College of Engineering
Discovery with Purpose www.engineering.iastate.edu
Iowa State University WESEP REUJune 11, 2012
Wind & energyJames McCalley ([email protected])
College of Engineering
Homework
2
DOE20by2030 report:•Full report:
http://www.nrel.gov/docs/fy08osti/41869.pdf •Summary
www.nrel.gov/docs/fy11osti/49975.pdf
College of Engineering
Overview (focus mainly on US)• Preliminary energy concepts• Background on wind power
growth• Policy issues for wind energy• Wind energy in context• Grand challenge questions
3
College of Engineering
Some preliminaries• Power: MW=1341HP.• Energy: MWhr=3.413MMbtu (106btu); 1btu=1055joules• E=P×T• Run 1.5 MW turbine at 1.5 MW for 2 hrs: 3 MWhrs.• Run 1.5 MW turbine at 0.5 MW for 2 hrs: 1MWhrs
4
Power, P Time, T Energy, ECapacity, Prated
T
P(t)dtE0
Time, t
Power, P(t)1.5 MW
8760
8760
0
ratedP
P(t)dt
CF
• If P varies with t: • Capacity factor:
A lawnmower engine is 3HP (2.2kW or 0.0022 MW).Typical car engine is 200 HP (150kw or 0.15MW).Typical home demands 1.2kW at any given moment, on avg. 1MW=106watts106w/1200w=833 homes powered by a MW.Ames peak demand is about 126MW.The US has 1,121,000MW of power plant capacity.
1 gallon gasoline=0.0334MWhr; Typical home uses 11000kWhrs=11MWhrs in 1 year (about 1.2kW×8760hrs).1 ton coal=6MWhrs.
Actual annual energy production as a percentage of annual energy production at Prated
College of Engineering
Worldwide
Source: RenewableS 2011, Global Status Report5
College of Engineering
Worldwide
Source: BTM Consultants, www.btm.dk/reports/world+market+update+2010
6
College of Engineering
Background on Wind Energy in US
US Generation mix
Wind & renewables are 3.6% by energy.
Source: AWEA 2010 Annual Wind Report 7
College of Engineering
Background on Wind Energy in USU.S. Annual & CumulativeWind Power Capacity Growth
Source: AWEA 2010 Annual Wind Report 8
But what happened in 2010, 2011?
College of Engineering
Background on Wind Energy in US
Source: AWEA 2011 Fourth Quarter Market Report9
2010 is different! And 2011 is not much better. Why?
College of Engineering
Why was wind growth in 2010/2011 less than in previous years?
Poor 2008-2009 economy:• Less willingness to load, to build projects• Less power demand!
10
Declining natural gas prices
College of Engineering
Background on Wind Energy in US
Percentage of New Capacity Additions.
Source: AWEA 2010 Annual Wind Report 11
N. GASWIND
College of Engineering
12
Cur US/Can nat gas production= 26Tcf/yrProven reserves=260Tcf: R/P=10yrsProve+unprove reserves=2372Tcf: R/P=91
College of Engineering
13
Risks of a very high gas-electric future:•Lifetime: Infrastructure investments live for 40-60 years and are not easy to “turn” once developed. •Diversification:
Today’s national energy system portfolio consists primarily of electric (coal, nuclear, gas, renewables), heating/industrial (gas), & transportation (petroleum). A high gas-electric future, with transportation electrification, will decrease portfolio diversification, creating a national vulnerability.
•Cost: Is heavy gas-electric investment the lowest cost option in terms of long-term {investment+production}?•Depletability: R/P ratios 10-90 yrs - what will be price effects as gas depletes?•Fracking: How much will public resistance grow?•CO2 emissions: Will coal-to-gas shift reduce it enough?
Alternative future: •Reduce coal in electric sector while growing gas & pipelines equally with wind+electric transmission. Co-optimize gas pipeline & electric transmission.•Replace significant petroleum for light-duty vehicles with CNG vehicles & PHEVs.•Conjecture: This approach will reduce CO2 more than a high gas-electric approach and will result in greater diversification of energy resources.
College of Engineering
Top 20 states
14
Source: AWEA 2011 Third Quarter Market Report
14 of top 20 are in the interior of the nation. Top 3 coastal states are West. East coast is light on wind but heavy on load.Implication?
3 options for East coast use of wind:Build high cost inland wind, go offshore, or use transmission to move it from Midwest
College of Engineering
15
Source: AWEA 2012 First Quarter Market Report
U.S. Wind Power Capacity By State
College of Engineering
Background on Wind Energy in US
16
Source: AWEA 2010 Third Quarter Market Report
Source: AWEA Wind Power Outlook 2010
College of Engineering
Background on Wind Energy in US
Market share of total 2008 wind installations
Source: AWEA 2009 Annual Wind Report 17
College of Engineering
Background on Wind Energy in US
Ownership by company and by regulated utility
Source: AWEA 2009 Annual Wind Report 18
College of Engineering
Background on Wind Energy in US
Wind plant size
Source: AWEA 2009 Annual Wind Report 19
College of EngineeringBackground on Wind Energy in US
29 states, differing in % (10-40), timing (latest is 2030), eligible technologies/resources (all include wind)
College of Engineering
Background on Wind Energy in US
Tax incentives
• Federal Incentives:• Renewed incentives Feb 2009 through 12/31/12, via ARRA• 2.2 cents per kw-hr PTC for 10 yrs or 30% investment tax credit (ITC)
• State incentives:• IA: 1.5¢/kWhr for small wind, 1¢/kWhr for large wind• Various other including sales & property tax reductions
21
College of EngineeringFederal energy policy (don’t have one)
22
• In congress, “Energy bill” means Federal RPS, and “Climate bill” means CO2 emissions control.
• Waxman-Markey Energy/Climate bill passed house 6/09. Climate part was “Cap and Trade.”
• Related Kerry-Graham Climate bill did not pass Senate.• 2010 Carbon Limits & Energy For America’s Renewal, CLEAR
Act (Sen Collins/Cantwell), “Cap & Refund”• Cap CO2 “upstream” via sales of coal, gas, petroleum
• Producers/importers buys CO2 permits in monthly auction• 3/4 of auction revenues refunded to US citizens
• Congressional attention died; Climate/energy bill non-issue in pres. campaigns
• 7/11 EPA rules “Cross-State Air Pollution Rule” (CSAPR, for SO2, NOx), “Mercury/Air Toxics Standards” (MATS) have more effect, causing near-term power plant shut-down, but CSAPR stayed on 12/30/11 by US Court of Appeals, DC Circuit.
College of Engineering
Background on Wind Energy in US
23
College of Engineering
Grand Challenge Question For Energy:
What investments should be made, how much, when, and where, at the national level, over the next 40 years, to achieve a sustainable, low cost, and resilient energy & transportation system?
24
College of Engineering
NUCLEAR
GEOTHERMALSOLAR
WindBIOMASS
CLEAN-FOSSIL
Where, when, how much of each, & how to interconnect?
College of Engineering
Grand Challenges For Wind:1. Move wind energy from
where it is harvested to where it can be used
2. Develop economically-attractive methods to accommodate increased variability and uncertainty introduced by large wind penetrations in operating the grid.
3. Improve wind turbine/farm economics (decrease investment and maintenance costs, increase operating revenues).
4. Address potential concerns about local siting, including wildlife, aesthetics, and impact on agriculture.
26
College of Engineering
Wind vs. people
27
College of Engineering
How to address grand challenges
28
#1. Move wind energy from where it is harvested to where it can be used.• Transmission
• Eastern interconnection Midwest to East coast• National Superhighways at 765 kV AC and/or 600/800 kV DC
• Right of way (rail, interstate highwys, existing transmission)• Cost allocation• Organizational nightmare
• Conductor technologies: overhead/underground, materials
• Offshore, lower CF turbines, higher turbines, but all of these result in higher cost of energy
College of EngineeringHow to address grand challenges
29
30
NETPLAN: multiperiod, multiobjective, multisector
Investments mainly in renewables with some nuclear.
Flow is west to east.Highest trans cap investment is MAIN (4) to ECAR (1) because: •CF (0.5 in MAIN, 0.3 in ECAR)•Load is very high in ECARHigh trans cap investment from SPP (10) to STV (9) because:•CF (0.4 in SPP, 0.1 in STV)•Load is very high in STV
CPLEX LP inside evolutionary program; co-optimizes generation, transmission, gas pipelines to minimize 40 year investment+production costs, network flow.
College of Engineering
How to address grand challenges
31
#2. Develop economically-attractive methods to accom-modate increased variability and uncertainty introduced by large wind penetrations in operating the grid.• Variability:
• Increase gas turbines• Wind turbine control• Load control• Storage (pumped hydro, compressed air, flywheels, batteries, others)• Increase geodiversity
• Uncertainty:• Decrease it: improve forecasting uncertainty• Handle it better: Develop UC decisions robust to wind pwr uncertainty
College of Engineering
How to address grand challenges
32
#3. Improve wind turbine/farm economics (decrease investment/maint costs, increase operating revenues).• Investment: Improve manufacturing/supply chain processes, construction, collection circuit layout, interconnection cost, land lease, and financing• Operating & maintenance:
• Improve monitoring/evaluation for health assessment/prediction/life-ext• Decrease maintenance costs (gearbox vs. direct-drive)
• Enhance energy extraction from wind per unit land area• Improved turbine siting• Inter-turbine and inter-farm control• Increased efficiency of drive-train/generator/converters• Lighter, stronger materials and improved control of rotor blades• Taller turbines
College of Engineering
33
Wind turbine down-time distribution
Reference: McMillan and Ault, “Quantification of Condition Monitoring Benefit for Offshore Wind Turbines,” 2007.
College of Engineering
How to address grand challenges
34
#4. Address potential concerns about local siting, including wildlife, visual/audible, impact on agriculture.• Migratory birds and bats: mainly a siting issue for birds. Bat-kill is more frequent.•Agriculture: Agronomists indicate wind turbines may help!• Visual: a sociological issue
These issues have not been significant yet. Today, in Iowa, there are ~2600 turbines, with capacity 4200 MW. At 2 MW/turbine, a growth to 60 GW would require 30000 turbines, and assuming turbines are located only on cropland having class 3 or better winds (about 1/6 of the state), this means these regions would see, on average, one turbine every 144 acres.