Construction Analysis during the
Design Process
Construction Analysis during the
Design Processwww.ddss.arch.tue.nl
Bauke de Vrieswww.ddss.arch.tue.nl
Bauke de Vries
www.ddss.arch.tue.nl
4D-CAD4D-CAD
•Linking building components with construction activities•Manual task of the construction planner•Dedicated systems: NavisWorks, 4D Suite, …•Advantages: Simulation, Visualization
www.ddss.arch.tue.nl
ChallengeChallenge
Automation of the planning process.
Advantages:• Independency from the planner• Quick first concept plan
www.ddss.arch.tue.nl
ImplementationImplementation
EquipmentLabour
Constr.Analysis
Comp.Rel. +Dur.
CADmodel
Formulas
CAD ProjectPlanning
PlanningSchema
Design evaluation
www.ddss.arch.tue.nl
Construction algoritmsConstruction algoritms
Analysis by object name:Walls are bearing floors, colums are bearingbeams, etc.
www.ddss.arch.tue.nl
Construction algorithmsConstruction algorithms
Analysis by object elevation:Object with a lower elevation is bearing an object with a higher elevation
www.ddss.arch.tue.nl
Construction algorithmsConstruction algorithms
Analysis by directed graph:Each object is a node in a connection graph.
www.ddss.arch.tue.nl
Construction algorithmsConstruction algorithms
Analysis by object adjacency:Each object is a node in a topological graph
A
C
B I
G
FD
JE
H K
L
M
N
- Objecten zonder voorganger
www.ddss.arch.tue.nl
Construction analysisConstruction analysisObject of anlysis
www.ddss.arch.tue.nl
Construction analysisConstruction analysisMove down
– Inleiding – Oriëntatie – Doelstelling van het onderzoek – De algoritmen – Implementatie –– Case Study – Reactie uit het bedrijfsleven – Conclusie en Aanbevelingen – Einde –
www.ddss.arch.tue.nl
Construction analysisConstruction analysisThe green objects have an intersection in the verticaldirection with the red object
– Inleiding – Oriëntatie – Doelstelling van het onderzoek – De algoritmen – Implementatie –– Case Study – Reactie uit het bedrijfsleven – Conclusie en Aanbevelingen – Einde –
www.ddss.arch.tue.nl
Construction analysisConstruction analysisThe red object has in intersection with the green objectsin the horizontal direction
www.ddss.arch.tue.nl
Construction analysisConstruction analysis
Example:Objects adjacent to floor
www.ddss.arch.tue.nl
Pilot studyPilot study
www.ddss.arch.tue.nl
Planning comparisonPlanning comparisonReal planning
Generatedplanning
www.ddss.arch.tue.nl
DifferencesDifferences
• Concurrency whenever possible• Unlimited resources• Construction method
www.ddss.arch.tue.nl
Complete processComplete process
www.ddss.arch.tue.nl
ExperiencesExperiences
• Model preperation through clash detection• Generated planning 2 months longer than
real planning over a a period of 1 ½ year• Suitable for a quick first guess• Further development of: Construction
method, Humen resources, Material resources