cedc agenda 9 2 2014
Community & Economic Development Committee Meeting
AGENDA
September 2, 2014 – 12:00 pm Conference Room A/B/C, Second Floor
Agenda Item 1. Architectural Building Standards 2. Floodplain ordinance, FEMA revision to the Floodplain regulations 3. Zoning Ordinance update
4. Owner occupied business in Falmouth 5. Readiness and Environmental Protection Integration (REPI) through MCBQ
6.
DEQ presentation – Scope of MS4 Stormwater Program Thomas Faha, Northern Virginia Regional Director Bryant Thomas, Water Permits Northern Virginia Jamie Bauer, MS4 Program Manager
7. Strategic Plan update 8. Cluster Ordinance 9. Aquia Towne Center update
10. Crow’s Nest update
KINGS HWY
WHITE OAK RD
POPL
AR R
D
BROOKE RD
TRUSLOW RD
WHITE OAK RD
HARTWOOD RD
BRENT POINT RD
CAISSON RD
BELLE PLAINS RD
FERRY R
D
MINE
RD
ENON RD
DEACON RD
ESKIMO HILL RD
LEELAND RD
FOREST LANE RD
ARKE
NDAL
E RD
BUTLER RD
ONVILLE RD
WALPO
LE ST
S t a f f o r d C o u n t yS t a f f o r d C o u n t yA r c h i t e c t u r a l B u i l d i n g S t a n d a r d sA r c h i t e c t u r a l B u i l d i n g S t a n d a r d s
§̈¦95
£¤1
£¤17
1
2
4
57
6
8
U r b a n S e r v i c e A r e aU r b a n S e r v i c e A r e a
R e d e v e l o p m e n t A r e aR e d e v e l o p m e n t A r e a
R u r a l A r e aR u r a l A r e a
H i g h w a y O v e r l a y D i s t r i c tH i g h w a y O v e r l a y D i s t r i c t
³0 7.5 15 22.5 303.75Miles
LegendHighway Overlay DistrictUrban Service AreaRedevelopment AeraUrban Development Area
Future Land UseUrban Development AreasSuburban
Business and IndustryAgricultural/RuralFederalParkMining and ExtractionResource Protection
• Neighborhood Design Standards of architecturalelevations for rezoning proffers and CUP conditions• Developer covenants for by-right development
• Mechanical systems screened from public view alongstreets and adjacent properties
• Underground utilities required for new subdivisions
• Neighborhood Design Standards or architecturalelevations for rezoning proffers and CUP conditions• Redevelopment Vision Document for rezoning
proffers and CUP conditions• Mechanical systems screened for public view along
streets and adjacent properties• Developer covenants for by-right development• Underground utilities required for subdivisions
• Outdoor storage screened fromview along highway• Loading areas and service bays notvisible from highway• Neighborhood Design Standards forrezoning proffers and CUP conditions• Developer covenants for by-right-development• Underground utilities required bysubdivision and zoning codes
• Same Architectural treatment on allbuilding sites
• Mechanical Systems screened frompublic view along streets and adjacent
properties• No unadorned concreate or metal siding
• Mechanical equipment shielded frompublic view
• Dumpsters and loading spaces screenedfrom public view
U r b a n D e v e l o p m e n t A r e aU r b a n D e v e l o p m e n t A r e a• Neighborhood Design Standards or architecturalelevations for rezoning proffers and CUP conditions
• Mechanical systems screened from public view alongstreets and adjacent properties
• Developer covenants for by-right development• Underground utilities required new subdivisions
• Developer covenants for by-right development
Items for discussion on rewriting the zoning ordinance are recommended by Staff and Consultants Insure all Va Code reference are current and zoning ordinance up to date Remove regulations from the definitions and place is special regulations section 28-39 Special
Regulation List districts from less intense to most intense Staff suggested that graphics be included within each district illustrating the lot size, buildable
area according to setbacks required, structure height, etc. A-1, Agricultural District
o Remove uses from district Parking and storage of commercial vehicles ( business use) Agricultural service businesses (business use) Automobile avocation ( work allowed on personal vehicles) Golf course (included in community use)
o Amend the following uses Feed lots - add a greater setback and lot size Boat sales at a marina and not a by right use on A-1 property Commercial kennels as by right on larger acreage not a CUP Campground with acreage requirement and to allow recreational and travel
trailer Slaughter and animal processing incidental to agri intensive use - add acreage
and setbacks School as a by right use with acreage requirement Plant and tree nursery - only if plants started and grown on property as a
agricultural use, not shipped in from bedding nurseries - increase acreage requirement
o Add uses: Beekeeping as agricultural use Agri-tourism Residential Facility (group home) Commercial outdoor shooting range as special exception with acreage
requirement o Add accessory uses category
home occupation in dwelling private swimming pool detached garage Wayside stands for selling of products grown on property Small family day care in dwelling
Group family day care in dwelling o Regulations
Add Acreage for uses other than single family dwelling = 5 acres
A-2, Rural Residential - transition between Agricultural and residential districts
o Remove uses from district Automobile avocation (business use) Golf course (included in community use) Parking and storage of commercial vehicles Remove hospital as a use
o Amend the following uses Agriculture only on 3 acres or more Aquaculture only on 3 acres or more Equestrian use and bridle path on 3 acres or more Non-commercial kennels on 3 acres or more Places of worship on 3 acres or more
o Add Residential Facility (Group Home) All uses as regulated and permitted in the A-1 Zone except for single family
dwellings Acreage for other uses = 3 acres
o Add Accessory Uses Accessory apartments in single family homes Home occupation private swimming pool detached garage small family day care in dwellings
R-1, Suburban Residential
o Remove the following uses The keeping of horses on 3 acres of land
o Amend the following uses Place of worship as by right with acreage requirement Community use as a Special Exception which includes golf courses
o Add the following uses as permitted
Residential Facility (group home) o Accessory uses
Home occupation Private swimming pool detached garage Small family day care
R-2, Urban Residential
o Add as permitted uses All uses permitted and as regulated in the R-1 except for dwellings Residential Facility (group home) Place of Worship with acreage requirement
o Remove uses Cluster development
Amend uses Community use to a special exception which will include golf courses School with acreage requirement
o Add accessory use category small family day care home occupation group family day care detached garage private swimming pool
R-3, High density residential
o Add as permitted uses All uses permitted in the R-2 Residential Facility (group home) Place of Worship with acreage requirement
o Remove uses Cluster development
Amend uses Community use to a special exception which will include golf courses Retirement housing (if only for over 55, then is multifamily units, not assisted
living ) School with acreage requirement
o Add accessory use category small family day care home occupation group family day care detached garage private swimming pool
R-4, Manufactured homes
o Amend Community facility to community use as a special exception
o Add accessory use category small family day care home occupation group family day care
P-TND, Planned Traditional Neighborhood Development
o Accessory uses
conference center in a hotel
accessory dwelling
Home occupation.
Push cart.
Kiosk
o Remove
Convention center – (it is accessory to a hotel?)
Carry out/cafe with no drive-through facility. (included in restaurant)
Medical, dental clinic and/or office(include clinic with office)
High intensity retail uses not otherwise listed
o Amend
School, college, university, vocational into one classification
Retail uses permitted and as regulated in the B-2 zoning district.
B-1, Convenience Commercial district
• Add the following uses:
o nail salon and spa
o artist studio
o garden center to plant and tree nursery
o boarding to veterinary clinic for patients only no outdoor kennels
o alterations to dry clean and laundry
• Remove the following uses
o Professional office (included in general office)
o Amend
Convenience store/center
Veterinary clinic - not out door pens
Pet store as permitted use
Retail photo laboratory processing as permitted use
B-2, Urban Commercial district Add
Adult day care center Small machinery sales and service, house hold appliances, lawnmowers and
similar machinery o Amend
All uses permitted by right in the B-1 District (do not list all of the uses again) Plant and tree nursery/greenhouse and garden center Public Parking lot to permitted use Retail photo laboratory processing as permitted use
o Remove Professional office Retail bakery Remove school Low intensity commercial retail (allow for medium so it includes it)
o Accessory Dwelling for watchman or caretaker on premises
B-3, Office
o Amend Medical/dental office and/or clinic School and vocational school Child Care center/adult day care center as special exception Public Parking lot as special exception
RBC, Recreation Business Campus
o Amend changing the name of this district
o needs to be reviewed in detail since it has been amended since its adoption, RC, Rural Commercial Investigate the possibility of incorporating this district into the B-2 Urban Commercial district SC, Suburban Commercial Investigate the possibility of incorporating this district into the B-1, Convenience Commercial District. There are no properties with this zoning designation. M-1, Industrial Light
o allow all uses in B-2 in the M-1 and let market govern the development o Add
Large machinery sales and service such as contractors equipment, o Amend
Veterinary clinic with outdoor pens Other light industrial and manufacturing uses allowed by right
o Accessory use Dwelling for watchman or caretaker on premises as special exception
o Remove Place of worship
M-2, Industrial Heavy
o Amend combine convenience story and center listing of all uses permitted in M-1 should only be referenced not listed
o Remove fleet parking places of worship clinic, medical and dental feed lots
light industrial and manufacturing uses from cup - uses already listed in as permitted in M-1
o Accessory uses dwellings for watchman or caretaker
PD-1, Planned Development district
o Add Residential facility (group home) Adult day care center as permitted use
o Amend convenience store/center child care center as permitted use not cup public parking lot as permitted use not cup
o Accessory uses Group family day care home occupation small family daycare dwelling for watchmen or caretaker on premises accessory dwellings
o Remove professional office
PD-2, Planned Development district
o Add Residential facility (group home) nail salon, spa beauty shop
o Amend convenience center/store low and medium intensity retail uses not listed adult day care center, child day care center as special exception public parking lot as permitted use
o Accessory uses Group family day care home home occupation small family day care home
accessory dwelling dwellings for watchmen or caretaker on premises
o Remove professional offices
HI, Heritage Interpretation district
o Remove professional offices accessory use or structure as a permitted use, it is just an accessory use archive, already have museum as permitted use
o Amend passive recreation to a park library to permitted use
o Accessory uses dwelling for caretaker or watchman on premises
AD, Airport impact overlay CB, Chesapeake Bay protection overlay FH, Flood hazard overlay district HC, Highway corridor overlay district
o Amend Consolidate all uses that include drive-thru require a CUP
o Remove Automobile graveyards as a permitted use lot width requirement, just use the regulations in underlying district
HG, Historic Gateway Corridor Overlay MZ, Military zone RP, Reservoir Protection overlay
LC, Life care/Retirement community o Amend
Dwelling for employee as accessory use not special exception RDA-1, Redevelopment Area I, Boswell’s Corner
o Amend combine like uses such as medical, dental clinic/office farmers market in accordance with 28-39v high intensity retail uses not listed and uses listed in B-2 ==decide parking garage as permitted use or cup as public parking lot?
o Accessory uses Accessory dwelling kiosk home occupation push cart
o Add Residential facility (group home)
UD Urban Development Transfer of development rights PD-1 and PD-2, Planned Development districts
o Buffer yards – amend to require in addition to yards to there is usable space on lot esp
residential waiver of setbacks must be in compliance with building code
Section 28-39, Special Regulations
o Place all regulations in this section, Regulations that were included in a definition will be taken out of the definition and placed.
Section 28-62, Chesapeake Bay preservation Area Overlay district
is being removed from the zoning ordinance but reference will still be zoning ordinance for required compliance.
Section 28-64, Airport impact overlay district is being reviewed Section 28-65, Historic Gateway Corridor Overlay District
o Add o Special regulations to encourage development of property within district
by allowing different setbacks, lot size and area, etc. Buffer yards, landscaping, screening and outdoor lighting
o landscaping regulations are contained a manual, o Add promote native plant species for reduction in water use LEED methods should be encouraged such as green roofs or green walls for open
space and impervious credits, Add minimum maintenance requirements for the landscaping with minimum of 1
year with securities to cover it o A new lighting ordinance has been adopted, staff anticipates changes due to the fast pace
of the changes in the commercial lighting industry. Section 28-101, Parking Encourage parking decks
o Amend Allow shared parking only on same side of street Add service industry to loading space standards to include such uses as hotels, hospitals
etc. Section 28-121, Signs
o Add require permit for reface sign relocate all the types of signs, regulations and definition to this section, the exception
to the definitions
703 Giddings Avenue, Suite U3, Annapolis MD, 21401 443.569.7220 www.vantagepointetds.com
Memorandum
To: Tim Baroody/Brad Johnson, Stafford County Economic Development & Tourism
From: Jim Prost/Tim George, Vantage Point Economic & Transportation Development Strategies
Date: August 28, 2014
RE: Kick‐off Meeting Discussion Memorandum, Revised
The purpose of this memo is to lay out our thoughts, as discussed with you today, on the kick‐off work session
scheduled for Sept. 3rd. We would like to make it as productive a day as possible and stand ready to spend a
full day on site. With that said, we understand that you and the key stakeholders we would like to reach out to
have other commitments and responsibilities and the suggested activities below takes that into consideration.
As stated in the proposal, the purpose of this first work session is to 1) kick‐off the project in a session with the
primary Client working group, 2) to meet with key stakeholders and 3) to conduct a site tour of important
catalytic project areas around the County. Each of these topic areas is discussed in greater detail in the
paragraphs below.
Potential Agenda
The agenda below lays out the meetings and sessions that would make the kick‐off work trip the most
productive. We have suggested times for the meetings, but these sessions can occur any time during the day
as it works best for you and the key stakeholders we will be trying to reach out to. For instance the kick off
meeting can start at 8:30, or can be pushed back to 9 or later. The closing session can happen as soon as all
the other sessions are done, or can start 4:30, 5:00, etc. We want you to have the greatest flexibility to
participate in the sessions you would like to without adversely affecting your regular work needs.
1) Kick‐off Meeting * 8:30am‐10:00am
2) Site tour (on the road) 10:00am‐12:00am
3) Lunch work session 12:00pm‐1:00pm
4) High level stakeholders focus group meetings (EDA, not board 1:00pm‐2:30pm
5) Additional internal staff/partners meetings 3:00pm‐4:30pm
6) Closing session with Client group * 4:30pm‐5:00pm
* Tim Baroody and Brad Johnson in attendance Meeting Logistics
We find it easier and more efficient if the interviewees can come to a central location, (your offices), where we
can meet with them without having to spend valuable time in transit. For the intro sessions where we are
looking for general input, small groups work well and allows us to shake more hands. Interviews later in the
process, particularly if there is a controversial issue to be discussed (for instance issues with the development
703 Giddings Avenue, Suite U3, Annapolis MD, 21401 443.569.7220 www.vantagepointetds.com
review process), interviews are held one‐on‐one with the results anonymous to encourage free and open
communication.
In setting up the sessions, it is very helpful if the key stakeholders hear from you first, to let them know we will
be calling. We can help draft the intro email that should be sent out. We will then assist you, or take the lead
role, in following up with these key stakeholders, making the calls and building the interview schedule.
We will have three staff on site, (Jim, me and Aviva), and can split up to meet with different folks if there are
scheduling conflicts.
Kick‐off Meeting (8:30am‐10:00am)
As described in the proposal, in the kick‐off meeting we will sit down with the Client Group (Tim, Brad and
designated staff) and other key stakeholders/participants you desire to develop, review and confirm:
Project goals and objectives
Project logistics, client communication, meetings, bi‐weekly calls
Previous work completed and discussion of same
Planned and proposed initiatives
Pipeline development projects (e.g. proposed and/or under construction)
Key contacts/appropriate stakeholders
Available resources (e.g. past plans, analyses, aerial maps, GIS databases, etc.)
Discuss and identify peer communities and Best Practices
Special characteristics of the County or Economic Development Plan Update
Effective economic development toolbox assets, and missing elements
Project expectations, assumptions, requirements, procedures and work plan
Regular schedule of key stakeholder meetings (EDA, Board, Planning Commission)
Schedule of project meetings, deliverables, project milestones
Key dates, meetings, County milestones, approval dates/periods
Review the “project bibliography” we are building on data, reports, project materials, etc.
We will prepare and submit an agenda for this meeting prior to our visit. This initial meeting should last
approximately one‐hour, but can go longer as required and time permits. Critical attendance would be core
client staff (Tim and Brad) and possibly Board/ EDA members or County staff as appropriate.
Site Tour (10:00am‐12:00pm)
During this work trip it would be helpful to have a guided tour of the relevant commercial/industrial areas of
the County and potential high priority development sites/areas that should be considered and included the
Economic Development Plan Update. We would be interested in seeing both the prominent
business/industrial areas to get a sense for what is working well and also the opportunity sites and preferred
703 Giddings Avenue, Suite U3, Annapolis MD, 21401 443.569.7220 www.vantagepointetds.com
development area. Touring the surrounding environs (residential, retail, access) would also be important. As
noted in our call, the site tour could be virtual and take place in your conference room using the aerials of the
County. Specific catalytic areas/sites that you define or that come out of our sessions would be visited
independently by the Consultant team as time permits.
High Level Key Stakeholder Sessions (1:00pm‐2:30pm)
It is often helpful for key stakeholder buy‐in and to get going on the right track to have “handshake” meetings
with any high level key stakeholders that you feel should be given an early opportunity to share their thoughts
on the project. We are certainly seeking your guidance as to who should be invited to attend these meetings
and if individual interviews or small focus groups are the better approach. These sessions could include, but
are not limited to the following invited participants:
EDA members
Business Advisory Council
University of Mary Washington
Fredericksburg Regional Alliance
Fredericksburg Regional Chamber of Commerce
Virginia Economic Development Partnership (VEDP)
While these sessions are intended to be listening sessions more that interviews/data gathering, lead off
questions could include:
What is your overall vision for economic development in the County?
What do you feel is working well? What areas of econ development need to be improved?
What components of the 10‐point Plan that have been implemented have had the greatest impact?
What remaining components should have the highest priority going forward?
What are some additional components that need to be included in the Update Plan?
This session is not intended to entail detailed interviews with data needs or other inquiries but more
opportunities for important community and business leaders to share their thoughts, vision and perspectives
early on in the process. Through this participation, important early buy‐in can be achieved and the ground laid
for subsequent more detailed interviews and data need requests. The Client would not be required to attend
this session, although you would be welcome to participate.
In a subsequent meeting held on a separate work trip, we will also be meeting with:
Board of Supervisors
Planning Commission members
Community Leadership/major business owners
Others as appropriate
703 Giddings Avenue, Suite U3, Annapolis MD, 21401 443.569.7220 www.vantagepointetds.com
Key Client Meetings/Interviews (3:00pm‐4:30pm)
These sessions would be more detailed and focused on the existing Plan and other pipeline projects/initiatives,
County economic base data, industry cluster analyses, etc. Likely interviews would include:
County Planning & Zoning
County GIS/data
Code Enforcement
Finance
Public Works
Utilities
Fire and Rescue
Sheriff’s Office
Director of Communications
Interview guides will be provided under separate cover as we get closer to September 3rd to allow us time to
review the existing documents and data referenced in the RFP and readily available. We will send these out
first of next week after we have reviewed the existing reports on file and have a better feeling for what
information we have, and what we still need to gather. Our interview guides would then seek to fill
information gaps and expand on data and findings in those previous reports and studies.
Recap Session (4:30pm‐5:00pm)
At the end of the work trip, time of which can be flexible, we will gather with the Client group to discuss the
overall impressions of the day, any key issues/questions that arose, and will discuss next steps. This session
should only take about 30 minutes.
Expected Outcomes
Confirmation of project logistics and project management
Project schedule, key dates, key milestones
Identification of important reports and analyses
Data availability, sources and contacts
Staff resources and contact information
List of key stakeholders – priority interviews
CLUSTER ORDINANCE DISCUSSION
There has been a request to reconsider some of the ordinance provisions pertaining to cluster subdivisions. There have been two areas of concern.
1. The R-1, Suburban Residential zoning district allows an increase of dwelling unit density from 1.5 dwellings per acre to 2.25 dwellings per acre with a Conditional Use Permit. Through conditions that can be imposed on the permit, the County can influence site design, architecture and house size. There is no ability to require off-site improvements or payment of funds to off-set impacts to County services. Eliminating the density bonus may encourage rezoning applications where proffers could be made to better off-set development impacts.
2. There have been some concerns raised about the configuration of open space within cluster developments. Some approved projects have utilized “buffer strips” of open space adjacent to lots rather than large contiguous areas that are more conducive to preservation of wildlife habitat. The County Code does not give any authority to regulate the configuration of open space.
¬«626
¬«629
¬«608
¬«621
¬«608
AQUIA CREEK
POTOMAC CREEK
CREEK
ACCOKEEK
ESKIMO HILL RD
COURTHOUSE RD
BROOKE RD
5CROWS NEST AREAStafford County, Virginia
June, 2014
CROWS NEST OWNERS PARCELS:OTHER OWNERSCOUNTY AND STATENORTHERN VIRGINIA CONSERVATION TRUST
JCM EAST LLCHERON HARBOR LLCDIVERSIFIED MORTGAGE INVESTORS INC
7K INVESTMENTS LLCALL MUSLIM ASSOCIATION
Path: W:\users\gis\Jacqueline\P lanning\CrowsNestOwners\CROWS NEST OWNERS June2014.mxd
Top Related