© 2010 Chevron © 2012 Chevron © 2012 Chevron
Chevron Subsea Projects
Peter Blake
Subsea Manager
Energy Technology Company
Subsea UK
Lunch and Learn
29/05/2012
© 2012 Chevron
Chevron’s Global Subsea Portfolio
2
20+ Major Capital Projects in queue
2015 Production > 800MBOED
© 2012 Chevron
Chevron Global Subsea Presence
3
Production/ MCPs
Exploration
Opportunities
NOJV
© 2012 Chevron
Chevron Global Subsea Projects
4
© 2012 Chevron
Chevron Global Subsea Projects Technology plays a vital role
5
Project 15 KSI
Instrumented
pipeline
protection
(HIPPS)
Multiphase
Flowmeters
Subsea
Sampling
Chem. Inj
Distribution
Intelligent
Well
Completion
Subsea
BoostingPower
Direct Elec
Heating
Project A
Project B Y
Project C
Project D Y Y Y
Project E Y Y
Project F Y Y Y Y Y Y
Project G
Project H Y Y Y
Project J Y Y Y Y Y
Project K Y Y Y
Project L Y Y
Project M Y Y Y Y Y
© 2012 Chevron
Gorgon Foundation Project
6 6
Runs through a three-train (15
million tonne per annum) LNG
and Domestic Gas facility on
Barrow Island.
It is the largest LNG plant ever
to be fed by a subsea system.
The Greater Gorgon Area
represents Australia's largest
known gas resource, estimated
to contain 40 trillion cubic feet
of gas – equivalent to 25% of
the country's total known gas
resources.
© 2012 Chevron 7
Gorgon Foundation Project
Gorgon
• 3 drill centres
• 8 wells
• 250 metre depth
• 70 km tie-back to plant
• 34” carbon steel pipeline
• High CO2 content (15%)
Jansz
• 2 drill centres
• 10 wells
• 1350 metre depth
• 147 km tie-back to plant
• 30/34” CS pipeline
© 2012 Chevron
Gorgon Foundation Project
Typical Arrangement of Subsea Equipment
8
© 2012 Chevron
Jack & St Malo
Wilcox Trend
9
Location – GoM WR 718
Water Depth – ~7000’
Semi-submersible Host FPU centrally
located between Jack and St. Malo
Shared process facilities initially sized
for 170,000 BOPD and 42.5 MMCFD
3 Subsea drill centres
Mobile Offshore Drilling Unit drilling
and completion operations
Dual 10" production flowlines from
each field to the Host
Oil and gas export pipelines operated
by third parties
Provisions for third party tie-backs
Provisions for future development
© 2012 Chevron
Jack & St Malo Project
10
Design SITP/Temp:
13,000psi
Tie-back Distance: 12 miles
for both fields
Three drill centers
Three single phase pumps
Well MPFMs on manifold
Subsea sampling on
manifold
CIMV future expansion
Artificial Lift Method: Seabed
pumping
1 – Oil Export SCR
1 – Gas Export SCR
© 2012 Chevron
Jack & St Malo Project
Typical Arrangement of Subsea Equipment
11
© 2012 Chevron
Jack & St Malo Project
Framo SPP Pump Station with Retrievable Modules
12
1
2
4 3
1) Pump Module
2) Transformer Module
3) SCM
4) Recycle Line Choke
© 2012 Chevron
Alder
13
Reservoir
Upper Jurassic Sandstone
14,700 ft tvdss
HPHT gas condensate
Location – UKCS Block 15
Water Depth – 150 metres
Tie-back Dist. – 28 Km
Design SITP – 694 bar
Design Temp – 135 C
Host - Britannia BLP
15
22
16
15 16
R
R
R
R
R
R
RR
R
R
R
III
III
VII
IV
II
X
IV
XX
III
XX
III
VII
XX
II
SA
X
IV
XXI
III
SA
VI
IV
IV
XX
XXI
II
IV
II
XXI
VII
III
III
IV
IV
XI
III
II
III
XX
VII
X
II
III
XIII
VII
Con-Ph.
Conoco-Phillips
Ta
lism
an
Conoco-Phillips
Apache
Con-Ph.
Shell
Chevron-Texaco
Chevron-Texaco
Conoco-Phillips
Conoco-Phillips
Apache
Conoco-Phillips
PGS
OilExco
Talisman
BP
ChevTex
Kerr-
McGee
Eni
BP
OilExco
Kerr-McGee
Premier
ChevTex
Con-Ph.
Kerr-McGee
BP
Eni
Chevron-Texaco
Kerr-McGee
Conoco-Phillips
Shell
VeritasExxonMobil
Conoco-Phillips
Exxo
nM
ob
il
BP
Con-Ph.
ChevronTexaco
PGS
Eni
Kerr-McGee
ChevronTexaco
Talisman
Statoil
Con-Ph.
Veritas
Conoco-Phillips
22
4
16
b
a
a
b
d
c
23
b
30
21
a
1
20
d
a
28
12
18
29a
19
b
c
a
5
c
17b
24
a
29
c
27
a
8
e
N
24
b
a
b
b
b
c
b
d
6
a
(N)
b
b
26
c
4
a
S
3
e
9
2
a
(S)
b b
b
a
a
a
a
25
d
b
a
a
a
ARMADACOMPLEX
STIRLING
MOIRA
FORTIES
BLENHEIM
BRITANNIA
CYRUS
HAWKINS
DRAKE
THELMA
MAUREEN
EVEREST
(Abandoned)
BLADONGUNGNE
BEAULY
BLAIR
(Decommissioned)
GLAMIS
(Decomm.)
FLEMING
BRIMMOND
ANDREW
BALMORAL
SEYMOUR
MACCULLOCH
CALEDONIA
ALBA
(Abandoned)
15/12-10S
CALLANISH
Farragon
Macallan
16/18-1
16/22-2
Mabel
16/28-8
Alpha Brenda
15/25b-3
Bosun
Ptarmigan
Alder
16/22-5
J-Prospect
22/1a-4
15/20b-11
22/2b-2
Chestnut
22/8a-2
Kidd
Blair West
30"
Bra
e-F
ort
ies
o
il
14" Everest-Fortiescondensate
10"c
ond.
N
oil
20"g
as
EWT
UnityD
8" And
rew-
CATS g
as
24
" B
ruce
-Fo
rtie
s
oil p
ipe
lin
e
26" Britannia-St.Fergus gas
2
4"
oil
Bru
ce-F
ort
ies
30" Mille
r-St.F
ergus
gas pipelin
e
6"o
il
A
24" S
cott-F
ortie
s oil
10"oil
14
"
B
C
PDQ
8
4
3
2
1
2
10
2
1
18
27
5
16
6
13
19
9
4,4a
5
5
7
4
2
3
1
8
8z
23a
5
5
6
2 2
6
17
8,8re
12
4
4
2
3
1
1
5
3
11
2
7
10z
6
7,7Z
9
3,3a
15,15Z
117
2,2a
1
1
3
4
19
1
5
11,13,13z
26
3
11
1
6
14
5
1z
17z
5
3
6
8
12
5
1
4
13
10
25,25z2
1a
11,11x,y,z
22
11
18
7
7
1,16
1
18
7
4, 4z
2
4,4a,22
6
8,11
4
9
1,1a
17
8
4
2
4
5
34,4a
2
4
2
1
1
2, 2a
5
2
1
1
13
11
31
25
11
29
14a
18
17
20
4
13
14
30
13
10
3
9
4
15
1
5
3,3z
15
10, 10z
3
6
6
19
6,6a
10
20a
3
2
5
3
2
6
10
2
8
7z
1
10
6
3
2
4
23
9
6
2
2
3
9
6
9
3
12
8
4
3
3
9
3
9
6,9,10S
21
4
3
4
3
21z
7,7z
1
3
7,7a
1
16
2
6
7
4
7
28
10
8
6
3
2
11
24
A12Z
12
12z
7
1
7
7
328,9
5
2,2a
1
5
1
5
4
21
15
0°45'E
0°45'E
1°0'E
1°0'E
1°15'E
1°15'E
1°30'E
1°30'E
1°45'E
1°45'E
57
°45
'N
57
°45
'N
58
°0'N
58
°0'N
58
°15
'N
58
°15
'N
0 105Km
© 2012 Chevron
Alder
Subsea Overview
14
© 2012 Chevron
Alder
Subsea System
15
Subsea tie-back to Britannia Bridge Link Platform (BLP).
Subsea manifold containing:
− Two fully populated wellbays
− Subsea HIPPS
− Manifold mounted split Cooling loop
− Well and HIPPS SCMs
− Umbilical termination and distribution
− Chemical injection points (various)
Subsea structures “Fishing Friendly” / designed for required snag loads.
© 2012 Chevron
Alder
Subsea Manifold
Manifold piping and cooling spool
design
– Cooling loop made out of two “coils” -
for flexibility - self-draining
– HIPPS valves
– Production Valves
– Manifold piping orientated to meet
area subsea architecture
requirements, predominant current
direction, etc
– Interface with temporary Subsea Pig
launcher.
© 2012 Chevron
Alder
Subsea Trees
HPHT: 15ksi, 350°F requirement.
Pressure Rating driven by Chemical
injection requirement. (Methanol bull
heading)
“Enhanced Vertical Design”
Separate protective structure
Tree mounted Flow Module (Choke)
© 2012 Chevron
Rosebank
18
Rosebank
© 2012 Chevron
Rosebank
19
Location
150km NW of Shetland
Islands
Water Depth – 1,100M
Tie-back Dist. – 6 Km
Design SITP – 3600 psi
Design Temp – 200 f
• Layout
Shipshape FPSO
4/6 well subsea clusters
Flexible risers
Gas export pipeline
© 2012 Chevron
Rosebank
Arrangement
20
© 2010 Chevron © 2012 Chevron © 2012 Chevron
Chevron Subsea Projects