DRAWING NO.
DRAWING TITLE
G-00COVER SHEET
A-01 EXISTING PLAN AND DEMOLITION PLAN
A-02
A-03
A-04
A-06
NEW TOILET LAYOUT
NEW LIGHTING CEILING PLAN
E-01
WATER SUPPLY PIPES
P-01
SOIL, WASTE, VENT PIPES
P-02
WALL ELEVATION 1, 2
WALL ELEVATION 3, 4
A-05
NEW CEILING PLAN
VENTILATION SYSTEM
M-01
AIR CONDITIONING SYSTEM
M-02
NEW OUTLET PLAN
E-02
CONCRETE PAD PLAN AND SECTION
P-03
A-07
DOOR DETAIL, MATERIAL LIST
WALL ELEVATION 5, 6, 7
COVER SHEET
G-00
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ JUN 17, 2019
SS. JUN 17, 2019
100% FINAL90%60%
FOR REVIEW & COMMENT
FOR YOUR INFORMATION
AS-BUILT DRAWINGS
FOR APPROVAL
FOR CONSTRUCTION
FOR ESTIMATION
CONTRACT DRAWINGS
SHOP DRAWINGS
35%
DESIGN PHASE
PRELIMINARY DESIGN
FACILITIES MANAGEMENT OFFICE
CMR MAINHOUSE LOWER FLOOR RESTROOM
UNCLASSIFIEDSBU
U.S. EMBASSY BANGKOK, THAILAND
UNITED STATES DEPARTMENT OF STATE
CHIEF OF MISSION RESIDENCE
FOR PERMIT
DRAWINGS LIST
ADD PAGE A-06 A-07 P-0306/17/1901
WOMEN MEN
STORE
UP
&
HANDICAP
PART OF THE WALL TO BE DEMOLISHED
DOOR SHOULD BE STORED FOR REUSE
EXISTING DOOR TO BE REMOVED
AND STORE FOR REUSE
COUNTER AND CABINET
TO BE DEMOLISHED
EXISTING DOOR TO BE REMOVED
AND STORE FOR REUSE
COUNTER AND CABINET
TO BE DEMOLISHED
WALL TO BE DEMOLISHED
EXISTING DOOR TO BE REMOVED
PART OF THE WALL TO BE
FLOOR RAMP TO BE REMOVED
DD
STRUCTURAL NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING EIXISTING FLOOR SYSTEM (SLAB, BEAMS, ETC.)
2. THE CONTRACTOR SHALL PROVIDE STRUCTURAL CALCULATIONS OF THE EXISTING FLOOR SYSTEM AND SUPPORT FOUNDATION.
3. IF THE EXISTING FLOOR SYSTEM AND SUPPORT FOUNDATION IS NOT ADEQUATE TO SUPPORT THE NEW LOAD, THE CONTRACTOR
SHALL PROVIDE STRUCTURAL DESIGN AND CALCULATIONS OF THE NEW SUPPORT BEAMS/SLABS.
AND SUPPORT FOUNDATION.
DEMOLISHED
EXISTING LAYOUT
1:50
A-01
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ JUN 21, 2019
SS. JUN 21, 2019
SBU UNCLASSIFIED
SCALE
EXISTING LAYOUT
1:50
ADD GRID LINE06/17/1901
WOMEN
MEN
STORE
UP
RELOCATED AHU
HANDICAP
PATIO
A-05 A-05
A-04
A-04
A-04
A-04
A-04 A-04
D1
D
D2
D2
D2
D2
D
1
1
1
1
1
2
1
1
2
2
2 2
2 2
2 2
2
1
2
2
2
2
2
1
Ø2"FD.
Ø2"FD.
Ø2"FD.
Ø2"FD.
Ø2"FD.
Ø2"FD.
FL+0.00
FL-0.05
FL+0.00
FL+0.00
FL-0.05
FL+0.00
300x600mm THAI MARBLE STONE (COLOR TO BE CHOSEN)
BRICK WALL / PLASTER FINISHED. PAINT TO MATCH EXISTING WALL COLOR
SYMBOLS:-
1
1
DREUSED DOOR
D1
D2
NEW TOILET DOOR (SEE A-05)
NEW TOILET DOOR (SEE A-05)
2 2
2
BRICK WALL / MARBLE FINISHED TO CEILING2
22
2
2
33
3
3
2
33
3 3
1 1
1
1
2
4
5
5
55
6
7
78
8
8
8
89
9
10
10
10
10
10
11
11
1111
11
11
3
BRICK WALL / MARBLE FINISHED TO CEILING3
Ø2"FD.
11
Ø2"FD.
11
A-06
A-06
A-06
A-06
A-07
A-07
NEW TOILET LAYOUT
1:50
A-02
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ JUN 21, 2019
SS. JUN 21, 2019
SBU UNCLASSIFIED
SCALE
NEW TOILET LAYOUT
1:50
FLOOR DRAINS LOCATION06/17/1901
WOMEN
MEN
STORE
UP
PATIO
FL+0.00
FL+0.00
1200x2400x9mm SCG PLUS GYPSUM BOARD WITH TAPERED EDGE. WOODEN STRIP DECORATION
SYMBOLS:-
1
MATCH WITH EXISTING PATIO CEILING
1
1
1
1
1
1
NEW CEILING PLAN
1:50
A-03
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ JUN 21, 2019
SS. JUN 21, 2019
SBU UNCLASSIFIED
SCALE
NEW CEILING PLAN
1:50
REVISE CEILING STRIP06/21/1901
5
5
1 1
8 8
1010
HANDICAP
WOMEN'S ROOMMEN'S ROOM
FOYER
TEAK MOLDING AROUND
CEILING LEVEL
FLOOR FINISHED
5
5
1 1
3 3
1
1
1
1
1
8
VERIFY TOILET SPEC.
AND REQUIRED DIMENSION
GRAY TONE MARBLE COUNTER TOP
0.20x0.20m WOODEN LIGHTING BOX
5mm THK. FRAMELESS
BEVELED EDGE MIRROR
ELEVATION 1 ,2
1:50
A-04
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ JUN 17, 2019
SS. JUN 17, 2019
SBU UNCLASSIFIED
SCALE
ELEVATION
1:50
SCALE
ELEVATION
1:50
WALL TILE SIZE06/17/1901
INTERIOR WALL HEIGHT06/17/1902
HANDICAP
1
9
2
4
10
8
WOMEN'S ROOM
FOYER
HANDICAP
MEN'S ROOMMEN'S ROOM
TEAK MOLDING AROUND
CEILING LEVEL
FLOOR FINISHED
5
5
6
9
9
8
77
11
33
1
1
1
1
1
8
5mm THK. FRAMELESS
BEVELED EDGE MIRROR
0.20x0.20m WOODEN LIGHTING BOX
GRAY TONE MARBLE COUNTER TOP
ELEVATION 3,4
1:50
A-05
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ JUN 17, 2019
SS. JUN 17, 2019
SBU UNCLASSIFIED
SCALE
ELEVATION
1:50
SCALE
ELEVATION
1:50
WALL TILE SIZE06/17/1901
SANITARYWARE DIMENSION06/17/1902
INTERIOR WALL HEIGHT06/17/1903
D2 D2
CEILING LEVEL
D1
CEILING LEVEL
D
CEILING LEVEL
ELEVATION 5,6,7
1:50
A-06
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ JUN 17, 2019
SS. JUN 17, 2019
SBU UNCLASSIFIED
SCALE
ELEVATION
1:50
SCALE
ELEVATION
1:50
SCALE
ELEVATION
1:50
D1 D2
WASH BASIN
2
DESCRIPTION PRODUCT MODEL
4
Q'TY
1
5
3
4
BASIN MIXER
HYGIENIC SPRAY GROHE 27807LOGROHE
6
TOILET MATERIALS LIST
TISSUE HOLDER
7
HR-320435-01
DESCRIPTION SUPPLIER MODELQ'TY
N/A
FLOOR TILE
MATERIALS LIST
1
4
1
4
1
1
AMERICAN STANDARD
HANDRAIL AMERICAN STANDARD
MARBLE STONE TILE 30 X 60 CM
COLOR TO BE CHOSEN
2
9
COTTO
FLOOR DRAIN
WATER CLOSET
COTTO
8
WATER CLOSET
WASH BASIN
FOR HANDICAP, SC6652+C9251WHITE
5
1
COTTO
FOR HANDICAP, SC00537
BASIN MIXER COTTO
URINAL
10
11
F-10701-CHACT100 NEO MODERN
FOR HANDICAP, CT1058X(HM)
CT647Y1 (HM)
5
7
N/A
WALL TILE1
MARBLE STONE TILE 30 X 60 CM
COLOR TO BE CHOSEN
AMERICAN STANDARD
AMERICAN STANDARD
AMERICAN STANDARD
CL470LI-6DAWDLU OVALYN
TF6301-WT, WHITE
K-2501-43-N CONCEPT SQUAREAMERICAN STANDARD
2630NSC-WT-0 NEO MODERN
CLOSE COUPLED TOILET, WHITE
BASIN MIXER WITH POP-UP DRAIN
UNDER COUNTER WASH BASIN
DOOR DETAIL & MATERIAL LISTS
1:30
A-07
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ JUN 17, 2019
SS. JUN 17, 2019
SBU UNCLASSIFIED
1:30
SCALE
DOOR DETAIL
MATERIAL LISTS
MATERIAL LIST REVISION06/17/1901
CHANGE DOOR SIZE06/17/1902
wp.
STORE
UP
PATIO
FL+0.00
BA C DE
4
3
NEW LIGHTING
CEILING PLAN
1:50
E-01
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ MAR 22, 2019
SS. MAR 22, 2019
SBU UNCLASSIFIED
SCALE
NEW LIGHTING CEILING PLAN
1:50
MEN
FOR WH.
+0.60M.
+0.60M.wp.+0.60M.wp. +0.60M.wp.
LP-xxLP-xx LP-xx
LP-xx(GFCI 10mA. CIRCUIT BREAKER)
LP-xx
FOR AMPLIFIERS
FOR EX.
C
FOR EX.
C
FOR OSC.FAN
C
FOR EX.
C
FOR OSC.FAN
C
LP-xx
STORE
UP
PATIO
FL+0.00
BA C D E
4
3
(NEW CKT. ON NEAREST LC)
(NEW) (EXISTING) (EXISTING)
NEW ELECTRICAL
OUTLET PLAN
1:50
E-02
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
VJ MAR 22, 2019
SS. MAR 22, 2019
SBU UNCLASSIFIED
SCALE
NEW ELECTRICAL OUTLET PLAN
1:50
STORE
UP
BA C D E
4
3
NEW TOILET LAYOUT
1:50
P-01
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
SS MAR 22, 2019
SS. MAR 22, 2019
SBU UNCLASSIFIED
SCALE
WATER SUPPLY PIPES
1:50
STORE
NOTE:
CW : USE PE-LINED STEEL PIPE (SYLER) CLASS M.
S, W, V. : USE PVC CLASS 8.5.
ALL FLOOR DRAINS SHALL BE INSTALLED WITH U-TRAPS (SEE DETAILS).
FD.FCO.
FD. = FLOOR DRAIN
FCO. = FLOOR CLEAN OUT
4
3
SOIL, WASTE, AND VENT PIPES
1:50
P-02
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
SS MAR 22, 2019
SS. MAR 22, 2019
SBU UNCLASSIFIED
SCALE
SOIL, WASTE, AND VENT PIPES
1:50
SCALE
U-TRAP DETAIL
NTS.
1 06/20/19 Revise number and locations of FD.
CONCRETE PILE Ø 0.15m, L=3m.
SATS TANK (MA-276)
RB9 @0.15mRB9 @0.15m
RB9 @0.15m
COMPACTED SAND 0.05m THK.
FINISHED GRADE
SAND BACKFILLED
CONCRETE PILE Ø 0.15m, L=3m.
Notes :
1. Compressive Strength of Concrete (f'c) = 240 ksc.
2. Tensile Strength of Rebar, Round bar (SR24) = 2,400 ksc., and Deformed bar (SD30) = 3,000 ksc.
3. Concrete covering and pile embedded length are as shown in the drawing.
4. SATs tank must be filled with water prior to backfilling with compacted sand.
CONCRETE PAD
PLAN AND SECTION
1:50
P-03
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
TP JUN 17, 2019
SS. JUN 17, 2019
SBU UNCLASSIFIED
SCALE
SEPTIC TANK (MA-276) CONCRETE PAD PLAN
1:50
SCALE
CONCRETE PAD SECTION
1:50
STORE
MODEL No.FCU No.
AIR CONDITIONING SPLIT TYPE SCHEDULE
FCU-01 CDU-01
CDU No. MODEL No. MANUFAC.
SUPPLY
V/PH/Hz
POWER IN DRAIN
TYPE
(W) (IN)
AIR
(Max. CFM)
CAPACITY
BTU/HR
FTKM12SV2S RKM12SV2S DAIKIN 11,900 357 220/1/50 895 3/4" WALL
FCU-02 CDU-02
FCU-02
FCU-01
FCU-03
FCU-01FCU-02FCU-03
FCU-03 CDU-03FTKM09SV2S RKM09SV2S DAIKIN 8,500 357 220/1/50 510 3/4" WALL
FTKM09SV2S RKM09SV2S DAIKIN 8,500 357 220/1/50 510 3/4" WALL
BA C DE
4
3
AIR CONDITIONING SYSTEM
1:50
M-01
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
SS MAR 22, 2019
SS. MAR 22, 2019
SBU UNCLASSIFIED
SCALE
AIR CONDITIONING SYSTEM
1:50
1 06/20/19 Change capacity of FCU02/CDU02
2 06/20/19 Relocate FCU-01
STORE
UP
VOLUME
(CMH)
ABBREV.
SCHEDULE OF VENTILATION FANS
AIR
TYPE
ELECTRICLA DATA
Q'TYPOWER
(W)
V. PH. Hz.
EF-1
415
CEILING 2 41 220 1 50
(250 CFM)
OF FAN
EF-2
175
CEILING 1 25 220 1 50
(103 CFM)
BA C D E
4
3
VENTILATION SYSTEM
1:50
M-02
CMR MAIN HOUSE
LOWER FLOOR RESTROOM
FACILITIES MANAGEMENT
FACILITIES MANAGEMENT
SS MAR 22, 2019
SS. MAR 22, 2019
SBU UNCLASSIFIED
SCALE
VENTILATION SYSTEM
1:50
1 06/20/19 Remove 2 oscillating fans.