Coast
Construction & Design
Challenges• Challenge One
– Staffing & Collaboration
• Challenge Two– Design
• Challenge Three– Execution
Staffing• Construction
– Project Executive• Scott Davis
– Project Manager• Dustin Crowell
– Project Superintendent• Danielle Dorsey
• Design– Principal Architect
• Philip Stott
– Lead Designer• Matthew Calvey
– Specialist Coordinator• Valerie Morin
Staffing
Collaboration
Support Services
Estimating Accounting
Purchasing Safety
Scheduling IT
Design Phase
Construction Phase
Valerie MorinSpecialist Coordinator
Stationed On-Site During Construction
Marine Biological Laboratory
Owner
Coast C & DDesign Build Firm
ConstructionDesign
Matthew CalveyLead Designer
Frank HoodProject Manager
Philip StottPrincipal Architect
Dustin CrowellProject Manager
Scott DavisProject Executive
Jessica WileyProject Engineer
Danielle DorseyArea Superintendent
Mike HassettSenior EstimatorMatt Crown
Technical Assistant
Joe SgambatoQuality Manager
John HuesSafety Manager
Ben ThibaultArea Superintendent
Rich McMahonOffice Engineer
MEP Specialists
LEED Specilaists
Communication Technologies Specialists
Design Approach-Integrated Practice
-Building Integrated Modeling (BIM)
- Design for Change -adaptability / expansion
- Professional InteractionBreak down the barriers – connectivity
-Permanent structures-Utilize existing grid
Architectural Integration -Integrated Practice (BIM)
-Client/designer/builder-reduce cost & Time-Higher quality
-Design Flexibility-Extensive Module Integration-Spatial Customization-Future expansion
Architectural Integration -Professional Interaction
-Increase Chance encounters-Extend production through connection
-Permanent Structure-building envelope-Independent utilities
New England Lab - Casework and furniture systems.
-3 Major Zones-Auditorium-Laboratory -Office/ Conference Space
-Sustainability-Social-Architectural
-Integrated Practice-Building Information Modeling
Flexibility
Flexibility
• Mechanical, Electrical and Plumbing
• Sustainable Strategies
Integration of systems
HVAC • 3 systems for 3 functions
• Zoning - Module - special requirements
Plumbing • Salt water supply
• High water quality - filtration systems - Thermal regulation
• Stormwater Management
• Water efficient landscaping
• Renewable energy
Sustainable Strategies
Challenge Three• Estimate
– Collaboration
– Extensive database
Challenge Three• Schedule
– Long lead items
– SIPS
– Closeout
Challenge Three• Site Logistics
– Storage Units– temporary facilities– Lay-Down Area– Permits– Parking
Challenge Three• Quality Control
– On-site Quality control manager
– Tagging Process
Challenge Three• Safety
– Safety Manager
– S.T.O.P. Program
Conclusion• We are the Right Team for the job
– Experience
– Collaboration