A CASE STUDY OFA CASE STUDY OF
CONTINGENCY ANALYSISCONTINGENCY ANALYSISON WRLDCON WRLDC
RATHORE SUMIT K.RATHORE SUMIT K.
M.E-1M.E-1stst -POWER SYSTEM-POWER SYSTEM
B.V.M VVNAGARB.V.M VVNAGAR
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
2/18
SYSTEM SECURITYSYSTEM SECURITY
System Monitoring.
Security constrained optimal power flow.
Contingency Analysis.
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
3/18
OPERATING STATE OF POWER SYSTEMOPERATING STATE OF POWER SYSTEM
NORMAL STSTE
RESTORATIVE STATE EMERGENCY STATE
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
4/18
CONTINGENCY????CONTINGENCY????
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
5/18
CONSTRAINED IN SYSTEMCONSTRAINED IN SYSTEM
maxmin ViViVi
maxkiki
Line flow (Branch flow)
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
6/18
APPLICATION IN FIELDAPPLICATION IN FIELD
WRLDC (Western Regional Load Dispatch Centre)
successful implemented POWER NETWORKANALYSIS(PNA) sub system of ENERGY
MANAGEMENT SYSTEM(EMS) after proper
tuning of STATE ESTIMATOR(SE).
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
7/18
About WRLDC (Western Regional Load Dispatch Centre)
Comprises states of GUJARAT, MAHARASTRA, MP,
CHHATTISGARH, GOA, DADRA AND NAGAR
HAVELI, DAMAN AND DIU.(WESTERN REGION40944 MW).
Private central sector of NTPC at KORBA,VINDHYACHAL, KAWAS & GANDHAR and nuclear.
(EASTERN REGION)
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
8/18
MAP OF WESTERN REGIONMAP OF WESTERN REGION
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
9/18
HV LINES LOACATION
400kV Chandrapur-Parli 1458MW-21degree-limit 25degree
400kV Koradi-Bhusawal 1011MW-21degree-23degree
400kV Itarsi-Khandwa-Dhule 1101MW-18degree-21degree
On MAY-08 western region catering a demand of 25000MW at
11:30hrs.
ER-WR-1200MW
NR-WR-1400MW
WR-SR-750MW
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
10/18
Information ObtainedInformation Obtained
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
11/18
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
12/18
EMS database for western region
591 buses
230 generators
603 loads 623 lines (Up to 132kV level)
10486 breakers
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
13/18
PREDEFINED CASE LIST AT WRLDC
400kV Chandrapur-Parli S/C outage
400kV Chandrapur-Parli D/C outage
400kV Koradi-Bhusawal S/C outage
400kV Koradi-Bhusawal D/C outage
400kV Itarsi-Khandwa S/C outage
400kV Itarsi-Khandwa D/C outage
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
14/18
CONTINGENCY CASESCONTINGENCY CASES
Acceptable cases.
Cases with overload, over voltage etc.
Not Converged case. Islanded cases.
Multiple contingency cases.
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
15/18
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
16/18
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
17/18
7/29/2019 Contingency2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref2006 Wind Turbine PSCAD V42 Ref
18/18
THANK YOU