FLOOR FRAMING PLANDRAWN NOT TO SCALE

2.5000 2.5000 1.5000

2.5000

2.5000

Given the framing plan shown above, spacing floor joist is0.45m on center,design the circular (C2) post.

Use Dao Lumber at 50% stress grade:

fc = 10.1 MPa

Roof Load = 1.44 KPa

Live Load = 1.90 KPa

Unit weight of 34 Height of Post = 3.5m