the county position along the equator and its position on the windward
side of Mt Kenya. The county has two rainy seasons, the long rains which average 2,146
mm and occur between the months of March to May and the short rains which average
1,212 mm and occur between the months of October to November. The amount of rainfall
declines from the high-altitude slopes of Mt. Kenya towards the Semi-arid zones in the
eastern part of Mwea constituency. The temperature ranges from a mean of 8.10C in the
upper zones to 30.30C in the lower zones during the hot season.
1.3 Administrative and Political Units 1.3.1 Administrative Subdivision
The county is divided into five districts currently sub-counties namely; Kirinyaga East,
Kirinyaga West, Mwea East, Mwea West and Kirinyaga Central. These districts are
subdivided further into 12 divisions, 30 locations and 81 sub-locations.
County constituencies and administrative units
DISTRICT/SUBCOUTY AREA(KM2) No. of Divisions
No. of Locations
No. of Sub-locations
Kirinyaga West 211.3 3 8 16 Kirinyaga Central 173.6 3 5 18 Kirinyaga East 229.7 3 10 27 Mwea East 512.8 1 5 16 Mwea West 204 2 2 4 Forest Area 308.2 Total 1435.6 12 30 81
1.4 Political Units The county has four constituencies namely Mwea, Ndia, Kirinyaga Central and Gichugu.
Mwea Constituency comprises of two sub counties namely Mwea East and Mwea West Sub
23
counties, while the other constituencies form Kirinyaga West, Kirinyaga Central and
Kirinyaga East districts respectively.
Kirinyaga County has twenty (20) county assembly wards. Table below shows the
constituency, name of County assembly ward and number of County Assembly wards per
constituency.
CONSTITUENCY NAME NAME OF COUNTY ASSEMBLY WARDS
NUMBER OF COUNTY ASSEMBLY WARDS
Mwea Wamumu, Mutithi, Kangai, Thiba, Nyangati, Tebere, Gathigiriri, Murinduko
8
Gichugu Kabare, Baragwi, Njukiini, Ngariama, Karumandi
5
Ndia Mukure, Kiine, Kariti 3 Kirinyaga Central Mutira, Kanyekiine,
Kerugoya, Inoi 4
24
25
1.5 Demographic Features
1.5.1 Population Size and Composition
2009 (Census)
2017 (Projections)
2019 (Projections) 2021 (Projections) 2023 (Projections)
Age Cohort Male
Female Total Male
Female Total Male Female Total Male Female Total Male Female Total
0-4 29,231
28,762
57,993
32,958
32,429
65,387
33,962
33,417
67,378
34,996
34,434
69,430
36,062
35,483
71,545
9-May
30,735
30,470
61,205
34,654
34,355
69,008
35,709
35,401
71,110
36,796
36,479
73,276
37,917
37,590
75,507
14-Oct
27,977
27,936
55,913
31,544
31,498
63,042
32,505
32,457
64,962
33,495
33,445
66,940
34,515
34,464
68,979
15-19
23,436
21,787
45,223
26,424
24,565
50,989
27,229
25,313
52,542
28,058
26,084
54,142
28,912
26,878
55,791
20-24
23,552
25,768
49,320
26,555
29,053
55,608
27,364
29,938
57,302
28,197
30,850
59,047
29,056
31,789
60,845
25-29
24,737
26,585
51,322
27,891
29,975
57,865
28,740
30,887
59,628
29,616
31,828
61,444
30,517
32,797
63,315
30-34
22,263
22,249
44,512
25,101
25,086
50,187
25,866
25,850
51,716
26,654
26,637
53,291
27,465
27,448
54,913
35-39
18,588
18,471
37,059
20,958
20,826
41,784
21,596
21,460
43,056
22,254
22,114
44,368
22,932
22,787
45,719
40-44
14,793
14,457
29,250
16,679
16,300
32,979
17,187
16,797
33,984
17,710
17,308
35,019
18,250
17,835
36,085
45-49
12,910
12,853
25,763
14,556
14,492
29,048
14,999
14,933
29,932
15,456
15,388
30,844
15,927
15,856
31,783
50-54 8,448 8,661
17,109 9,525 9,765
19,290
9,815
10,063
19,878
10,114
10,369
20,483
10,422
10,685
21,107
55-59 6,716 6,684
13,400 7,572 7,536
15,108
7,803
7,766
15,569
8,041
8,002
16,043
8,285
8,246
16,531
60-64 5,474 6,160
11,634 6,172 6,945
13,117
6,360
7,157
13,517
6,554
7,375
13,928
6,753
7,599
14,353
65-69 3,392 3,943 7,335 3,824 4,446 8,270
3,941
4,581
8,522
4,061
4,721
8,782
4,185
4,864
9,049
70-74 2,950 3,928 6,878 3,326 4,429 7,755
3,427
4,564
7,991
3,532
4,703
8,234
3,639
4,846
8,485
75-79 1,884 2,364 4,248 2,124 2,665 4,790
2,189
2,747
4,935
2,256
2,830
5,086
2,324
2,916
5,241
80+ NS 3,544 6,346 9,890 3,996 7,155
11,151
4,118
7,373
11,491
4,243
7,598
11,840
4,372
7,829
12,201
26
TOTAL
260,630
267,424
528,054
293,860
301,520
595,379
302,809
310,702
613,511
312,031
320,165
632,195
321,534
329,915
651,449
From the Kenya Population and Housing Census 2009 report, the population of the county
stood at 528,054 persons with an annual growth rate of 1.5 percent. The population is
projected to be 613,511 in 2019, 632,195 in 2021 and 651,449 in 2023.
The female population is expected to increase from 267,424 to 329,915 in the year
2023 while male population will increase from 260,630 to 321,534 in the year 2023.
60.78 percent of the population is below the age of 30 years; this requires concerted
efforts to invest in job creation so as to avoid social ills associated with high number
of idle youths such as crime, prostitution and drug abuse. The highest population falls
between the age group 5-9 years followed by those between 0-4 years and10-14 years.
The implication is that pre-primary and primary schools and also health facilities if not
increased and improved will not be able to accommodate this growing population.
County population projections for selected age groups of under 1, 3-5, under 5, 6-13,
and age group (14-17). Other age groups include, the youth population 15-30, female
reproductive age 15-49, the labour force 15-64 and the aged of over 65 years.
Population projection by Age Cohort
Age Group
Census (2009) 2017 Projections 2019 Projections 2021 Projections 2023 Projections
Male Female Total Male Female Total Male Female Total Male Female Total Male Female Total
Under 1 6,065 6,030 12,095 6,838 6,799 13,637 7,047
7,006
14,052
7,261
7,219
14,480
7,482
7,439
14,921
Pre –school (3-5)
18,480 18,298 36,778 20,836 20,631 41,467 21,471
21,259
42,730
22,125
21,907
44,031
22,798
22,574
45,372
Under 5 29,231 28,762 57,993 32,958 32,429 65,387 33,962
33,417
67,378
34,996
34,434
69,430
36,062
35,483
71,545
Primary School Age(6-13)
47,772 47,439 95,211 53,863 53,487 107,350
55,503
55,116
110,619
57,193
56,795
113,988
58,935
58,524
117,460
Secondary School Age (14-17)
42,184 41,274 83,458 47,562 46,536 94,099 49,011
47,954
96,964
50,503
49,414
99,917
52,041
50,919
102,960
Youth Population(15-30)
31,671 33,960 65,631 35,709 38,290 73,999 36,796
39,456
76,252
37,917
40,658
78,575
39,072
41,896
80,968
27
Reproductive age female (15-49)
- 142,170 0
160,296
160,296
-
165,178
165,178
-
170,208
170,208
-
175,392
175,392
Labour force (15-64)
160,917
163,679
324,596
181,433
184,548
365,981
186,959
190,168
377,127
192,653
195,959
388,612
198,520
201,927
400,447
Aged population 65+
11,770 16,581 28,351 13,271 18,695 31,966 13,675
19,264
32,939
14,091
19,851
33,942
14,520
20,456
34,976
Under 1: From the table the population below the age of 1 grew marginally from 12,095
in 2009 to 13,637 in 2017 and will subsequently increase to 14,921 in 2023, thus
pressure on the population to provide for this age group will be minimal. There is
however need to improve on medical services in the region so as to improve maternal
health.
Age group 3-5 (Pre-school): This population is projected to grow from 36,778 in 2009
to 41,467 in 2017 and subsequently to 45372 2023 hence there is need to improve
pre-primary school educational facilities. This will require the county to plan for pre-
school education and better health facilities to cater for this age group.
Age group 6-13 (Primary): This population is projected to grow from 95,211 in 2009
to 107,350 in 2017 and subsequently to 117,460 in 2023. This means that the number
of pupils enrolled in primary school will increase and constraint existing education
facilities. The county should therefore focus on increasing primary education facilities
to reduce congestion in the available facilities.
Age Group 14-17 (Secondary): The secondary age population is expected to increase
from 94,099 in 2017 to 102,960 by 2023. This means increasing the number of
secondary schools as well as the number of youth polytechnics to cater for the training
needs of those students who do not proceed to other tertiary institutions. Sports and
recreation facilities should also be constructed and rehabilitated to cater for this age
group and keep them off drugs, alcohol and crime.
Age group 15-49 (Female Reproductive Age): The female reproductive age was
projected to increase from 142,170 in 2009 to 160,296 in 2017, and the figure is
subsequently expected to increase to 175,392 in 2023.This implies that there is need
28
to increase resources going towards expanding health facilities like hospitals and
health centres as well as improving maternal and child care health services and
nutrition standards.
Age group 15-49 (labour force): Labour force population was projected to go up from
324,596 in 2009 to 365,981 in 2017 and this figure is projected to go up to 400,447 in
2023. The increase in labour force population will provide opportunities for further
investments but the county has to plan on absorption of this excess labour by creating
new and expanding existing employment opportunities.
Aged Population (65+): The population under this category was projected to increase
insignificantly from 28,351 in 2009 to 31,966 in 2017 and is also projected to increase
to 34,076 in 2023. This means that the county will cater for this aged population
through the normal family setting as well as providing the necessary welfare support.
The county has an estimated urban population of 57,024 with 26,928 being male and
30,096 being female. Table below shows population projections of these towns and
urban centers by sex projected up to 2023
Population Projections for Major Urban Areas
Urban centres
Census (2009) Projections (2017) Projections (2019) Projections (2021) Projections (2023)
M F Total M F Total M F Total M F Total M F Total
Kerugoya 7,586 8,783 16,369 8,553 9,903 18,456 8,814 10,204 19,018 9,082 10,515 19,597 9,359 10,835 20,194
Sagana 4,729 5,160 9,889 5,332 5,818 11,150 5,494 5,995 11,489 5,662 6,178 11,839 5,834 6,366 12,200
Wang’uru 8,496 9,130 17,626 9,579 10,294 19,873 9,871 10,608 20,478 10,172 10,931 21,102 10,481 11,263 21,745
Kagio 1,548 1,809 3,357 1,745 2,040 3,785 1,799 2,102 3,900 1,853 2,166 4,019 1,910 2,232 4,141
Kagumo 1,524 1,811 3,335 1,718 2,042 3,760 1,771 2,104 3,875 1,825 2,168 3,993 1,880 2,234 4,114
Total 23,883 26,693 50,576 26,928 30,096 57,024 27,748 31,013 58,761 28,593 31,957 60,550 29,464 32,931 62,395
SOURCE: 2009 KENYA POPULATION AND HOUSING CENSUS.
According to table 3, Kerugoya, Sagana and Wang’uru are the only towns in the County
while Kagio and Kagumo comprise the urban centers. The town with the highest
population is Wang’uru with a population of 19,873; followed by Kerugoya with a
population of 18,456; the least populated town is Sagana with a population of 11,150.
The urban center with the highest population is Kagio with a population of 3785
29
followed closely by Kagumo with a population of 3,760. The population of Wang’uru is
highest because it has a lot of economic activities, mainly rice farming and growth of
horticulture while Kerugoya town had long been the District administrative
headquarters.
Markets and Urban Centres
Kerugoya, Sagana and Wang’uru are the only towns in the county while Kagio and
Kagumo comprise the urban centers. The growth of these towns and urban centers is
largely dependent on the agriculture sub sector. Wang’uru the most populated town in
the county is mostly dependent on rice and horticulture cultivation in the expansive
Mwea irrigation scheme. The second most populated town is Kerugoya and its growth
stems from the fact that it has been the district administrative headquarters making it
the economic hub of the county as most of the financial institutions are located in
Kerugoya. The least populated town is Sagana and it is dependent on mining of sand,
stone and ballast. It is also located on the Nairobi – Nyeri highway offering a ready
market for travelers.
The urban center with the highest population is Kagio followed closely by Kagumo.
Both urban centers derive their growth from the existence of markets that deal with
agriculture. The towns and urban centers are however not well planned and lack basic
sewerage systems and proper solid waste management systems.
1.5.2 Population density and distribution
Generally, there are two types of settlements in the county namely; clustered
settlement and scattered settlement. Clustered settlement patterns are primarily found
around towns and irrigation schemes where those who work in the rice fields have
settled. Scattered settlement patterns are found mostly in the lower zones of the county
where land sizes are large. Ecological and climatic factors influence settlement in upper
zones where land is fertile and receives more rainfall. Another factor that influences
settlement is the type of farming practiced in the upper zone where cash crops such as
tea and coffee attract a high population because residents have a higher preference for
cash crops farming compared to food crops. Another reason for clustered settlement is
30
the growth of towns such as Kerugoya, Sagana, Wang’uru and Kagio where there are
many migrant workers and business people.
There are also marked variations in settlement patterns in the constituencies within
the county. Mwea constituency exhibits two types of settlements. There is a clustered
settlement in Wang’uru town and Kagio urban center and scattered settlement
occupying the lower arid parts of the constituency. Ngariama ranch is also a fast
growing area owing to the government programme of re-settling the landless in the
area. Settlements in Ndia constituency are concentrated in Sagana, Baricho and
Kibirigwi towns and in the upper part of the constituency where coffee and tea are
grown. There is no marked variation in settlement pattern in Gichugu, even though
the upper parts of the constituency are more populated than the lower part.
The population density for the County was projected to 528 people per Km2 in 2017
but expected to increase to 578 people per Km2 in 2023. Table below shows the
projected population distribution and density by constituency, for the period 2009-
2023.
Projected Population Distribution and Density by Constituency
Constituenc
y
Census (2009) Projections (2017) Projections (2019) Projections (2021) Projections (2023)
Populatio
n
Densit
y (Km2)
Populatio
n
Densit
y (Km2)
Populatio
n
Densit
y (Km2)
Populatio
n
Densit
y (Km2)
Populatio
n
Densit
y (Km2)
Ndia 99,515 471 112,203 531 115,620 547 119,141 564 122,769 581
Mwea 190,512 372 214,802 419 221,343 432 228,084 445 235,030 458
Kirinyaga
Central 113,355 653 127,807 736 131,700 759 135,711 782 139,844 806
Gichugu 124,672 543 140,567 612 144,848 631 149,259 650 153,805 670
Total 528,054 468 595,379 528 613,511 542 632,195 560 651,449 578
SOURCE: 2009 KENYA POPULATION AND HOUSING CENSUS.
Table shows that Kirinyaga Central constituency is the most densely populated with 736
people per Km2 in 2017 and as per the projection is expected to increase to 806 people
31
per Km2 in 2023, while, Mwea constituency with a density of 419 in 2017 will have a
density of 458 by 2023.
Table below shows the Projected Population Distribution by Constituency and gender, for
the period 2009-2023.
Population Projections by Constituency
Constituen
cy
Census (2009) Projections (2017) Projections (2019) Projections (2021) Projections (2023)
M F Total M F Total M F Total M F Total M F Total
Ndia 48,323 51,192 99,515 54,484 57,719 112,20
3 56,143 59,477
115,62
0 57,853 61,288
119,14
1 59,615 63,154
122,76
9
Mwea 95,898 94,614 190,51
2
108,12
5
106,67
7
214,80
2
111,41
8
109,92
6
221,34
3
114,81
1
113,27
4
228,08
4
118,30
7
116,72
3
235,03
0
Kirinyaga
Central 55,280 58,075
113,35
5 62,328 65,479
127,80
7 64,226 67,474
131,70
0 66,182 69,528
135,71
1 68,198 71,646
139,84
4
Gichugu 61,129 63,543 124,67
2 68,923 71,645
140,56
7 71,022 73,826
144,84
8 73,185 76,075
149,25
9 75,414 78,392
153,80
5
Total 260,63
0
267,42
4
528,05
4
293,86
0
301,52
0
595,37
9
302,80
9
310,70
2
613,51
1
312,03
1
320,16
5
632,19
5
321,53
4
329,91
5
651,44
9
SOURCE: 2009 KENYA POPULATION AND HOUSING CENSUS
Table above shows that Mwea Constituency is the most populated with a total
population of 214802; followed by Gichugu Constituency with a population of 140,567;
the third most populous constituency is kirinyaga Central with a population of 127,807
and the least populous constituency is Ndia Constituency with a population of
112,203.
1.5.4 Populations of persons with disabilities
People living with disabilities by type, sex and age
Particulars Male Female Total Albinism 13 16 29 Autism 26 12 38 Blind 58 40 98 Cerebral Palsy 22 11 33 Deaf able to talk normally
9 9 18
32
Deaf using sign language
95 91 186
Epilepsy 182 106 288 Hearing 83 69 152 Mental 459 307 766 Physical 1204 900 2104 Visual 137 101 238
Adopted from the Kenya National Survey Report for persons with Disability
1.5.5. Demographic Dividend
Demographic dividend is defined as the accelerated economic growth that a county can
experience as a result of declining fertility levels that occasion a reduction in the
dependency levels and an increase in the proportion of the population in the working
ages (15-64 years). With fewer dependents to support, those in the working ages will
have more savings that can be invested for the economic growth of the county thereby
improving the wellbeing of the county’s residents. However, the attainment of a
demographic dividend is not automatic. As the fertility levels decline, the county needs
to make simultaneous strategic investments in the health, education, economic and
governance sectors. The aim of these investments is to ensure that as the county’s
children and youth get older, they remain healthy, are able to access education and
training opportunities, as they enter the labour force they get income and employment
opportunities, they invest for their life in old age, and they participate fully in
governance matters affecting the county.
Kirinyaga County Demographic Dividend Indicators
Category 2009* 2014 2017 2022 2030 Population Size 527,881 549,356 563,699 588,398 625,157 Population below 15 (%) 33.2 30.0 27.6 24.3 22.9 Population 15-64 (%) 61.5 65.3 67.8 71.1 70.8 Population above 65 (%) 5.3 4.8 4.6 4.5 6.3 Dependency ratio 62.6 53.0 47.5 40.6 41.2 Fertility rate 3.4 2.3 2.3 2.2 2.1
Source: National Council for Population and Development
33
Table above shows the key demographic dividend indicators for Kirinyaga County. In
2017, the population of the county was projected to be 563,699 people, up from
527,881 in 2009. This figure is projected to reach 588,398 and 625,157people in 2022
and 2030 respectively assuming that the county’s fertility will continue declining over
the years to reach 2.1 children per woman by 2030. By the end of the MTP III period
in 2022, the fertility is expected to decline to 2.2 from the average of 2.3 children in
2014, before declining further to 2.1 by 2030. Given this decline in fertility, the
proportion of children below age 15 is expected to decline from 33.2 percent in 2009 to
22.9 percent in 2030. This will result in a corresponding increase in the proportion of
the population in the working ages (15-64 years) from 61.5 percent in 2009 to 71.1
percent in 2022. However, due to large number of person’s individuals getting into the
age of 65 and above, the working age will reduce to 70.8 percent in 2030.
The Kirinyaga County demographic window open in 2015 and is expected to last for
about 40 years. Demographic window is the period when the proportion of a country’s
population aged below 15 years falls below 30 percent of the total population while at
the same time the proportion of those aged 65 years and above is still below 15 percent
of the total population. This is the period when the county can achieve maximum pace
of economic growth as a result of the huge labour force relative to the dependent
population. During this period, the proportion of children below age 15 will be below
30 percent while the proportion of older persons above 65 years will be less than 15
percent.
To be able to reap from this demographic dividend, Kirinyaga will have to refocus on
the development of its young population. Kirinyaga County needs to undertake the
following, among other things, to harness the potential of its youth in preparation for
the demographic dividend window;
Health
• Since the county’s demographic window opened in 2014, there is need to
maintain the average number of children at 2.3 otherwise the county may suffer
from having an elderly population by 2050.
34
• There is need for the county government to channel more funds into the health
sector, to staff and equip health facilities and establish YFCs across the county
so that young people access SRH information and services.
• The illicit brew is still rife in the county. The brewing cartels should be eradicated
and rehabilitation centres should be established to accommodate the addicted
youth and counsel them in order to stop the addiction.
• The health facilities need to be staffed and more employment opportunities in
this sector given to young people who have the skills and knowledge.
Education
• The government needs to ensure that the tertiary institutions in the county are
not all upgraded because the county will lack institutions that would impart
young people with technical skills.
• The gender imbalance should be arrested by taking into consideration the boy-
child, since the girl-child seems to be more empowered.
• Some learning institutions have inadequate teachers, inadequate facilities like
laboratories, chairs, desks, dormitories, libraries, toilets, electricity, computer
laboratories—hence there is need to provide funds to equip the learning
institutions to make learning for the students conducive and the TSC should
employ more teachers in order to improve the quality of education.
• Young people in the county need a lot of guidance and counselling in issues
affecting them. There is need to establish guidance and counselling clubs in the
learning institutions in the county.
Economy
• Some roads were reported to be impassable, making it impossible for farmers to
take their produce to the markets, especially during the rainy season. The county
government ought to improve the infrastructure and get markets for young
people to sell their produce.
35
• There is need to capacity build young people on the interventions the government
has put in place to empower them economically. These funds should be availed
to young people without bottlenecks and on merit. Corruption and nepotism
which was reported to have penetrated all sectors should also be fought and
eradicated so that young people can have a level playing field where there are no
bottlenecks.
• The county government should device ways of economically empowering young
people to reduce the high unemployment rate. For instance, the unemployed
young people could provide services like running market toilets, manning of bus
parks and garbage collection—which should all be run by young people so that
they are empowered economically.
• The county government should adhere to AGPO – an intervention that indicates
that 30 percent of procurement that should be awarded to young people, women
and PWDs. In order to ease the registration of companies for the young people,
the government needs to decentralize registration of companies by introducing a
desk in the Huduma centres so that the young people are able to register
companies and reap the benefits of AGPO.
Governance
• The provincial administration together with the county government should work
together and fight the cartels that manufacture and sell second hand liquor in
the county. Until this is done, this alcoholism menace threatens to wipe out a
whole generation of young people.
• The government should strengthen mechanisms that encourage cohesion in the
community. Young people ought to be capacity built on civic education so that
issues to do with the rule of law are understood and inculcated in young people.
• There is need to involve young people at all levels of project design and
implementation, especially in projects that are suitable for young people.
• The national government should beef up security by employing more security
officers, increasing patrols and establishing more police stations in the county.
36
As shown above, Kiringaga County got in to the demographic window in 2015. It
therefore calls for the right health, education, economic and governance policies are
put in place now and implemented over the coming years so that the county maximizes
on the opportunity.
1.6 Human Development Approach Human Development Indicators
The Human Development Index (HDI) represents a broader definition of wellbeing by
providing a composite measure of three basic dimensions of human development which
are health, education and income. HDI is derived from the life expectancy index,
education index and GDP index of the county. Table 9 below shows a comparison of
the county and national indicators
Table 9: Human Development Indicators Indicators County level National level
GDI 0.5132 0.4924
HPI 25.2% 29.1%
HDI 0.589 0.509
SOURCE: KENYA NATIONAL HUMAN DEVELOPMENT REPORT UNDP KENYA, 2009
The Gender Development Index (GDI) in the county stands at 0.5132 compared to the
national GDI of 0.4924 showing that the county has a better GDI than the national
level, Human Poverty Index (HPI) in the county is 25.2 percent compared to the national
HPI of 29.1 percent showing that the county HPI is better than the national HPI. HDI
in the county stands at 0.589 compared to the national HDI of 0.509, which indicates
the county, is performing better in human development compared to the country as a
whole.
37
1.7 Infrastructure and Access Road, Rail Network and Airstrips
The total road network of in the county is 2,320 Km.
ROAD ID LINKS LENGTH ABC Trunk roads 343 DE Sub-county feeder roads 279.6 FG Market link roads 1603.3 OTHERS Town ship roads 94.1 TOTAL 2,320
The county has an established road network with 7 major tarmac roads passing
through it namely Makutano – Embu road, Kutus – Karatina road, Baricho road,
Kiburu road, Kutus – Sagana road, Kutus – Kianyaga road and Kabare – Kimunye road.
The gravel and earth surfaced roads in most areas are however not motorable during
the rainy season due to poor maintenance, poor drainage and unstable soils.
There are 5 km of railway line and one railway station in the county located in Ndia
Constituency but currently not in use. There is one airstrip located in Mwea
constituency but is greatly underutilized.
Posts and Telecommunications
The mobile phone coverage stands at 99 percent while the number of fixed lines stands
at 693 units. There are 5 sub- post offices and 25 cyber-cafes. There is also an increase
in the usage of computers and internet in government offices, private businesses and
homes due to availability portable modems and affordability of computers and laptops.
Five (5) private courier services operate in the county most of which are linked to the
Public Service Vehicles (PSV). The courier services deliver parcels to and from major
towns around the country and include Kukena travellers Sacco, 4NTE Sacco, 2NK
Sacco, Karombu Sacco, Emuki Sacco, Mt. Kenya sacco, Supreme sacco, G4S courier
services and Wells- fargo courier services.
Energy Access
All the major towns and urban centres in the county such as Kerugoya, Sagana,
Wang’uru, Kianyaga, Kimunye, Kagio, Kutus,and Kagumo are connected with
38
electricity, however the major source of energy in the county is firewood which is used
by 105,756 households followed by charcoal and gas used by 59,579 households and
28,987 households respectively. There are only 11,652 rural homes with electricity and
40 trading centres are not connected to the national grid.
Housing
The classification of housing is based on the type of wall, and building materials used.
According to the Kenya Population and Housing Census 2009, there were 53,073
houses with wood walled material, 37,396 stone walled houses; 28,517 Mud/wood
walled houses, 25,880 Brick/block walled houses. The most common floor material
used in the houses is Earth 92,239, Cement- 60,133, wood 735, and tiles 680.
1.8 Land and Land Use
Individual people own most of the land in the upper parts of the county (Gichugu,
Kirinyaga Central and Ndia Constituencies) while in the lower parts (Mwea
Constituency); National Irrigation Board (NIB) owns most of the land. There is one
settlement scheme located in Mwea Constituency known as South Ngariama Ranch
where the community without land was settled in 2007.
Mean Holding Size
There are 154,220 households and the total land mass is 1478.1 ha giving a mean land
holding size of 0.0958 ha/HH. In the lower regions of the county which comprise Mwea
Constituency, the average land holdings are larger while they are smaller in the central
and upper regions of Gichugu, Ndia and Kirinyaga Central Constituencies.
Percentage of land with title deeds
While 67 percent of farmers in the county have title deeds, 23 percent of the farmers
especially in the lower zones of Mwea Constituency are farming on the land owned by
National Irrigation Board.
Incidence of landlessness
This is not a major issue in the County. Most of the land in the upper parts of the
county is ancestral land which has been passed down from one generation to the next
39
over past years, therefore there are no major conflicts as most of the land is inherited.
Most of the lower parts of the county comprising Mwea Constituency most of the land
is owned by NIB and farmers lease the land which is under irrigation.
1.9. Employment and Other Sources of Income Wage earners
The number of wage earners in the county stands at 22,828 persons, the majority of these
earn their living from the agricultural and construction sectors. Wage employment contributes
about 7 percent to household income in the county.
Self-employed
Total rural self-employment is 49,200 persons and sectoral contribution to household income
from self-employment is 10 percent. Urban self-employment is 39,365 persons and has a
sectoral contribution to household income of 8 percent.
Labour force
The total labour force in the county currently stands at 338,229 persons comprising of 167,676
male and 170,554 female, this comprises 61.5 percent of the total population. The number of
people employed by agriculture stands at 193,257 while those in wage employment are 22,828.
The urban self-employed are 39,365.
Unemployment levels
The number of unemployed people in the county stands at 67,003 persons with 32,951 being
male and 34,052 being female, this represents 19.8 percent of the total labour force who are
mostly youth.
1.10 Irrigation Infrastructure and Schemes Most irrigation schemes practiced in Kirinyaga county are; Furrow, Basin and Sprinkler
In Mwea subcounty, they use Furrow and basin irrigation scheme/ flooding of water in rice
paddies, while in Kirinyaga East they use furrow and few traces of sprinkler. Kirinyaga West
and Central mostly use sprinkler irrigation.
Crops grown under irrigation in Kirinyaga County include; Sweet potatoes, French beans,
bananas, tomatoes, onions, rice. Also, currently in Mwea, East and West Arabica flowers are
grown.
40
Rivers that facilitate irrigation are, Thiba, Nyamindi, Rwamuthambi, Ragati and Tana
1.11 Crop, Livestock and Fish Production Agriculture is the most important activity in the county with 87 percent of the total
population deriving their livelihood from the sector and accounting for 72 percent of
household income.
Main crops produced
The type of crops grown is influenced by the various ecological zones. Main crops
include rice which is grown in paddies in the lower zones and tea which is grown in
the upper parts of the county. Coffee is also a major crop grown in the upper and
middle zones. Other major crops grown include bananas, tomatoes, beans, mangoes,
maize and other horticultural crops.
Acreage under food crops and cash crops
The total arable land in the county stands at area 116,980 Ha which represent 79
percent of total area. The total land under food crop production is currently 50,864 Ha
and 31,244 Ha under cash crop production which shows that only 70 percent of the
arable land is utilized in food production.
Average farm sizes
The average farm size for large scale farms is 5.2 Ha and 1 Ha for small scale farms.
This is likely to change in future as the population increases and land is fragmented
for inheritance.
Main storage facilities
Most farmers have small storage facilities in their homes for storage of dry grain
products. However, there are 2 National Cereals and Produce Board (NCPB) silos
located in Ndia Constituency, 2 Horticultural Crops Development Authority (HCDA)
cold storage facilities located at Ndia and Mwea Constituencies, 1 National Irrigation
Board (NIB) store in Mwea Constituency and 1 Kenya Planters Cooperative Union
(KPCU) store located in Ndia. Most of these storage facilities are however underutilized
due to large transport costs incurred by farmers and poor promotion about the
existence of these facilities.
41
Main Livestock breed
There are 762,682 Poultry in the county comprising of 680,343 indigenous chicken,
55,578 Layers; 20,439 broilers and 5,162 ducks. Cattle total which 98,899 and
comprise 69,183 dairy cattle and 29,716 zebu cattle. The zebu cattle are mostly bulls’
used for cart pulling as well as in tilling the land. These are mostly found in the upper
and middle parts of the county. Goats total 73,978 where 48,960 are indigenous goats
and are 11,068 dairy goats; the total number of sheep is 13,950. Other livestock bred
are bees with a total of 18,199 beehives in the county and rabbits with a total number
of 39,491 being bred in the county.
1.12 Mineral Resources Ongoing activities
The mining activities carried out in the county are ballast mining which yields about
456,000 tonnes yearly and sand mining yielding about 294,000 tonnes annually. All
mining activities are concentrated at Sagana area.
1.13 Tourism and Wildlife
Main tourist attractions, National Parks/Reserves
Mt Kenya forest and Mt. Kenya National park located in the upper parts of the county
boasts of thick indigenous forests with a lot of wildlife, and cottages providing a serene
environment for both domestic and foreign tourists.
Sagana white water rafting is another tourist attraction offering visitors with a chance
to learn canoe rafting as a sport. Other tourist attractions are Daraja ya Mungu (“God’s
Bridge”) and numerous waterfalls located in the upper parts of the county. Although
the county is well endowed with tourist attractions, they are underutilized due to poor
marketing, insufficient hotel capacities and poor transport network.
Main wildlife
Mt. Kenya National park is a habitat to a variety of birds, elephants, buffaloes, hippos,
monkeys, bushbucks, crocodiles and snakes.
42
Tourist class hotels/restaurants
There is 3 three star hotel, 3 two star hotels, 4 one star hotel, 12 unclassified hotels
and 348 bars and restaurants located in different parts of the county.
1.14 Industry and Trade There are 16 industries located in Kirinyaga County which specialize mostly in
agricultural based products. There are 5 tea factories (Thumaita tea factory, Kimunye
tea factory, Kangaita tea factory, Mununga tea factory and Thima tea factory), 1 coffee
miller (KPCU), 2 maize millers (Joymax millers and Centur millers), 7 major rice millers
(Mwea rice mills, MRGM , Tai rice millers, Victory rice millers, Top grade rice millers,
Nice rice millers, Boma rice millers). There is also John Kaburo animal feeds in Kangai
ward. There are 22 jua kali associations around the county and 1,270 jua kali artisans.
There is high industry potential especially on value addition and agro-processing and
tinning industries considering the high production of tomatoes, sugarcane, mangoes,
watermelons, bananas and green grams.
1.15 The Blue Economy Main fishing activities
Aquaculture has recently emerged as a major agricultural activity in the county with a
total of 1,281 fishponds spread throughout the county. Most of the public primary and
secondary schools in the county have also embraced fish farming with the aim of
enhancing their income. Fishing is also carried out at Tana River mostly in Sagana
area. There are 200 fishermen who mostly sell the fish by the roadside and this makes
it difficult to establish the amount of fish that is sold. The fishermen mostly use hooks
while fishing and the main species of fish found in the river are mudfish, tilapia and
catfish.
1.16 Forestry, Agro- Forestry and Value Addition Main Forest Types and size of forests
The main types of forests in the county are indigenous natural forests which cover an
area of 35,876 Ha, plantations which cover 1,540 Ha, bamboo forests which cover
7,500 Ha, bush land/grassland forests that cover 6,956 Ha and tea zone forests which
cover 290 Ha.
43
Main Forest products, gazetted and un-gazetted forests
There are 7 forests in Kirinyaga County with 5 gazetted forests namely, Mt. Kenya
forest covering 35,043 Ha; Njukiini west forest covering an area of 570.2 Ha;
Murinduku forest covering an area of 194.2 Ha; Kariani forest covering an area of 24.28
Ha and Kamuruana forest with an area of 23 Ha. There are also 2 non gazetted forests
namely Karimandu forest covering an area of 12 Ha and Kerugoya urban forest
covering an area of 10 Ha. The main products from these forests are timber, poles, fuel
wood, fruits and honey.
Promotion of Agro-forestry and Green Economy.
a) Income Generating Activities including farm forestry
A number of farmers and institutions have been able to establish woodlots in their
farms. These are mainly for commercial, which are mainly timber and logs and they
sell to traders who mostly target neighboring counties.
b) Protection of water catchment areas.
There has been rehabilitation of degraded catchment areas at Kangaita, Castle Lodge
and Kathandeini forest stations while river line tree planting is ongoing. This has been
jointly done by Kenya Forest Service (KFS) and youth departments.
c) Prevention of soil erosion
Degraded sites in farmlands have been implemented, steep slopes in river banks have
continuously been planted with indigenous trees by KFS, youth and Agriculture
departments.
d) Provision of wood fuel and generation of energy for industries
44
Tea factories are sometime supplied with Eucalyptus fuel wood from all the forest
stations through contractors. There is also one micro – hydropower station namely
Thiba micro – hydropower station which generates electricity for the community and
the industries located in the area.
e) Improvement of Soil fertility by growing fertilizer trees
Farmers have embraced the practice of planting Agro forestry tree species like calliadra,
lecaena, casuarinas. These trees are nitrogen fixing and hence fertilize the soil. Some
of these trees are used to reclaim degraded soils.
f) Growing of fruit trees for improved nutrition.
Nearly all the households grow fruits trees like mangoes and avocadoes. Some have
fruit orchards on their farms. These groups comprise of the youths and women and
are supported by NGOs, Youth Enterprise Fund, Women Enterprise Fund and Njaa
Marufuku Kenya programmes.
g) Beautification activities in towns, highways, schools, homes and other public
places
This is another activity where ornamental trees are planted in the specified sites for
beauty, roadside tree planting, and avenue planting. Some of the towns which have
been beautified are Kerugoya, Kagumo, Wang’uru, Kianyaga and Baricho. Several
government departments have been involved in this activity include youth, forestry,
education as well as CDF.
h) Animal feeds production ventures
In the county, trees like lecaena and calliadra are used for production of fodder for
livestock. KFS is promoting growing of the same to provide food for animals. These tree
species are important during the dry spell.
i) Growing and processing for medicinal purposes/value plants and products
In the county, there has been promotion of high value indigenous trees on private farms
like Prunus Africana (Muiri), Kigelia Africana (Muratina) and Fagara macrophylla
45
(Munganga). There has also been promotion of herbs from gazetted forests which are
used by herbal doctors to cure various diseases and elements.
1.17 Financial Institutions There are 21 bank branches belonging to all major commercial banks in the county
which include Equity bank, KCB, Co-operative bank, Barclays bank, Family bank and
K-rep bank, Faulu bank. in addition, there are 8 Micro-finance institutions, 18
Building societies and 5 insurance company branches. There is also a growing number
of agency banking with a registered number of 58 agents.
1.18 Environment and Climate Change Major contributors to environmental degradation in the county
The major contributors to the degradation of the environment are deforestation, poor
solid waste disposal, cultivation along river banks by the community, and pollution
from industries and farmers. Water waste from residential areas and car washes
located on river banks has also greatly contributed to water pollution.
Due to a poor solid waste management system in the county, there is rampant dumping
especially in the urban centres. Illegal logging has also been a major challenge and a
cause of environmental degradation. Noise pollution associated with exhibition and
road shows have greatly contributes to noise pollution and lastly air pollution mostly
caused by burning of old tyres and motor vehicle emission all of which have contributed
to air pollution.
Effects of environmental degradation
Deforestation has caused unpredictable weather conditions which adversely affect
farming due to lack of proper rainfall patterns. Disease prevalence has also increased
due to water and air pollution leading to increased costs of treatment and loss of labour
force.
Climate change and its effects in the county
46
Climate variability and extremes is emerging as a major threat to sustainable
development of the county. There has been rise in temperatures which have resulted
in increase of malaria, erratic rainfall resulting to drying up of some rivers and also
flooding especially on the lower parts of Mwea. The county is also already experiencing
the effects of the recession of the glaciers on Mt Kenya which is a water tower in the
county. The most affected sectors are agriculture and health.
Climate change mitigation measures and adaptation strategies
In addressing climate change, the county is planting more trees especially along the
rivers, roads, public places and schools. Other actions being undertaken are
distributing treated nets to malaria prone areas, constructing water pans which will
reduce withdrawal of water from rivers and public education on awareness of
environmental friendly technologies and their transfer to the community. Also there
has been promotion of drought resistant crops.
1.19 Water and Sanitation Water resources and quality
There are six main rivers in the county namely: Sagana, Nyamindi, Rupingazi, Thiba,
Rwamuthambi and Ragati, which ultimately drain into the Tana River. These rivers are
the principal source of water. Other resources are unprotected springs which are 29 in
number, 12 water pans, 3 dams, and 208 shallow wells, boreholes & protected springs.
Water quality in the county is good in the upper parts where there are numerous
springs, but in the lower parts of Mwea Constituency where tha main source are rivers,
Thiba and Nyamindi, the water is contaminated due to use of fertilizers and pesticides
in irrigation.
Water supply schemes
The water in the rivers has been harnessed through canals to provide water to the
lower zones of the district especially in Mwea for irrigation purposes. Domestic water
47
has also been tapped from these rivers using piped schemes. The piped schemes supply
51,515 households.
Water sources
There are 12 established Water Resource User Associations (WRUA) in the county along
various sub-catchments. Water access in the county is shown in Table 10.
Table 10 below shows the mean time taken to nearest water point by HHs
Table 10: Time Taken to Nearest Water point by HHs
Time taken to fetch drinking water (Mins) Percentage of HHs (%)
0 9.6
1-4 12.7
5-14 17.6
15-29 55.9
30-59 3.2
60+ 1
SOURCE: 2009 KENYA POPULATION AND HOUSING CENSUS.
The average time taken to the nearest water point is 26 minutes.
Sanitation
There is no sewerage system in the entire county and the households with flush system
construct their own septic tanks. About 90 percent of the households use a pit latrine,
while 6.2 percent use VIP latrines. The proportion with Flush toilets is 3.3 percent,
Bucket 0.2 percent while 0.4 percent of the population has no form of sanitation.
1.20 Health Access and Nutrition Health Access
There are 202 health facilities in the county with a total bed capacity of 764 comprising
of 109 public health institutions, 39 mission/NGO institutions the largest one being
Mwea Mission hospital and 54 private clinics. There are 3 level four facilities located in
Kirinyaga Central, Gichugu and Mwea Constituencies in addition there is one private
hospital namely Mt. Kenya hospital located in Kerugoya town. In addition to these,
48
there are 10 level three facilities, 45 level two facilities and 51 level one facilities which
are spread all over the county. The doctor population ratio is 1:36,339 and the average
distance to the nearest health facility is 5 Km.
Morbidity
The most prevalent diseases in the county are; Flu at 38 percent and respiratory
diseases at 36.9 percent others are Malaria/fever at 21.6 percent, diarrhoea at 6
percent, and stomach ache at 2 percent. Malaria is however on an upward trend mostly
due to stagnant water in the rice fields at Mwea irrigation scheme.
Nutritional Status
Malnutrition is not a big concern in the county. The proportions of stunting,
underweight and acute malnutrition is below 2.5 percent among children below 5
years. This is attributed to the fact that most mothers’ breastfeed their children during
their first year coupled with constant supply of food.
Immunization Coverage
Child vaccination in the county is 98.3 percent while Antenatal Care (ANC) is 42
percent. This is higher than the national figure which stands at 78 percent and 36
percent respectively. The vaccines that are administered free of charge by government
healthcare centres include polio, tuberculosis, measles, diphtheria, meningitis,
pertussis, tetanus and typhoid diseases.
Access to family planning services
Access to contraceptives is high since most of the services are offered free of charge in
most government owned institutions. Contraceptive acceptance in the county is 66.3
percent. This high level of access can be attributed to free family planning services
offered at public health facilities and high level of awareness. Condoms, pills and coils
are the most prevalent contraceptives.
1.21 Education Skills, Literacy and Infrastructure Pre-school Education
49
The number of ECD centres is 348 with a total of 358 teachers and enrolment of 24,672
students. The teacher pupil ratio is 1: 41.and gross enrolment rate is 62 percent.
Primary Education
The number of Primary schools in the county is 326 with a 2,916 teachers and total
enrolment of 111,400 students. These figures give a teacher pupil ratio of 1: 38. The
gross enrolment rate in the county is 117 percent due to the introduction of Free
Primary Education programme (FPE). Kirinyaga County has been performing very well
nationally in KCPE and was ranked first for the last two consecutive years (2011 and
2012).
Literacy
The literacy level defined as those who can read and write is 78.4 percent. There
however exists a disparity between male and female with literacy levels of 81 percent
and 75 percent respectively.
Secondary Education
Secondary schools in the county total 143 with a total of 1,329 teachers and total
enrolment of 39,988 students. The teacher: pupil ratio is 1: 29 and gross enrolment
rate is 47.91 percent.
Tertiary Education
In the year 2012, Kirinyaga Technical Institute (KTI) was converted into a constituent
university college of JKUAT and renamed Kirinyaga University College which on date
7th October, 2016 was granted charter by HE Uhuru Kenyatta the president of the
republican of Kenya with 13 academic degree programmes and has since increased the
number of academic degree programmes to 17 hence giving the County the first public
university. The county also has one private university namely TESCO College. There
are 2 public colleges (AHITI Ndomba and Kamweti ATC), 11 Youth polytechnics (YP)
(Kimweas YP, Kaithai YP, Kiambatha YP, Kiambwe YP, Kibingoti YP, Kiamikuyu YP,
50
Mucie wa Urata YP, Nyangati YP, Kamigua YP, Mutitu YP and Kiambatha YP), 5
accredited colleges and 8 private non-accredited colleges.
Education Institutions
a) ECDE Sector
Currently Kirinyaga County has 198 public ECDE centres manned by 447 ECDE
teachers under contract. The ECDE enrolment as at May2017 was 15,851. This implies
the teacher child ratio stand at 1:36. The ECDE centres are still allocated within the
public primary schools except for five (5) which are standalone ECDE centres and
feeder schools to nearby primary schools. The transition rate has improved from
14,834 in 2013 to 15,851in 2017.
b) DVET Sector
The education sector, as stipulated in the constitution 2010, (Fourth Schedule),
constitutes village polytechnics, home craft centres, ECDE centres, and Childcare
centre. The Kirinyaga DVET subsector has a total of 105 instructors constituting of 10
home craft instructors and 95 polytechnic instructors, and 12 principals. The current
enrolment is at 752 students in the year 2017.The instructor trainee ratio currently
stands at 1:6.
1.22 Sports, Culture and Creative Arts Museum
Kirinyaga County has only one Museum which is a church based. It was initiated and
managed by Kabare Bible School though currently, not in function it was abandoned.
Heritage and Cultural sites
There are several Heritage and cultural sites located in various wards within the
county. These sites attract tourists to visit the county;
Some of these sites are
• Kirinyaga Mass Grave in Kerugoya
• Muringa wa Giacai in Kanyekiini ward
51
• ‘Darasa ya Ngai’(Gods bridge) in Murinduko ward. Around this place there are
also caves where Maumau used to hide during the war
• Munyu wa Ngungu and Ngungu fall in Kabare ward
• Initial Kabare church with its initial bell tower on top which was built by
missionaries in Kabare ward
• Munyu wa KAbonga in Kabare ward
• Castle forest lodge in Kabare ward
• A remnant cell of Karaba prison and a mass grave site in Wamumu ward
• Old structures within Wamumu rehabilitation school
• Sagana old bridge in Kariti ward
• Mugumo wa Kiini in Kiini ward
• General Kassan Njogu stadium in Kianyaga baragwi ward
• Munyu wa Matiiru along Nyamindi river
• Shrine area at Kadongu
Talent Academies
Kirinyaga County Talent Academy is under construction at Thanju, Kariti ward in
Kirinyaga West sub county
Sports facilities
Kirinyaga county has 3 main stadia, one located in Mwea sub county, the other at
Kianyaga in Kirinyaga East sub county and the last one in Kerugoya, Kirinyaga
Central.
Libraries/information documentation centers/ citizen service centres
Kirinyaga County is in the process of implementing a documentation centre
1.23 Community Organization/Non State Actors Cooperative societies
52
There are 119 registered cooperative societies distributed among the sectors as follows:
Name of Cooperative
Active cooperatives
Dormant cooperative
Membership Turn Over
1 Coffee 16 16 0 60023 2,548,720,786 2 Housing 17 15 2 29832 31,587,168 3 Saccos 62 55 7 537471 43,027,355 4 Dairy 4 4 0 6617 92,440,224 5 Multipurpose 3 2 1 3149 6 Irrigation 10 10 0 1276 601,328,019 7 Union 1 1 0 21 8 Others 6 6 5 0 365967 Total 119 109 15 638,389 3,317,469,519
Non-governmental organizations (NGOs)
As at 2012, the number of registered NGO’s stood at 603. These organizations mostly
implement activities related to youth, women and children empowerment; promotion
of agricultural production; advocacy on research and education on property rights;
campaign against tribalism; poverty eradication and environmental management. The
distribution of NGOs is all over the county but with a larger concentration in Kirinyaga
Central and Mwea Constituencies where there are higher incidences of poverty and the
population is high.
Self Help, Women and Youth Groups
There are 4,763 registered self-help groups in the county, 1,345 of which are women
groups and 1,164 are youth groups. Most of the groups are involved in agricultural
activities and are funded by both government and donors.
1.24 Security, Law And Order Number of police stations and posts by sub county
Kirinyaga county has 6 police stations located in all sub counties; there is Kerugoya,
Kianyaga, wang’uru, Kagio, Baricho and Sagana police stations.
Each police station has its police posts, like we have Gatwe and Kabonge police posts
which are under Kerugoya police station.
53
Types, trends and crime prone areas
Most prosecuted crimes in Kirinyaga include; Assault, house breaking, rape,
defilement, robbery though few cases, drunk and disorderly, brewing illicit brew
without license and traffic offences
Types and number of courts
Kirinyaga county has only 1 high court located in Kerugoya. Other courts include
Magistrate, Environment Land courts and Children’s magistrate court.
Kerugoya has 3 magistrate courts, 1 Environment Land Court and 1 Children’s court.
Other courts based in Baricho, Wang’uru and Kianyaga has 2 magistrate courts each.
Prisons and probation services
Kirinyaga county has 2 prisons; Kerugoya prisons in Kirinyaga central and Gathigiriri
prisons in Mwea East sub county. Probation office is in Kerugoya.
Number of public prosecution offices
There are 4 public prosecution offices located in Central, East West and in Mwea East.
Number of prosecutions over the years
On average there are 500 cases prosecuted in one year
Community policing activities
Currently Kirinyaga county has only implemented ‘Nyumba Kumi’ Initiative
Immigration facilities
Kirinyaga county has no Immigration services. People tend to travel to Nyeri in case
one is need of such service which now becomes a problem because of the distance.
54
55
CHAPTER TWO: LINKAGES WITH VISION 2030 AND OTHER PLANS
2. Introduction
This chapter provides the linkages between the Sessional Paper 2032 – Mountain Cities Blueprint 2032, County Integrated Development Plan (CIDP), Kenya Vision 2030, Medium Term Plans (MTP), international commitments made by government such as Millennium Development Goals (MDG’s) and the Constitution of Kenya, 2010, and how they apply to the county. 2.1. Linkages between the Sessional Paper 2032 – Mountain Cities Blueprint 2032 with the County Integrated Development Plan and County Annual Development Plans
The Mountain Cities Blueprint 2032 proposes to brand each constituency as a city with a specific identity. Gichugu Constituency is branded as the Resort City, Kirinyaga Central is branded as the Health and Wellness City, Ndia Constituency is branded as the Organic City while Mwea Constituency is branded as the Green Industrial City. The Mountain Cities Blueprint 2032 identifies each city as the dwelling and foundation of generations, past, present and future. The Blueprint recognizes the ability of every city to identify and define its unique problems through a process of critical thinking and analysis of its own situation as such a city is able to identify the opportunity for adaptive leadership and creative collective action. This approach focuses on restoring the authority and the mind of God over the affairs and relationship of human kind. Mountain regulations are determined by the application of the wisdom established through the power of neighbourhood and partnership. Its control mechanisms are built on ‘creativity, seasons, and partnership' as opposed to competition between Cities. The application of the Mountain Cities Blueprint on relations between Cities is therefore founded on adaptive leadership. This approach ensures that leadership is not about charisma, strength and experience. In this way, leadership becomes about creating the opportunity for boldness to emerge as a facilitator of risky situations that are of deep importance and concern within the community. This engenders a continuous and collective action process whose outcome is strong citizenship. In addition to the foregoing, the following seven principles guide the citizens of the county under the Mountain Cities Blueprint are, i) resilience; ii) knowledgeable; iii) problem solvers; iv) responsible v) hospitable; vi) stewards; vii) just. The identification of projects and programmes in the Mountain Cities Blueprint 2032 is not only informed by public participation, but they are also informed by the national development agenda
56
as envisaged in Vision 2030. In essence the projects and programmes are complementary and synergize on the projects and programmes identified under Vision 2030. Since the County Integrated Development Plan is informed by the Mountain Cities Blueprint 2032, the development of the CIDP upholds the principles envisaged in the Mountain Cities Blueprint 2032. In addition, CIDP incorporates the projects and programmes identified under the Mountain Cities Blueprint 2032 as such ensuring linkage between the two. 2.2 Linkages between the County Integrated Development Plan, Vision 2030 and the Medium Term Plans
Sessional Paper Number 10 of 2012 on Kenya Vision 2030 is the National Policy Economic Blueprint that entrenches Kenya Vision 2030 as the long term development strategy for Kenya. The Kenya Vision 2030 aims to transform Kenya into a modern, globally competitive, middle income country providing a high quality of life to all its citizens. Kenya Vision 2030 is a product of highly participatory, consultative and inclusive stakeholders process conducted throughout the country and in all sectors of the economy. The Vision is anchored on three key pillars: economic; social; and political. The Economic Pillar aims to achieve an average Gross Domestic Product (GDP) growth rate of 10 percent per annum and sustain the same till 2030 in order to generate more resources to reinvigorate the economy to meet its envisaged goals and aspirations. The key sectors in this pillar include: tourism, agriculture and livestock, manufacturing, wholesale and retail trade, Business Process Outsourcing (BPO) and financial services. A seventh sector, oil and mineral resources, has now been added taking cognizance of the recent developments. The Social Pillar seeks to build a just and cohesive society with social equity in a clean and secure environment. The main sectors under this pillar include education and training, health, water and irrigation, environment, housing and urbanization, gender, sports, youth and culture. The Political Pillar aims at realizing a democratic political system founded on issue based politics that respect the rule of law, and protects the fundamental rights and freedoms of every individual in the society.
57
The three pillars are anchored on a number of foundations, which serve as enablers that create an environment that is geared towards the realization of Vision 2030. These include: macroeconomic stability; continuity in governance reforms; enhanced equity and wealth creation opportunities for the poor; infrastructure; energy; Science, Technology and Innovation; Land Reforms; Human Resource Development; Security and Public Sector Reforms. An additional enabler, National Values and Ethics, has been included following the passing of the Constitution of Kenya 2010. The Kenya Vision 2030 is phased to be implemented in successive five year Medium Term Plans. The first plan covered the period 2008-2012. The Medium Term Plan (MTP 2013-17) is the second in a series of successive 5-year plans under which the Kenya Vision 2030 is to be implemented. The Third Medium Plan (MTP 2018 -2022) builds upon gains made and lessons learnt in implementing both the 1st MTP and the 2nd MTP. It seeks to implement the flagship projects identified under Vision 2030 over the five year period together with incomplete flagship and other projects and programmes in the previous Medium Term plans. It will also take due cognizance of the devolved structure of government following promulgation of the Constitution of Kenya 2010 and recent discovery of oil and mineral resources. The Third MTP will endeavor to move the economy towards a high growth trajectory to achieve 10 percent economic growth rate target by the end of the Plan period. It will prioritize policies, programmes and projects which generate broad based inclusive economic growth, as well as faster job creation, reduction of poverty and inequality, take into account climate change impacts, and meeting the 17 Sustainable Development Goals (SDGs) and the goals of African Union Agenda 2063. The broad key priority areas that were the focus of the Second MTP include: employment creation; development of human resource through expansion and improvement in quality education, health and other social services; reducing the dependence of the economy on rain fed agriculture through expansion of irrigation; higher investment in alternative and green sources of energy; improving the economy‘s competitiveness through increased investment and modernization of infrastructure; increasing the ratio of saving, investment and exports to GDP; implementation of key Kenya Vision 2030 Flagship projects including development of LAPSSET Corridor; improving national security; promoting national values and ethics; and continue implementing the Constitution including devolution. It will target not only at increasing the level of investment but also completing the incomplete projects under the 2nd MTP, enhancing productivity of investment, as well as raising productivity in all sectors of the economy.
58
The broad key priority areas that have been highlighted to be the focus of the Third MTP include: completing the programmes and projects initiated during the Second MTP; including policies, programmes and projects aimed at meeting the Sustainable Development Goals (SDG) targets; outlining strategies to increase domestic savings and investment (including FDI); increasing the share of manufacturing and industrial sectors and increasing the share of exports to GDP; development of the Micro Small and Medium Enterprises (MSME) sector of Kenya’s economy and outlining measures to further support the sector’s growth; development of infrastructure and the enabling environment to develop the country’s oil and gas other mineral resources sector; development of the maritime sector and the Blue Economy utilizing our marine and fisheries resources in the 230,000 km square of Kenya’s Exclusive Economic Zone in the Indian Ocean as well as in international territorial waters; implementing the Vision 2030 flagship project on irrigating 1.3 million acres of land, rejuvenation of the agricultural extension and advisory services, value addition of agricultural products, expanding existing and creating new markets, regional integration, improving competitiveness, plan for relevant and quality education and training to meet the country manpower needs and skills development, focus on community-based approaches to improve access to essential services including achieving Universal Health Coverage, focus on policies and measures to build domestic capacity and capabilities especially in engineering and construction through local and overseas training and cooperation and joint ventures with leading foreign construction and technology firms; incorporation of plans and strategies to progressively achieve universal access to water and sanitation; addressing issues related to pesticides and heavy metal contamination for safe production of food and animal feeds; development of strategies to combat harmful emissions and pollution from vehicles and industrial activities; mainstreaming of productivity improvement in public and private sectors with a view to increasing the country’s competitiveness; prevention of corruption and improvement of governance and accountability; deepening of public sector reforms and strengthening the capacity of county governments as well as coordination between national and county governments and; implementing the constitutional provision of more than 2/3 gender principle and 15% empowerment of women to reduce gender inequalities in public and private spheres; The County Government Act, 2012, stipulates that county government shall plan for the county and no public funds shall be appropriated outside a planning framework developed by the County Executive Committee and approved by the County Assembly. This Act along with the Public Financial Management Act, 2012, therefore calls for preparation of a County Integrated Development Plan (CIDP) which must be aligned to the National Development Plan. In view of this, the County Integrated Development Plans and other plans provided in the County Government Act have been
59
aligned to Kenya Vision 2030 and the Medium Term Plan 2018-2022. As such, the CIDP will provide the essential linkages of the National and County Governments by facilitating the implementation of Vision 2030 flagship projects as well as other projects and programmes that will ensure implementation of Kenya Vision 2030 at both levels of Government. The County government has embraced the Kenya Vision 2030 and Medium Term Plans during the preparation and development of this 2nd CIDP. In particular, it supports the implementation of Vision 2030 flagship projects that are located in or which cut across the county. In addition, the county has identified specific projects and programmes for implementation over the medium term period towards achievement of the Kenya Vision 2030 and MDG goals. In addition to the foregoing, this CIDP has specifically prioritized the “BIG FOUR” pillars that have been identified by the National government namely; 1) Manufacturing 2) Food and Nutrition Security 3) Health and 4) Housing
2.3 Linkages with Sustainable Development Goals (SDG’s) Prior to the lapse of the Millennium Development Goals (MDGs), negotiations on the Post-2015 Development Agenda began in January 2015 and ended in August 2015. A final document was adopted at the UN Sustainable Development Summit in September 2015 in New York, USA. The 17 new goals that were adapted were referred to as the “Sustainable Development Goals. These SDGs include to end poverty in all its forms everywhere; to end hunger, achieve food security and improved nutrition and promote sustainable agriculture; to ensure healthy lives and promote well-being for all at all ages; to ensure inclusive and equitable quality education and promote lifelong learning opportunities for all; to achieve gender equality and empower all women and girls; to ensure availability and sustainable management of water and sanitation for all; to ensure access to affordable, reliable, sustainable and modern energy for all; to promote sustained, inclusive and sustainable economic growth, full and productive employment and decent work for all; to build resilient infrastructure, promote inclusive and sustainable industrialization and foster innovation; to reduce inequality within and among countries; to make cities and human settlements inclusive, safe, resilient and sustainable; to ensure sustainable consumption and production patterns; to take urgent action to combat climate change and its impacts; to conserve and sustainably use the oceans, seas and marine resources for sustainable development; to protect, restore and promote sustainable use of terrestrial ecosystems, sustainably manage forests, combat desertification, and halt and reverse land degradation and halt
60
biodiversity loss; to promote peaceful and inclusive societies for sustainable development, provide access to justice for all and build effective, accountable and inclusive institutions at all levels and to strengthen the means of implementation and revitalize the global partnership for sustainable development. It is important to note that the SDGs build on the principles agreed upon in resolution A/RES/66/288, entitled "the future we want". The SDGs have time- bound targets and indicators for measuring progress in all areas of the 17 goals. Being a member of the UN as such a signatory to the Declaration, Kenya is committed to achieving the SDGs. As such, this CIDP has taken cognizance of this and the projects and programmes are linked to the 17 SDGs.
61
CHAPTER THREE: REVIEW OF IMPLEMENTATION OF THE PREVIOUS CIDP
3.0 Introduction
Pursuant to the Public Finance Management Act 2012 Sec 126 (1), every county government ought to prepare a development plan in accordance with Article 220 (2) of the constitution. In compliance with that legal provision, the Kirinyaga County Government developed a five-year plan (CIDP) also termed as the First Generation CIDP (2013-2017). The CIDP was segmented into eight distinct chapters namely, the introduction to the county, the County Development Analysis. The goal of the CIDP was to have an enhanced plan for a five-year period. The plan was to guide the county during the development of the annual development plans and the budget. Concurrently, the objectives of the CIDP were to highlight the county development profile, the strategic priorities for the five-year term, and the legal basis for preparing the plan, a monitoring and evaluation framework for the five years and the programmes and projects captured per CIDP Sectors. It is imperative to note that the goal and objectives of the CIDP were aligned with the vision and mission of the county government. 3.1 0bjectives of the review
The primary objective of conducting this review is to track the implementation rate of the first generation CIDP in terms of how far the development needs of the county have been addressed. To be precise, the review intends to assess the progress made in terms of achieving the CIDP goal stipulated in the previous section and the implementation of the particular programs and projects as stipulated in the CIDP. Further, the review also intends to identify and expound on the challenges, lessons learned, and the proposed solutions during the implementation of the CIDP.
3.2 Process of review The review was guided by information gathered through Focus Group Discussions with county government officials, through face-to-face interviews, observations made through the field visits (public participation fora), and in-depth desk review of vital documents. Budget Analysis and Revenue Collected. Below is an overview of the budgetary allocations and the expenditure during the period under review.
62
Budget Analysis Financial Year Budget Expenditure Rec Dev Total Rec Dev Total 2013/14 2.1B 907.8M 3.02B 1.52B 308.8M 1.8B 2014/15 2.53B 1.57B 4.10B 2.28B 902.57M 3.18B 2015/16 3.27B 1.51B 4.78B 3.08B 1.06B 4.14B 2016/17 3.37B 1.88B 5.24B 1.08B 3.16B 4.25B
3.3 Key Achievements by Sector/ Department
3.3.1 Agriculture, Veterinary, Livestock and Fisheries Sector brief The county department of Agriculture, Veterinary, Livestock and Fisheries based its 2013-2017 CIDP planning on the Country’s MTP II benchmark which was anchored in the Vision 2030 Blueprint. The Overall goal of the sector was to attain food security and Increase Household Incomes. The sector aims at ensuring food security and prosperity thru innovative, commercially oriented and competitive agriculture. The goal of the sector is to be achieved through enhanced food production, Creation and maintenance of an enabling environment for development of agriculture, Livestock and Fisheries, Formulation and Implementation of appropriate agricultural policies and Strategies and employment creation. From a statistical perspective, agriculture is the main economic activity of the county. Over 72% of the citizens of Kirinyaga County rely directly or indirectly on agriculture. The key enterprises are Dairy, tea, coffee, bananas, horticulture, and rice. A key objective of the County Government is to improve productivity in these and other value chains with a view of raising rural incomes. The department has been laying its focus on implementing the following strategic objectives that are in line with the 2nd (SDG) Sustainable Development Goals which is to create an enabling environment and enhance institutional efficiency and effectiveness for agricultural development through:
i. Increase agricultural productivity and outputs ii. Enhance institutional efficiency and effectiveness in implementation and
extension iii. Identification of market opportunities and linking of farmers and
producers to markets iv. Increase livestock productivity and outputs v. Increase fish production from capture and culture fisheries.
63
Budgetary Allocations and Expenditure Analysis Budget Analysis Financial Year
Budget Expenditure
2013/14 REC DEV TOTAL REC DEV Total 2014/15 37.54M 55.45M 92.99m 2.28B 902.57M 3.18B 2015/16 237.19M 77.3M 314.49M 219.2M 41.61M 260.81M 2016/17 208.31 153.19M 361.5M 211.88M 104.17M 316.05M
Sectorial Achievements The key achievements of the sector/ department are as provided:
1. Support of micro irrigation through purchase of pipes and construction of intake for 15 water projects across the county benefitting over 2,000 farmers worth Ksh. 12,931,250.
2. 207,670 bags of assorted subsidized fertilizer worth over Ksh 364 Million was accessed by 51,917 farmers from all wards of the county this was supported by National government
3. Constructed and rehabilitated 7 tea buying centres across the tea growing zones of the county.
4. Distributed 16,500 coffee seedlings to farmers through Coffee improvement program
5. Trained 38 spray service providers in support of horticulture farmers so as to meet market standards globally.
6. Development of Rice, dairy and banana value chains 7. Facilitated formation and registration of 5 County commodity umbrella bodies
namely; macadamia, horticulture, banana, dairy and agro-dealers to ease regulation, bargaining power and access of quality inputs and services.
8. Linked 8 horticultural farmer groups to market with a membership of 2580 farmers.
9. Enhanced pest control by introduction and equipment of 8 plant clinics serving over 3500 farmers
10. Organized 8 exhibitions for farmer training in collaboration with stakeholders in the sector with an attendance of over 20,000 farmers.
11. Distributed horticulture clean planting materials to farmers. These included; ü 4,000 Banana seedlings worth Ksh 630,000 ü Macadamia seedlings worth Ksh 171,233 ü Avocado seedlings worth Ksh 85,616 ü Arabicum flowers worth Ksh 500,000 ü Maize seed worth Ksh 2,359,805
64
12. Conducted 2 eat more fish campaigns and over 1000 farmers attended 13. Increased access to fish feeds after acquiring 1 fish feed mill with the
assistance of the National government 14. Conducted 3 vaccination campaigns against major diseases such as Foot and
mouth disease, Lumpy skin disease black quarters and anthrax. Over 90,000 animals have been vaccinated.
15. Issued Ksh 20 Million tea levy to the tea factories for infrastructure development in the tea zones of the county
16. Commissioned a Liquid Nitrogen harvesting plant at AHITI Ndomba for semen storage and hence reduction in cost and increased access to AI to the farmers with a capacity of 50 litres of liquid nitrogen per hour.
17. Formulated 7 bill which were enacted by the County assembly namely; ü Livestock sales yard ü Kirinyaga Agricultural training centre ü Agricultural mechanization station ü Agricultural boards and committees ü Animal welfare. ü Abattoirs
18. Issued 7 coolers for fish bulking to 7 farmer groups. 19. Issued 7 milk coolers to 7 dairy farmer groups
Challenges encountered in the implementation plan
1. Insufficient budgetary allocation 2. Late disbursement of funds, 3. Slow procurement process, 4. Inadequate technical staff 5. Unfavourable and unpredictable weather conditions, 6. Land subdivision to uneconomical sizes 7. Inadequate office space, IT infrastructure & equipment 8. High incidences of pest and diseases including emerging ones; MNLD, Tuta
Absoluta 9. High cost of inputs, 10. Declining soil fertility, 11. Poor road infrastructure, 12. Poor marketing outlets, 13. Insufficient water for horticulture, rice, livestock and fish production,
Lessons learnt
1. Need to have early warning systems on weather patterns and pests occurrence
65
3.3.2 Energy, Infrastructure and ICT A. Transport, Roads and Public Works Department Brief The department/ sector operate in line with its vision and mission. Below are the vision and mission, as well as, the strategic goals of the sector. Strategic Objectives of the Sector
v To develop and maintain a well-trained and competent workforce. v To continuously benchmark the internal functions and deliverables of the roads
sector against other Counties and international best practice. v Provide and maintain a transport network, road safety network and road
infrastructure which are safe, functional and enhance the economic development of the County and the region in general.
Budget Allocations and Expenditure Budget Analysis Financial Year
Budget Expenditure
2013/14 REC DEV Total REC DEV Total 2014/15 14.43m 357.29 371.72M 9.11M 231.6M 240.71M 2015/16 72.86M 316.69M 389.55M 56.25M 294.64M 350.89M 2016/17 77.46M 608.31M 685.77M 40.09M 393.0.M 316.05M
Department Achievements Below is a tabular representation of the achievements of the department for the planning period 2013-2017. Program/ Project Fin.
Year Objective(s) Target(s) Achievement(s) Remark(s)
Flagship Project
1. Purchase of Fire Engine
2014-2015
Improved fire-fighting capacity.
1No. 1No. Delivered. Functioning very well.
2. Purchase of 3 trucks plus tracking system
2014-2015
Improved county graveling capacity.
3No. 3No. Delivered. Functioning very well.
3. Hire of Graders & Machinery
2016-2017
Improved roads in the entire County.
45,000m2 of roads in each ward.
Implemented in 12 wards. i.e. 540,000m2 of roads.
Work expected to continue.
66
Other Achievements The department, besides successfully implementing the flagship projects named above also managed to make some other achievements. The department, over the last five year planning period, has managed to install approximately 28 box culverts, 311 units of culvert lines, and more than 9 culvert lines. In addition, the department has managed to maintain 36.8 kilometers worth of roads. Further, it has managed to undertake spot improvement on 583.55 kilometers of road. 35.45 kilometers of road have also been constructed. 24 footbridges have also been constructed. Other developments that have been facilitated by this department include installment of 2 spring drifts, murruming of roads, 2.5-kilometer canal, and river crossing including Rurii river crossing and Ndiriti crossing. Key challenges experienced This section provides detailed information on the challenges experienced by the roads sector during the implementation of the above plan.
1. Initial delay in County projects implementation processes due the fact that it
was a new form of Government. 2. Delays in the entire procurement process from BoQs preparations up to award
of tender. 3. Lack of proper facilitation to the Department staff hindering their efficiency i.e.
lack of supervision vehicles. 4. Financial constraints of the Contractor causing delays and poor works. 5. Inadequate experience of the Contractor i.e. technical expertise due to use of
unskilled labour and supervisors. 6. Local political conditions i.e. unnecessary interference from the locals and
politicians. 7. Extreme weather i.e. long rainfall period.
Key lessons learnt This section outlines the key lessons learnt from the implementation of the above plan and the proposed recommendations.
1. To avoid too much delays experienced during the procurement process, work on
Boqs should start immediately after the new budget is read. 2. The supervising staff should be provided with enough supervision vehicles to
enable them carry out proper monitoring of projects.
67
3. The local population should be well informed before implementation starts instead of cases where they gate-crush a project with all manner of accusations.
4. The Contractors should be instructed to always use trained and experienced labor and supervisors to avoid delays and poor workmanship.
5. The Contractors should be paid immediately they complete a task or works i.e. monthly to enhance their financial capabilities.
B. Physical Planning, Land & Housing Department Brief The Department of Physical Planning implements sound planning principles and efficient management of land resources. In addition, the Department undertakes development control to ensure compliance with approved plans.
The Sector Plan has been developed within the framework of the Department’s mandate and functions and will be guided by its vision, mission and core values as stated below: Strategic goal of the Sector: To Facilitate improvement of livelihoods of the people of Kirinyaga County through efficient Land resource management, Equitable Access, secure Tenure and Sustainable housing Strategic objectives of the Sector:
1. To ensure sustainable development 2. To improve housing, sanitation and management of urban centres 3. To increase the number of surveyed plots and improve security of tenure
Budgetary allocation and expenditure Budget Analysis Financial Year Budget Expenditure 2013/14 REC DEV Total REC DEV Total 2014/15 10.38M 75.59M 85.97M 8.70M 33.09M 41.79M 2015/16 29.33M 91.5M 120.83M 23.73M 27.79M 51.52M 2016/17 26.07M 74.43M 100.5M 19.58M 12.93M 32.51M
Sectorial Achievements
68
Program/Projects Objectives Targets Achievements Remarks 1.Expansion of the Land registry
Efficient service delivery
Kirinyaga Land Registry
Modernization of Land registry
Complete Land registry
2.Digital Mapping of four priority towns
Data for Spatial planning
Kerugoya, Kutus, Kianyaga, Wanguru towns
Creation of database for the four towns
Stalled
3.Development of County Spatial plan
Broad framework for land management for the County
County wide 60% Done Ongoing
4.Planning and Surveying of 15 colonial villages
Improvement of Land tenure
Initial selected 15 villages
60% Done Ongoing
Other Achievements of the Department of Lands, Housing and Urban Development for the planning period 2013-2017 include.
i) County Spatial Plan-The purpose of the plan is to provide a broad framework into land use management, guide, harmonize and facilitate all land use developments within the county. As stipulated in the County Government Act, this plan forms the basis for all budgeting and spending in the county. The project was awarded to a consultant and up-to-date they have prepared inception report, carried out primary and secondary data collection, 1st stakeholders meeting and now awaiting 2nd stakeholders meeting to present the draft plan.
ii) Planning and Surveying of 15 colonial villages-The department of Physical Planning commenced preparation of Advisory plans for fifteen (15) colonial villages with an aim of providing framework for sustainable development. The exercise entails verification of plot ownership, Planning, Surveying and finally titling. The department is partnering with the national Government Survey of Kenya under the National titling programme. Data collection has been done, 1st stakeholders meeting, draft plan preparation and now awaiting 2nd stakeholders meeting, plot beaconing and titling.
iii) Expansion of The Land Registry-In the 2013/2014 F/Y the County Government allocated a total amount of Ksh 5Million for the expansion of the National Land registry. This was to decongest the registry and ensure improved services to the citizens.
69
Key challenges encountered during the period Land is an important factor of production because it provides the foundation for all other activities such as agriculture, water, settlement, tourism, wildlife, forestry and infrastructure. Land issues are important to the social, economic and political development of the county. Secure land tenure, sustainable land-use planning and equitable distribution of land contribute to food security and social-economic development of a county. However, there are various challenges that the department encounters while delivering its legal and functional mandate. The main challenges facing the department include:
i. Inadequate technical staff on Development Control ii. Budget Allocation: Low budgetary allocation for the department iii. Land disputes;-This comes about due to boundary encroachments and multiple
allocations of plots; existence of undeveloped plots; un-concluded land exchange transactions; unplanned and un-surveyed colonial land and trading centers.
iv. Slow pace for the preparation of the County spatial plan due to slow release of money
How the challenges can be addressed in the next strategic plan 2016/17 – 2020/2021
a) On budgetary allocations’-adequate funding for the entire life cycle of the projects and also sufficient allocation for the department projects and administrative operations is necessary.
b) Timely release of AIEs c) unauthorized transfer of funds assigned for other project-strictly follow the
budgetary provisions(respect departments proposals) d) Improve land data management systems e) Recruiting qualified personnel for Development control
3.3.3 Economics, Commercial and Labour Affairs Department Brief The department was composed of two directorates, namely Trade, Tourism, Industrialization and Enterprise Development directorate and Cooperatives development directorate. Overview of the sector directorates
70
The Cooperative Directorate key role was to ensure there is development of cooperative societies in the county through establishment of an enabling environment and mutual working relationship between the stakeholders. Enhancement of cooperative societies performance, revival of dormant and formation of new cooperative societies are indicative of the level of growth in the cooperative movement. Cooperative movement plays a very significant role in improving livelihoods of members and the community at large. Cooperative societies empower members to jointly carry out a common economic, social and cultural activity for the general good of all members. They help in creating equity in resources distribution as well as in job creation. The county has 105 cooperative societies distributed in all the sub counties as here below. Budgetary Allocations and Expenditure Budget Analysis Financial Year Budget Expenditure REC DEV TOTAL REC DEV 2014/15 17.57M 66.69M 84.26M 8.64M 11.67M 20.31M 2015/16 43.98M 95.8M 139.78 28.88M 60.45M 89.33M 2016/17 33.76M 92.86M 126.62M 22.91M 33.75M 56.66M
Below is a tabular and statistical representation of the cooperatives in the county. Sub county Coffee
based Urban & rural based SACCOs
Dairy based
Housing Irrigation Muilti purpose
Others Total
Kirinyaga east
10 7 2 7 2 1 3 31
Kirinyaga central
2 25 1 5 1 - 2 35
Kirinyaga west
2 1 1 1 2 1 - 6
Mwea east 1 15 - 2 2 2 2 24 Mwea west - 2 - - 3 - - 5 Total 15 50 4 15 10 4 7 105
The Trade, Tourism, Industrialization and Enterprise Development Directorate The directorate is responsible for regulating, facilitating and promoting the various business activities The Department’s core activities include the management of Joint Loan Board scheme, entrepreneurship development through business counseling, training and consultancy services, markets development and dissemination of trade information, tourism development and promotion, industrialization promotion and
71
development, promotion of small and medium enterprises and ensuring fair trading practices Sectorial Achievements The sector, over the last planning period of five years, has managed to achieve a series of things. Among them include the installation of one milk cooler in Kerugoya. Further, the department has managed to construct 10 market toilets, 3 market sheds, 5 market fences for the open air markets, 2 market roofing, and rehabilitation of 13 markets and facilitated the drainage at one of the markets. The county has managed to establish a rice husk briquetting machine at Tebere. The department has also managed to establish 1 social hall, supported the boda boda operators with services such as boda-boda sheds, helmets, reflector jackets, and Saccos. The county has also installed approximately 5 market floodlights, a new open air market, and one oil pump. The department has also supported at-least 2 youth and women groups and purchased 1 oil pump. Below is an overview of the trends in terms of the Kirinyaga Trade Development Loans Board Year Activity Amount
disbursed No of loans
Beneficiaries trained
Loans recovered/repayment
2013-2014
Issuance and disbursement of loans
8,000,000.00 72 72 4,531,065.00
2014- 2015
Issuance and disbursement of loans
5,470,000.00 49 49 6,155,520.65
2015-2016
Issuance and disbursement of loans
7,750,000.00 65 65 7,412,859.50
Total 21,220,000.00 186 186 18,099,445.20 Below is a tabular representation of the provision of business advisory services 2013- 2014 312 The number of people who sought business
advisory services 2014-2015 371 The number of people who sought business
advisory services 2015-2017 420 The number of people who sought business
advisory services Programmes
72
The department, as part of value addition and promotion of the Kirinyaga county brand, has managed to successfully host a set of programs. Below is an enumeration and brief explanation of these programs.
ü Department successfully hosted 3 Miss Tourism Editions –Miss Tourism is considered to be an activity that is set to promote tourism both locally and nationally. The winner of the pageant at the county level then proceeds to compete at the national level. The event attracts huge publicity hence promoting tourism for the participating counties.
ü The department also successfully hosted 2 cooperative exhibitions in Gichugu – The exhibitions do play a big part in enhancing the core objectives of bringing cooperatives together, as well as, showcasing and learning from one another on best practices.
ü The department also hosted 1 successful SME expo at Jeevanjee gardens in Kerugoya – The key objective of the expo was to showcase the various products produced by SMEs in the county and also bring them together to bench mark against bets practices and learn new technologies. Other stakeholders including financiers also participated to explore ways of promoting SMEs to grow to the next level
o Participated in major National and international exhibitions including, WTO, GES, ATA, and two Devolution conferences
o International forums such as the World Trade organization, Global Entrepreneurship Summit attended by the US President and the Africa Travel association held in Nairobi provide a unique opportunity to show case our county in terms of investment opportunities, tourism attractions and other trade opportunities. The Devolution conference also provides an opportunity for our county to show case the best that we have and also learn what other counties are doing better than us.
Challenges Faced during the implementation of the CIDP The major challenges that the department faced included:
v Inadequacy of Finances All re- current programmes are underfunded. Such items as fuel, stationary and travel allowances are really underfunded and this affects the implementation of various programmes. Trade exhibitions both at National and international level are also essential to promotion of our county. Inadequate funding means we are not in a position to participate in many of these exhibitions
v Late/Delayed financing
73
The late release of funds has affected the implementation of both development and recurrent programmes. Related to this is the amount released on a monthly basis versus the approved budget which is always far below the prorata amounts
v Staffing Some key departments like tourism, Industrialization and Enterprise development do not have any staff. The director carries out the duties of the departments and therefore is overloaded.
v Vehicles /Transport The whole department has only two vehicles one of which is an old GK vehicle which keeps on breaking down. The other vehicle a double cab is used by the CEC and other ministry staff. This means that implementation key programmes that require movement are sometimes affected by being immobile.
v Lack of a confirmed inventory of all the markets within the county This makes it difficult to plan for a comprehensive development Programme for all markets across the county.
v Lack of a comprehensive inventory of all Tourism sites in the county Purchase of land is complex and we have not been able to conclude any land purchase with the time period
v Site disagreements have also led to some projects being put on hold
v Timely preparation of bill of quantities has also been a challenge.
v Political -The cooperative sub-sector experiences a lot of political turmoil with stakeholders especially the society members perceiving that all matters must be resolved through involvement of politicians or political forums. This causes a lot of unrest that adversely affects the performance of the cooperative movement. These unrest are also a risk to security in the county
v Lack of legal framework- This has hindered the effective operations in the sector.
3.3.4 Health Sector brief
74
The Health sector is guided by a vision and mission. The vision of the sector is to offer an efficient and high quality health care system that is accessible, equitable and affordable for every Kenyan. As stipulated in Article 43 (1) (a) of the constitution 2010, every person ought to have access to the highest attainable standard of Health care services including reproductive Healthcare. Further, pursuant to Article 43 (2) further recommends that no person ought to be deprived of emergency health care. The Health sector, in reference to the three economic pillars, falls under the Social Pillar. It is envisaged to contribute to the realization of the Kenya’s Vision 2030. In addition, the objectives of the department/ sector are in line with the Sustainable Development Goal 3 (Good Health and Well-Being). The department, up to date, still strives to achieve the specific objectives of the SDG Goal 3 achievable by 2030 including:
1. Reducing the global maternal mortality ratio to less than 70 per 100, 000 births 2. Prevent deaths of new-borns and children under 5 years of age 3. End the epidemics of AIDS, tuberculosis, malaria, neglected tropical diseases
and other communicable diseases. 4. Strengthen the prevention and treatment of substance use including narcotic
drug abuse and harmful use of alcohol 5. Ensure access to sexual and reproductive health-care services including family
planning, information and education, as well as, integration of reproductive health into national strategies and programmes
6. Ensure that there is ample access to quality essential health care services, access to safe, effective, quality and affordable essential medicines and vaccines for all
7. Ensure that the number of deaths and illnesses from hazardous chemicals, soil, and water, and air contamination are reduced significantly.
8. Support research and development of vaccines and medicines for communicable and non-communicable diseases which affect the county as one of the counties in the developing country, Kenya.
9. Increase the health financing and recruitment, development, training and the retention of health work force in the county.
Upon the adoption of the third SDG, “Ensuring healthy lives and promote well-being for all ages”, the county government has been seen to allocable sizeable financial resources towards achieving it. Budget Allocations Budget Analysis Financial Year Budget Expenditure
75
REC DEV TOTAL REC DEV Total 2014/15 185.49M 314.47M 499.96m 121.43M 81.08M 202.51M 2015/16 1155.40M 295.21M 1450.61m 1155.4M 132.53M 1287.93M 2016/17 1252.13M 308.64M 1560.73m 1251.92M 141.3M 1393.22M
Sector achievement As at 2015/16, approximately 1.0 billion of financial allocation goes towards cushioning recurrent expenditure including the provision of medical supplies and compensating the expansive human resource in the sector. The Health Sector through the County Public Service has achieved strategic milestones towards improving Health Services by increasing its Human Resources throughout the five years with 305 new workers, 109 ESP staff, 2 Medical consultants, 14 medical officers and 3 pharmacists. The sector achieved the following milestones; Milestone 2013/14 2015/16 (as at
Dec 2015) Remarks
Doctor: Population ratio
1: 21,652 1: 13,518 As a result of increased Health workers as analyzed above
Percentage of Children accessing full immunization
85.2% 88.5% Improvement was due to: Increased Health Workers Increase in immunization centers from 56 to 66
Percentage of expectant mothers accessing Maternal Health Care
92.4/48 96.4/60 Improvement was due to: • Increased Health Workers • Increased Health Care
facility • Free Maternal Health Care • Free Skilled Delivery
Expectant Mothers accessing skilled delivery
73% 92.5%
Average distance to the nearest Health Facility
4.6Km 4.3 Km The reduction in the distance to the nearest Health Facility is attributed to:
• Expansion of existing health care facilities
• Establishing new facilities in underserved areas.
The prevalence amongst the males is slightly lower than that of the females. For instance, in the financial year 2014/2015, the prevalence amongst the males stood at 1.20% while that of the females was estimated at 2.4 %. In the year 2015, the prevalence was observed to reducing with males registering 1.07 percent HIV/AIDS prevalence while the prevalence of the women dropped to 2.1 (section needs update on progress for year 2016/2017).
76
By the month of December 2015, the proportion of Mother to Child Transmission of HIV had significantly dropped from 7.5 % to 5.7 % mother to child transmission in the previous year 2014/2015. That is as a result of the increase in the health care facilities that offer antenatal care across the county and free access to skilled child delivery as stipulated in the table above. Improved Health Infrastructure The county department of health, besides having achieved in the usage of the allocated budget, it has also managed to address the infrastructural needs of the county. That includes improving the already existent Health Care facilities and also establishing new ones. The criteria used in the development of the infrastructure oscillated around a selection of parameters such as the population density, the population growth projections, the distance to the nearest Health Facility, sustainability of existing and the highly demanded new facilities. Below is a summary of the extent in which the Department of Health has improved its infrastructure for the five year period starting from 2013- 2018. Facility Type 2013 2015
Public Hospitals 3 4 Health Centers 12 22
Dispensaries 37 32 (10 dispensaries upgraded to Health Centers and 6 new dispensaries opened)
Community Units 62 65
Currently, the department of health has more than 98 development projects constituting the complete and ongoing projects. These projects constitute construction of new dispensaries, upgraded health care facilities, and the construction of laboratories, morgues, and purchases of ambulances, radiology departments and equipping of health facilities. The major projects that are complete, functional and non-functional constitute:
• Gathuthuma Dispensary (Functional) • Nguguini Dispensary (Functional) • Kiamuthambi Dispensary (Functional) • Kiarukungu Dispensary (Functional) • South Ngariama Dispensary (Functional) • Kamuiru Dispensary (Not functional) • Kiaga Dispensary (Not functional) • Expansion of maternity at Mutithi Health Center (Functional)
77
• Construction of a waiting bay and a laboratory at Kirogo Dispensary (Functional) • Construction of a laboratory at Karimaini Dispensary (Functional) • Drilling of a borehole at Sagana Hospital(awaiting electrification) • Kibirigwi Health Center(not functional) • laboratory at Kiburu Dispensary (functional) • waiting bay and parking at Uceru Heath Center(functional) • Installation of electricity at Kanjinji & Mumbuiini Dispensary and purchase of
water tank. (functional) Major ongoing projects include but not limited to
• Construction of 9 new dispensaries in underserved areas. • Construction of X-ray Department at Kianyaga Hospital • Construction of Morgue at Sagana Hospital • Construction of Modern Maternity Block at Kimbimbi Hospital • Construction of X-ray Department at Sagana Hospital • Construction of Maternity/MCH Block at Kianyaga Hospital • Construction of In- patient wards at Baricho and Njegas Health Centers.
Certain assorted Health equipment and machinery are due for procurement within the 2015/16 Financial Year.
• Assorted Medical Equipment for 18 health facilities. • 4 ambulances to supplement the 5 existing ambulances. • Standby Generators, Oxygen plants, Morgue Coolers
3.3.5 Education Department Brief Pursuant to the Constitution of Kenya 2010, Schedule Four, the County Department of Education is in charge of pre-primary education, village polytechnics, home crafts centers and childcare facilities. The County Department of Education is further subdivided into two distinct subsectors with the aim of undertaking the aforementioned functions. Further, the education sector/department work in line with the below are the sub-sectors.
ü Directorate of Vocational Education and Training (DVET) that is mandated to manage the devolved polytechnics and Home craft Centers.
ü Directorate of Early Childhood Development Education (ECDE) that is mandated to manage the pre-primary education and the children facilities (Day Care Centers).
78
Sector Goals and Objectives
The sector has and still works towards the achievement of the Sustainable
Development Goal Number 4: Ensure inclusive and quality education for all and
promote lifelong learning. Particularly, the department is driven by the urge to offer
quality education considering that it is a foundation towards improving people’s lives
and sustainable development.
Budget Analysis Financial Year
Budget Expenditure
2013/14 REC DEV Total REC DEV Total 2014/15 85.16m 121.78M 206.94M 70.76M 85.08M 155.84m 2015/16 182.63M 85.72M 268.35M 162.12M 54.73M 216.85m 2016/17 231.59M 93.65M 325.24M 235.04M 45.18M 280.22m
Sector Achievements The education sector constitutes two subsectors namely ECDE and DVET. Each of
these departments has experienced a set of achievements in the last 5-year planning
period from year 2013-2017. Below is an outline of these achievements.
i. Recruited 403 Care-givers (ECDE-Teachers)
ii. Increased levels of enrolments in public ECDE Centers from 14, 834 pupils in
the year 2013 to 15,800 pupils in the year 2017.
iii. Increased ECDE Centres to 198
iv. Construction of Exhaustible toilets in 66 ECDE Centres.
v. Provision of Teaching Learning resources worth approximately 6M to ECDE
Centres
vi. Trained 403 ECDE teachers on Child Counselling and Development of Teaching/
Learning Materials
vii. Provided 5 ECDE centres with Appropriate furniture for pupils & teachers
viii. Provided 20 ECDE Centres with Fixed play facilities.
Challenges during the implementation
One major challenge that the department experienced was the delayed disbursement
of funds necessary to execute projects.
79
3.3.6 Social Protection, Culture and recreation
The Youth and Sports department operates in line with the vision and mission. The
vision of the department is to be a dynamic and youth oriented and policy driven
department. Concurrently, the mission statement of the department is to co-ordinate
and facilitate the delivery of quality development services with special emphasis on the
enhancement of youth and sports for recreation and development. In response to these
vision and mission, the sector takes it to be a responsibility for it to promote and
develop sports talents and empowerment of youth. The county through the department
of youth and sports will improve sporting standards through training and improvement
of sport infrastructure. It will also empower youths through trainings and improving
access to employment information and opportunities to empower and business.
Budget Analysis Financial Year
Budget Expenditure
2013/14 REC DEV Total REC DEV Total 2014/15 14.99m 29.87M 44.86M 11.71M 16.29M 28M 2015/16 70.58M 51.85M 122.43M 53.5M 23.63M 77.13M 2016/17 51.67M 98.91M 150.58 43.43M 23.85 M 67.28M
3.3.7 Environmental Protection, Water and Housing Department Brief The environment, water, natural resources and energy is guided and operates in line with the vision and mission. Below is an overview of the vision and mission of the department. Pursuant to the Constitution of Kenya, 2010 fourth schedule, the devolved function in the department involves implementation of specific national and county government policies on the natural resource and environmental conservation. Below is an overview of the constitutional provision in schedule four.
(a) Soil and water conservation – (i) Implementation of county specific water conservation and forestry
policies through water resources users; (ii) Water pollution control; and (iii) Borehole site identification and drilling; and
80
(b) Forestry including farm forest extension services, forests and game reserves formerly managed by local authorities excluding forests managed by Kenya forest Service, National Water Towers and private forests.
Sector Goal and Objective The department’s functions are in line the Social Economic Pillar upon which the Vision 2030 is anchored. One of the key intentions of the county is to increase the forest cover by 10 % in the county. Further, it is imperative to denote that the county co-shares this vision with the country and hence aimed at progressively increasing the forest cover by 1.5 % to 2.0 % in every year financial year within the five years term. Further, the department’s functions are purposed to achieve the sustainable development goals. Below is an overview of SDGs that are line with the department’s functions. ü Sustainable Development Goal 6 – Ensure availability and sustainable
management of water and sanitation for all. ü Sustainable Development Goal 7 –Ensure access to affordable, reliable, sustainable
and modern energy for all ü Sustainable Development Goal 13 –Take urgent action to combat climate change
and its impacts ü Sustainable Development Goal 14 – Protect, restore and promote sustainable use
of terrestrial ecosystems, sustainably manage forests, combat desertification, and halt and reverse land degradation and halt biodiversity loss.
Budget Analysis Financial Year
Budget Expenditure
2013/14 REC DEV Total REC DEV Total 2014/15 23.56m 344.82 368.38 15.52M 326.7M 342.22 2015/16 71.67M 320.34M 392.01 67.67M 311.6M 379.27 2016/17 97.68M 248.73M 346.41 77.2M 182.79M 259.99m
Key Achievements The sector has a, in the last five-year planning period registered a number of achievements. The department was tasked with the responsibility of ensuring that the people gain access to clean and safe water for consumption, water for irrigation, harnessing and protecting the natural resources in the county. The sector has managed to protect the key sources of water including the six rivers in the country including Sagana, Nyamindi, Rupingazi, Thiba, Rwamuthambi and Ragati. In addition, it has continually protected the unprotected 29 spring, 12 water pans, 3 dams and 208
81
shallow wells, boreholes and additional protected springs. The quality of water being supplied to the respective households in the country has improved greatly. Water in the rivers has been harnessed via canals with the intention of providing water to the lower zones of the county and particularly Mwea for domestic consumption and irrigation purposes. Currently, the piped schemes supply is approximately 51, 515 households. In addition, the county has managed to establish approximately 12 Water Resource User Associations along the different sub-catchments. The table below shows the current time taken to the nearest water point by House Holds.
Time taken to fetch drinking water (Mins)
Percentage of HHs (%)
0 9.6 1-4 12.7 5-14 17.6 15-29 55.9 30—59 3.2 60+ 1
The sector has also been playing its role in protecting the natural resources in the
environment. It has engaged in the renovation of a number of botanical gardens in the
major towns including Kerugoya town. It has also facilitated the planting of trees the
artificial forests across the county. IT has also engaged in the cleaning and garbage
collection in the urban centers in the county. The sector has managed to undertake up
to 95% of the clean-up targets across the county. Exhaustion of public toilets, in
reference to what has been planned is complete and construction of other toilets is 50
percent complete where there is construction of 3 toilets still in progress. The
installment of receptacles is 70 percent complete and the dumpsites have continually
being maintained in time. About 15 high mast lights have been installed. Tips for
forestry have been completed and have already been submitted for approval.
Challenges Experienced, lessons learnt and Recommendations Below is a tabular representation of the challenges experienced, the lessons learnt, and the Recommendations. Section Key Challenges Recommendations General Administration
Inadequate Key professionals
Internal/ external recruitment of key personnel for; • Environment Hydrology – 2 • Forestry - 2
82
• Solid waste management 2 • Renewable energy - 2 • Environmental compliance – 4
(see Directorate organogram) Lack of environmental governance structure and policy
• Constitution of County Environmental committee • Drafting and adoption of County Environmental Action
Plan.
Inadequate and delay of fund
Lobby for more a location especially for projects that are not Ward based but critical for county
Inadequate of essential and appropriate office tools and equipment for the service
Strive to acquire the following: • Furniture for offices in Baricho, Kimbimbi & Kutus • Training facilities (Computers/ Laptops, Heavy duty
colour Copiers, LCD projectors, White portable Screens). • 2 Double Cab field Vehicles.
Solid Waste Management
In appropriate system of garbage collection and disposal.
The following need to be undertake gradually: • Adopt door to door system of garbage collection &
Phase out Receptacle system of garbage collection.
• Involvement of community based groups in garbage collection & disposal programmes.
• Acquire adequate garbage collection & exhauster vehicles or sub-contract the services especial on major towns.
• Sub-contract the cleaning of government buildings and other amenities such as Markets, public toilets, bus stops.
• Invest/ partner in appropriate garbage processing and disposal system.
Encroachment to lands designated for dumpsite
• Acquisition of land ownership documents for areas designated as dumpsites.
• Fencing the land & installing essential amenities such as water, toilets security lights & office
Natural Resources Management
Encroachment to lands designated as riparian, wetland, springs, Forests, quarries, natural wells, water pans and rivers.
• Acquisition of land ownership documents for areas designated for natural resources.
• Fencing the land & installing essential amenities such as water, toilets security lights & office as appropriate
Lack of appropriate regulations to manage the utilization of natural resources.
• Enactment/ approval and enforcement of natural resources regulations.
• Encouraging the nature based enterprises
Renewable energy Slow up take and adoption of clean energy in households and institutions
• Establishment & equipping of County energy centre at Kimbimbi Forest buildings to promote clean energy and energy saving initiatives.
• Enhance partnerships in clean energy promotions and adoptions
83
Revenue Collected In the Last Five Years
ACTUAL OWN REVENUE COLLECTION FY 13/14
ACTUAL OWN REVENUE COLLECTION FY 14/15
ACTUAL OWN REVENUE
COLLECTION FY 15/16
ACTUAL OWN REVENUE COLLECTION FY 16/17
235,814,804.00 309,539,918.51 390,377,140.30 320,638,298.35
Environment Compliance & Enforcement
Lack of Certified personnel for environmental assessments, audits and inspection.
• Training adequate personnel on environmental assessment, audits and inspection.
Lack essential tools and equipment for enforcement
• Acquire adequate essential tools for environmental assessment such noise meter
Lack county based regulation to control public nuisance
• Adoption of appropriate regulations for control of noise, public nuisance and other environmental standards.
84
CHAPTER FOUR: COUNTY DEVELOPMENT PRIORITIES AND STRATEGIES
4.1 Introduction
This chapter discusses spatial development framework, priority development projects and programmes identified through stakeholders forums. Projects and programmes identified will seek to steer the county to economic prosperity. The projects are also part of the long-term economic strategy as envisioned in Kirinyaga County sessional paper 2032.
4.2 Spatial Development Framework In this section the county has described the spatial development framework within which the developments projects and programmes will be implemented. The section also has presented an analysis of natural resources in the county.
County Spatial Development Strategies by Thematic Areas
Thematic Area Overview/ Current Status
Policy Strategy Potential Geographical Areas
Lead Agencies/ Departments
Promotion of agribusiness
Agro-processing is an untapped potential which can contribute to alleviating unemployment among the youth. Key horticultural crops grown in the county, availability of resources like
• Establishment of agro-based industries e.g. fruit and food, milk, poultry, fish (canning) and hide (tanning)
• Promotion of value addition e.g. establishment of value addition factories in Ndia
Ndia, Mwea Trade, Cooperatives, Industrialization, Agriculture, veterinary, Livestock & Fisheries
85
water, fertile soils
County Spatial Planning
A comprehensive development plan is yet to be finalized
• Finalization and adoption of county spatial plan
• Adoption of proper farming methods.
• Enforcement of development control.
• Protection of agricultural land
Whole County Department of lands, Physical Planning
Enhance efficiency in cash crop production
Key cash crops in the area includes Tea, Coffee and Rice. Over 70% rely on cash crop production. Unfavorable prices, irregular weather patterns and low crop production lowering the earnings.
• Offer support to farmers in use of modernized agriculture mechanization.
• Promotion use of green houses
• Promoting use of higher quality seeds
• Provision of extension services to farmers
• Partnering with research centers for coffee and tea produce
• Promoting use of organic fertilizers
• Adoption modern irrigation systems
• Adoption of modern storage facilities
Upper zones (tea and coffee growing areas), Lower zones (Mwea) rice growing zones
Department of Agriculture
Enhance effective marketing systems and networks
The County holds annual agriculture trade fair which attracts investors in the county and Kenya.
• Ensure a robust marketing and branding strategy both local and international.
• Encourage more and diversified trade fairs in the county.
• Capacity building for cooperative societies
•
Whole County Trade, Cooperatives, Industrialization, Agriculture, veterinary, Livestock & Fisheries
Protection and sustainable use of water resources
Community water projects have constructed uncontrolled water intakes along rivers. Currently 63.7% of households use improved water sources
• Promotion of roof water harvesting
• Harness water through construction of Dams
• Construction of water pans especially in Murinduko area
Along major rivers, highlands and riparian lands.
Water, environment and natural resources. Agriculture, veterinary, Livestock & Fisheries
86
with only 1.4% of them using rain water collection.
• Enforcement of water regulation (chocking rivers)
• Protection of riparian lands
Enhancing food security
Irregular weather patterns have led to draught leading to many households needing food rations especially in the lower zones of the county.
• Promotion use of modern farming mostly irrigation methods
• Expansion of existing storage facilities
• Promotion growing of crops with minimal water requirements
Areas with arable soils for mixed farming (Ndia)
Agriculture, veterinary, Livestock & Fisheries Water, environment and natural resources.
Industrialization Manufacturing and industrialization can leverage on locally produced horticultural products. The county also will offer readily available labor. The county is also strategically placed to a transport corridor at Sagana. Reviving the tanning industries and coffee processing industries
• Infrastructure service provision
• Development of land use plans/zoning
• Enforcement of the land use plans
• Development of Special Economic Zones with provision of incentives and subsidies
• Encouragement of rural industrialization
Sagana Area Trade, Cooperatives, Industrialization
TOURISM The County is home to major tousist attractions in Kenya; Mt. Kenya is a key tourism attraction with activities like mountain climbing. Historical sites, and Natural wonders like ‘Daranja ya Mungu’ can be harnessed and marketed.
• Identification of the zones
• Mapping of the zones • Upgrading of the
existing tourism facilities and creating additional facilities e.g.
• Mwea National Game Reserve to a National Park.
• Introduce initiatives to increase the number of animals in the Mwea National Game Reserve and thus turn it into a
Mt. Kenya forest, Daranja ya Mungu along river Nyamindi Other potential historical sites.
Trade, Cooperatives, Industrialization
87
National Animal Sanctuary.
• Establish Kirinyaga International Golf and County Resort along the Sagana-Makutano Road running along the Tana River.
• Enhance eco- and conference tourism, mountain climbing, mountain hiking, motor racing, water sporting and golfing.
• Establishment of annual tourism expos.
• Diversification of tourism product.
• Enabling environment for tourism investment.
• Development of hiking routes
• Hospitality-hotels, restaurants, resorts, homestay and guest houses
• Sports tourism and training, mountaineering, eco-tourism and medical tourism
• Education tourism-training facilities, colleges, institutes and universities
• Establishment of a tourism development centre and develop linkages with the Kenya Tourism Development Board/Corporation
4.3 Natural Resource Assessment Name of Natural Resource
Dependent Sectors
Status, Level of Utilization & Scenarios for future
Opportunities for optimal utilization
Constraints to optimal utilization
Sustainable Management strategies
88
Surface Water
Agriculture , Water& Environment
The county is home to major rivers; Thiba, Nyamindi, Rwamuthambi. Water resource is highly but not optimally utilized for irrigation and domestic use.
Adoption of modern irrigation systems. Improvement of water distribution networks.
Inadequate financial support to farmers acquire modern irrigation systems
Regularization of water intakes, ensure conservation of riparian lands and water tower catchment areas.
Building stones
Lands, Housing and urban development
The county has a quarry site in Murinduko ward which produces building stones, quarry waste. Utilization is high, sites not owned by county government. Revenue raised charged on licenses and transportation fees
Infrastructure development in the areas the sites are located, using modern mechanization
Poor terrain, land ownership problems, high cost of equipment
Regularization of natural resources extraction.
land Across sectors
Out of the total county land size, 1170.7km2 is arable land which is used for cash crop, and mixed farming.
Development of spatial plans to designate lands for various activities and protect areas for food production, industrial development.
Lack of proper development and spatial plans
Finalization and enforcement of county spatial plan.
Forests Agriculture, lands, housing, tourism
The county has 7 forests with 5 Gazzetted forest (Mt. Kenya, Njukiini west, Murinduko, Kariani, Kamuruana)
Forests are water towers in the county. They are mainly utilized for water sources and sources of wood fuel. Mt. Kenya forest is home to national park tourist attraction. Tourism can be improved by marketing strategies and infrastructural developments
Deforestation is a big challenge to sustainable use
Measures to protect the catchment areas should be put in place among them enforcement of riparian and wetlands protection
89
4.4 Development Priorities and Strategies In this part, development programmes of various county sectors are presented. The programmes are identified through stakeholder forums and consultations. These programmes are also derived from long term development blueprint presented in the Kirinyaga County sessional paper 2032.
4.4.1 Agriculture and Rural Development This sector comprises of the department of Agriculture, veterinary, Livestock and Fisheries and the Directorate of cooperative development
Mission: To improve the livelihoods of Kirinyaga people by promoting competitive farming as a business through appropriate policy environment, effective support services and sustainable agricultural base resources management Sector development needs, priorities and strategies In response to the sector vision and mission, the county has stepped up extension services making them target specific, more demand driven and customer oriented. This is aimed at ensuring farmers in the county enjoy comparative advantage in their areas of specialization. As indicated earlier, production in Agriculture has registered mixed results. Efforts will be geared towards increasing production in both crop and livestock sub sectors by creating an enabling environment for agricultural development through review of the current policy framework.
In a bid to maximize output from farmers, the county will focus on value addition and marketing of produce. There are several storage facilities for both food and cash crops though their utilization has not been optimal.
Transfer of modern technology from researchers to farmers and enhanced liaison with the private extension providers like breeders, suppliers of veterinary drugs, dairy cooperatives and NGOs will be enhanced. Promotion of agro-forestry shall be advocated in extension services. The government is addressing the land issue with emphasis on land ownership and settling squatters in South Ngariama scheme. Improvement of cooperative sector will be critical in marketing of Agricultural produce and other services like farm input supply, credit etc.
Sub-sector Priorities, Constraints and Strategies Sub-sector Priorities Constraints Strategies Crop development Improve food security;
Production of high quality produce
High cost of farm inputs; Inappropriate credit facilities and high cost credit; Low market prices for the products
Revitalize the co-operative sector to offer loans and inputs at reduced prices; More appropriate credit facilities/ scheme to be pursued; source for external markets.
90
Livestock development Improve the quality of products; Increase quality of pasture, training on livestock farming, commercializing livestock farming
Poor/Low quality breeding, High disease incidence, Inadequate/ poor quality pasture due to frequent drought leading to high mortality, poor fodder, Preservation methods, poor livestock management techniques.
Improve skills on proper husbandry; Intensify vaccination campaigns. Improve skills on proper pasture and fodder management techniques.
Research and development
To improve on the crops and livestock quantity and quality
Inadequate resources to carry out long term research on breeding, High costs of research on seeds making replication difficult.
Collaboration with other stakeholders, Dissemination of seeds to organized groups.
Sector Programmes
Programme Name: Livestock Resource Management and Development Objective: To enhance dissemination of livestock information to the farmers for improved livestock production Outcome: Increased livestock productivity and outputs Sub- programme
Key Outcome
Baseline -
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
Target
Cost (Ksh-Millions)
Target
Cost(Ksh-Millions)
target
Cost(Ksh-millions)
target Cost(Ksh-Millions)
target
Cost(Ksh-Millions)
Livestock disease management and control (Veterinary) -
Plan and Manage Disease control/ Vaccinations
- Number of vaccinations provided to the farmers
125,000
17 125,000
17.0 125,000
17.0 125,000
17.0 125,000
17.0 85.0
Cattle dips rehabilitation projects
- The number of cattle dips rehabilitated
125,000
2 125,000
2.0 125,000
2.0 125,000
2.0 125,000
2.0 10.0
Animal Product Safety and Quality Assurance
- - 0.4 - 0.4 - 0.4 - 0.4 - 0.4 2.0
7Rehabilitation Modernization of County Diagnostic laboratories
- Number of county diagnostic laboratories rehabilitated and
128,000
5.0 128,000
5.0 128,000
5.0 128,000
5.0 128,000
5.0 25.0
91
Programme Name: Livestock Resource Management and Development Objective: To enhance dissemination of livestock information to the farmers for improved livestock production Outcome: Increased livestock productivity and outputs Sub- programme
Key Outcome
Baseline -
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
Target
Cost (Ksh-Millions)
Target
Cost(Ksh-Millions)
target
Cost(Ksh-millions)
target Cost(Ksh-Millions)
target
Cost(Ksh-Millions)
modernized
Put perimeter wall fence around veterinary compound –Kerugoya
- Establishment of perimeter wall around veterinary compound-Kerugoya
1 2.5 - 2.5 - - - - - - 5.0
Construct County abattoirs for cattle, pigs, small stock and poultry
- Number of abattoirs established
- 4.0 - 4.0 - 4.0 - 4.0 - 4.0 20.0
Livestock extension and Capacity building
Sahiwal Breed Improvement
- Number of sahiwal breed improved
32,000
0.5 - - - - - - - 0.5
Establishment and stocking of Hay barns
- Number of hay barns established
40,000
4.0 40,000
3.0 - 3.0 - - - - 10.0
Establish a livestock sale yard in the county
- Establishment of livestock yard established
1 4.0 - 3.0 - 3.0 - - - 10.0
Livestock exhibition
- Number of exhibitions
1 0.2 1 0.2 1 0.2 1 0.2 1 0.2 10.0
Purchase poultry, dairy goats, rabbits and bee hives for farmers
- Number of poultry, dairy, goats, rabbits and beehives purchased
- 2.4 - 2.4 - 2.4 - 2.4 - 2.4 12.0
Aquaculture
Installation of Animal
Animal and fish
1 10 - 10 - - - - - - 20.0
92
Programme Name: Livestock Resource Management and Development Objective: To enhance dissemination of livestock information to the farmers for improved livestock production Outcome: Increased livestock productivity and outputs Sub- programme
Key Outcome
Baseline -
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
Target
Cost (Ksh-Millions)
Target
Cost(Ksh-Millions)
target
Cost(Ksh-millions)
target Cost(Ksh-Millions)
target
Cost(Ksh-Millions)
development
and Fish Feed Mill
feed mill installed
Develop a Trout Hatchery project
Trout Hatchery project established
1 5.0 - 5.0 - - - - - - 10.0
Building and installation of a plant Mini fish processing plant
Mini fish processing plant built
1 5.0 - 5.0 - - - - - - 10.0
Rehabilitation of ESP ponds by buying pond liners
Number of pond liners purchased and installed
- 10.0 - 9.0 - 9.0 - 9.0 - 9.0 46.0
Development of ponds learning institutions
Number of ponds learning institutions developed
1 10.0 1 10.0 1 10.0 1 10.0 1 10.0 50.0
Deep freezers for bulking of fish in wards
The number of deep freezers purchased and installed
- 1.0 - 1.0 - 1.0 - 1.0 - 1.0 5.0
AGRICULTURE PROGRAMME-CROP DEVELOPMENT AND MANAGEMENT Objective- Increase agricultural productivity and outputs Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned Targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total Sub-
programme
Key outcome
Baseline
Key performance indicators
Target
cost
Target
cost
Target
cost
Target
cost
Target
cost
93
Land and crops development
Soil sampling and testing
- -Number of soil samples collected and analysed
7.0 7.0 6.0 20.0
Management and control of crop pests and diseases
- -Number of surveillance points in place -Pest control products purchased -Number of beneficiaries
30.0
30.0
30.0
30.0
30.0
150.0
Food security initiatives
Promotion of traditional high value crops county wide
- -Amount of planting materials purchased -Amount of produce harvested -Number of beneficiaries
40.0
40. 40.0
40.0
40. 200.0
Crop insurance
- -Number of crops insured -Number of beneficiaries
10.0
10.0
10.0
10.0
10.0
50.0
Agricultural extension services
Mechanization and modernization of agricultural sector
- -Number of equipment purchased -Farm land developed -Mechanization station operationalized
50.0
50.0
50.0
- - 150.0
County agricultural extension program
- -Number of farmers served -Number of staffs trained -Amount of facilitation to staff
12.0
12.0
12.0
12.0
12.0
60.0
Coffee, rice and tea improvement program
- -Improvement in unit production -Trainings done -New planting materials purchased
40.0
40.0
40.0
40.0
40.0
200.0
Completion of offices for agricultural
- -Number of office blocks completed
10.0
10.0
10.0
- - 30.0
94
extension services in Mwea East, West, Kirinyaga West, Kianyaga and Wamumu
and furnished
Rehabilitation and modernization of Kamweti ATC
-Facilities rehabilitated
7.0 7.0 6.0 - - 20.0
SHEP PLUS -Number of groups trained -Number of groups linked to market
7.0 7.0 6.0 - - 20.0
ASDP -Number of farmers trained
10.0
10. 10. 10.0
10.0
50.0
UTaNRMP -Number of groups funded -Number of projects completed -Income generated
40.0
40.0
40.0
40.0
40.0
200.0
Plantwise - -Operational clinics -Staffs trained -Equipment purchased
5.0 5.0 5.0 - - 15.0
PARDA - -Stakeholders trained -Equipment purchased -Farmers trained
17.0
17.0
16.0
- - 50.0
RiceMAPP - -Groups trained -Technologies up-scaled
25.0
25.0
25.0
25.0
16.0
116.0
2. Agribusiness and information management Agriculture & market development
Establishment of a county agricultural revolving fund
- -Amount of money disbursed -Projects supported
- 150 150 - - - 300
95
Horticultural productivity and marketing
- -Number of marketing linkages -Number of groups trained
24.0
24.0
24.0
24.0
24.0
120.0
Value addition of agricultural produce
- -Number of groups trained -Number of value addition facilities constructed and operational
6.0 6.0 6.0 6.0 6.0 30.0
Purchase of high quality dairy stock at Kamweti ATC
- -Number of animals purchased
3.0 - - - - 3.0
Agricultural information management
-Collecting, maintaining and managing agricultural sector information
- -Number of equipment purchased -MIS installed and operationalized -Number of staff trained -Reports generated by system
4.0 4.0 4.0 4.0 4.0 20.0
Support to agriculture research
-Number of research activities participated in
2.0 2.0 2.0 2.0 2.0 10.0
3.Agriculture inputs support program Outcome- Enhance accessibility of quality farm inputs
Accelerated agriculture inputs access service
Fertilizer subsidy
- -Amount of fertilizer purchased -Number of beneficiaries
85.0
- - - - 85.0
Distribution of planting materials
- -Number of planting materials purchased -Number of beneficiaries
50.0
- - - - 50.0
Flagship /County Transformative Projects
These are projects with high impact in terms of employment creation, increasing county competitiveness, revenue generation etc. They may be derived from the Kenya
96
Vision 2030 (to be implemented in collaboration with the National Government) or from the County Sessional Paper 2032 – Mountain Cities Blueprint.
This sector is comprised of the department of Agriculture, veterinary, Livestock and Fisheries and the Directorate of cooperative development
Project Name
Location
Objective
Output / Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Disease control All wards Control all notifiable and zoonotic diseases
Cover 80% of all the animals within the County
Number of animals vaccinated
2018-2022 ALVF 25 M
Subsidized artificial insemination
All wards Affordable AI services to the dairy sector
Double AI 20,000-40,000
Number of AI applied
2018-2022 ALVF 50 M
Fish and animal feeds plant
Kiatha-Kanyekiine
To process high quality and affordable animal and fish feeds
High quality feeds
Tonnes of animal and fish feeds produced annually
2018-2022 ALVF 50 M
Procure milk coolers
Upper zone of the County
To help dairy bulk milk for value addition and marketing
Increment of milk prices and reduction of milk losses
Number of milk coolers procured and installed
2018-2022 ALVF 60 M
School milk programme
All ECDE Pupils
Provide milk to all ECDE pupil in the County
All pupils under 5 years access free milk
Number of pupils accessing free milk
2018-2022 ALVF, Ministry of Education and Youth
440 M
Purchase of pedigree animals (livestock and fish)
Kamweti ATC
Training on good animals husbandry and be a source of pedigree heifers, broilers and fingerlings
High quality animal breeds
Number of pedigree purchased
2018-2022 ALVF & Kamweti ATC
60 M
Subsidy Fertilizer All Wards Provide Subsidy Fertilizer to Farmers
Increased Production
Number of bags issued
2018- 2022
ALVF 41 M
Purchase of Assorted seeds & seedlings
All Wards To increase access to high quality planting seeds and seedlings Assist farmers recover from drought effects
Increased Production
Number of Seeds and seedlings distributed
2018-2022 ALVF 29 M
Capacity Building for Youth & Women
All Wards To encourage more women & youth in Agriculture and Agri-business
Improved incomes
Number of Women & youths to be trained and mentored
2018-2022 ALVF 60 M
97
Project Name
Location
Objective
Output / Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Establishment of producer groups
County To enhance food security
Increase availability of food
Number of groups created Number of tonnes produced for food
2018-2022 ALVF 4 M
Enhanced extension services
County To ensure food security and quality assurance with an emphasis on nutrition
Increase food supply and improved nutrition
Number of farmers visited by the extension officer
2018-2022 ALVF 80 M
Review and implementation of a cooperative development policy
County To improve governance, efficiency and effectiveness
Efficient and productive cooperatives
No. of efficient and productive cooperatives
2018-2022 Department of cooperative development, trade, tourism, industry, enterprise development
40 M
Registration of produce cooperatives/ groups
County To enhance organized production and productivity
Increase productivity
No of Cooperatives / groups registered
2018-2022 Department of cooperative development, trade, tourism, industry, enterprise development
5 M
Mainstreaming Cross-cutting Issues
In mainstreaming of cross cutting issues, the sector departments will team up with the Social Protection, Culture and Recreation to provide training for women and youth engaging in sector related activities. Human resource sector contributes significantly in empowering women and youth to access enterprise funds. The sector will also ensure that both men and women are involved and recognized in decision making on farm use and products and ensure not more than two thirds of same gender occupy leadership positions in the groups. On HIV/AIDS, the sector will continue with sensitizing the community on the effects of the scourge. Enterprises that provide nutritious food to infected people like promotion of dairy goats, kitchen gardens traditional vegetables targeting vulnerable
98
groups including those infected will be promoted. HIV/AIDS curriculum will also be introduced in training of farmers to sensitize farmers on issues regarding HIV/AIDS. The sector will also focus on technologies and enterprises that are friendly to the environment. This will include sensitizing farmers on the dangers of the blue gum trees and protection of water catchments. Farmers will also be sensitized on the need to conserve the environment and protection of water catchment areas. They shall also be sensitized on the need to conserve environment as an income generating activity.
4.4.2 Environmental Protection, Water, Natural Resources and Housing The sector is comprised of the department of water & irrigation, environment & natural resources
Sub-sector vision and mission. Vision A clean, healthy and secure environment to guarantee high quality life for a prosperous county Mission To enhance governance in the protection, restoration, conservation, development and management of the environment and natural resources that creates an enabling environment for economic and social development.
County response to sector vision and mission Since the County is endowed with six permanent rivers, additional irrigation projects will be initiated to increase food production, high yielding livestock rearing and intensive cash crop farming among others. The county interventions will focus on increasing the area under irrigation; increasing the coverage of clean and safe water to both rural and urban areas; increasing water storage in the county; implementing policies on management of water and irrigation; the development and management of ground water and lastly the coordination of water and irrigation sector stakeholders.
Environment and Natural Resources This sub sector is mandated with proper management of environment and natural resources within the county
Sub-sector vision and mission. Vision A clean, healthy and secure environment to guarantee high quality life for a prosperous county Mission To enhance governance in the protection, restoration, conservation, development and management of the environment and natural resources that creates an enabling environment for economic and social development
County response to sector vision and mission
99
The sector will ensure that sustainable projects and programmes are initiated in the County and Environmental Impact Assessment (EIA) is done on them. In addition the county will focus on the following key interventions; 1) Management and formulation of policies relating to Environment, Solid Waste Management, Issuance of Noise License, Licenses for refuse transportation, Environmental protection, and awareness campaigns, and county forestry and other natural resources. 2) Undertake conservation, control and protection of water catchment areas, water quality and pollution control, restoration of wetlands, conservation and protection and provision of county forestry services, county environment management, and restoration of strategic county water towers and coordination of climate change enabling activities. 3) Develop and coordinate projects in renewable energy 4) The county will invest in environment conservation through private and public organizations which will ensure better methods of environment conservation. 5) The county will also train people on resource management especially with respect to the environment 6) The county will formulate and implement policies on management of the environment and natural resources.
Sector programmes
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: improved efficiency in waste management Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
Urban Centers Solid Waste Management Programme
Improved efficiency in urban waste management
- No. Bulk-Bins acquired
Acquire 20 Bulk-Bins
100 Acquire 20 Bulk-Bins
100 Acquire 20 Bulk-Bins
100 Acquire 20 Bulk-Bins
100 Acquire 20 Bulk-Bins
100 500
100
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: improved efficiency in waste management Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
No. of Bulk-Bins Carrier trucks Acquired
Acquire 1 Bulk-Bin Carrier truck
Acquire 1 Bulk-Bin Carrier truck
Acquire 1 Bulk-Bin Carrier truck
Acquire 1 Bulk-Bin Carrier truck
Acquire 1 Bulk-Bin Carrier truck
No of Medium size specialized Hazardous waste bins Acquired
Acquire 1 Medium size specialized Hazardous waste bin
Acquire 1 Medium size specialized Hazardous waste bin
Acquire 1 Medium size specialized Hazardous waste bin
Acquire 1 Medium size specialized Hazardous waste bin
Acquire 1 Medium size specialized Hazardous waste bin
No. of specialized Hazardous waste Vans acquired
Acquire 2 specialized Hazardous waste
No. of Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
101
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: improved efficiency in waste management Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
No. of Acres Acquisitioned and developed
Acquisition of 10 acres and development of County Dumpsite
No. of acquisitioned and installed Medical and hazardous waste incinerators.
Acquisition and installation of Medical and hazardous waste incinerator
Urban Centers Liquid Waste management
Acquiring 3-Exhauster Trucks
500 Acquire 1 exhauster truck
1000 Acquire 1 exhauster truck
1000 Acquire 1 exhauster truck
1000
500 4000
102
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: improved efficiency in waste management Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
Programme
No. of major towns connected with sewerage system (Kerugoya, Kutus, Sagana, Kagio, Ngurubani and Kianyaga), Percentage of sewerage system complete,No. Of households connected to the sewerage system.
Feasibility study, plans and design
25 percent of sewerage system complete
50 percent of sewerage system complete
75 percent of sewerage system complete
100 percent of sewerage system complete
103
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: improved efficiency in waste management Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
County Rivers Conservation Programme
No of Reposed statutory riparian zones.
Repossession of all statutory riparian zones along one major river and its main tributaries (Thiba).
50 Repossession of all statutory riparian zones along one major river and its main tributaries (Nyamindi)
125 Repossession of all statutory riparian zones along one major river and its main tributaries (Sagana)
125 50 50
No of County Bamboo Propagating Nursery established.
Establishment of County Bamboo Propagating Nursery.
Establishment of County Bamboo Propagating Nursery.
Establishment of County Bamboo Propagating Nursery.
Establishment of County Bamboo Propagating Nursery.
Planting bamboo seedlings on the 60% of riparian land of the 3 major rivers
25 percent of Planting bamboo seedlings on the riparian land
50 percent of Planting bamboo seedlings on the riparian land
75 percent of Planting bamboo seedlings on the riparian land
100 percent of Planting bamboo seedlings on the riparian land
104
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: improved efficiency in waste management Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
County Wet-Land Conservation Programme
No. of County Wetlands and water-pans Repossessed and land ownership documents processed
25 percent of repossessed and processed ownership documents
50 50 percent of repossessed and processed ownership documents
50 75 percent of repossessed and processed ownership documents
50 100 percent of repossessed and processed ownership documents
50 200
Percentage of County’s Wetland and water pans reclaimed
Reclaim 15 percent of wetlands and waterpans
Reclaim 50 percent of wetlands and waterpans
Reclaim 75 percent of wetlands and waterpans
Reclaim 100 percent of wetlands and waterpans
County Natural Carbonated Water points conservation programme
No. of land ownership documents for the 8 natural carbonated water points processed
Processing of land ownership documents for 2 natural carbonated water points
7.5 Processing of land ownership documents for 2 natural carbonated water points
7.5 Processing of land ownership documents for 2 natural carbonated water points
7.5 Processing of land ownership documents for 2 natural carbonated water points
7.5 30
105
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: improved efficiency in waste management Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
No. of areas with Natural carbonated water deposits secured
Securing 2 areas with Natural carbonated water deposits
Securing 2 areas with Natural carbonated water deposits
Securing 2 areas with Natural carbonated water deposits
Securing 2 areas with Natural carbonated water deposits
Regulating utilization of the carbonated water.
Regulating utilization of the carbonated water.
Regulating utilization of the carbonated water.
Regulating utilization of the carbonated water.
Regulating utilization of the carbonated water.
County Forestry Enhancement Programme
No. of Processed land ownership documents of County forests lands
Processing 3 land ownership documents of County forests lands
75 Processing 3 land ownership documents of County forests lands
75 Processing 3 land ownership documents of County forests lands
75 Processing 3 land ownership documents of County forests lands
75 300
No. of the Re-established the County tree nurseries
Re-established the 2 County tree nurseries
Re-established the 2 County tree nurseries
Re-established the 2 County tree nurseries
Re-established the 2 County tree nurseries
106
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: improved efficiency in waste management Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
No. of forestry extension services provided
Provide forestry Extension services
Provide forestry Extension services
Provide forestry Extension services
Provide forestry Extension services
No of botanical gardens established
Establish 1 botanical garden
Establish 1 botanical garden
Establish 1 botanical garden
Establish 1 botanical garden
Beautification of 3 urban centers and 3 main county corridors(gateways)
Develop county environmental regulatory framework
No. of county environmental ACTs Drafted, enacted and disseminated.
Drafting, enacting and dissemination of county environmental ACTs
25 County environmental Acts implemented
25 County environmental Acts implemented
25 County environmental Acts implemented
25 100
107
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: improved efficiency in waste management Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
No. of environmental monitoring and enforcement unit Established and operationalised
Establish environmental monitoring and enforcement unit
operationalize environmental monitoring and enforcement unit
operationalize environmental monitoring and enforcement unit
operationalize environmental monitoring and enforcement unit
No of double cab pick-ups for environmental assessment and inspections purchased
Purchase 1 double cab pick-ups for environmental assessment and inspection
Purchase 1 double cab pick-ups for environmental assessment and inspection
No. of county environmental resource center Establish and operationalize.
Establish county environmental resource center.
Operationalize county environmental resource center.
Operationalize county environmental resource center.
operationalize county environmental resource center.
108
Programme Name: Solid Waste Management Objective: To Provide sustainable urban center solid and liquid waste management services Outcome: Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target
Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
target Cost(Million)
Million
Urban Centers Solid Waste Management Programme
No. Bulk-Bins acquired
Acquire 20 Bulk-Bins
100
Acquire 20 Bulk-Bins
100
Acquire 20 Bulk-Bins
100
Acquire 20 Bulk-Bins
100
Acquire 20 Bulk-Bins
100
500
No. of Bulk-Bins Carrier trucks Acquired
Acquire 1 Bulk-Bin Carrier truck
Acquire 1 Bulk-Bin Carrier truck
Acquire 1 Bulk-Bin Carrier truck
Acquire 1 Bulk-Bin Carrier truck
Acquire 1 Bulk-Bin Carrier truck
No of Medium size specialized Hazardous waste bins Acquired
Acquire 1 Medium size specialized Hazardous waste bin
Acquire 1 Medium size specialized Hazardous waste bin
Acquire 1 Medium size specialized Hazardous waste bin
Acquire 1 Medium size specialized Hazardous waste bin
Acquire 1 Medium size specialized Hazardous waste bin
No. of specialized Hazardous waste Vans acquired
Acquire 2 specialized Hazardous waste
No. of Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
Involve 20 Youth groups in urban centers Cleaning Services
109
No. of Acres Acquisitioned and developed
Acquisition of 10 acres and development of County Dumpsite
No. of acquisitioned and installed Medical and hazardous waste incinerators.
Acquisition and installation of Medical and hazardous waste incinerator
Urban Centers Liquid Waste management
Acquiring 3-Exhauster Trucks
500 Acquire 1 exhauster truck
1000 Acquire 1 exhauster truck
1000 Acquire 1 exhauster truck
1000
500 4000
110
Programme
No. of major towns connected with sewerage system (Kerugoya, Kutus, Sagana, Kagio, Ngurubani and Kianyaga), Percentage of sewerage system complete, No. Of households connected to the sewerage system.
Feasibility study, plans and design
25 percent of sewerage system complete
50 percent of sewerage system complete
75 percent of sewerage system complete
100 percent of sewerage system complete
County Rivers Conservation Programme
No of Reposed statutory riparian zones.
Repossession of all statutory riparian zones along one major river and its main tributaries (Thiba).
50 Repossession of all statutory riparian zones along one major river and its main tributaries (Nyamindi)
125 Repossession of all statutory riparian zones along one major river and its main tributaries (Sagana)
125 50 50
111
No of County Bamboo Propagating Nursery established.
Establishment of County Bamboo Propagating Nursery.
Establishment of County Bamboo Propagating Nursery.
Establishment of County Bamboo Propagating Nursery.
Establishment of County Bamboo Propagating Nursery.
Planting bamboo seedlings on the 60% of riparian land of the 3 major rivers
25 percent of Planting bamboo seedlings on the riparian land
50 percent of Planting bamboo seedlings on the riparian land
75 percent of Planting bamboo seedlings on the riparian land
100 percent of Planting bamboo seedlings on the riparian land
County Wet-Land Conservation Programme
No. of County Wetlands and water-pans Repossessed and land ownership documents processed
25 percent of repossessed and processed ownership documents
50 50 percent of repossessed and processed ownership documents
50 75 percent of repossessed and processed ownership documents
50 100 percent of repossessed and processed ownership documents
50 200
Percentage of County’s Wetland and water pans reclaimed
Reclaim 15 percent of wetlands and water pans
Reclaim 50 percent of wetlands and water pans
Reclaim 75 percent of wetlands and water pans
Reclaim 100 percent of wetlands and water pans
112
County Natural Carbonated Water points conservation programme
No. of land ownership documents for the 8 natural carbonated water points processed
Processing of land ownership documents for 2 natural carbonated water points
7.5 Processing of land ownership documents for 2 natural carbonated water points
7.5 Processing of land ownership documents for 2 natural carbonated water points
7.5 Processing of land ownership documents for 2 natural carbonated water points
7.5 30
No. of areas with Natural carbonated water deposits secured
Securing 2 areas with Natural carbonated water deposits
Securing 2 areas with Natural carbonated water deposits
Securing 2 areas with Natural carbonated water deposits
Securing 2 areas with Natural carbonated water deposits
Regulating utilization of the carbonated water.
Regulating utilization of the carbonated water.
Regulating utilization of the carbonated water.
Regulating utilization of the carbonated water.
Regulating utilization of the carbonated water.
County Forestry Enhancement Programme
No. of Processed land ownership documents of County forests lands
Processing 3 land ownership documents of County forests lands
75 Processing 3 land ownership documents of County forests lands
75 Processing 3 land ownership documents of County forests lands
75 Processing 3 land ownership documents of County forests lands
75 300
113
No. of the Re-established the County tree nurseries
Re-established the 2 County tree nurseries
Re-established the 2 County tree nurseries
Re-established the 2 County tree nurseries
Re-established the 2 County tree nurseries
No. of forestry extension services provided
Provide forestry Extension services
Provide forestry Extension services
Provide forestry Extension services
Provide forestry Extension services
No of botanical gardens established
Establish 1 botanical garden
Establish 1 botanical garden
Establish 1 botanical garden
Establish 1 botanical garden
No. of urban centers and main county corridors(gateways) beautified
Beautification of 3 urban centers and 3 main county corridors(gateways)
Develop county environmental regulatory framework
No. of county environmental ACTs Drafted, enacted and disseminated.
Drafting, enacting and dissemination of county environmental ACTs
25 County environmental Acts implemented
25 County environmental Acts implemented
25 County environmental Acts implemented
25 100
114
No. of environmental monitoring and enforcement unit Established and operationalised
Establish environmental monitoring and enforcement unit
operationalise environmental monitoring and enforcement unit
operationalise environmental monitoring and enforcement unit
operationalise environmental monitoring and enforcement unit
No of double cab pick-ups for environmental assessment and inspections purchased
Purchase 1 double cab pick-ups for environmental assessment and inspection
Purchase 1 double cab pick-ups for environmental assessment and inspection
No. of county environmental resource center Establish and operationalise.
Establish county environmental resource center.
Operationalise county environmental resource center.
Operationalise county environmental resource center.
Operationalise county environmental resource center.
Programme Name: Water Supply Services Objective: Outcome: Sub-programme
Key outcome
Baseline
Key Performance indicators
Planned Targets Year 1 Year 2 Year 3 Year 4 Year 5 Total
Budget
Target Cost
Target Cost
Target Cost Target Cost
Target Cost
Water and Irrigation
Sufficient water for irrigation
Number of households (HH) connected
42.8 percentage of households connected with
878.75
26.1 percent of the households connected
535.7
16.8 percent of the households connected
344.5
9.2 percent of the households connected with
189.5
5.4 percent of households connected with clean water.
105.5
2053.95
115
and clean water for
with clean water
clean water.
with clean water.
with clean water.
clean water.
Number of Hectares of land supplied with water for Irrigation
42.8 percent of land supplied with water for irrigation
42.8 percent of land supplied with water for irrigation
42.8 percent of land supplied with water for irrigation
42.8 percent of land supplied with water for irrigation
42.8 percent of land supplied with water for irrigation
Drainage systems put in place (Thiguku Village Drainage System)
1 Drainage system put in place.
Number of Dams constructed
6 2 dams constructed
2 dams constructed
2 dams constructed
Number of Dams desilted (Nyaikungu dam)
1 1 dam desilted (nyakungu dam)
Number of water pans rehabilitated
2 water pans rehabilitated
2 water pans rehabilitated
2 water pans rehabilitated
Number of Boreholes drilled and in use.
116
Number of schools accessing clean water.
5 schools connected with clean water
5 schools connected with clean water
5 schools connected with clean water
5 schools connected with clean water
Number of staff trained and number of project management committee members trained
4 staff members and 20 members of the project management committee trained
4 staff members and 15 members of the project management committee trained
4 staff members and 15 members of the project management committee trained
Number of water tanks purchased/ constructed (20)
5 water tanks purchased/constructed
5 water tanks purchased/constructed
5 water tanks purchased/constructed
5 water tanks purchased/constructed
5 water tanks purchased/constructed
Flagship /County Transformative Projects
These are projects with high impact in terms of employment creation, increasing county competitiveness, revenue generation etc. They may be derived from the Kenya Vision 2030 (to be implemented in collaboration with the National Government) or from the County Sessional Paper 2032 – Mountain Cities Blueprint.
Project Location Description Outcome Performance Indicator
Expected completion date
Implementation agencies
Cost in Kshs (Millions)
Waste Management & Resource Recovery
Kerugoya Kutus Mwea Kagio
Community awareness and capacity building on individual and collective responsibility on waste collection from the source (households,
Clean Environment
No. of households, markets and businesses serviced
2018 - 2020
Directorate of Environment and Natural Resources
5 M
117
Project Location Description Outcome Performance Indicator
Expected completion date
Implementation agencies
Cost in Kshs (Millions)
businesses, markets and farms) that should be well packaged for ease in collection.
Organization and capacity building of waste handlers. The waste handlers and other interested individuals to be organized into cooperatives so they can handle waste management as a business and industry engagement
Community Economic empowerment Social Integration
No. of SACCOs created Amount of Saving & Investments
No of strategic Partnerships
2018 - 2022
Directorate of Environment and Natural Resources
25M
Collection of waste from source by designated waste collectors. The Co-operatives servicing the major towns should be provided with the necessary protective gear and tool kits (e.g. overalls, helmets, gumboots, gloves, spades, rakes, wheel burrows, dust masks etc) for waste management
Effective waste collection Minimized health risks to waste handlers Increased Revenue Co-operatives
Amount of waste removed/collected from source Amount of income from Improved skills and appropriate technology in Waste management
2018 - 2022
Directorate of Environment and Natural Resources
80M
Transfer of waste from source should
Clean Environment
Amount of garbage collected
2018 - 2022
To be Procured 80M
118
Project Location Description Outcome Performance Indicator
Expected completion date
Implementation agencies
Cost in Kshs (Millions)
be well mechanized including additional equipment and vehicles for transfer of waste from source to end point.
Economic Empowerment Enhanced and appropriate technology Improved skills
No of vehicles collecting garbage
Resources recovery at buy back centers. Skips, Receptacles to be converted to buyback centers to be created in the main towns and administrative HQ’s Engage the Cooperatives created also to manage buy back centers and recover reusable and recyclable waste at the buyback centers
Minimal waste at disposal Resources Recovered and Reused
Amount of waste at final disposal sites Income Generated Management Skills No of recycling business and industries created
2018 - 2020
Directorate of Environment and Natural Resources
16M
Mwea Makima Water project
Thiba/ Nyangati
Expansion of the existing project to provide portable, adequate water to Kimbimbi and Ngurubani towns.
More residents with access to clean water for domestic use
Number of households connected to clean and safe water
June 2018 Directorate of water
3.6m
Njukii-ini water project
Njukii Construction of an intake point along Igenda Mbola river, a storage tank at Mbiri Market and a distribution system to serve residents of Njuki-ini ward.
More residents with access to clean water for domestic use
Number of households connected to clean and safe water
June 2018 Directorate of water
15m
South Ngariama
Construction of an intake point along Rupingazi
More residents with
Number of households connected to
June 2018 Directorate of water
12 M
119
Project Location Description Outcome Performance Indicator
Expected completion date
Implementation agencies
Cost in Kshs (Millions)
Water Project (Mugaru Water Project)
River, a storage tank and a distribution system to serve residents of South Ngariama
access to clean water for domestic use
clean and safe water
Riagicheru Water Project
Improvement of the existing water supply and construction of a new water storage tank so as to serve more households
More residents with access to clean water for domestic use
Number of households connected to clean and safe water
May 2018 Directorate of water
12M
Rukenya- Kutus Water project
Rehabilitation of the existing intake and pipeline so as to increase supply of water to Kutus town and it’s environs
More residents with access to clean water for domestic use
Number of households connected to clean and safe water
May 2018 Directorate of water
5.5 M
Mainstreaming cross cutting issues
To mainstream cross cutting issues, the sector has continuously addressed environmental
issues by ensuring that industries adhere to environmental standards and prevention of
pollution of surface water. During the plan period, the County will engage available labour
force in environmental conservation to reduce the unemployment. To mitigate on disasters
especially during rainy season, the sector will build dams to harvest rain water. Gender
parity is a crossing-cutting issue that environment, water and sanitation will be able to
integrate through maintaining at least 30 per cent of either gender in the membership in
the water users associations. In collaboration with other sectors the sector will work
towards improving the lives of people affected or infected with HIV/AIDS as a
developmental issue.
Most of the projects in the sector are aimed at alleviating poverty by ensuring there is
access to markets, goods, social amenities such as water and sanitation facilities thus
ensuring there is an enabling environment for poverty reduction. The sector also employs
a number of young people in casual labour thus mainstreaming youth issues. Soil and
water conservation efforts will be applied so as to protect the environment.
120
4.4.3 General Economics, Commercial and Labour Affairs This sector comprises of the department of Cooperative Development, Trade, Tourism,
Industry and Enterprise Development. The department is composed of four directorates,
namely Cooperative Development, Trade and Enterprise Development, Tourism and
Industrialization.
The cooperative directorate key role is to ensure there is development of cooperative
societies in the county through establishment of an enabling environment and mutual
working relationship between the stakeholders. In addition, it focuses on the enhancement
of cooperative society’s performance, revival of dormant and formation of new cooperative
societies are indicative of the level of growth in the cooperative movement. The basis of this
focus on cooperative development is the understanding that the cooperative movement
plays a very significant role in improving livelihoods of members and the community at
large. Since cooperative societies seeks to empower members to jointly carry out a common
economic, social and cultural activity for the general good of all members, the directorate
is keen to create a conducive environment for the same. They help in creating equity in
resources distribution as well as in job creation. The county has 126 cooperative societies
distributed in all the sub counties.
The trade and enterprise development directorate is responsible for regulating,
facilitating and promoting the various business activities. The directorate’s core activities
include the management of Joint Loan Board Scheme; entrepreneurship development
through business counseling; training and consultancy services; markets development
and dissemination of trade information; promotion of small and medium enterprises and
ensuring fair trading practices.
The tourism directorate’s key role is tourism development through the development,
formulation and implementation of a county tourism strategy and all related policies. The
directorate further has the responsibility of planning and researching on potential tourist
sites translating to product development. The directorate has the responsibility of
developing tourist related calendar of events; branding, marketing and promoting the
county’s tourist attraction sites through publications and documentaries.
The industrialization directorate is responsible for the industrial promotion and
development of the county. It is responsible for resource mapping of the county so as to
identify and analyse the comparative advantage of the county. It is also responsible for
121
commodity mapping so as to understand the geography of the county’s supply chain
through which the county can then identify which industries beside the agro-processing
industries that can be established. The directorate is also responsible for the development
of cottage industries.
Sector Vision and Mission Vision “A globally competitive county economy with sustainable and equitable socio-economic development with enhanced redistribution of wealth” Mission “To develop, promote, coordinate and implement sustainable integrated cooperative
development, trade, tourism, industry and enterprise development policies and
programmes for an emerging economy.
County response to sector vision and mission In response to the sector vision and mission, the strategic priorities of the sector will
include the establishment of a responsive, efficient and sustainable cooperative movement
through capacity building and the improvement of governance in the cooperatives and
Saccos; the development of a conducive business environment which will promote
enterprise development inclusive of capacity building for the enterprises;
the identification, mapping and branding of tourist attractions sites which will result in
the increase of the number of tourists coming into the county thus the development of the
hospitality sector so as to accommodate the soaring numbers; the development of annual
calendar of the events which will ensure a consistent inflow of local, regional and
international tourists; the establishment of five star hotels which will attract tourists in
addition to promotion of domestic tourism through seminars; the county establishment of
agro-based and cottage industries especially those which add value to the locally produced
agricultural produce.
Sector Programmes
122
Programme Name: Trade Development and Industrial Investment Objective: Creation of wealth and poverty reduction Outcome: Improved living standards Sub-programme
Key Outcome
Key performance Indicators
Baseline
Year1 Year2 Year3 Year4 Year5 Total
target cost
target cost
target cost
target cost
target cost
30M
Capacity Building for traders and SMEs
Better skilled traders and business people
No of trained traders,
500 trained
training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Promotion Development And growth of Trade
Employment creation
List of names of those assisted financially and their respective amounts
200 business people facilitated with credits
Facilitating 100 business people with credit
10M
Facilitating 100 business people with credit
10M
Facilitating 100 business people with credit
10M
100 business people With credit
10M
Facilitating 100 business people with credit
10M
50M
123
Programme Name: Trade Development and Industrial Investment Objective: Creation of wealth and poverty reduction Outcome: Improved living standards Sub-programme
Key Outcome
Key performance Indicators
Baseline
Year1 Year2 Year3 Year4 Year5 Total
target cost
target cost
target cost
target cost
target cost
30M
Capacity Building for traders and SMEs
Better skilled traders and business people
No of trained traders,
500 trained
training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
air trade practices and consumer protection
Accurate weighing and measuring for use for trade
Accurate statement in the course of trade
Available avenues of consumer protection
Reduction of counterfeits and substandard goods
Number of W&M equipment verified and stamped, amount of revenue collected and cases (w&m) prosecuted.
Reports on surveillance done prosecution returns. Number of cases reported. Number of cases prosecuted.
7000 equipment are verified
Annual verification of 10 000 equipment
6M
Annual verification of 10 000 equipment
6M
Annual verification of 10 000 equipment
6M
Annual verification of 10 000 equipment
6M
Annual verification of 10 000 equipment
6M
30M
124
Programme Name: Trade Development and Industrial Investment Objective: Creation of wealth and poverty reduction Outcome: Improved living standards Sub-programme
Key Outcome
Key performance Indicators
Baseline
Year1 Year2 Year3 Year4 Year5 Total
target cost
target cost
target cost
target cost
target cost
30M
Capacity Building for traders and SMEs
Better skilled traders and business people
No of trained traders,
500 trained
training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
125
Programme Name: Trade Development and Industrial Investment Objective: Creation of wealth and poverty reduction Outcome: Improved living standards Sub-programme
Key Outcome
Key performance Indicators
Baseline
Year1 Year2 Year3 Year4 Year5 Total
target cost
target cost
target cost
target cost
target cost
30M
Capacity Building for traders and SMEs
Better skilled traders and business people
No of trained traders,
500 trained
training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Facilitating 100 business people and training 300
6M
Promotion of Industrial Development
Processed good, increase in employment ,revenue, Market for agricultural produce
Industries in place
20 industries in place
1 industry and conducting a feasibility study
3M
1 industry and conducting a feasibility study
3M
1 industry and conducting a feasibility study
3M
1 industry and conducting a feasibility study
3M
1 industry and conducting a feasibility study
3M
15M
126
Programme Name: Cooperative Extension Services Objective: Improve on governance and management of cooperative societies Outcome: Progressive and stable cooperative movement Sub-programme
Key Outcome
Key performance Indicators
Baseline Year1 Year2 Year3 Year4 Year5 Total
target cost
Target Cost
target cost
target cost
target cost
5M
Cooperative advisory and Extension services
Improved governance in the management of cooperative societies
Turnover of operations and number of disputes
Officers attends management and general meetings in the field
80 meetings
1M
80 meetings
1M 80 meetings
1M
80 meetings
1M
80 meetings
1M
Cooperative education and training
Improved efficiency in service delivery
Number of trainings done and list of attendance
Occasional trainings done
z15 trainings
2M
15 trainings
2M
15 trainings
2M
15 trainings
2M
15 trainings
2M
10M
Programme Name: TOURISM DEVELOPMENT AND MARKETING Objective: Attract local and international tourists in the county Outcome: Increased revenue and job creation Sub-programme
Key Outcome
Key performance Indicators
Baseline
Year1 Year2 Year3 Year4 Year5 Total
target cost
target Cost
Target cost
target cost
target cost
85M
Domestic tourism promotion and marketing
Increased revenue and job creation
Number of tourists
No available data
Conducting feasibility study
17M
Conducting feasibility study
17M
Conducting feasibility study
17M
Conducting feasibility study
17M
Conducting feasibility study
17M
International tourism promotion and
Increased revenue
Number of international tourists
No available data
Conducting feasibility study
20M
Conducting feasibility study
20M
Con
ducting feasibility study
20M
Con
ducting feasibility study
20M
Con
ducting feasibility study
20M
1
00M
127
Programme Name: TOURISM DEVELOPMENT AND MARKETING Objective: Attract local and international tourists in the county Outcome: Increased revenue and job creation Sub-programme
Key Outcome
Key performance Indicators
Baseline
Year1 Year2 Year3 Year4 Year5 Total
target cost
target Cost
Target cost
target cost
target cost
85M
Domestic tourism promotion and marketing
Increased revenue and job creation
Number of tourists
No available data
Conducting feasibility study
17M
Conducting feasibility study
17M
Conducting feasibility study
17M
Conducting feasibility study
17M
Conducting feasibility study
17M
marketing
visiting the county
Flagship /County Transformative Projects
These are projects with high impact in terms of employment creation, increasing
county competitiveness, revenue generation etc. They may be derived from the Kenya
Vision 2030 (to be implemented in collaboration with the National Government) or from
the County Sessional Paper 2032 – Mountain Cities Blueprint
Project Name
Location
Objective
Output / Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Milk packaging machines
County Value addition to the milk product
Installed milk packaging machine
Number of machines 2018-2019
Department of cooperative development, trade, tourism, industry, enterprise development
6 M
128
Project Name
Location
Objective
Output / Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Coffee roasting, griding and packaging machine
County Value addition to coffee
Installed, commissioned and operational machine
Number of machines 2018 -2019
Department of cooperative development, trade, tourism, industry, enterprise development
6 M
Industrial and Business park
Thigirishi land near sagana
Revenue generation, Job creation, value addition
Operational industrial park
No of factories/industries/businesses in the park
2018-2022
Department of cooperative development, trade, tourism, industry, enterprise development and National government
1 Billion and PPP model
Establisment of a Apparels and Textiles Cottage Industry
County Job creation, value addition
Production of hospital linen and other apparels
No of job created No of apparels produced
2018-2022
Department of cooperative development, trade, tourism, industry, enterprise development and National government
100 M
Purchase of various equipment and inputs as grants in support of Women and Youth Empowerment Programm
County Job creation, value addition
Production and value addition in numerous sectors
No of job created No of products developed No of equipment purchased Quantity of inputs purchased
2018-2022
Department of cooperative development, trade, tourism, industry, enterprise development and National
100 M
129
Project Name
Location
Objective
Output / Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
e (“Wezesha Programme”)
government
Establishment of various cottage industries
County Job creation, value addition
Production and value addition in numerous sectors
No of job created No of cottage industries established
2018-2022
Department of cooperative development, trade, tourism, industry, enterprise development and National government
80 M
Construction of market sheds, laying of slabs, toilets,
drainage and flood lights
Wang’uru, Makutano, Kiamutugu, Kutus and Kagio
Job creation Revenue creation
Well maintained market
Fully structured markets
2018-2020
Trade and cooperative department
92M
Development of an 18 hole golf course, luxury houses, low cost housing
Gichugu
Job creation, income redistribution, tourist attraction
Fully developed gold course,
Operational golf course 2018 -2022
Department of cooperative development, trade, tourism, industry, enterprise development and National government
100 M and PPP Model
Development of Kamweti Mountain Climbing Route
Gichugu
Job creation, income redistribution, tourist attraction
Well developed and mapped out route
Usable route 2018 – 2022
Department of cooperative development, trade, tourism, industry, enterprise
50 M
130
Project Name
Location
Objective
Output / Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
development
Development of a canoeing course
Sagana – Mwea
Job creation, income redistribution, tourist attraction, adventure sports
Well developed and mapped out water course
Number of people using the course
2018 -2020
Department of cooperative development, trade, tourism, industry, enterprise development
30 M
Development on a documentary
County To showcase county investment opportunities and tourist attraction sites
Increase investment and increase number of tourists
No. of new investments No. of tourists Documentary
2018 -2020
Department of cooperative development, trade, tourism, industry, enterprise development
30 M
4.4.4 Education and Public Service Sector This sector is comprised of the department of education and public service. Sector Vision and Mission Vision: To have a globally competitive quality education, public service delivery and child care in Kirinyaga County’s for sustainable development Mission: To provide holistic and integrated educational programs and efficient public service
delivery and child care
131
Sector programmes
Department of Vocational Training
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Vocational Training and Home Craft Centers
Number of Title deeds secured (27)
27 title deeds secured
1.35.m
1,350,000
Number of physical plans secured
28 physical plans secured
2.7m
2,700,000
Number of Branded Gate and Fence erected (30 branded gates)
6 institutions with branded gates and fences
18m
6 institutions with branded gates and fences
18m
6 institutions with branded gates and fences
18m
6 institutions with branded gates and fences
18m
4 institutions with branded gates and fences
12m
132
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Number of fully furnished county polytechnic workshops. (6)
6 fully furnished county polytechnic workshops.
18m
Number of fully furnished home craft admin blocks. (30)
6 fully furnished home craft admin blocks completed
30m
6 fully furnished home craft admin blocks completed
30m
6 fully furnished home craft admin blocks completed
30m
6 fully furnished home craft admin blocks completed
30m
4 fully furnished home craft admin blocks completed
20m
Number of fully furnished home craft classes (30)
6 fully furnished home craft classes
15m
6 fully furnished home craft classes
15m
6 fully furnished home craft classes
15m
6 fully furnished home craft classes
15m
4 fully furnished home craft classes
10m
133
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Number of institution
Supplied with Home Craft equipment. (30)
6 fully furnished institutions with home craft equipment
9m
6 fully furnished institutions with home craft equipment
9m
6 fully furnished institutions with home craft equipment
9m
6 fully furnished institutions with home craft equipment
9m 4 fully furnished institutions with home craft equipment
6m
Number of home craft institutions supplied with learning material (30)
6 institutions supplied with learning material
7.5m
6 institutions supplied with learning material
6m
6 institutions supplied with learning material
4.5m
6 institutions supplied with learning material
3m 4 institutions supplied with learning material
1m
Number of institutions with home craft ablution blocks (30)
6 institutions have home craft ablution blocks constructed
18m
6 institutions have home craft ablution blocks constructed
18m
6 institutions have home craft ablution blocks constructed
18m
6 institutions have home craft ablution blocks constructed
18m
4 institutions have home craft ablution blocks constructed
12m
134
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Number of VETI that have fully furnished administration block (30)
7 VETI fully furnished administration blocks
35m
6 VETI fully furnished administration blocks
30m
5 VETI fully furnished administration blocks
25m
6 VETI fully furnished administration blocks
30m
4 VETI fully furnished administration blocks
20m
Number of VETI institutions that have fully furnished Classroom blocks (30)
7 VETI are fully furnished classroom blocks
17.5m
6 VETI are fully furnished classroom blocks
15m
5 VETI are fully furnished classroom blocks
12.5m
6 VETI are fully furnished classroom blocks
15m
4 VETI have fully furnished classroom blocks
10m
Number of institutions with VETI Equipment (30)
7 (VETI) institution supplied with equipment
14M
6 (VETI) institution supplied with equipment
16M
5 (VETI) institution supplied with equipment
10M
5 (VETI) institution supplied with equipment
10m
4 (VETI) institution supplied with equipment 14M
8m
135
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Number of ( VETI)institutions supplied with VETI equipment (30)
7 institutions fully supplied with learning materials
7.7m
6 institutions fully supplied with learning materials
6.6m
5m institutions fully supplied with learning materials
5.5m
6 institutions fully supplied with learning materials
6.6m
4 institutions fully supplied with learning materials
4.4m
Number of VETI with ablution blocks (30)
Ablution blocks constructed for 7 institutions
21m
Ablution blocks constructed for 6 institutions
18m
Ablution blocks constructed for 5 institutions
15m
Ablution blocks constructed for 6 institutions
18m
Ablution blocks constructed for 4 institutions
12m
Number of institutions with fully furnished standard dormitory (30)
Fully furnished standard dormitories in 6 VETI
30M
Fully furnished standard dormitories in 6 VETI
30M
Fully furnished standard dormitories in 6 VETI
30M
Fully furnished standard dormitories in 6 VETI
30M
Fully furnished standard dormitories in 4 VETI
20M
136
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Number of institutions with fully furnished standard dinning with fully furnished standard kitchen (30)
Fully furnished standard kitchens for 6 VETI
33M
Fully furnished standard kitchens for 6 VETI
33M
Fully furnished standard kitchens for 6 VETI
33M
Fully furnished standard kitchens for 6 VETI
33M
Fully furnished standard kitchens for 4 VETI
22M
Number of institutions/ Septic tanks constructed or purchased (30)
Septic tanks are constructed/established for 6 VETI
18m
Septic tanks are constructed/established for 6 VETI
18m
Septic tanks are constructed/established for 6 VETI
18m
Septic tanks are constructed/established for 6 VETI
18m
Septic tanks are constructed/established for 4 VETI
12m
137
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Number of institutions that have fully furnished computer labs (30)
Fully furnished computer labs for 6 institutions
27m
Fully furnished computer labs for 6 institutions
27m
Fully furnished computer labs for 6 institutions
27m
Fully furnished computer labs for 6 institutions
27m
Fully furnished computer labs for 4 institutions
18m
Number of institutions supplied with ICT Equipment (30)
Supply of ICT equipment for 6 institutions
9m
Supply of ICT equipment for 6 institutions
9m
Supply of ICT equipment for 6 institutions
9m
Supply of ICT equipment for 6 institutions
9m Supply of ICT equipment for 4 institutions
6m
Number of institutions supplied with ICT Training material (30)
Supply of ICT Training material for 6 institutions
15m
Supply of ICT Training material for 6 institutions
12m
Supply of ICT Training material for 6 institutions
9m
Supply of ICT Training material for 6 institutions
6m Supply of ICT Training material for 4 institutions
2m
138
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Number of institutions connected with electricity (17)
6 institutions connected to electricity
1.2m
6 institutions connected to electricity
1.2m
5 institutions connected to electricity
1m
Number of institutions connected with water. (27)
6 institutions connected with water
1.2m
6 institutions connected with water
1.2m
6 institutions connected with water
1.2m
6 institutions connected with water
1.2m
3 institutions connected with water
0.6 m
Number of fully furnished institution library (1)
Phase 1 of the institutional library constructed
2m
Phase 2 of the institutional library constructed
2m
Phase 2 of the institutional library constructed
2m
Number of public libraries (1)
Phase 1 completed
5m
Phase 1 completed
5m
Phase 1 completed
5m Phase 1 completed
5m
139
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Quality Assurance and Standards
Quality assurance and standards maintained
0.4m
Quality assurance and standards maintained
0.4m
Quality assurance and standards maintained
0.4m
Quality assurance and standards maintained
0.4m
Quality assurance and standards maintained
0.4m
Number of institutions rebranded
1.5m
1.5m
1.5m
1.5m
1.5m
Number of exhibition and trade fares supported
1.5m
1.5m
1.5m
1.5m
1.5m
Capacity building
Capacity building facilitated
2m
Capacity building facilitate
2m
Capacity building facilitated
2m
Capacity building facilitated
2m Capacity building facilitated
2m
140
Programme Name: Vocational Education and Training Objective: improve the quality of skills offered in technical training institutions
Outcome: creation of employment to youth through skills offered in vocational training institutions
Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
Target cost
target cost
target cost
target cost
Number of internal exams and industrial attachments facilitated.
1.6m
1.6m
1.6m
1.6m
1.6m
Number of external exams facilitated (KNEC & NITA)
KNEC exams done
980, 000
KNEC exams done
1.078m
KNEC exams done
1.185m
KNEC exams done
1,304,380
KNEC exams done
1,434,818
NITA GIT II EXAMS done
1.9m
NITA GIT II EXAMS done
2.090m
NITA GIT II EXAMS done
2.299m
NITA GIT II EXAMS done
2.5289m
NITA GIT II EXAMS done
2,781,790
141
ECDE
Program Name: Early childhood education Objective: to improve learning conditions and standards in ECDE Outcome : Strengthened county education field services for effective and coordinated service delivery Sub-Progamme
Key outcome
Baseline
Key Performance Indicators
Planned Targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al cost
Target Cost
Target Cost
Target Cost
Target Cost
Target Cost
Curriculum implementation monitoring supervision and evaluation
Well prepared children before joining primary schools, Smooth transition to primary schools, Improved access and retention in the ECDE centres. -Increased ECDE enrolment. Decreased rate of truancy and drop-outs.
Successfully implement the curriculum and facilitated monitoring and evaluation throughout the year.
10.7
Successfully implement the curriculum and facilitated monitoring and evaluation throughout the year.
10.7
Successfully implement the curriculum and facilitated monitoring and evaluation throughout the year.
10.7
Successfully implement the curriculum and facilitated monitoring and evaluation throughout the year.
10.7
Successfully implement the curriculum and facilitated monitoring and evaluation throughout the year.
10.7
53.5m
Trainings ECDE Caregivers
Trained ECDE teachers on new curriculum About 500 ECDE teachers trained on new curriculum
Training of ECDE Teachers
Enhanced research,
Number of ECDE
125 ECDE
0.45m
125 ECDE
0.45m
125 ECDE
0.45m
125 ECDE
0.45m
125 ECDE
0.45m
2m
142
Program Name: Early childhood education Objective: to improve learning conditions and standards in ECDE Outcome : Strengthened county education field services for effective and coordinated service delivery Sub-Progamme
Key outcome
Baseline
Key Performance Indicators
Planned Targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al cost
Target Cost
Target Cost
Target Cost
Target Cost
Target Cost
training and capacity building of ECDE programs, Skilled ECDE teachers in material development -Increased teaching and learning materials in ECDE centers, Informed ECDE teachers lower primary teachers, h/trs manager on transition Increased percentage rate on transition, ECDE teachers empowered with special needs education. Increased identified children with special needs.
teachers trained.
teachers trained,
teachers trained,
teachers trained
teachers trained
teachers trained
143
Program Name: Early childhood education Objective: to improve learning conditions and standards in ECDE Outcome : Strengthened county education field services for effective and coordinated service delivery Sub-Progamme
Key outcome
Baseline
Key Performance Indicators
Planned Targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al cost
Target Cost
Target Cost
Target Cost
Target Cost
Target Cost
TRAINING OF OFFICERS
Empowered offers with knowledge and skills. Output Promotions and better salary, Empowered ECDE officers.
Number of Officers trained.
Officers trained
1.8M
Officers trained
1.8M
Officers trained
1.8M
Officers trained
1.8M
Officers trained
1.8M
9m
Community mobilization
Early Identification referral and placement of children with special needs Helping each child to realize his/her full potential
Co-Curricular activities
Children engaged in various co-curricular activities
Pre-school
All or a selected number of learners engage in co-curricular activities.
0.5m
All or a selected number of learners engage in co-curricular activities.
0.5m
All or a selected number of learners engage in co-curricular activities.
0.5m
All or a selected number of learners engage in co-curricular activities.
0.5m
All or a selected number of learners engage in co-curricular activities.
0.5m
2.5m
Inauguration of ECDE center management committees
Well prepared children and high retention and completion rate in the
Inaugurate and learn the ECDE Centre management committee
0.3 Inaugurate and learn the ECDE Centre management committee
0.3 Inaugurate and learn the ECDE Centre management committee
0.3 Inaugurate and learn the ECDE Centre management committee
0.3 Inaugurate and learn the ECDE Centre management committee
0.3 1.5m
144
Program Name: Early childhood education Objective: to improve learning conditions and standards in ECDE Outcome : Strengthened county education field services for effective and coordinated service delivery Sub-Progamme
Key outcome
Baseline
Key Performance Indicators
Planned Targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al cost
Target Cost
Target Cost
Target Cost
Target Cost
Target Cost
ECDE centers Cordial relations existing amongst the stakeholders involved in the ECDE sub-sector
Initiation of a feeding program
Improved nutritional status of pre-school which will help retention of children in school
Number of learners that benefit from the feeding program
All learners benefit from the feeding program
30.4m
All learners benefit from the feeding program
30.4m
All learners benefit from the feeding program
30.4m
All learners benefit from the feeding program
30.4m
All learners benefit from the feeding program
30.4m
152m
Land demarcation, fencing, landscaping and drainage
improved infrastructure and learning environment in ECDE centers
Number of institutions demarcated, fenced, well landscaped institutions
7.5m
7.5m
7.5m
7.5m
7.5m
37.5M
Supply of learning materials
Improved access, quality and equity of ECDE Services
Number of learning institutions supplied with learning materials
All institutions supplied with learning materials
3m All institutions supplied with learning materials
3m All institutions supplied with learning materials
3m All institutions supplied with learning materials
3m All institutions supplied with learning materials
3m 15m
Construction of classes
Available, Enough and standard learning space
Number of classrooms completed
6m 6m 6m 6m 6m 30m
145
Program Name: Early childhood education Objective: to improve learning conditions and standards in ECDE Outcome : Strengthened county education field services for effective and coordinated service delivery Sub-Progamme
Key outcome
Baseline
Key Performance Indicators
Planned Targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al cost
Target Cost
Target Cost
Target Cost
Target Cost
Target Cost
Construction of exhaustable toilets
Available Suitable and hygienic toilets
No.of toilets constructed
6m 6m 6m 6m 6m 30m
Supply of furniture
improved infrastructure and learning environment in ECDE centres
No.of furniture supplied.
Furniture supplied
2.5m
Furniture supplied
2.5m
Furniture supplied
2.5m
Furniture supplied
2.5m
Furniture supplied
2.5m
12.5m
Supply and fixing of play facilities
Appropriate and safe play materials and equipment in the centres
No. of play facilities supplied and fixed
3.0m
3.0m
3.0m
3.0m
3.0m
15m
Completion of classes
Enough and standard learning space
Number of classes completed
3m 3m 3m 3m 3m 15m
Completion of toilets
Suitable and hygienic toilets
Number of toilets completed
Toilets completed
3m Toilets completed
3m Toilets completed
3m Toilets completed
3m Toilets completed
3m 15m
Water connection/ drilling of boreholes
Increased access to water for learning institutions
No. of ECDE centers connected with water/No. of boreholes drilled
ECDE learning centers connected with water.
3m Learning institutions connected with water
3m Learning institutions connected with water
3m Learning institutions connected with water
3m Learning institutions connected with water
3m 15m
Purchase of land.
To provide additional facility for learning and extra-curricular activities
Number of parcels of land purchased
Parcels of land bought
2m Parcels of land bought
2m Parcels of land bought
2m Parcels of land bought
2m Parcels of land bought
2m 10m
146
Flagship /County Transformative Projects
These are projects with high impact in terms of employment creation, increasing county competitiveness, revenue generation etc. They may be derived from the Kenya Vision 2030 (to be implemented in collaboration with the National Government) or from the County Sessional Paper 2032 – Mountain Cities Blueprint.
Project Name
Location
Objective
Output /Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh.)
Implementation of Performance Contracting
HQ Improve public service delivery
Efficient and effective service delivery.
Turnaround time and resident satisfaction
2018-2019 Department of Education and Public Service
5 M
Upgrading of existing polytechnics
County To improve facilities, learning equipment, trainee capitalization, instructor ratios in order to prepare children, entrepreneurs, farmers, women and young people for learning, industry and life
Increase in number of new industries Increase in industry knowledge and skill competences Increase in Industry partnerships
No. of students enrolled No of industry partnerships within Polytechnics
2018 -2022 Department of Education and Public Service
125 M
Review of Polytechnics curriculums
County To align the curriculum to local, regional and global industry and market requirements
Increase productivity Industry and Market Competency Based Graduates Master Craft Artisans
No of curriculums reviews Partnerships with Industry No of students enrolled in new courses
2018 -2022 Department of Education and Public Service
60 M
Improvement and upgrading of the general infrastructure and furniture of the ECDE centres
County To improve learning environment for the children through resource recovery strategy of agricultural and appropriate technology
Increase number of children enrolled Utilization of agricultural and natural resource by products
No of students enrolled Research and Development of Environmentally friendly learning materials
2018 -2022 Department of Education and Public Service
100 M
147
Project Name
Location
Objective
Output /Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh.)
and equipment
Upgrade of delivery of curriculum to e-learning and digital devices within ECDE, Libraries and Polytechnics
County To improve delivery of curriculum that prepares children, entrepreneurs, farmers, women and young people for learning, industry and life
Increase access to e-learning, connectivity and digital devices Increase access to local, regional and global online job opportunities Increased use of data for decision making
No of students with access to e-learning and digital devices No of young people accessing online job opportunities No of citizens, visitors and investors accessing information through online presence No of trainers and mentors on e-learning and digital skills
2018 -2022 Department of Education and Public Service
100 M
Strategies to Mainstream Cross-cutting Issues Tree planting in schools has been ongoing as a measure of increasing the forest cover in
the County. Environmental conservation will be taught in schools through environment
clubs formed in these institutions to sensitize students on the need to conserve the
environment. Support for the girl child education is bearing fruit and this can be seen from
the retention rate and enrolment rate in primary and secondary schools. The revival of
vocational training centres is expected to absorb the students who drop out of school for
various reasons to acquire skills to make them productive and marketable.
The sector will also target the secondary school age population for HIV/AIDS behavior
change. This age group is vulnerable and specific measures will be introduced such as
establishment of youth friendly centres and VCT. Introduction of abstinence clubs in
secondary schools is another measure that will be used to mainstream HIV/AIDS.
148
4.4.5 Health The health sector comprises of medical services and public health and sanitation sub
sectors. As a county we recognize that a healthy population is an important ingredient
of the development process in the county. In this regard then, this section provides a
review of the sector Vision and mission, county response to the sector vision and
mission and its importance to the county. The section also outlines the role of
stakeholders, the sector Priorities, Constraints and Strategies and status of the
projects and programmes being undertaken in the county in line with the nine MTEF
sectors. The section also presents the status of the Kenya Vision 2030 projects being
implemented in the county and how the cross cutting issues will be mainstreamed.
In Kirinyaga County, health service delivery is offered through public, private and faith
based health facilities which are classified from level 1 to level 6. The County has 4
Public hospitals, 23 health centres, 35 dispensaries, 2 faith based hospitals and 130
private clinics spread across the county.
Absence of conventional sewerage treatment system is a major contributor to the low
standards of sanitation in the County. Also majority of the county citizen have no
access to safe drinking water despite the county having adequate water sources leading
to increased number of waterborne /water wash diseases in the county.
Tremendous infrastructural, equipment and human resources for health investments
have been done and many more need to be done in order to guarantee the people of
Kirinyaga Universal Health Coverage (UHC).
Sector Vision and Mission
This sector is comprised of the department of medical services, public health and sanitation. Vision:
A healthy and productive population Mission:
149
To establish a progressive responsive and sustainable technologically driven evidence
based and client centered health system able to deliver an accelerated achievement of
high standards of health for the people of the County.
County response to sector vision and mission
In response to the health sector, the county will aim at improving access to quality
health care to the community. Focus will be given on reduction of infant mortality rate
and maternal mortality through upgrading of local facilities to offer maternity services
that will help the rural communities’ access pre and post natal maternal services. The
county will support reduction of malaria in the lower zones of the county, TB,
HIV/AIDS and other communicable diseases. A lot of emphasis will be placed on health
education, training of community health workers and partnership between the
government and other service providers in provision of preventive services.
Sector Programmes Programme 1 Name: Curative and Rehabilitative Services Objective: To Provide high quality curative care services. Outcome: Reduced mortality and disability due to ill health. Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al budget
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target
Cost (Ksh
millions)
Medical Equipment
Improved preservation of bodies.
0 9 body capacity morgue Equipped in Kimbimbi SDH 18 body capacity morgue in Kianyaga SDH
9 18
6M 15M
21M
Medical Infrastructure
Enhanced inpatient health care
54 Kimbimbi SDH, 40 Kianyaga SDH
No of beds acquired in Kimbimbi SDH, Kianyaga SDH
78 Kimbimbi SDH, 64 Kianyaga SDH
35M 64 Sagana SDH
15M 50M
150
Programme 1 Name: Curative and Rehabilitative Services Objective: To Provide high quality curative care services. Outcome: Reduced mortality and disability due to ill health. Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al budget
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target
Cost (Ksh
millions)
& 40 Sagana SDH
and Sagana SDH
Access to radiology related services
0 An operational radiology department in Kianyaga and Sagana SDH
1 radiology department in Kianyaga SDH
7M 1 radiology department in Sagana SDH
7M 1 in Baricho
15M 1 in Thiba
15M 44M
Reduced distance to the nearest health care facility
31 13 No. of dispensaries Constructed and equipped 13 new dispensaries( Njukiini, Kavote, Kamugunda, Mucagara, Mathia, Kiandai, Mung’etho, Kamwana, Matandara, Kirwara, Kiandieri, Kimweas and Ng’othi)
4 4 4 1 110M
Enhanced health care
23 8 No. of Upgraded and equipped health
1 6M 2 40M 2 40M 2 40M 2 40M 166M
151
Programme 1 Name: Curative and Rehabilitative Services Objective: To Provide high quality curative care services. Outcome: Reduced mortality and disability due to ill health. Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al budget
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target
Cost (Ksh
millions)
centres (Baricho, Njegas, Thiba, Difathas, Kagumo, Kabare, Kiamutugu, Karumandi,)
Enhanced health care
31 9 No. of Upgraded and equipped dispensaries (Kang’aru, Gatitu, Kutus, South Ngariama, Gatugura, Kiang’ombe, Gaciongo, Njikiini and Joshua Mbai dispensaries)
1 10M 2 20M 2 20M 3 30M 2 20M 100M
Enhanced storage for drugs and Non- pharmaceuticals
0 I No. warehouse Constructed and equipped 5 No. sub-county stores constructed and equiped
1 county warehouse
50M 2 sub-county stores
20M 2 sub-county stores
20M 1 sub-county stores
10M 100M
152
Programme 1 Name: Curative and Rehabilitative Services Objective: To Provide high quality curative care services. Outcome: Reduced mortality and disability due to ill health. Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al budget
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target
Cost (Ksh
millions)
Enhanced security for all the health facilities
0 a perimeter wall around each of all 4 hospitals, 23 health centres and 31 dispensaries
4 100M
10 60M 10 60M 5 10M 240M
Enhanced intensive health care
0 4 No. of isolation wards Constructed and equipped at (Kerugoya, Kimbimbi, Kianyaga and Sagana hospitals)
1 15M 1 15M 1 15M 1 15M 60M
Improved waste disposal
0 no. of incinerators and bio digesters Constructed in selected facilities (4 hospitals, 10 health centres and 10 dispensaries)
1 12M 1 incinerator 4 bio digesters
12M 2M
1 incinerator 4 bio digesters
12M 2M
1 incinerator 4 bio digesters
12M 2M
6 57M
Enhanced Health Care Service Delivery
0 No. of Modern Kitchens Constructed and furnished
- - 1 15M 1 15M 1 15M 1 15M 60M
153
Programme 1 Name: Curative and Rehabilitative Services Objective: To Provide high quality curative care services. Outcome: Reduced mortality and disability due to ill health. Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al budget
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target
Cost (Ksh
millions)
in 4 hospitals (Kerugoya, Kianyaga, Kimbimbi, Sagana)
78 No. of beds available for admission in Kimbimbi Sub-county hospital
60 30M 60 30M 60M
Enhanced Health Care Service Delivery
64 No. of beds available for admission in Kianyaga sub-county hospital
40 20M 40 20M 40M
0 an Operation theatre Constructed and equipped at Sagana Sub-county hospital
1 20M 20M
66 No. of beds available for admission in Sagana Health Centre
40 20M 40 20M 40M
0 1No.palliative care centers Constru
1 10M 10M
154
Programme 1 Name: Curative and Rehabilitative Services Objective: To Provide high quality curative care services. Outcome: Reduced mortality and disability due to ill health. Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets Year 1 Year 2 Year 3 Year 4 Year 5 Tot
al budget
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target Cost (Ksh millions)
Target Cost (Ksh
millions)
Target
Cost (Ksh
millions)
cted and equipped
0 1 cancer treatment centre Constructed and equipped
1 40M 40M
0 Construct and equipped 1 regional diagnostic centre
Phase 1
150M
Phase 2
150M
300M
Disaster preparedness and referral services
0 Constructed and equipped 3 casualty and emergency units in 3 hospitals
1 20M 1 20M 1 20M 60M
Hospital Management Information Systems
4 Automated and integrated health information system in 4 hospitals, 23 health centres and 35 dispensaries
4 20M 20 30M 20 30M 17 10M 90M
Programme 2 Name: Preventive and Promotive Services Objective: To reduce incidence of Preventable diseases and ill health. Outcome: Reduced burden of preventable diseases. Sub- programme
Key Outcome
Baseline
Key performance
Planned targets Year 1 Year 2 Year 3 Year 4 Year 5 Tota
l
155
indicators
budget
Target
Cost (Ksh
millions)
Target
Cost (Ksh millions)
Target
Cost (Ksh millions)
Target
Cost (Ksh millions)
Target
Cost (Ksh millions)
Disease prevention and Control
0 All households profiled and registered in the county
124,000
20M 20M
10
Number of villages triggered and certified ODF
5 2.5M 5 2.5M 5 2.5M 5 2.5M 10M
Community Health
67 NO. OF Established community units
5 2.5M 5 2.5M 5 2.5M 5 2.5M 10M
Flagship /County Transformative Projects
These are projects with high impact in terms of employment creation, increasing county
competitiveness, revenue generation etc. They may be derived from the Kenya Vision 2030
(to be implemented in collaboration with the National Government) or from the County
Sessional Paper 2032 – Mountain Cities Blueprint.
Project Name
Location
Objective
Output /Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Upgrading of county hospitals
Kerugoya County Referral hospital (Kerugoya Ward)
Increased access to basic and specialized health services
Increased bed capacity from 250 to 500 beds in Kerugoya Referral hospital
Number of beds n(500)
2018-2022
County Government
1,000 M
Kimbimbi SDH (Nyangati Ward)
Increased bed capacity from 78 to 200 beds in Kimbimbi Sub-county hospital
Number of beds (200)
2018-2022
County Government
70M
Kianyaga SDH
Increased bed capacity
Number of beds (150)
2018-2022
County Government
50M
156
Project Name
Location
Objective
Output /Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
(Baragwi Ward)
from 64 to 150 beds in Kianyaga sub-county hospital
Sagana SDH (Kariti Ward)
Increased bed capacity from 64 to 150 beds in Sagana Health Centre
Number of Beds (66)
2018-2022
County Government
50M
Sagana SDH (Kariti Ward)
Construction and equipping of an operating theatre
Operational theatre
2018-2022
County Government
20M
Diagnostic Centre
County To strengthen and improve the diagnostic and laboratory services
Construct equipped 1 regional diagnostic centre
Number of constructed and equipped diagnostic centre No. of patients
2018-2022
County Government
300 M and PPP model
Enhanced diagnostic and laboratory services
County To strengthen and improve the diagnostic and laboratory services
Rehabilitate/Renovate and equip the existing laboratories in the County
No. of laboratorial rehabilitated/renovated and equipped
2018-2022
County Government/ Private Partner
300 M and PPP Model
4.4.6 Recreation, Culture and Social Protection This sector is made up of two departments namely the department Gender, Culture and Social Services and the department of Youth and Sports Sector Vision and Mission
(i) Department of Gender, Culture and Social Services Vision
157
‘Sustainable and equitable socio-culture and economic empowerment of all Kenyans.’ Mission
“To formulate, mainstream and implement responsive policies through coordinated strategies for sustained and balanced socio- culture and economic development of the county and empowerment of vulnerable and marginalized groups and areas.” (ii) Department of Youth and Sports Vision
Centre of excellence in youth transformation, empowerment and sports talent development Mission
To provide leadership, coordinate and create enabling environment for empowering the youth, enhancing sports development and transforming a positive mindset in the youth County response to sector vision and mission
The sector is responsible for promoting gender equality, empowerment of youths and women through gender mainstreaming in development process, social protection, community participation and public private partnership. The county will improve the existing children’s homes, build and improve the existing recreation facilities, coordinate youth organizations in the county to ensure youth resource centers. The county will also through the department of special programs improve disaster preparedness. Cash transfer program has been on pilot in the county and now it will be rolled out to cover all aged people. In addition to the foregoing, the sector is also responsible for the promotion and development of sports talents and empowerment of youths. The county through the department of youth and sports will improve sporting standards through training and improvement of sports infrastructure. It will also empower youths through trainings and improving access to employment information and opportunities to employment and business. The sector will further coordinate and facilitate the delivery of quality development services with special emphasis on the enhancement of youth and sports for recreation and development.
158
Sector programmes
Gender, Culture and Social Services
Programme Name: Promotion of Culture and Heritage
Objective: To promote cultural and heritage activities
Outcome: Bringing Kirinyaga people together Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets Year 1 Year 2 Year 3 Year 4 Year 5 Total
budget(Ksh) Million
-
Target
Cost (Ksh millions)
Target
Cost (Ksh millions)
target
Cost(Ksh millions)
target
Cost (Ksh millions)
target
Cost (Millions)
Culture, Recreation and Heritage
Promotion of visual arts/performing acts
-
No of visual arts promoted
300 0.5 305 0.5 310 0.5 315 0.5 320 0.5 2.5
Nutrition and traditional medicine
-
No of traditional herbalist promoted
10 0.4 12 0.4 15 0.4 20 0.4 25 0.4 2.0
Cultural days
-
No of cultural days held annually
1 0.6
1 0.6 1 0.6 1 0.6 1 0.6 3.0
Cultural competitions
-
Number of cultural days held
1 0.6 1 0.6 1 0.6 1 0.6 1 0.6 3.0
Cultural sites
- Number of cultural sites identified and or renovated
30 1.0 40 1.0 50 1.0 55 1.0 60 1.0 5.0
-Recreational park
- -Number of recreational park established
1 0.4 1 0.4 1 0.4 1 0.4 1 0.4 2.0
Capacity building and life skills training for youth,
Research and writing
- Number of research and writing completed
- 0.8 1 0.8 1 0.8 1 0.8 2 0.8 4.0
159
women and people with special abilities
Support to income generating project for men and women
- Number of income generating projects funded
- 16 - 16 - 16 - 16 - 16 80
Capacity building on community groups on legal, business skills, health development and implementation
- Number of training achieved annually on legal, business skills, health development and implementation
4 0.6 20 0.6 30 0.6 35 0.6 40 0.6 3.0
Young mothers and fathers training on breast feeding alongside centre construction
- -Number of trainings conducted -Centre construction
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 5.0
Rehabilitation, information & vocational training centre
- -Training centre constructed
1 4.0 1 4.0 1 4.0 1 4.0 1 4.0 20
Promotion of the reading culture particularly among young people
Construction of community cultural library
- -Construction of the county cultural library
1 10 1 10 1 5 1 - - - 25
Rehabilitation and counseling services to the drug and substance abuse and domestic
Baseline survey on alcohol drinks
- -Number of surveys carried out
1 7 - - - - - - - - 7.0
-Control of scales and usage of alcohol drinks
- - 2.0 2.0 2.0 2.0 1.5 9.5
School-based
- -School visits
1.0 1.0 1.0 1.0 1.0 5.0
160
violence victims
programme to educate children on drug and substance abuse alongside rehabilitation services provided
-Number of beneficiaries
-Establishment of funds for people with disabilities
- - Number of PWDs benefited
80 3.0 80 3.0 80 3.0 80 3.0 80 3.0 15.0
-Improvement of accessibility to PWDs
- 2.0 0.7 2.0 0.7 2.0 0.7 2.0 0.7 2.0 0.7 3.5
-Relief center construction
- Construction of relief center
1 2 - 1.5 - 1.5 - - - - 5.0
Social protection for PWDs
- -PWDs accessing affordable healthcare
100 0.6 100 0.6 100 0.6 100 0.6 0.6 100 3.0
Resource, rehabilitation and vocational center
- -Economic empowerment
70 4.0 70 4.0 70 4.0 70 4.0 70 4.0 20.0
Promotion of para-sports
- -Amputee football -Goal ball -Bosia game -Sitting football
3.0 4.5 3.0 4.5 3.0 4.5 3.0 4.0 3.0 4.0 20.0
Modified vehicle for PWDs director
- -Vehicle purchased
1 3.0 - - - - - - - - 3.0
Profiling and documentation
- -Number of profiles developed
1000
1.2 500 1.2 500 1.2 500 1.2 500 1.2 6.0
Older persons
Care and support for
- -Number of
- 1.0 - 1.0 - 1.0 - 1.0 - 1.0 5.0
161
vulnerable older persons
beneficiaries
Home for older vulnerable persons
- -Home constructed
1 4.0 - 4.0 - 2.0 - - - 10.0
Weavi ng and decoration for elderly persons
- -Number of weaving and decoration achieved
- 1.0 - 1.0 - 1.0 - 1.0 - 1.0 5.0
Cash transfer for the older persons
- -Number of beneficiaries
800 1.0 800 1.0 800 1.0 800 1.0 800 1.0 5.0
Charity shop
- -Charity shop established
1 2.0 - - - - - - - - 2.0
Rescue center for domestic violence victims and other neglected people
- -Rescue center established
1 4.0 - 4.0 - 2.0 - - - 10.0
Programme Name: Sport Development and Empowerment Services Objective: To improve social and Economic youth status Outcome: More socially and economically youths Sub- programme
Key Outcome
Key performance indicators
Baseline Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target cost
target cost
target cost
target cost
target cost
Management and Development of Sports and Sports Facilities
Upgraded stadia
3 upgraded stadia
No standard stadium
Upgrading of kerugoya Stadium started
200M
Upgrading of kerugoya Stadium complete
200M
Upgrading of Wang’uru Stadium started
200M
Upgrading of Wang’uru Stadium complete
200M
Kianyaga Stadium upgraded
200M
1B
Equipped athletes and sports club
No of clubs and athletes equipped
200 clubs uniformed
Equip 100 clubs and 2 sport association
20M
Equip 100 clubs and 2 sport association
20M
Equip 100 clubs and 2 sport association
20M
Equip 100 clubs and 2 sport association
20 M
Equip 100 clubs and 2 sport association
20 M
100M
162
Sports championships in different disciplines
No of sports championships held
8 championships
8 sports championships held
20M
8 sports championships held
20M
8 sports championships held
20M
8 sports championships held
20M
8 sports championships held
20M
100M
Trained technical sports personnel
No of couches, officials and referees and staff trained
180 officials and couches trained
200 sports officials and couches trained
3M
200 sports officials and couches trained
3M
200 sports officials and couches trained
3M
200 sports officials and couches trained
3M
200 sports officials and couches trained
3M
15M
Operational Talent academy
No.of youths admitted to the talent academy
No operational talent academy
Complete phase 1 of talent academy
40M
Complete phase 2 of talent academy
40M
Complete phase 3 of talent academy and admit
40M
Complete phase 4 of talent academy and admit
40M
Admit talented youths
40M
200M
Programme Name: Youth Development and Empowerment Services Objective: Outcome: Sub- programme
Key Outcome
Key performance indicators
Baseline
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget
target Cost
target cost
target cost
target cost
target cost
Youth Development and Empowerment Services
1)Operational Youth Saccos
1)No.of saccos Formed and membership
1)We have several youth groups and 9 operational Sacco
Form 20 youth Saccos(ward based) and 4 sub county youth saccos
20M
Financial boost to 20 youth saccos
20M
Initiate investment of youth Sacco
20M
Enhance investment of youth Sacco
20M
Boost investment opportunities
20M
100M
2)Youths trained on entrepreneurship skills
2)No of youths trained and the name and no. of training centres
2)560 youths traned
200 youths trained
10M
200 youths trained
10M
200 youths trained
10M
200 youths trained
10M
200 youths trained
10M
50M
3) Operational Youth empowerment
3) No.of youths reached and assisted
3) 35 youth business enterprises supported
200 youths
1M
200 youths
1M
200 youths
1M
200 youths
1M
200 youths
1M
5M
163
4)Operational Youth empowerment centres
4)No of operational youth empowerment centres
4) Currently we only have national which are not fully operational at all
Operationalize one youth empowerment
50M
Operationalize one youth empowerment
50M
Operationalize one youth empowerment
50M
Operationalize one youth empowerment
50M
Operationalize one youth empowerment
50M
250M
5) Operational youth departmental vehicle
5) Operational vehicle
5) There is departmental vehicle
Buy 1 departmental vehicle
30m
30M
6)Available youth data
6) Documentation on youth data
6) No current inventories on youth data
Develop a county inventory youth data
1M
Develop a county inventory youth data
1M
Develop a county inventory youth data
1M
Develop a county inventory youth data
1M
Develop a county inventory youth data
1M
5M
Flagship /County Transformative Projects
These are projects with high impact in terms of employment creation, increasing county competitiveness, revenue generation etc. They may be derived from the Kenya Vision 2030 (to be implemented in collaboration with the National Government) or from the County Sessional Paper 2032 – Mountain Cities Blueprint.
Department of Gender, Culture and Social Services
164
Project Name
Location
Objective
Output/ Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Rehabilitation centre for drug and alcoholic abuse
Mwea sub-county
Treatment and rehabilitation of drug abuse addicts
Increase number of treatment of the substance abuse addicts
Number of addicts treated
Establishment of the rehabilitation centre
2018-2022
Gender, culture and social services
50 M
Cultural theatre
Kirinyaga East sub-county
Promotion of Kirinyaga heritage Promotion of local arts Reservation of cultural artifacts Promotion of revenue collection
Empowered artists
Enhanced cultural enlightment and continuity Enhanced revenue collection
Construction of the cultural theatre Local artists promoted Number of artifacts reserved
2018-2022
Gender, culture and social services
100 M
Gender based violence rescue center
Kirinyaga central sub-county
Temporary rescue of gender based violence victims
More victims reconciled
Treatment and counseling Reduced number of domestic/ gender based violence
Establishment of the rescue centre Number of rescued victims Number of reconciled families
2018-2022
Gender, culture and social services
5 M
Women Empowerment Programme “Wezesha Mama”
County To mobilize and empower women through technical support and financing
Increase of women engaging in economic activities Increase in income
Number of women involved in the economic activities through program
2018-2022
Gender, culture and social services
100 M
Fencing and face lifting of Kianyaga children home
Kirinyaga East Sub-county
Enhance security for the children
Safer children home
Construction of the perimeter wall
Rehabilitated buildings
2018-2022
Gender, culture and social services
15 M
Department of Youth and Sports
165
Project Name
Location
Objective
Output/ Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Youth Empowerment Programme “Wezesha Programme”
County To create employment and engage youth in economic activities To empower youth through technical support and financing
Economic Empowerment for Youth Reduction of unemployed youth
Number of Youth empowered. Number of youth involved in the economic activities through this programme
2018-2022
Youth and Sports Department
100 M
Rehabilitation and standardization of Stadia to incorporate sports and performing arts development
Kerugoya Kianyaga, Wang’uru
Standardizing of stadia
Standardized stadia Increased performance of county residents especially children and youth in competitive sporting and performing arts
No of stadia improved No of local and international events held in stadia both sporting and performing arts
2018-2022
Youth and Sports Department, Public works department
180 M and PPP Model
Rehabilitation/ renovation of existing youth empowerment centres
County To increase the number of facilities available for youth empowerment
Increased empowerment facilities thus engagement of the youth
No. of facilities/ centres rehabilitated/renovated
2018-2022
Youth and Sports Department, Public works department
250 M
Strategies to mainstream cross cutting areas
The sector has mainstreamed issues of gender through empowerment of all genders
while taking into consideration gender inequalities. Efforts will now be concentrated in
developing and enhancing productivity of these groups. HIV/AIDS greatly affects this
sector. The sector will be involved in mobilization of the community to participate in
HIV/AIDS related activities and work with other sectors to address the needs of
vulnerable groups e.g. youth, migrant workers in HIV/AIDS related issues, mitigation
of social and economic impacts of HIV/AIDS. The sector will mobilise the community
166
in environmental conservation that will be factored in community trainings and
capacity building.
4.4.7 Energy, Infrastructure and ICT This sector is made up of two departments namely department of Physical Planning, Lands and Housing and Department of Transport, Roads and Public Works Sector Vision and Mission:
(i) Department of Physical Planning, Lands and Housing
Vision
Excellence in Land and Housing management for sustainable development of Kirinyaga County Mission:
To Facilitate improvement of livelihoods of the people of Kirinyaga County through efficient Land resource management, Equitable Access, secure Tenure and Sustainable housing (ii) Department of Transport, Roads and Public Works
Vision
To have a reliable, safe and efficient road network and transport sector for the prosperity of Kirinyaga County. Mission
Provide and maintain an integrated road network and infrastructure that is functional and reliable to encourage social and economic development of the region. County response to sector vision and mission
The sector is responsible for physical planning, lands and housing which are key factors of production. The sector recognizes that physical planning is a priority aspect of economic development as such proper physical planning will determine the progressive economic development of the county. Land is a scare resource in the county as such proper land management is critical for sustainable economic development in the county. In view of this as against the backdrop of the County sessional paper 2032, the sector will ensure proper land use that will seek to actualize the provisions of the sessional paper. Housing is a factor that determines the productivity of a workforce as such the county has prioritized housing so as to ensure that the workforce within the
167
county is well catered for. Overall, the strategic goal of the sector is to facilitate improvement of livelihoods of the people of Kirinyaga County through efficient land resource management especially with respect to physical/urban planning, equitable access, secure tenure and sustainable housing In addition to the foregoing, the sector is also responsible for the reliable road network is a very fundamental contribution to economic development. In this regard then, it is the strategic priority for the sector to ensure that the road network is the entire county is reliable thus providing accessibility to social economic facilities. The sector will seek to provide and maintain an integrated road network and infrastructure that is functional and reliable to encourage social and economic development of the region. The sector will further promote the mobility of people, goods and services within and without the County; the development and maintenance of a well-trained and competent workforce; to continuously benchmark the internal functions and deliverables of the roads sector against other Counties and international best practice, to provide and maintain a transport network, road safety network and road infrastructure which are safe, functional and enhance the economic development of the County and the region in general. Sector Programmes
Department of Physical Planning, Lands and Housing Programme Name: LAND MANAGEMENT Objective: To guide development in urban and rural areas and generate, maintain, update and disseminate geographical data for land use planning Outcome: Sub- programme
Key Outcome
Baseline
Key performance indicators
Planned targets
Year 1 Year 2 Year 3 Year 4 Year 5 Total budget (M)
target
cost
target
Cost
target
cost
target
cost
target
cost
Survey and Mapping
Improved sustainable land use
No. of surveyed villages, no of plans developed
380
County Spatial Planning
Improved sustainable land use
Completed spatial plan
35
Established GIS lab
25
168
ii) Department of Transport, Roads and Public Works Programme Name: Disaster Management (Fire Bridge).
Objective: To improve the response by the fire department and safety measures of institutions in the County.
Outcome: Improved disaster management practices, response by the fire department and prevention of disasters
Sub- programme
Key Outcome
Key performance indicators
Planned targets
Year 1: FY 2018/19
Year 2: FY 2019/20
Year 3: FY 2020/21
Year 4: FY 2021/22
Year 4: FY 2021/22
Total budget
target Cost targ
et cost target cost targ
et cost target cost
Fuels for the fire equipment
Volume of fuel consumed.
21,600
2052000
43,200
4104000
43,200
4104000
43,200
4104000
43,200
4104000
20520000
Purchase of new fire engine
Number of units purchased
1No. 50000000
50000000
Installation of water hydrants in major towns
Number of units installation
3No. 120,000
3No. 120,000
3No. 120,000 3No. 120,000
3No. 120,000
600,000
Purchase of Smoke generator (Medium)
Number of units purchased
1No. 50,000 50,000
Installation of low level water tank
Number of units installation
1 No.
5000000
5,000,000
Operation uniforms
Number of units purchased
8No. 200,000
12 No.
350,000
550,000
Communication gadgets (VHF Radios)
Number of units installation
1No. 3,000,000
1 No.
1500000
4,500,000
169
Programme Name: Disaster Management (Fire Bridge).
Objective: To improve the response by the fire department and safety measures of institutions in the County.
Outcome: Improved disaster management practices, response by the fire department and prevention of disasters
Sub- programme
Key Outcome
Key performance indicators
Planned targets
Year 1: FY 2018/19
Year 2: FY 2019/20
Year 3: FY 2020/21
Year 4: FY 2021/22
Year 4: FY 2021/22
Total budget
target Cost targ
et cost target cost targ
et cost target cost
Purchase of operating gadgets (Cold foam, Occupational first aid kits, metal blade cutter, tile blade cutter and rescue rope(general purpose))
Number of units purchased
5No. 200,000
5No. 200,000
400,000
Refilling of breathing apparatus, water extinguishers and carbon dioxide extinguishers
Number of units refilled
13No.
100,000
13 No
100,000
13 No.
130,000
330,000
Purchase of computer, photo printer, mobile phone, digital camera, Safaricom modem and Wall clock
Number of units purchased
6No. 500,000
500,000
170
Programme Name: Disaster Management (Fire Bridge).
Objective: To improve the response by the fire department and safety measures of institutions in the County.
Outcome: Improved disaster management practices, response by the fire department and prevention of disasters
Sub- programme
Key Outcome
Key performance indicators
Planned targets
Year 1: FY 2018/19
Year 2: FY 2019/20
Year 3: FY 2020/21
Year 4: FY 2021/22
Year 4: FY 2021/22
Total budget
target Cost targ
et cost target cost targ
et cost target cost
Construction and Equipping of a County fire station
Number of units constructed
1No. 25,000,000
25,000,000
Purchase of general office supplies (Pens, rim papers, paper punch, staplers, staple pins, marking pens and ink, pencils, spring files, counter books, envelops and short-hand books
Number of units purchased
Items
10,000 Items
10,000
Items
10,000 Items
10,000
Items
10,000
50,000
Sanitary and cleaning materials (Detergents, mops, buckets, brooms, sanitary soaps and tissue papers)
Number of units purchased
Items
20,000 Items
20,000
Items
20,000 Items
20,000
Items
20,000
100,000
171
Flagship /County Transformative Projects
These are projects with high impact in terms of employment creation, increasing county competitiveness, revenue generation etc. They may be derived from the Kenya Vision 2030 (to be implemented in collaboration with the National Government) or from the County Sessional Paper 2032 – Mountain Cities Blueprint.
(i) Department of Physical Planning, Lands and Housing
Project Name
Location
Objective
Output / Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
County Spatial Plan
Countywide To provide broad policy framework to guide the use and management of land
County Spatial Plan
County Spatial Plan and Report
Physical Planning CGK
47.6M
Preparation of Kerugoya Kutus Municipal Urban Plan
Kerugoya/ Kutus Municipality
To provide a basis for investment and use of land
Urban Plan
Approved Urban Plan
April 2018-April 2019
Physical Planning CGK
50M
Preparation of Wang’uru Urban Plan
Wang’uru To provide a basis for investment and use of land
Urban Plan
Approved Urban Plan
1st July 2018-1st July 2019
Physical Planning CGK
80M
(ii) Department of Transport, Roads and Public Works
Project Name
Location
Objective
Output/ Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Improvement of Town Parking
Kutus, Kerugoya, Wang’uru, Kianyaga, Makutano, Sagana, Kibingoti, Kibirigwi, Kagio and other proposed towns
To improve county transportation system, traders environment and increase revenue collection
Improved parking areas and drainage system
Number of square meters of parking lots constructed
2018 - 2023
County Government
200 M
172
Improvement of Town roads to bitumen standards
Kutus, Kerugoya, Wang’uru, Kianyaga, Makutano, Sagana, Kibingoti, Kibirigwi, Kagio and other proposed towns
To improve county transportation system, residents environment and ease of doing business.
Improved road surfaces and drainage system
Number of square meters of roads constructed
2018 - 2023
County Government
250 M
Strategies to mainstreaming cross cutting areas
The lands, physical planning and housing sector is a very key sub sector with respect to economic development. The land and urban development in the County can either spur economic development of hinder the same. In this regard, the County takes cognizance of this fact as such this sector will ensure that the component of land and physical planning are prioritized. The road sub sector is a very key sub sector with respect to economic development. The road network in the County can either spur economic development of hinder the same. In this regard, the County takes cognizance of this fact as such this sub-sector will ensure that the roads across the County are useable in all season. In addition, the County will cooperate with the national government to ensure that all urban roads are maintained in a good condition so as to promote economic development. Improving the road will definitely improve access to goods and services both from a consumer perspective and from a producer/supplier perspective. The roads sub - sector will also improve the accessibility to markets and agricultural inputs by farmers. The fact that the cost of transporting goods and agricultural products will reduce means that the price per item will also reduce thus translating to the general positive welfare of the entire County and in particular the consumers will benefit. Reducing the transportation cost will also means that more farmers will transport their produce to the markets thus their incomes will increase thus increasing the purchasing power of that farmer. Increase in efficiency and reduction of production costs through improved road network will increase employment opportunities as such high numbers of youth are employed.
4.4.8 General Public Services This sector is made up of the Office of the Governor, Office of the Deputy Governor, County Public Service Board, County Executive Committee and the Department of Finance, Marketing and Economic Planning. Vision and Mission
173
Vision:
An authentic public administration that upholds efficient and effective public governance in the delivery of public goods and services Mission
To provide overall leadership and policy direction in resource mobilization, public administration and public governace for quality public service delivery County response to sector vision and mission
The scope of the county public administration sector is the efficient and effective
delivery of public goods and services to the residents of the county. The sector shall
prioritize public participations so as to have an inclusive government were the
residents of the county can actively participate in the development agenda of the county
as detailed in the Mountain Cities Blueprint 2032 which is the sessional paper for the
county
Sector Programmes
County administration has several departments as such the projects under each department are as follows; (I) Administration Unit
This department comprises of the four sub-county administrator offices namely Kirinyaga East; Kirinyaga West; Kirinyaga Central and Mwea.
a) Public Participation An efficient public participation system is critical for the effective involvement of the public in policy formulation and related activities. Project identification and implementation will be undertaken in consultation with all the stakeholders and the resultant beneficiaries. In addition the County will establish an integrated feedback system to ensure a healthy communications ecosystem.
b) Staff log in system Administration ICT system where all staffs can log in and access all county admin updates among them being what other departments are doing- this will help all staffs to be up-to-date on all relevant matters pertaining to the entire county
174
c) Establishment of the village administration
The Constitution 2010 requires respective county governments to create village administrators offices for efficient and effective service delivery up to the grassroots level
d) Establishment of ICT ward administration system Administration in liaison with the county Ict department will develop/establish Ict systems up to the ward level- again this will see better service delivery up to the grassroots level. For example whenever a merchant deposits a license fund from the very end of the county don’t have to travel long distance to submit receipts- these receipts can be collected and scanned by respective ward administrators at their offices
e) Refurbishment and equipping of sub-county administrators offices Efficient delivery of public services is dependant of the availability of a conducive working environment. In this regard then, the county will ensure that all county administrators have offices where they can work from thus providing a centralize place for the provision of public goods and services to the residents of the county
f) Branding of County Projects The county administration will develop standard signboards for all county public projects so as to clearly distinguish projects that have been initiated by the count government and those that have been initiated by other entities e.g. national government and other development partners programs/projects. This will ensure that the public are well informed on which projects have been initiated by the county government
(II) Records & Archive Management Unit
a) Records Management
This addresses the need to set up registries and necessary systems which can either be manual or automated in nature. It will entail the automation of all county records which will thereafter result to the establishment of common record centers and archives
b) Personnel training Training of personnel of all clusters to equip them with up-to-date knowledge and skills on all matters related to archive management and subsequently formulation of monitoring and evaluation policies to guide the performance of record management
c) Policy development Development of policies to govern risk management, disaster preparedness of and preservation of the records
175
d) In house records survey
A survey, appraisal and disposition of all county records will be carried out to authenticate the number, types and nature of all records pertaining to the County Government of Kirinyaga
e) Creation of records archive Archive and all common record centres ought to be furnished with the modern storage equipment for convenient storage and security purposes
(III) Legal unit
a) Development of IT legal system
This department in liaison with county ICT office will develop/introduce IT legal system where citizens and other stakeholders can log in and hence access all the legislations already passed by the County assembly as well as those waiting passage/approval- public will be more aware on the policies and laws that are touching their personal lives as well as their businesses.
b) E establish a Kenya Gazette Publication Program Kenya gazette publication program and hence establishment of registry where staffs and other stakeholders may refer i.e. a special legal library/archive for reference of the most recent national laws/various enactments
(IV) Communications unit
a) Documentaries covering all the sectors
This will act as a strong communication tool both to the public and other relevant stakeholders of what various county sectors are doing- these documentaries will also cover all the projects and programs implemented by the county government across all the twenty wards-documentation will be inform of videos and audio
b) Online and print content production
This involves communication using social media channels such as Facebook, Twitter etc. on all the projects and programs done by the county. Strategically placing notice boards in the county government premises such as social halls, markets, billboards as a communication mechanism. Publication of quarterly county newsletter
c) County documentaries The unit will develop county documentaries which cover all county sectors. This will
act as a strong communication tool both to the public and other relevant stakeholders
176
of what various county sectors are doing- these documentaries will also cover all the
projects and programs implemented by the county government across all the twenty
wards-documentation will be inform of videos and audio
Sector Programmes
Department of Finance, Marketing and Economic Planning.
Programme Name: Administrative Support Services Objective: Coordination of all county activities Outcome: Improved performance of service delivery Sub-programme
Key Outcome
Key performance Indicators
Baseline
Year1 Year2 Year3 Year4 Year5 Total
target cost target cost target cost target cost target cost 250,000,000
Coordination of service delivery down from villages to county level
Improvement of service delivery to the community
Projects and program s implemented
Current status of services delivery
Optimal operation of all the departments
50,000,000
Optimal operation of all the departments
50,000,000
Optimal operation of all the departments
50,000,000
Optimal operation of all the departments
50,000,000
Optimal operation of all the departments
50,000,000
177
Programme Name: support and coordination services Objective: improve service delivery of all departments Outcome: Improved living standards Sub-programme
Key Outcome
Key performance Indicators
Baseline
Year1 Year2 Year3 Year4 Year5 Total
target cost
target cost
target cost target cost
target cost
5M
Formulating policies for the county
Improve operations of all the departments
No of policies formulated
6 policies developed
3 policies 1M 3 policies
1M
3 policies
1M 3 policies
1M
3 policies
1M
Development of plans and budget
Plans and budget developed
No. of plans and budgets developed
CIDP ADP AB CFSP CBROP FB
1-CIDP 1-ADP 1-AB 1-CFSP 1-CBROP 1-FB
10 M
1-ADP 1-AB 1-CFSP 1-CBROP 1-FB
10M
1-ADP 1-AB 1-CFSP 1-CBROP 1-FB
1
0M
1-ADP 1-AB 1-CFSP 1-CBROP 1-FB
10M
1-ADP 1-AB 1-CFSP 1-CBROP 1-FB
10M
50M
procurement support services
No. of procurements completed
No. of projects and programs implemented
Procurement documents
300 procurements
5M 300 procurements
5M
300 procurements
5M 300 procurements
5M
300 procurements
5M
25M
Recruitment of staff services
Efficient and qualified human capital
No. of staff recruited
Current number of staff
No. of staff to be recruited this year
5M No. of staff to be recruited this year
5M
No. of staff to be recruited this year
5M No. of staff to be recruited this year
5M
No. of staff to be recruited this year
5M
25M
ICT support services
County fully connected with ICT
No. of offices connected with ICT
Implementation of revenue management system
200M
Fiber optic
600M
-M & E system -human resource system
10M 20M
Data centre
300M
1.13B
Flagship /County Transformative Projects
178
These are projects with high impact in terms of employment creation, increasing
county competitiveness, revenue generation etc. They may be derived from the Kenya
Vision 2030 (to be implemented in collaboration with the National Government) or from
the County Sessional Paper 2032 – Mountain Cities Blueprint.
Project Name
Location
Objective
Output /Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Development of the Mountain Cities Blueprint 2032 / Sessional Paper 2032
HQ To articulate the strategic development vision and agenda for the county To recruit technical assistants
Improved and enhanced utilization of resources A model sub national government
Mountain Cities Blueprint 2032 / Sessional Paper 2032
2018 -2022
Office of the Governor
176 M
Establishment of Kirinyaga Investment Development Authority (KIDA)
HQ To provide a legal and institutional framework for promotion and coordination of investment and development and for related purposes
Structured institutional framework for promotion and coordination of investment and development of the county
Kirinyaga Investment Development Authority (KIDA)
2018-2019 Office of the Governor
300 M
Implementation of Performance Contracting
HQ Improve public service delivery
Efficient and effective service delivery.
Turn around time and resident satisfaction.
2018-2019 Office of the Governor
5 M
179
Project Name
Location
Objective
Output /Outcome
Performance indicators
Time frame (Start-End)
Implementing Agencies
Cost (Ksh. Millions)
Implementation of Revenue management System
Whole county
Maximize revenue collection
Successful implementation of finance act modules on the system.
Successful access to the payment portal.
2018-2022 ICT Department
200M
Implementation of fibre optic
All sub-counties
Improve communication
Fibre optic connection in the sub-counties.
-Access to internet in the sub counties.
2018-2022 ICTA 600M
Establishment of a M&E system
Whole county
Improve supervision of all projects and programmes
Access of dash board for the county resources
Access of a GIS dash board
2018- 2022
ICT Department
10M
Establishment of a human resources system
County Improve performance of all staffs and thus their output
Successful implementation of the human resource modules on the system
Availability of the system to the county government staff
2018-2022 ICT Department
20M
Data Center County Make sure that all types of statistics are available
Successful capture, analysis, storage and hosting of all data in the county
Availability of all county system and policy data and reports
2018-2022 ICT Department
300M
Strategies to mainstreaming crosscutting issues
The Constitution is clear about the 30% representation of gender in management committees irrespective of the level. In view of this, the county administration will ensure that this is upheld. To address and maintain HIV/AIDS, the sector will ensure the implementation of the National HIV/AIDS Strategic plan 2009/10-2012/13 which aims at the prevention of new infections, improvement of the quality of life of people infected and affected by HIV/AIDs and mitigation of the socio-economic impact of HIV/AIDs
180
County Public Service Board
There will be a continuous sensitization of National Values and Principles on matters pertaining to the County Public Service Board (CPSB). This includes constitutional duties and responsibilities of CPSB. Vision and Mission
Vision
To be the leader in the provision, management and development of competent human resource for the public service” Mission.
“To transform the public service to become professional, efficient and effective for the realization of county development goals” CPSB response to sector vision and mission
The strategic priority of the CPSB is to recruit talent that is aligned to the development agenda of the county government. Such talent will ensure that all flagship projects and other projects/programmes are fully implemented as such actualizing the Mountain Cities Blueprint 2032. Sector Programmes
The broad projects and programmes that will be undertaken by the CPSB will include the following;
a) Development of robust service charters which will clearly define employees roles and responsibilities in order to improve performance, enhance and fast track delivery of services for improvement of right holders wellbeing
b) Harmonization of human resource management policies Strategies to mainstreaming crosscutting issues
To have a vibrant working staff is very integral to the delivery of public services. In this regard, this sector will ensure that all staff affected by HIV/AIDS are well catered for whilst ensuring there is no discrimination. The county will ensure that it will put in place mechanisms that see to it that the working environment is conducive for them as such maximizing on their productivity.
181
4.4.9 County Assembly The County Assembly of Kirinyaga consists of 30 members, structured into 20 elected, nine nominated and the speaker as the ex-officio .The members discharge a range of important issues on legislation, oversight and representation responsibility both in the house and in the ward. Vision and Mission
Vision
A model of an independent, progressive and peoples' oriented county assembly.
Mission
To promote principles of good governance in Kirinyaga County, through constructive legislative agenda, in consultation with all stakeholders, and use of appropriate technology to scrutinize policy implementation to improve service delivery County Assembly response to vision and mission
The strategic priorities of the County Assembly is to diligently uphold its mandate and to effectively carry out it roles. The management and performance of the assembly will be predicated on its core values which are independence and integrity; commitment and respect; professionalism and accountability; tolerance and innovation and lastly creativity and sever hood. Projects and Programmes
Development priorities and Strategic priorities
Project Name Location/Division/ Constituency
Objectives Targets Description of activities
County Assembly administration block
Provide additional office space for MCA and staff
One administration building.
Construction and equipping the building Installation of CCTV security systems
Cabro paving and extension of parking lot
Improve and increase parking space at the county assembly compound
60 parking space created and paved
Laying of cabro stones and extending the parking
Construction and equipping County Assembly Hotel
Enhance efficiency, convenience and hospitality
One county assembly hotel constructed and equipped.
One hotel established
182
Establishment of County assembly library, ICT and research centre
Improve capacity of MCAs and staff plus dissemination and flow of information
One library, ICT and Research centre
Establishing of library/ ICT and research room Purchase of relevant library materials -Provide at least 20 computers and related connection peripherals
Establishment of media centre
Enhance access of information by public including press
One media centre established and equipped
-Purchasing and installation of 10 computers -high speed internet connectivity -establish audio-visual equipment
Purchase of new County Assembly mace and accessories
Support assembly traditions and practices- as symbol of authority
One mace and accessories
One mace and accessories
Construction of official residential houses
Improve efficiency Number of houses constructed
Residential building construction.
Purchase and installation of a generator
Provide 24 hours power back-up
One generator purchased
Purchase and installation of a generator
Construction of ward offices
To enhance representation by providing offices closer to the public
20 offices constructed in various wards
Construction of offices Equipping of offices Purchase of land
Strategies to mainstreaming cross cutting issues
It is expected that there will be sufficient representation of all groups: women, youths, people living with disability, people infected or affected by HIV/AIDS and, ethnic or religious minorities in all subsectors under the productive sector. The viewpoints of all such groups will be sought, listened to and factored in the planning, implementation and monitoring of all projects and programmes under the sector. It is also expected that ICT, HIV and AIDS and environmental conservation issues will
be given due consideration in the formulation and enforcement of sectoral policies.
Greater use of ICT is a major objective of the productive sector in the same way that
sustainable development has been
183
CHAPTER FIVE: IMPLEMENTATION FRAMEWORK Introduction
Chapter five outlines the institutional framework and organizational flow that will be followed in implementing the plan. It not only outlines the institutional framework that will oversee the implementation of the Sessional Paper 2032 – Mountain Cities Blueprint 2032, but it also highlights the stakeholders in the county, the roles that they play and how their functions will be accommodated to avoid duplication of efforts as such enhancing separation of duties.
5.1. Mountain Cities Blueprint 2032 Implementation Structure Since the strategic goals of the Mountain Cities Blueprint 2032 are ; Job Creation through the establishment of new Industries; Better Health through Accessible & Affordable Care; Increased Income from Improved Yield, Market Access, Product Marketing & Market Prices; Improved Urban Planning & Infrastructure in order to create Beautiful Towns & Cities and Enhanced Knowledge & Skills Development (Academic & Vocational) in order to establish an adaptive, diligent, talented and unique workforce, the institutional framework for implementing the Mountain Cities Blueprint 2032.
On the basis of the foregoing, the Mountain Cities Blueprint 2032 will propose for the set-up of an entity which will be the oversight body in addition to being the Mountain Cities Delivery Unit to oversee the day to day implementation of the Mountain Cities Blueprint 2032. The unit will be guided by the performance standards, measures and indicators set out under The Mountain Cities Index. The Index indicators will consist of:
a) Mountain Cities Human Development Index (Education, Employment, Health and Social Services)
b) Mountain Cities Economic Performance Index (Agricultural Yield, Market Prices, Tourists)
c) Mountain Cities Urban Service Index (Disease control, Accident and Emergency, Hotel & Restaurant Management, community policing)
d) Mountain Cities Environment, Health and Safety Index (Public Health, Food Handling, Pollution control, Solid Waste Management)
5.2. Organization flow chart The Constitution 2010 read together with the County Government Act of 2012 outline the basic organizational chart for the county government. As such, the organization flow chart shown herein under is informed by the two laws, which laws sought to achieve timely and efficient implementation of the county policies, projects and programmes thus avoiding duplication of roles and functions. Below is a summary of the organizational flow chart
184
There are different committees and institutions which came into existence following the promulgation of the Kenya Constitution in 2010 and the enactment of various Acts of parliament which sought to operationalize devolution. These bodies include The County Executive Committee, Kirinyaga County Assembly, County Budget and Economic Forum, Departmental County Directors and Sub-County Heads of Departments.
5.2.1 Kirinyaga County Executive Committee The executive authority of the county is vested in and exercised by the County Executive Committee (CEC). The CEC comprises of the Governor as the chairperson, Deputy Governor, County Secretary and nine CEC members appointed by the Governor with the approval of The County Assembly (CA). The main roles of the CEC are to implement county legislation, implement within the county national legislation to the extent that the legislation requires, manage and coordinate the county administration and its departments. In addition the CEC may prepare proposed legislation for consideration by the county assembly as well as provide the county assembly with full and regular reports on matters relating to the county.
Governor
Deputy Governor County Budget and economic Forum
County Commissioner
County Security Committee
Community Policing Committee
County Assembly
Sector Committees
County Assembly Committees
Chief Officers
County Directors (Devolved)
County Directors (National)
CDF Committees
County Public Service Board
Sub-County HOD’s(National)
County Executive Committee
Sub-County Development Committee
Ward Development Committee
Village Development Committee
Sub-County HOD’s (County)
Governors DU and Front Office
Development Partners County
Secretary
185
CEC members will be the policy makers as well as coordinate the implementation of development projects and programmes that fall within the jurisdiction of the county. The sectors that will spearhead the development agenda in Kirinyaga County are: Sector
Departments /Directorate
Agriculture & Rural development
Department of Agriculture, Livestock, Veterinary and Fisheries Directorate of Cooperative development
Directorate of Land
Research and development
Energy, infrastructure & ICT
Department of Transport, Roads and Public works Department of Physical Planning, lands and Housing Research and development
General Economics, Commercial and labour affairs
Department of Cooperative Development, Trade, Tourism, Industry and Enterprise Development
Health Department of Medical Services, Public Health and Sanitation Education Department of Education and Public Service
Research and Development
General public services Office of the Governor Office of the Deputy Governor County Public Service Board County Executive Committee Department of Finance, Marketing , Economic Planning and ICT County Assembly
Social protection, culture and recreation
Department of Gender, Culture and Social Services Department of Youth and Sports
Environmental protection, water and housing
Department of Environment, Water and Natural Resources Directorate of Housing
186
5.2.2. Kirinyaga County Assembly The County Assembly (CA) is an independent arm of Kirinyaga County Government that consists of 20 democratically elected Members of County Assembly (MCA’s) from each of the 20 Wards in the county, 14 nominated MCA’s and the County Assembly Speaker who is an ex-officio member. The major roles of the CA are; perform the legislative functions within the county including approval of county laws, policies, budgets and expenditures, integrated development plans, tariffs, rates and service charges. The CA further considers and scrutinizes reports received from the County Executive, approves county borrowing, ensures community and stakeholder participation as well as playing an oversight role of the County Executive. The CA will therefore play an important role in ensuring that the objects and principles of devolved government as enshrined in the constitution are achieved through promotion of democratic and accountable exercise of power, protection and promotion of the interests of minorities, ensuring equitable sharing of resources throughout the county and enhancing checks and balances and the separation of powers. In the implementation of the CIDP the CA will be responsible for approving the policies that are aimed at developing the county, hence their role is of critical importance.
5.2.3. Kirinyaga County Budget and Economic Forum The County Budget and Economic Forum (CBEF) comprises the Governor as the chairperson, other members of the CEC, a number of representatives not being public officers equal to the number of executive committee members appointed by the Governor. These persons are nominated by organizations representing professionals, business, labour issues, women, persons with disabilities, the elderly and faith based groups at the county level. The purpose of CBEF is to provide a means for consultation by the county government on preparation of county plans, the county fiscal strategy paper and the budget review and outlook paper for the county. It also provides a means of consultation on matters relating to budgeting, the economy and financial management at the county level.
5.2.4 County Public Service Board The county public service board (CPSB) is a body corporate with perpetual succession and a seal and comprises of a chairperson nominated and appointed by the Governor with approval of the CA, not less than three but not more than five other members appointed by the Governor with the approval of the CA and a certified public secretary. The roles of the CPSB will include establishment and abolition of offices in the county public service, appointment of county public servants including in boards of cities and urban areas within the county, confirmation of county appointments, exercising disciplinary control over and removal of persons holding or acting in county public service as well as prepare regular reports for submission to the CA on the execution of the functions of the board. The board will also be expected to provide for human
187
resource management and career development practices, address staff shortage and barriers to staff morbidity between counties, facilitate the development of coherent, integrated human resource planning and budgeting for personnel emoluments in counties. The Board is also expected to offer advice to the county government on implementing and monitoring of the national performance management system in the county as well advising the county government on human resource management and development. The board can also make recommendations to the Salaries and Remuneration Commission (SRC) on behalf of the county government on the remunerations, pensions, and gratuities for county public service employees.
5.2.5 County Chief Officers County Chief Officers (CCO) are officers appointed by the Governor from qualified experienced individuals through nomination by the County Public Service Board and the approval of the CA. CCO’s are officers responsible to the respective CEC member for the administration of a county department and will be the authorizing and accounting officer in their respective sectors.
5.2.6 County Directors and Sub-County Heads of Departments County directors and sub-county heads of departments will consist of civil servants both from the county government as required by the county executive and the national government as may be required by the national executive. These officers will offer technical assistance and will be directly responsible for implementation of the policies of the executive. They will be required to work with mutual respect and consultations for the achievement of the development agenda in their respective departments.
5.3 Resource Requirements by Sector Table 14: Summary of Proposed Budget by Sector Sector Name Amount (Billion) As a percentage of total
budget General Economics Commercial & Labour Affairs
2.389 9.1659
Education and Public service Sector
2.1034 8.0701
Environmental protection, Water, Natural Resources and Housing
7.75145 29.74
Health 1.637 6.2807 Land ,Physical Planning and Housing (Land Management)
0.6176 2.3696
Agriculture 4.63535 17.7845 Recreation ,Culture and Social Protection
2.411 9.2503
188
Transport, Roads and Public works
1.453676 5.5773
Finance, Economic Planning, Marketing and ICT
3.066 11.7634
Total 26.0644 -
5.4: Resource mobilization framework Type of revenue
2018 2019 2020 2021 2022 Total
Local revenue category
429,414,854.33
472,356,339.76
519,591,973.74
571,551,171.11
628,706,288.22
2,621,620,627.16
Equitable share
4,409,200,000
4,850,120,000
5,335,132,000
5,868,645,200
6,455,509,720
26,918,606,920
Conditional grants
- - - - - -
Equalization funds
- - - - - -
Total amount
4,838,614,854.33
5,322,476,3339.76
5,854,723,973.74
6,440,196,371
7,084,216,008.22
29,540,227,547.16
5.5 Estimated resource gap and measures of addressing it The county government of Kirinyaga projects to collect local revenue amounting to Ksh 2,621,620,627.16 and equitable share worth Ksh 26,918,606,920 totaling to Ksh 29,540,227,547.16
The recurrent expenditure is projected to be Ksh 20.678 billion versus Ksh 8.862 billion for capital projects. This results to a deficit of Ksh 17.2024 billion
Measures to bridge the deficit to finance capital projects
a) Cooperation within the county and across the region to achieve jointly established priorities will help leverage the assets that each can bring to the table.
b) Making it easier for interested businesses and developers to invest in the community in ways that support the community’s long-term priorities.
c) Collaboration with national government departments in jointly undertaking capital projects.
d) Infrastructure Projects to be funded through Public Private Partnerships
e) Introduction of parking fees in urban areas where such had not been levied such as Wang’uru, Kianyaga and Kagio
f) Introduction of cess on rice, timber, horticultural produce and milk
189
g) Development of tourist sites such as God’s Bridge, Mau Mau-caves in Mt. Kenya, tourist information centres at the three entry point into the county, Kamweti Climbing Lane,
h) Carrying out valuation roll in the urban centres, gazetted forests of Mt. Kenya and Njukiine. This will lead to an increase of income on land rates upon completion of valuation roll
i) Review the ground rent fee charged on plots.
j) Consult with the national government over borrowing to finance capital projects
190
CHAPTER SIX: MONITORING AND EVALUATION FRAMEWORK
6.1 Introduction
The County Government of Kirinyaga is setting up crucial institutional structures that are
needed for M&E, performance management and statistical data collection. At this initial
stage of developing and use of M&E systems, the county has experienced the following
challenges:
• Weak management of programmes, projects and supporting activities
• Poor linkage between performance and resource allocation
• Weak capacity of co-operating government agencies, non-governmental
organizations and local community to monitor and evaluate
• The data collected are often not used for decision-making,
• Some of the data collected is of poor quality due to low capacity,
• Lack of appreciation, and inappropriate data collection tools,
• Lack of baseline data in development of indicators for various projects and
programmes.
• Non optimal use of funds and other resources
6.2 M&E Policy The purpose of the County Monitoring and Evaluation Policy is to establish a common
basis for implementation of the County Integrated Monitoring and Evaluation System
(CIMES). The Policy is prepared as an operational guide and a framework for the
coordination and implementation of CIMES. It is therefore designed to increase
transparency and efficiency in reporting among stakeholders involved at all levels. Benefits
from the implementation of the Policy will accrue not only to stakeholders at the County
level, but also at sub-County, Ward and Village levels
Monitoring and evaluation policy will also put in place tools to measure the degree to which
an intervention, strategy or policy has achieved its objectives. The policy will always provide
a basis for accurate reporting and the identification of lessons learned and obstacles faced.
This can be used to plan new interventions as well as streamline existing programs.
191
Through the Policy, the County Government will be able to meet its own information
requirements for on-going policymaking and budgeting at all levels. Additionally, the
County Government will be able to meet donor partners, civil society and private sector
requirements for information that will help and promote investment in the County. Overall,
the County Monitoring and Evaluation System will result in long-term benefits to Kirinyaga
County
6.3 Data collection, Analysis, and Reporting Institutional set-up for the CIMES
Article 176 of the Constitution of Kenya 2010, established the County Governments with
each government consisting of the County Executive and the County Assembly. The two
arms of County government have an important role to play in the successful
implementation of monitoring and evaluation. In order to understand better the role played
by the two institutions and other stakeholders, Table 2 below gives a brief description of
their functions relating to M&E.
Table 2: Responsibilities of Stakeholders in M&E Institutional Framework
Stakeholder Responsibility Legislative Arm of the County Government
County Assembly - Overall public oversight on all development programmes/projects
- Approval of county development plans and budgets
- Receiving and adopting county M&E reports
- Approval of legislative policies
Executive Arm of the County Government
County Executive Committee
- Deliberates on and sets the development agenda in the county
- Drives delivery of the CIDP projects through each ADP
- Ensuring M&E structures are established in the county
- Promoting the role of the M&E Section in advancing Results Based Management and Public Service
192
Stakeholder Responsibility Delivery that ensures the CIDP objectives and outcomes meet the needs of the citizens.
- Receive, review and ratify cabinet memos on M&E issues.
- Receive annual M&E reports and give policy directions
- Sharing the County’s Annual Progress Reports (APR) on the implementation of the CIDP with the County Assembly, county citizens and other stakeholders
County Chief Officers - Responsible for the portfolio of services, programmes and projects within a devolved function
- Produce technical M&E reports for the projects/ programmes that are under their administration
Directors of Sector Departments
- Implementation of programmes/ projects in their sectors
- Report on progress of programmes/projects
Economic Planning Department
- Lead department in the coordination and implementation of M&E policy
- Coordinates integrated development planning within the county while ensuring linkages between CIDP, MTP, SDGs and Vision 2030
- Formulate guidelines, standards and norms on issues relating to M&E
- Ensures meaningful engagement of citizens in the CIMES and CIDP preparation and implementation process
- Ensures the collection, collation, storage and updating of data and information needed for the planning and M&E processes
Monitoring and Evaluation Unit (Under the Economic Planning Department)
- Coordination of CIMES including its institutionalization within the county
- Develop the overall framework of the integrated M&E activities
- Prepare work plans and detailed budgets for the M&E activities
193
Stakeholder Responsibility - Provide oversight for the development of performance
indicators
- Establish contacts with national and other county M&E stakeholders
- Mobilize resources for M&E activities in the county
- Coordinate the preparation of all county M&E reports; guide staff and executing partners in preparing their progress reports in accordance with approved reporting formats and ensure their timely submission.
- Prepare the consolidated county M&E reports for the CEC
- Coordinate field visits to support implementation of M&E
- Check the quality of data produced during field visits and identify where adaptations may be needed;
- Follow up on the implementation of evaluation recommendations with project managers;
- Review and provide feedback on the quality of methodologies established to collect monitoring data, and document the protocols that are in place for the collection and aggregation of this data;
- Establish an effective system for assessing the validity of monitoring and evaluation data through a review of CIDP implementation activities and completed monitoring forms/databases.
- Ensure availability of relevant software and ICT tools for M&E
- Maintaining the support systems that underpin reporting such as the monitoring website
- Facilitate harmonization of M&E tools and processes at all county administrative units
- Foster participatory planning and monitoring
- Support development of M&E capacity through training mentoring and coaching.
194
Stakeholder Responsibility - Systematically capture lessons learnt from successes
and failures
- Prepare communications strategy to promote CIMES
The Citizenry and Non-State Actors Citizenry - Demand for transparency and accountability in the
running of county affairs
- Participate in local development projects and decision making
- Participate in M&E activities in the county
- Report on the outcome/impact of various project/programme interventions
Development Partners - Provide technical and financial support
Civil Society Organizations (NGOs, FBOs, CBOs)
- Community mobilization for county planning and development
- Collaborate in conducting participatory monitoring and evaluation
Reporting
Stakeholders shall be required to produce timely and accurate progress reports in the
formats designed by M &E Unit in collaboration with departments, agencies and non-state
actors. The format shall be a standard format, designed in such a way that, it facilitates
effective data collection, analysis and reporting.
The unit shall also focus its reporting on development projects and programmes outlined
in the County Budget. The reports shall be elaborate and shall be used to evaluate the
performance of departments comparative to departmental sectoral plan
Computerization of Reporting
For the full realization of the CIMES objectives, the county government will be required to
digitize the collection and analysis of M&E information for the projects and programmes
in the CIDP. This will be achieved through having an automated information management
system, which will allow real time reporting of projects. Key features of the system will
include:
• Online/offline data entry – enables users to easily collect, modify relevant data and
submit it
195
• Analytical reporting, charting and mapping – enables users to create sophisticated
and user friendly reports
• Work flow manager
• On-the-fly querying – enables users to conduct custom querying of data by any
combination of variables (sector, project status, source of finance etc.)
6.4 M&E Outcome Indicators This section gives the monitoring and evaluation of outcome Indicators by sector. Outcome
indicators will be used to measure the quantity and quality of the results achieved through
the provision of services, an outcome indicator will answer the question: “How will we know
success when we see it?
In this section, the County will use the outcome indicators developed and adopted in
Kenya to monitor Sustainable Development Goals targets. However, some of the indicators
can only be measured at the National level.
Outcome Indicators
Sectors SDG GOAL Outcome indicators
Baseline Source of Data
Reporting responsibility
End-term target 2022
Agriculture, Rural Development, Education, Health
Goal 1. End poverty in all its forms everywhere
Proportion of population living below the national poverty line, by sex and age
20%- 2015 KIHBS
KNBS KNBS 19%
Proportion of men, women and children of all ages living in poverty in all its dimensions according
children- 22.3%, Adult (18-35)- 16.7%, Adult (36-59)- 17.1%, Adult (60-69)-24.7%, Adult (70+)-28.7%
KNBS KNBS children- 20%, Adult (18-35)- 15%, Adult (36-59)- 15%, Adult (60-69)-20%, Adult (70+)-20%
196
to national definitions
Proportion of local governments that adopt and implement local disaster risk reduction strategies in line with national disaster risk reduction strategies
Disaster response unit to be operational by 2018
Department of Transport, public works
Department of Transport, public works
Fully operational with 24hrs availability
Proportion of total government spending on essential services (education, health and social protection)
health, education, culture and social services, youth and sports takes a combined 50% in the 2017/18 budget.
Departments of Finance, Education, Health, social services
Departments of Finance, Education, Health, social services
Increase expenditure on education, health, and social to 60%
Agriculture, Rural Development, Education, Health
GOAL 2: End hunger, achieve food security and improved nutrition and promote sustainable agriculture
Prevalence of stunting (height for age <-2 standard deviation from the median of the World Health Organization (WHO) Child Growth Standards) among
Severe(13.2%), Moderate(28.3%)
KNBS KNBS Severe(10%), Moderate(20%)
197
children under 5 years of age
Prevalence of malnutrition (weight for height >+2 or <-2 standard deviation from the median of the WHO Child Growth Standards) among children under 5 years of age, by type (wasting and overweight)
Severe(0.7%), Moderate(0.7%)
KNBS KNBS Reduced malnutrition Severe to below 0.7%), Moderate to below (0.7%)
Health GOAL 3: Ensure healthy lives and promote well-being for all at all ages
Maternal mortality ratio
298/100000 Live Births- (2016 statistical abstract)
KNBS, Min of Health
KNBS, Min of Health
Proportion of births attended by skilled health personnel
92%-2014 KDHS
KNBS, Min of Health
KNBS, Min of Health
Under-five mortality rate
72/1000 livebirths (2016 statistical abstract)
KNBS, Min of Health
KNBS, Min of Health
198
Number of new HIV infections per 1,000 uninfected population, by sex, age and key populations
Annual new infections at 13 persons in 2016- Kenya HIV County Profiles
Min of Health
Min of Health
Tuberculosis incidence per 100,000 population
248- 2015 Ministry of Health
Min of Health
Min of Health
Malaria incidence per 100,000 population
6,218- 2015 Ministry of Health
Min of Health
Min of Health
Proportion of women of reproductive age (aged15-49 years) who have their need for family planning satisfied with modern methods
76%- 2014 KDHS
Min of Health
Min of Health
Health worker density and distribution
Nurses (per 100,000 people)- 87, Doctors (per 100,000 people)- 5, Clinical Officers (per 100,000)- 22 Ministry of Health 2015
Department of Health, Min of Health
Department of Health, Min of Health
199
Education GOAL 4 Ensure inclusive and equitable quality education and promote lifelong learning opportunities for all
Participation rate in organized learning (one year before the official primary entry age), by sex
current enrolment in ECDE at 15,800 in 2017
Department of Education
Department of Education
Proportion of teachers in: (a) pre-primary; (b) primary; (c) lower secondary; and (d) upper secondary education who have received at least the minimum organized teacher training (e.g. pedagogical training) pre-service or in-service required for teaching at the relevant level in a given country
403 ECDE trained care givers by 2018
Department of Education
Department of Education
Gender , youth and Social protection
GOAL 5: Achieve gender equality and
Proportion of individuals who own
55% KNBS KNBS
200
empower all women and girls
a mobile telephone
Proportion of countries with systems to track and make public allocations for gender equality and women’s empowerment
wezesha programme in the department of gender aimed at women empowerment
Department of Gender and Social services
Department of Gender and Social services
Water, Health
GOAL 6: Ensure availability and sustainable management of water and sanitation for all
Proportion of population using safely managed drinking water services
63.7% - 2015 KIHBS
KNBS KNBS
Proportion of population using safely managed sanitation services, including a hand-washing facility with soap and water
87%- 2015 KIHBS
KNBS KNBS
Proportion of local administrative units with established and
Community Based water management units established under the Department
Department of water services
Department of water services
201
operational policies and procedures for participation of local communities in water and sanitation management
of water services
Energy and Infrastructure
GOAL 7: Ensure access to affordable, reliable, sustainable and modern energy for all
Proportion of population with access to electricity
43.7%- 2015 KIHBS
KNBS KNBS
Proportion of population with primary reliance on clean fuels and technology (Electricity, LPG, Biogas)
12.7%- 2015 KIHBS
KNBS KNBS
Energy and Infrastructure
GOAL 9: Build resilient infrastructure, promote inclusive and sustainable industrialization and foster innovation
Proportion of the rural population who live within 2 km of an all-season road
568 km of total 1109 Km of road network is all weather (51%)
Min of Transport
Min of Transport
Proportion of population
mobile network
KNBS KNBS
202
covered by a mobile network, by technology
coverage at 99%
Environment, Water
GOAL 15: Protect, restore and promote sustainable use of terrestrial ecosystems, sustainably manage forests, combat desertification, and halt and reverse land degradation and halt biodiversity loss
Forest area as a proportion of total land area
20.6%- Kenya Forest Service 2015
Kenya Forest Service
Kenya Forest Service
All Sectors GOAL 17: Strengthen the means of implementation and revitalize the Global Partnership for Sustainable Development
Proportion of individuals using the Internet
13.9% (of 3 years and above)
KNBS KNBS