P/1Superior Industries / © 03-2015
Construction ManagementEngineering / Manufacturing / Project Management / Field Services
Planning, coordination and control of dry bulk plant construction projects from concept to completion. n
Team consists of seasoned, well-respected industry veterans to achieve timeliness and profitability. n
Accurate integration of processing and handling equipment to ensure proper flow, essential uptime and saleable products. n
Combination of vast engineering, world-class manufacturing and highly experienced project managers. n
P/2 © 03-2015 / Superior Industries
New Hampshire
Vermont
Rhode Island
Massachusetts
Delaware
Conneticuit
New Jersey
Maryland
A/ BULK HANDLING MANUFACTURING
C/ COMPANY STATISTICS
B/ RADIAL STACKING CONVEYOR
B/ FINE MATERIAL WASHER
HEADQUARTERS: MORRIS, MINNESOTA
A/ BULK HANDLING MANUFACTURING FACILITIES
¾ Morris, Minnesota (Established in 1972) ¾ Prescott Valley, Arizona (Established in 2006) ¾ Loganville, Georgia (Established in 2008) ¾ Columbus, Nebraska (Established in 2014)
B/ BULK HANDLING MANUFACTURED PRODUCTS
¾ TeleStacker® Conveyor ¾ Stacking Conveyors ¾ Transfer Conveyors ¾ Feed Systems ¾ Portable Plants ¾ Classifying Tanks ¾ Washing Equipment ¾ Dewatering Screens ¾ Conveyor Idlers ¾ Conveyor Pulleys ¾ Conveyor Accessories
C/ COMPANY STATISTICS
¾ 1,350 employees in 25+ states ¾ 925,000 square feet of building space ¾ 17 facilities in 9 states ¾ 75 engineers, drafters and designers ¾ 100% certi�ed welders (AWS D1.1) ¾ 25+ patented technologies
D/ CORE VALUES
¾ Integrity ¾ Long-Term Relationships ¾ Culture of Opportunity ¾ Strong Work Ethic
About Superior Industries
P/3Superior Industries / © 03-2015
A/ ENGINEERING
C/ PROJECT MANAGEMENT
B/ MANUFACTURING
D/ FIELD SERVICE
A/ ENGINEERING
¾ Return on Investment (ROI) Analysis ¾ Concrete Footings, Mats, Piers ¾ Plant Design and Layout ¾ Structural Design ¾ Mechanical Design ¾ Electrical Design ¾ Machinery Selection
B/ MANUFACTURING
¾ Plate Burning ¾ Structural Steel ¾ Welding ¾ Drilling ¾ Fitting ¾ Purchasing ¾ Machining ¾ Sand Blasting and Painting/Galvanizing ¾ Component Assembly ¾ Freight Management
C/ PROJECT MANAGEMENT
¾ Project Planning ¾ Estimating and Pricing ¾ Return on Investment (ROI) Analysis ¾ Scheduling ¾ Purchasing ¾ Engineering Management ¾ Fabrication Management ¾ Field Services Management
D/ FIELD SERVICES
¾ Excavations ¾ Concrete Placement ¾ Structural Erection ¾ Mechanical Millwright Services ¾ Electrical Controls and Wiring ¾ Start Up Services ¾ Mechanical Piping
Construction Management Services
P/4 © 03-2015 / Superior Industries
Photo gallery
P/5Superior Industries / © 03-2015
Photo gallery
P/6 © 03-2015 / Superior Industries
Construction Management Data SheetA/ CONTACT INFORMATION
¾ Business Name: ¾ Contact Name: ¾ Title: ¾ Office Number: ¾ Mobile Number: ¾ Email Address:
B/ SCOPE OF WORK ¾ Design-Build: [ ] Yes [ ] No ¾ Fabrication Only: [ ] Yes [ ] No ¾ Foundation/Footing Design: [ ] Yes [ ] No ¾ Concrete Installation: [ ] Yes [ ] No ¾ Project Management: [ ] Yes [ ] No
C/ DEVELOPMENT CONSIDERATIONS ¾ Are you using consultant or engineering
firm? [ ] Yes [ ] No [ ] Maybe ¾ Is there a process flow sheet? [ ] Yes [ ] No ¾ Do you need one? [ ] Yes [ ] No ¾ Is there existing plant layout? [ ] Yes [ ] No ¾ Do you need one? [ ] Yes [ ] No ¾ Is there topographical map? [ ] Yes [ ] No ¾ Is there geotechnical report? [ ] Yes [ ] No ¾ Do you need electrical/programming
services? [ ] Yes [ ] No ¾ Are you utilizing new or existing
equipment? [ ] New [ ] Used [ ] Both(If existing, provide list of equipment in notes.)
¾ Is bid package available? [ ] Yes [ ] No
D/ APPLICATION SPECIFICATIONS ¾ Tons/Hour (short/metric): ¾ Maximum (tph): ¾ Average (tph): ¾ Operating Hours/Day: ¾ Elevation (if above 5,000’):
E/ MATERIAL INFORMATION ¾ Material: ¾ Bulk Density/Specific Gravity (pcf ): ¾ Angle of Repose (degrees): ¾ Max Lump Size (in): ¾ Min Lump Size (in): ¾ Fines (%): ¾ Additional Material Information Description
9 [ ] Explosive 9 [ ] Corrosive 9 [ ] Sticky 9 [ ] Oil/Petroleum Exposure 9 [ ] Other:
¾ Chemical Analysis:
F/ PLANT COMPONENTS ¾ Primary Crusher
9 [ ] Jaw 9 [ ] Gyratory 9 [ ] HSI
¾ Secondary Crusher 9 [ ] Cone 9 [ ] HSI 9 [ ] VSI
¾ Screens 9 [ ] Incline 9 [ ] Horizontal
G/ DESIGN SPECIFICATIONS ¾ Do you need install services? [ ] Yes [ ] No ¾ Belt Splice
9 [ ] Mechanical (Standard) 9 [ ] Factory Vulcanized (must ship complete) 9 [ ] Onsite Vulcanizing by Others
¾ Belt Speed (fpm): ¾ Minimum Tail Clearance: ¾ Maximum Conveyor Angle (degrees): ¾ Dust control and/or suppression? [ ] Yes [ ] No ¾ Impact beds/rollers at load points? [ ] Yes [ ] No ¾ Environment
9 [ ] Inland 9 [ ] Coastal 9 [ ] Salt Exposure 9 [ ] Underground
¾ Specialized coating? [ ] Yes [ ] No ¾ If yes, which coatings? ¾ Lined chutes or rock shelf design? [ ] Yes [ ] No ¾ Rollaway chutes? [ ] Yes [ ] No ¾ Liner
9 [ ] AR Steel 9 [ ] Urethane 9 [ ] Rubber 9 [ ] Ceramic
¾ Liner thickness (inches): ¾ Maintenance platforms? [ ] Yes [ ] No ¾ Plant Type
9 [ ] Static 9 [ ] Modular 9 [ ] Skid
Top Related