8/22/2019 Chapel 2 HSR
1/47
1
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Historic Structures Report: Eternal Father of the
Sea Chapel
8/22/2019 Chapel 2 HSR
2/47
2
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Table of Contents
Introduction ..3
History and development of the PropertyNavy Yard Timeline..4History of the North Charleston Navy Yard ...6History of the Chapel8Building chronology/ alterations list...........10
Architectural description/evaluationGeneral.12
Analysis of Character defining features..13Analysis of historic integrity.20
Assessment of Existing ConditionsExterior.25Interior..29
Maintenance RequirementsPrioritized maintenance issues.42Mothballing checklist..43Maintenance schedule.44Recordation of Maintenance45
AppendixWorks Cited..46
8/22/2019 Chapel 2 HSR
3/47
3
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
IntroductionThe first portion of this report is an historic structures analysis of the Eternal Father of the Sea Chapel. The following
pages explores the history and context of the building, identifies important architectural elements and character
defining features worthy of preservation, and provides information on the current condition of the Chapel building.
Analysis of the Chapels integrity was organized using the National Park Services National Register BulletinGuidelines for Evaluating and Documenting Historic Aids to Navigation to the National Register of Historic Places.
Our findings confirm that stabilization of the buildings weather envelope and restoration of the exterior siding are
critical to the preservation of the structure. Termite damage, water infiltration, and foundation settlement are some
of the major threats to the building that must be addressed before any adaptive use project is undertaken.
While the Chapel is in need of significant repairs, the building has retained a substantial amount of its character
defining features and overall integrity. The following Historic Structures Report provides a detailed analysis of the
Eternal Father of the Sea Chapels history, current physical conditions, and historic integrity. A recommended
maintenance schedule is included with the report, in the interest of preserving the Chapel site, and ensuring its future
use as a viable part of the North Charleston community.
8/22/2019 Chapel 2 HSR
4/47
4
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
History and Development of the PropertyTimeline
1706 Colonel William Rhett raises a navy in defense of the city against French vessels during Queen Annes War.
1775 1783 American Revolution South Carolina Navy established to protect Charleston.
1861 1865 Civil War South Carolina Navy called up as part of the Confederate Navy, participated in severalbattles and fought in Charleston Harbor.
1900 An act of congress allows Secretary of the Navy to relocate Port Royal Naval Station to 2,250 acres of thewest bank of the Cooper River.
1902 First officer assigned to Naval Base overseeing construction of buildings and dry dock.
1909 1910 Red brick buildings, main power plant, dry docks, and first ship constructed on the Naval Base.
Early 1900s The building boom continues on the Naval Base with new buildings and ships.
1914 1918 World War I Naval Training Center established. The Sixth Naval District recognized as a separateentity in 1916.
November, 1918 Naval Base employment reaches 6,500.
1922- 1933 As a result of the Great Depression, there is a significant decline in the amount of work coming into theharbor and reduction of workforce. Work at the Naval Base consists largely of shipping repairs andalterations.
1933 Naval Base receives an assignment of new construction and an increase in shipbuilding activity.
1930s Great Depression WPA and PWA programs spur activity at Naval Base and provide jobs for unemployedCharlestonians.
Late 1930s Large numbers of civilian employees on Naval Base make it the largest single employer in the history ofSouth Carolina.
1940s Employees work around the clock to construct over 200 ships and repair or convert hundreds of others.
December 5, 1941 Naval Base complex expands to include the Charleston Naval Ammunition Depot.
1941 Naval Base surpasses tourism as Charlestons largest industry.
1942 Eternal Father of the Sea Chapel built.
1943 Civilian employment reaches 26,000 and Base acquires new land areas known as South Yard, Naval AirStation, and the Noisette Creek Area.
1944 First major alterations are made to the Navy Chapel including the North addition (robing rooms).
8/22/2019 Chapel 2 HSR
5/47
5
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
1945 End of WWII Decline in activity at the Naval Base.
1950s The Naval Shipyard becomes facility for overhaul of submarines and an outfitter for new ships constructedfor the Navy in private shipyards.
1959 Naval Base begins construction on piers for new mine warships and barracks. Charleston is established as a
major port for the U.S. Atlantic Fleet.
1960s Facilities developed to perform repairs and service to nuclear powered submarines.
1979 Second major alterations are made to the Navy Chapel including HVAC changes, Blessed Sacrament Chapel,Apse, and Exterior alterations.
1982 New reserve frigate program begins.
1983 Shipyard receives the Chief of Naval Material Productivity Excellence Award for improved production andquality of work.
1995 Naval Base closes.
2001 Noisette Company announces a 20-25 year Master Plan for the redevelopment of the Naval Base.
2003/2004 The filmThe Notebook uses the Navy Chapel for several scenes and makes alterations including southeast
wall wainscoting, refinished flooring, and new paint on the walls.
2006 Lindberg and Associates alterations are made to the Navy Chapel including the replacement of three nave
trusses with holes cut in the north and south walls for access. Nave windows are inspected and restored,
including replacement of wood where necessary, and new window hardware.
2006 Discussions begin regarding the establishment of the Clemson University Restoration Institute ResearchCampus in North Charleston.
2008 First phase of the Clemson University Restoration Institute (CURI) North Charleston Research Park and the
development of a master plan.
8/22/2019 Chapel 2 HSR
6/47
6
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
History of the Charleston Navy YardCharleston has been wedded to the sea since the arrival of the first Carolina colonists in 1670.1 The townstarted out as a humble settlement located on a peninsula bordered by the Ashley and Cooper Rivers. Soon,the colony began earning revenue by exporting local goods. By the eighteenth century, Charleston hadbecome one of Americas most important seaports. Major exports such as rice, indigo, furs and other
commodities were shipped to foreign locations including England, Holland, Germany, Portugal, and theCaribbean.2 The colony grew into a wealthy yet diverse city-state inhabited by planters, merchants,commoners, and slaves. However, since it was located so far way from Englands protection, the colonydeveloped its own provincial navy to be raised by the Royal Governor in times of trouble. This sparked along tradition of naval occupation and influence in Charleston.
In 1900, an act of congress allowed the Secretary of the Navy to relocate the Port Royal Naval Station froman area near Beaufort, South Carolina to the west bank of the Cooper River six miles north of the CustomsHouse in the city of Charleston. Red brick buildings, the main power plant, dry docks, and the first shipwere all constructed on the Naval Base during the period between 1909 and 1910.3
During the years preceding World War I, the Naval Base employed approximately eight hundred civilianswho helped construct both buildings and ships. World War I led to the establishment of a Naval TrainingCenter and an expansion of facilities, land area, and the work forces of the Navy Yard, with employmentreaching 6,500 personnel in November 1918. However, the end of the war and the depression of the 1930scaused a significant decline in the amount of work coming into the harbor and reduced the work force to fivehundred workers, leaving the future of the Naval Base unclear.4
From 1922 to 1933, work at the Naval Base consisted primarily of shipping repairs and minor alterations. In1933, a drastic increase in shipbuilding activity brought new construction projects which created a need formore facilities and a significantly larger work force. 5 These workers would play a large role in helpingsupporting the nations shipbuilding and repair needs. Civilian employment peaked at almost 26,000workers in 1943, and the Naval Base acquired new land areas known as South Yard, Naval Air Station,and the Noisette Creek Area. 6 On November 5, 1941, the Naval Base complex expanded to include the
Charleston Naval Ammunition Depot which was located on the west bank of the Cooper River abouttwenty miles from downtown Charleston. That same year, the Naval Base surpassed tourism asCharlestons largest industry.7
This activity was spurred by several New Deal programs under the Works Progress Administration (WPA)and Public Works Administration (PWA) that provided jobs to many Charlestonians who were unemployeddue to the Great Depression. The Naval Bases large number of civilian employees made it the largest
1Jim McNeil, Charlestons Navy Yard: A Picture History, (CokerCraft Press: Charleston, S.C., 1985), 1.
2 Kenneth Morgan, "The Organization of the Colonial American Rice Trade," The William and Mary Quarterly, Third Series, Vol.52, No. 3 (July 1995), 435.3 Donna L. Kaup, Dining in Quarters A: Charleston Naval Base, Charleston, South Carolina (Charleston, SC: Gateway Publications,Inc.), 7, From the Naval Base: 1949 vertical file, South Carolina Room, Charleston County Library, Charleston, SC.4 Kaup, Dining in Quarters A, 7.5 Clyde Johnson, Yard Site bought in 1901, The News and Courier/Charleston Evening Post, May 15-19, 1972, From the NavalBase: 1970-1972 vertical file accessed at the South Carolina Room, Charleston County Library, Charleston, SC.6 Kaup, Dining in Quarters A, 8.7 W. Hugh Harky Jr., Greetings from Charleston: A Pictorial Postcard History of Charleston, South Carolina (Asheboro, NC: Down HomePress, 1994).
8/22/2019 Chapel 2 HSR
7/47
7
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
single employer in the history of South Carolina. During the 1940s, employees worked around the clock toconstruct over two hundred ships and repair or convert hundreds of others.8
The new activity brought during the World War II era affected the buildings within its boundaries as well asthe greater Charleston area. Almost 200 buildings survive from this period.9 The Eternal Father of the SeaChapel, built in 1942, is one of these buildings that not only served as a house of worship and a host for
weddings, but also accommodated military and civilian needs within the community.
Despite the industrial and employment boom during World War II, activity at the Naval Base began todecline drastically by the end of the war. However, all work did not cease. According to Donna Kaup,During the 1950s, the Naval Shipyard became the major overhaul facility on the East Coast for submarines,as well as the outfitter for new ships constructed for the Navy in private shipyards in the district.10 In 1959,the Naval Base began construction on piers for new mine warships and barracks for personnel which helpedestablish the city of Charleston as a major port for the U.S. Atlantic Fleet.
In the 1960s, the shipyard moved toward a nuclear age along with the rest of the world by developingfacilities to perform repairs and service to nuclear powered submarines. The Charleston Naval Shipyard wasunique because it had all-inclusive support base for nuclear submarines.11
Activity at the Naval Base has been relatively quiet in the last few decades of the twentieth century despitethe fact that it was one of the three major naval bases on the east coast. In an effort to modernize the reservecombat forces, the Naval Base began a new reserve frigate program in 1982.12 That following year, theShipyard received the Chief of Naval Material Productivity Excellence Award for improved productivityand quality of work.13
In 1989, at the height of the navys presence in Charleston, there were over eighty ships home-ported at theCharleston Naval Base. The base also had a submarine tender located on-site, making it an ideal place forsubmarines in the Atlantic fleet to refuel and be repaired. At this time, the base was employing 15,000 navypersonnel and over 21,000 civilians, making it the largest employer of civilians in the Charleston area. Butin the following years, the navy began to reconsider the value of the Charleston Naval Base.
By 1990, the navy appeared to have outgrown its base in Charleston, saying that it was at excess capacity.The navy also said that the base in Charleston was not an ideal location for repair and refueling because thenearby bridge was too low for aircraft carriers to pass underneath it. It was during this period that the navydecided to spend less money on their bases and focus available funds on building ships. The base began tofall into disrepair and was closed in 1995, but it did not sit empty for long.
Not long after the base closed, a redevelopment commission was started by the state to reuse the base andencourage jobs in the area. The redevelopment commission partnered with the city of North Charleston to
8 Ian Hill and Tracy Power, Preservation and the Charleston Naval Base, Preservation News & Notes 5, no. 3 (Autumn 1994): 2,
From the Naval Base: 1990-1999 vertical file, South Carolina Room, Charleston County Library, Charleston, SC.9 R. Christopher Goodwin and Associates, Inc., Inventory, Evaluation, and Nomination of Military Installations: Naval BaseCharleston, Final Report, U.S. Army Corps of Engineers Baltimore District, p. 58, April 19, 1995.10 Kaup, Dining in Quarters A, 10.11 Charles T. Seabrook, Congress Authorized Navy Yard in 1900, News & Courier/Charleston Evening Post, March 31, 1970, page12D, From the Naval Base: 1970s vertical file, South Carolina Room, Charleston County Library, Charleston SC.12 Jane E. Allen, Frigate Program Coming Here, The Post and Courier, October 4, 1982, page 1B, From the Naval Base: 1980-1989 vertical file accessed at the South Carolina Room, Charleston County Library, Charleston, SC.13 Charleston Naval Shipyard Best in the Nation, Charleston Evening Post, January 1, 1984, From the Naval Base: 1980-1989vertical file, South Carolina Room, Charleston County Library, Charleston, SC.
8/22/2019 Chapel 2 HSR
8/47
8
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
buy the northern 1/5 of the Navy Base to make it into a city center. The plot of land that the commissionpurchased was an ideal location for downtown shopping as it was centrally located and within walkingdistance for nearby neighborhoods.
In March of 2001, the Noisette Company announced a 20-25 year Master Plan for the redevelopment of theNaval Base that was centered around the concept of sustainability. Noisettes planned called for a mixed use
approach, combining both commercial and residential spaces while at the same time reusing the existingstructures as much possible from the former Naval Base. A range of revitalization projects that include therezoning of residential areas to business and commercial are currently being planned in and around the NavyBase to encourage economic development.14
History of the ChapelThe Eternal Father of the Sea Chapel served as house of worship from its construction in 1942 closure of theNavy Yard in 1995. The rapid growth experienced by the base after US entrance into WWII may have beena factor in the construction of the Chapel, as increased numbers of personnel would have increased demandfor religious facilities. Prior to construction of the chapel, services were held in a small school on the base,inadequate for the increasing numbers of people on the base or the diverse religions represented by the
bases population.15 The Chapel held Catholic, Protestant, and Jewish services on the weekends, and servedas the main venue for weddings in the navy. The large number of servicemen being deployed because of theactive war likely caused an increase in marriages on the base, making the Chapel a vital part of life. Thebuilding was also used for candlelight services held the night before a ship left for sea and for ThanksgivingServices held when a ship returned.16
At the time of construction, masons placed a time capsule into the first corner stone of the chapel. The boxincluded a Holy Bible, Prayer Book for Soldiers and Sailors published by the Army and Navy Commission,Protestant Church, New York 1941, Army - Navy Service Book, Service Prayer Book, and theArmy-Navy Hymnal.There were also 41 American pennies and 4 dimes. This box was opened at the last service in 1995. Thebooks showed evidence of water damage likely caused by Hurricane Hugo in 1989.17
The chapel continued to offer services until the 1990s. It then experienced a period of decline thatcoincided with the decline of the Naval Base. In 1994, the last Rabbi that served the site was transferred toanother post. In the spring of 1995, the last Catholic chaplain was transferred as well. A protestant chaplainremained until September 3rd 1995 to conduct the last service.18 Based on documents found in the chapel, anew congregation used the space beginning in September of 1998. The God's True Deliverance Church heldservices at the site under Pastor Robert Grant and Sister Nadine Grant until at least September 26th, 2004.
After the Naval Base closed, the North Charleston Arts Festival began to use the property as a performancespace. As late as May 7th 2005, the festival was held on the base. The chapel housed a theater productioncalled The Meeting, which was based on a fictional meeting between Dr. Martin Luther King, Jr. andMalcolm X. Set prior to Malcolm X's assassination in 1965, it explores their different philosophies and
14 Jim Augustin, Director of Community Revitalization, Sustainability, Noisette Company, Interview, January 27, 2009.15 Gail A. and James R. Piedmont. A Small Church Called Saint John Catholic Church located in North Charleston, S.C.,http://www.saintjohncatholicsc.org/parish/history.htm.16 Ruth Cupp, Final Farewell, Post and Courier, Oct 9 1995.17 Ruth Cupp, Corner Stone Opened at Chapels Last Service, Post and Courier, Sept 6 1995.18 Ruth Cupp, Final Farewell, Post and Courier, Oct 9th 1995.
8/22/2019 Chapel 2 HSR
9/47
9
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
approaches to the Civil Rights Movement, Gullah Experience, and Gospel Extravaganza.19 In 2003, scenesfrom the motion picture, The Notebook, were filmed at the site. 20
An interesting and somewhat cryptic feature of the chapel is the large art piece now located in the BlessedSacrament Chapel off the south side of the apse. This piece was made in the early 1960s by FatherRodriguez of St. Johns Catholic Church and subsequently moved to the Navy Chapel. 21
19 Carolina Arts, The 2005 North Charleston Arts FestivalTakes Place in North Charleston, SC, from Apr. 29 - May 7, 2005,April 2005 Issue, http://www.carolinaarts.com/405nchas.html.20 Nick Cassavetes, Director ofThe Notebook (motion picture) New Line Cinemas, June 2004, Email Interview, January 28 & 31,2009.21 Joe McIntyre, Member of St. Johns Catholic Church who helped move piece of art to the Eternal Father of the Sea, Interview,March 2009.
8/22/2019 Chapel 2 HSR
10/47
10
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Chronology of building alterations
1942 Original Construction Naval Archives: Photos/Architectural Drawings
1944 First major alterations Naval Archives: Architectural DrawingsNorth addition (robing rooms)Altarpiece changed, molding altered to accommodate larger pieceOriginal windows movedFan room added in vestibule (attic)
1949 Naval Archives: Architectural DrawingsOrgan speakers moved from altar to second floor/ceiling above apse
1979 Second major alterations Naval Archives: Architectural DrawingsHVAC changes
Radiators removedAC units installed/replaced
Blessed Sacrament Chapel alterationsLighting fixtures and electrical wiringAcoustic tile/drop ceilingAltar relocatedWood paneling added on wallsTabernacle shelves replaced
Apse alterationsAltar moved from against wall and extendedAltar stairs extended1944 altarpiece and artwork removed, replaced with wood cross, hanging curtainsMolding and wood veneer replaced (covering evidence of previous altar art)Altar rail (between choir and sanctuary) removedNew door installed between altar/sacristy
ExteriorAccessibility ramp addedRe-painted siding (per drawings, colors to match original)Sign re-painted (West elevation)Wood trim stripped and re-painted
Decayed exterior wood trim replacedGutters and downspouts replaced
SacristyRe-design of shelves and molding on south elevationPartition walls alteredAccordion door installed
Re-wiring of electrical systemsConfessional booths in southeast corner of nave removedPaint removed from interior window frames, jambs, and sills
8/22/2019 Chapel 2 HSR
11/47
11
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
2003/4 The Notebook filmed Movie footage, Location scout interview, physical evidenceSoutheast wall wainscotingPaintTicket Booth in southwest corner of nave
2006 Lindberg and Associates alterations City of North Chas. Public Works Dept drawingsNave windows inspected and restored
Replaced wood where necessaryNew window hardware
Three nave trusses replaced (holes cut in south wall for access)South wall wainscoting replaced (?)Foundation reinforcement
West wall of chapel, including window, replaced
Dates to be determined/Further research necessary:
Date of original Eternal Father sign (not on original drawings or photos)Interior wall fans (mentioned on original drawings) Were they ever installed? When removed?Asbestos siding removed (post 1979) (post Hugo)
8/22/2019 Chapel 2 HSR
12/47
12
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Architectural Description and EvaluationGeneral DescriptionBuilt in 1942, The Eternal Father of the Sea Navy Chapel is a gable roofed building that possesses a number
of neoclassical details. Symmetry is present throughout the buildings details and is a defining characteristic
of its overall design. The main facade which faces west includes a portico with a parapet that is tiered to
accommodate a cross. Unfortunately, the cross was removed from the parapet, most likely when the church
was closed in 1995. Four square columns support the parapet and frame the three double door entrances
that lead into the vestibule. The building is finished with white clapboard siding with five 16 over 16
windows running along both the north and south walls of the nave. Two wings flank the apse which
protrudes from the east wall. An addition was added to the north wing in 1944 which slightly altered the
symmetry of the building. Pilasters accent the four corners of the building creating cohesive detailing
throughout the exterior of the building.
Upon entrance through the western faade, there is a vestibule approximately 20 feet-8 inches wide by 8
feet-7 inches long which possesses original moldings and light fixtures. Three interior doorways, which
mirror the three exterior doorways in the western faade, lead from the vestibule into the nave. The nave is
35 feet wide by 65 feet-3 inches long. It is an open space with a small room in the northwest corner that
was added for the filming ofThe Notebook (2004). The 16 over 16 windows mentioned above run the length
of the room on the north and south walls and are interspersed with the vertical support beams for four
trusses. The exposed trusses are painted white and feature braces running from the north and south walls to
the bottom beam of each truss. Each of the four trusses supports two hexagonal light fixtures. The nave has
a wood floor and is separated from the apse by an archway with detailed pilasters.
The apse, located at the east end of the nave is elevated by three steps, a small landing, and another two
steps, with an additional three steps up to the altar space against the east wall. The ceiling over the apse is
arched and the back wall is curved. Four sets of chandelier lights hang from the apse ceiling. A second
decorative arch spans the area between the second two sets of steps. It consists of a double set of pilasters on
each side of the altar space, connected across the ceiling by a coffered molding. Two doors on the first level
of the altar area lead to the side wings on the north and south sides of the apse.
The north wing of the building, including the 1944 addition, is a secondary space, consisting of two
rectangular rooms with very little details in molding or fixture. A narrow staircase on the eastern end of the
first room leads to a small upstairs area. This space was once used as chaplains office but was later divided
into two rooms with speakers in the western most room. The south wing had once been a smaller chapel,
but was altered during the 1979 renovations. The addition of a drop ceiling and HVAC equipment has
converted this wing into a secondary space.
8/22/2019 Chapel 2 HSR
13/47
1
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
AI
T
el
Featu
Porti
Parapand Si
A n a l y s i s o fany structure
he character d
hich make the
ements remai
e
o
Thedefin
(wesremathrobuild
etgn
As e
photparaorigiit is tcrossparalengtwhesignparathe si
manthe bthe athethe b
f C h a r a c t e, there are cert
fining feature
building both
intact, if reha
Desc
orticos neoes the entran
faade). Thiined relativelghout othering.
idenced by c
graphs takenet located onal. The desiered to accoin the centerets that are l
of the buildthe Eternalas added to
et. Howevegn was added
other alteratilding. Thissociation bethristian religiilding.
e r D e f i n i n gain design ele
of the Eternal
ignificant and
bilitation is un
iption
lassical desige to the buil
s design hasunchangedlterations to
nstruction
in 1942, thethe west fan is unique imodate a C
unlike mostvel across thing. It is unclFather of thehe west faa, it is knownbefore 1979
ions were mphrase repre
een the navous affiliatio
g F e a t u r e sents which c
Father of the
unique. Sensi
dertaken on th
ing
the
de isthat
ristian
earSeaethatwhen
de tosents
andwith
sntribute signi
Sea Chapel, as
ivity should b
is building.
icantly to its p
outlined belo
observed to
Photograp
ysical charact
, are the ele
nsure that the
er.
ents
e
8/22/2019 Chapel 2 HSR
14/47
1
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Trans
Windo
Aps
Friez
and Cor
m
Thewindentrabuildconsreprelines
ws
Thesouthelp
and rdesigpresecoveplyw
The
eastthe bAlso,indictradieast
eice
Theare rarchito thdecodesig
istinctive desows above thnce doors ising from theruction. Thesentative of tand classic st
ave windowselevations as
to define the
eflect traditions. The winnt, but theyed with largeood.
xterior shape
levation is heildings origthe directio
ative of severions in whicard.
rieze and corlated to thetecture. This
building, anative aspectn.
ign of the trawest faade
riginal to theate of
ir design ise buildingsle.
on the norta collectiveuilding as a
nal sacred buows are stillre currentlysheets of pai
of the apse o
xagonal andnal symmetrof the apse il religiousthe altar poi
ice on the peoclassical stfeature is ori
d provides ao a relatively
nsom
clean
androuphapel,
ilding
ted
n the
eflects.
ts
rticoyle ofginal
oresimple
8/22/2019 Chapel 2 HSR
15/47
1
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Pilast
Nav
Expos
Truss
and Cei
rs
The ebuildi
and a
up th
buildi
the c
The l
defini
of the
cere
towar
servic
ed
es
ling
The e
are p
of the
trusse
trussemano
trusse
featur
ngaged columng are made u
e designed to
cornice, friez
ng. These eng
lumns found o
yout of the na
ng feature unt
space reflects
ony. The nav
d the apse wh
es would have
xposed trusses
esent in the or
building. Wh
s are replacem
s were constrr and style as t
s and exposed
es noticed upo
s at the corneof wood mol
ppear to be h
e, and roof of
aged pilasters
n the portico.
e is a charact
itself. The o
its use for reli
e draws the ey
re the religio
been conduct
and wooden c
iginal 1942 dr
ile three of th
ents, the repla
cted in the sae original. T
ceiling are the
n entering the
s of theding
lding
the
atch
r
enness
ious
e
s
d.
eiling
wings
four
cement
ee
first
chapel.
8/22/2019 Chapel 2 HSR
16/47
1
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Windo
Light Fix
in the N
Aps
ws
The 1
lengtnave,
chape
provi
The
syste
sym
lengt
tures
ave
The li
show
distin
1940
The
char
elem
locat
or ch
as thduri
signi
the n
lend
recall
funct
6 over 16 win
of the northfive windows
l a distinct feel
e a sense of c
indows altern
vertical supp
etrical pattern
of the nave.
ght fixtures ar
in the 1942 d
ctive design is
s style.
pse itself is a
cter defining
ent of the Ch
d at the east
apel, the rais
focal point fg the buildin
icance. The
ave and dome
a sense of dra
the building
ion.
ows that run
nd south wallson each side, g
ing. The win
remony to th
ate with the tr
ort beams, cre
running the f
e original and
rawing. Their
characteristic
important
architectural
pel. Traditi
rn end of a c
d platform s
or religious ss period of
rched openi
d ceiling in t
a to this sp
s original reli
he
of theive the
ows
nave.
ss
ating a
ll
re
f
nally
urch
rved
rvices
g onto
e apse
ce and
gious
8/22/2019 Chapel 2 HSR
17/47
1
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Interi
archw
Moldi
or
ay
Pilas
of th
mold
seco
areadept
the c
Inter
gsPilas
The s
apseclean
char
Pilas
ers on either
apse are con
ing on the cei
dary archwa
f the apse, aand detail to
apel.
or archway,
er capital
imple moldi
area contribulines and cla
cter.
er base
side of the in
nected by co
ling, creating
above the c
ding a sensethis focal po
etail
gs througho
e to the Chasical revival
terior
fered
a
hoir
ofnt in
t the
els
8/22/2019 Chapel 2 HSR
18/47
1
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Wainsc
Windo
ting
The
nort
well
The slines
char
ws
Twoeaste
this f
beco
Thes
wind
and f
interi
wate
Win
riginal wains
and south w
as on the nor
imple designcontribute to
cter and feeli
windows setn wall of the
ocal point of
ing focal po
six over six
ows are origi
eature interes
or sills, pres
from enteri
ow sill detail
coting exists
alls of the aps
h wall of the
and clean verthe 1940s
g of the spa
into the curvapse admit li
he building,
nts themselv
double-hung
al to the buil
ting detailing
mably to pre
g.
on the
e, as
nave.
tical
e.
dght to
es.
sash
ding,
on the
vent
8/22/2019 Chapel 2 HSR
19/47
1
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
CS o u t h eA
c
c(1
t
a
p
So
We
C h a r a c t e r da s t a n t e c hccording to a
apel to the
nsidered as942 1959)
e exception,
t piece in t
eriod of signi
Windows
th wall wind
st wall wind
d e f i n i n g f eh a m b e r a .rchitectural d
south of th
defining thesince they ar
as they appe
is space may
icant at this t
w
T
s
li
in
w (r
e a t u r e s :. k . a . B l e srawings and
apse were
istoric charae relatively n
r to have ma
eventually
ime.
e elongated
all side chap
ht and dram
terior space.
econstructed
s s e d S a c r ahysical evide
replaced in
cter of the sew. The inte
intained thei
e considere
indows in t
el add a sense
to this small
in 2007)
a m e n t C h ance, interior
1979. Man
ace for therestingly sha
original loc
character d
e
of
a p e lfixtures and
of these el
uildings peed windows
tion and dim
efining, but
inishes in the
ements cann
iod of signifimay be consi
ensions. The
alls outside
small
ot be
cancedered
large
f the
8/22/2019 Chapel 2 HSR
20/47
20
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Analysis of Historic IntegrityThe integrity of the Eternal Father of the Sea Chapel on the North Charleston Naval Base has beendetermined to be moderately high, based on the seven criteria determined by the National ParkService. The Chapel has varying degrees of integrity in each category and in different areas of thebuilding. The exterior of the building, which has suffered the most damage from the elements,neglect, and human intervention, appears to have less integrity of materials and workmanship thanother areas of the building. The 1979 building alterations changed several aspects that had been inplace during the Chapels main period of historic significance. Much of these alterations arereversible and sensitive treatment during repairs to the exterior could result in an increase inintegrity.
Location:
The Eternal Father of the Sea has not been moved from its original location on the NorthCharleston Naval Base. The retention of its original site affords the chapel a high level of integrityin consideration of this criterion.
Setting:
The immediate physical setting of surrounding buildings and lots is similar to that of 1942 with theexception of the school located to the east of the property. However, the social setting has changedconsiderably due to the fact that the Naval Base is not longer active and the building is no longerused for its intended purpose as a chapel.
Design:
The overall design of the Chapel has remained intact since its construction in 1942. The originalsymmetry of the building was slightly disturbed by an addition on the north elevation in 1944.Exterior elements that define the building, such as the portico, parapet, transoms, nave windows,
and the shape of the apse have retained their design integrity, and therefore contribute to thebuildings overall merit as a historic structure.
Many of the character defining features can be found within the portico which was designed byAlbert Simmons in the neoclassical style of architecture. This style makes the Navy Chapel one ofthe last examples of classical architecture built on the Navy Base before the shift to modernism inthe 1950s. The columns, cornice, frieze, and parapet all illustrate the neoclassical design.
The large nave windows lining the north and south elevations are representative of religiousarchitecture. These windows are significant to the design of the chapel both externally andinternally. Fortunately the size and shape of the windows have remained the same throughoutmany alterations to the building. There is evidence from historic photos that the glass in these
windows has been replaced, the original being clear, un-textured glass.
The interior layout of the building is mostly intact. The vestibule that separates the entrance to thechapel on the east elevation to the nave retains two of the three doorways from the original design.The northern most door way was altered for the filming ofThe Notebook (2004). The door way wasconverted into a ticket window and was enclosed by a room constructed in the northwest corner ofthe nave. A confessional booth was also removed from the southwestern corner of the nave at thistime.
8/22/2019 Chapel 2 HSR
21/47
21
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
The addition of the room in the northwest corner of the nave impacted the integrity of design.Aside from this room, which can be removed, the overall layout of the nave remains intact. Theglass windows lining the north and south walls have retained their original size and shape, and thealternating layout of the windows and trusses has remained the same.
The apse retains its overall dimensions, scale, and proportions, including ceiling heights, elevations
of the space in relationship to the nave, and patterns of window and door openings. There is someevidence that the original windows along the east wall were each moved approximately three feetin 1944, to accommodate a new altarpiece. This change took place within the period ofsignificance and shortly after completion of the Chapel, minimizing its detraction from the integrityof the building. Some minor re-organization of space and ornamentation took place during the1979 alterations, including the re-orientation of altar. The re-organization affects the ceremonialspace of the Chapel and the integrity of the apse.
The northeast wing off the apse has experienced some alterations. The partition wall in theaddition has been removed to create one large room. A partition wall was added to the upstairsroom, which use to be the chaplains office, to create two rooms. These alterations changed the
layout of the space, but because these are secondary spaces of significance the alterations do notgreatly impact the integrity of the building.
The Southeast wing off the apse has experienced some alterations although the basic overalldimensions remain the same. The most dramatic of these changes was the installation of newlighting system and a drop ceiling which reduces the ceiling height of more than half the room bynearly fifty percent. The ceiling could likely be removed to restore the original spatialorganization. In 1979, the confessional booth was removed which occupied the southwesterncorner of the room during the period of significance; this alteration has effected to proportions ofthe small space. A doorway in the western wall of the chapel which originally led directly from thesmaller chapel into the nave has been closed off, and a protrusion into the chapel space has beenbuilt, presumably for HVAC duct work.
Materials:
The exterior has experienced a great loss of historic fabric. The original asbestos siding has beenreplaced with wood, air conditioners and wheelchair ramps have been added, and large incisionshave been made to accommodate the replacement trusses in the nave. These incisions have beencovered over with large sheets of painted plywood, shielding the nave windows from exterior view.Weather, neglect, and human intervention have compromised the integrity of materials on theexterior.
The interior of the Chapel has a relatively high integrity in materials. The vestibule has originalmoldings and wainscoting, although the northern most door was enclosed. The original heating
equipment is present on the north and south walls of the vestibule and the light fixtures areoriginal.
The nave has suffered some loss of original materials as a result of the replacement of the trusses.The western most truss, nearest the entrance of the building is original. The other three trusses arereplacements installed in 2006. The construction of the replacement trusses follows the model ofthe original closely. The floors in nave are the original from 1942, but were refinished for theproduction of The Notebook (2004). The panes in the windows have been replaced, most likelyduring the 1979 renovations, with textured, colored glass. The wainscoting from the 1942
8/22/2019 Chapel 2 HSR
22/47
22
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
drawings has been retained on the north wall of the nave. On the south the wainscoting has beenreplaced with different wainscoting, most likely during the filming of The Notebook. The lightfixtures that hang from the trusses are original and are present in the 1942 drawings. The glass insome of these may have been replaced, but most of the material in these fixtures is original.
Integrity of materials in the apse of the Chapel appears relatively high. Original windows,
moldings, and portions of the wainscoting evident in the original 1942 and 1944 drawings are stillin place. In 1979, changes were made to the paneling on the east wall when the altarpiece wasmoved from against the wall to further out the apse area. At the same time, a choir rail,approximately 2.5 feet high, which has separated the choir and sanctuary areas of the apse wasremoved. Pieces of this partial wall are currently stored in various rooms in the building, and couldpotentially be re-installed if a restoration project were undertaken. The 1979 alterations alsoincluded extensions to the steps in the apse, allowing more room for the new location of the altar.The original stair configuration still exists behind the extension, maintaining integrity of materialsin the space. The north and south doors leading from the apse to the robbing rooms and smallerchapel were replaced in 1979 in consideration of fire codes.
A majority of the materials in the northeast wing are original. Besides the removal of the partitionwall in the addition and the addition of a partition wall in the second story room, there have notbeen alterations to this space. A sink that was at once time present in the chaplains office has beenremoved leaving a ghost mark on the east wall. Of particular interest is an original light fixture inthe bathroom located in the addition.
The integrity of materials in the southeast wing has been compromised by considerable alterationscompleted in 1979. The original tabernacle shelves were removed and replaced, the altar wasremoved, and wood paneling and new wall sconces were installed on the walls. It is likely that anyoriginal wall materials that remain have been affected by the extensive water and termite damageevident throughout the room.
Workmanship:The great loss of original fabric on the exterior of the building has made determining workmanshipextremely difficult. The original structure and brick foundation are still intact and in relativelygood condition, indicating a fairly high level of workmanship. The construction type, which iswood construction along the lines of balloon framing, is typical of the period of significance. Thedetails present in the cornice and pilasters indicate a fairly high level of skill and craftsmanship.Unfortunately, the exterior of the building has been re-dressed with inferior materials and methodsthat have caused a rate of rapid decay resulting in a loss of original materials and evidence ofworkmanship.
The interior of the Chapel provides more evidence of workmanship. The trusses are one element
of workmanship in the building that remains. The original truss is a primary source of informationon how the trusses were put together; they show typical 1940s construction and electrical wiring.The replacement trusses were carefully constructed to mimic the way the original truss wasconstructed so as not to detract from the integrity o the site. The trusses are put together with boltsand screws. The braces were bolted to the vertical posts that run floor to ceiling. This is typicalconstruction for the period. Decorative details such as the curving elements near the start of theroof show the skills required to make these stylistic details. The original floor is indicative of the
8/22/2019 Chapel 2 HSR
23/47
23
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
workmanship in the building. The original wainscoting on the north wall also provides someinsight into the skills required to complete this building.
The clean lines of the apse area, including classical moldings and simple wainscoting, offer someinformation about the aesthetic principals of the period of significance. Some minimal waterdamage near the interior archway and peeling paint on the ceiling are the only indicators of failing
materials in this space, suggesting quality of original craftsmanship. The 1979 alterations removedsome original material, making workmanship difficult to determine in the apse. The originalmaterial present does suggest a quality of construction.
Workmanship is more easily determinable in the northeast wing, where the integrity of materials islargely intact. There is a large degree of water damage in this wing, particularly on the west wall,but this stems from a compromised building envelope where a tree is growing in the roof and thepresence of a flat roof over the addition, not from faulty original workmanship. The constructiontype and electrical systems are typical for the period of construction with the bathroom retaining itsoriginal light fixture. The southeast wing of the Chapel experienced extensive renovations in 1979,along with water and termite damage, that make determining workmanship difficult in this space.
Feeling:
Original building materials and overall design elements combine to help the Chapel maintain thefeeling of a place of worship in the 1940s and 1950s. The exterior of the building looks like a placeof worship; however, the removal of the wooden cross on the porticos parapet detracts from thereligious feel that is associated with the building. There is no insignia that indicates that thebuilding was used for religious purposes. The only allusion to religious practices is the design of thebuilding. The general disrepair on the exterior of the building also detracts from the feeling, butcould be regained with proper treatment, such as the use of historically appropriate materials torepair the exterior.
The layout of the interior spaces, including the openness of the nave and apse as a focal point,
contribute to the feeling of the Chapel. The large windows lining the north and south walls of thenave are indicative of a ceremonial use. The retention of original design and materials areespecially significant to the chapel and contribute to feeling. The construction and design elements,such as the trusses and lighting fixtures, set a specific period of the 1940s and 1950s for thebuilding. The pews that were in the chapel are stored in the apse at this time but could be easilyreplaced to increase feeling. Missing elements such as the altarpiece and confessionals do detractsomewhat from the integrity of feeling.
Association:
The retention of the original location and setting help to create integrity of association. The chapelbecause it retains its relationship to the navy base and the existing naval building around it, stillevokes strong ties with the North Charleston Naval Base. The buildings presence as a non-denominational house of worship is an indication of the values and religious rituals of people usingthe base during a time of war. The chapel also shares in the history and tradition of navy chapelserected around the country. The nave, as mentioned in the feeling section, retains originalmaterials and design elements that are evocative of the 1940s.
The apse, where a majority of the religious symbolism and ceremonial objects would have beenlocated, does not have the same level of association as the nave. Only the architectural design and
8/22/2019 Chapel 2 HSR
24/47
24
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
physical layout of the building remain to speak of the buildings former religious uses. Detailsreferencing the specific spiritual purposes, for which the building was used, including physicalevidence of Christian and Jewish ritual, have been removed. The absence of altarpieces depicted inoriginal drawings is detrimental to maintaining integrity of association in these spaces.
The northeast wing of the building, a secondary space, does not factor into the integrity of
association as much as the primary ceremonial spaces of the Chapel. The addition of droppedceiling and the removal of the confessional detract from the integrity of association in this part ofthe building.
8/22/2019 Chapel 2 HSR
25/47
2
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
A s s e s s ELocation
North El(fig 1)
South anElevatio(fig 2)
West Ele(fig 3 & 4
s m e n t o fx t e r i o r C o
D
vation M
Easts
Er
ation)
CD
E x i s t i n go n d i t i o n s Sescription
issing downsp
osion hole
acked brickteriorating C
C o n d i t i oS u r v e y
ut
ulk
o n shotograph
8/22/2019 Chapel 2 HSR
26/47
2
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
North El
(fig 5)
South Ele(fig 6)
North El(fig 7)
vation
vation T
vation Sp
ood rot
rmite Damage
litting/Cracki
g Clapboards
8/22/2019 Chapel 2 HSR
27/47
2
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
East Elev(fig 8)
West, NoEast Elevrespectiv(fig 9)
tion Sa
th, andtions
ely
G
gging Baseboa
een, Rust, Bla
d
ck Bio-Growt
8/22/2019 Chapel 2 HSR
28/47
28
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
North Elevation(fig 10)
Tree/Weed-like Bio-Growth
West Elevation(fig 11)
Portico Columns
South Elevation(fig 12)
Peeling paint
8/22/2019 Chapel 2 HSR
29/47
29
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Interior Condit ions Survey
Western room ofsecond floor
north wing
This room has experienced extensive water damage possibly from the compromised building
envelop as the result of the tree growing on the roof directly above this room. The west wall of
this room has extensive termite damage as a result of the water infiltration from the
compromised roof. This has also affected the floor boards nearest the west wall, making them
largely unstable. Caution should be used when approaching this side of the room. Other
problems include damage to the sheet rock on the south wall which seems to have been a
deliberate act and holes in the windows on the north wall.
West Wall(fig 1& 2))
Water damage is present 2-3 feet off the
northwest corner. The tree that is
growing on the roof is immediately over
this portion of the building which
probably is the point where water enters
the building. There is also termite
damage inside the wall. The water
damage made the wood studs more
susceptible to termites. The floor below
the wall is also weaker due to the waterdamage. Along the west wall the paint is
cracking.
8/22/2019 Chapel 2 HSR
30/47
30
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
North Wall(fig 5)
Window on north wall. Holes in the
lower panes are most likely from impact.
Eastern Room,Second Floor
The condition of the Eastern room on the second floor is fairly good. There do not seem to be
any serious structural problems in this room. Most of the failures in this room are cosmetic.
The paint throughout the room is cracking and peeling from the walls, which is most likely dueto the age of the materials and the vast range of temperature and humidity experienced in the
building in the absence of climate control on the interior. There was a sink on the east wall of
the room but this has been removed leaving a ghost mark on the wall.
NortheastCorner(fig 6)
Paint cracking in the northwest corner
Northeast Roomoff of Apse
This room shows signs of serious structural problems. There is extensive water damage to the
south and west walls, most likely the result of the compromised building envelope and the tree
growing through the roof directly above the site of the water damage. On the west wall there
is also the presence of biological growth, most likely from the presence of moisture on the
north side of the building. The water damage is a serious problem in this room. There are
vertical cracks on the south wall which may indicate foundation settlement. All other noted
issues are cosmetic.
8/22/2019 Chapel 2 HSR
31/47
31
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
North WallDoor to the apse(fig 7)
Damage to the molding
on the right side of the door. It appears
to have been gouged
out, possibly from an accidental collision
from furniture which
was moved into the room for storage.
Corner to theright of door(fig 8)
There is a hole in
the sheetrock approximately one inch in
diameter.
Wall to the rightof Door(fig 9)
There is minor surface
damage near the floor. This is probably
the result of gluing a plastic
molding strip to the wall, which leftresidue when removed.
8/22/2019 Chapel 2 HSR
32/47
32
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
South Wall(fig 10)
A vertical crack extends from the ceiling
several feet down. May indicate
foundation settling
Surface finish(fig 11)
Failure of finish appears to indicate
water damage on this portion of the wall.
If this is the case, water is
migrating within the ceiling as this is an
interior wall which projects
into the nave. Fluctuations in
temperature and humidity expedite
the process of paint failure.
West Wall
Water Damage
(Fig 12)
There are signs of extensive water damage
on this wall. From the outside one can
see that the gutters in this corner are full
of plant material and there is a tree
growing from the roof roughly above the
corner shown here.
8/22/2019 Chapel 2 HSR
33/47
33
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Ceiling in thecenter of the
roomWater Damage(fig 13)
Stains on the ceiling also appear to stem
from problems with the gutters. This
corner also shares a wall with the additionwhich has a flat roof. Presumably, the flat
roof contributes to the problem of water
penetration.
Northern
addition:
Robing room
The addition has a flat roof which appears to be the cause of water damage throughout the
addition. In several places, water is pooling on the roof, causing marks on the interior ceiling.
Vertical cracks indicate foundation settlement throughout the room but particularly on the
northeast corner of the building. There is also a vine growing through the north wall window.
West Wall(fig 14 & 15)
Water damage is present above the west
window. The flat roof above the addition
probably is the cause of the water
entering the building because flat roofs do
not shed water well.
Cracks in the sheet rock above the
window might be
the result of water damage, particularly
on the west and south walls.
8/22/2019 Chapel 2 HSR
34/47
34
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Noeth Wall(fig 16 & 17)
Vine
There are cracks throughout the north
wall, the majority of which are vertical.
There are spots on the wall that
indicate some water damage attributableto the flat roof.
Northeast corner(fig18)
A vertical crack runs along the northeast
corner of the room. There is also a hole
in the bottom of the door which mightbe allowing pests in.
8/22/2019 Chapel 2 HSR
35/47
35
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
South Wall(fig 19)
There is water damage on the South Wall
above the doorway into the addition from
the original room. The picture suggests
that the water is pooling above the door
and also running down the north wall.
This is probably an effect of the flat roofover the addition.
The Nave Overall the nave is in fairly good condition. There is some water damage, particularly over the
arch that separates the nave from the apse, which indicate foundation settlement. None of the
damage is as extensive as the damage is the north wing off the apse. The three trusses in the
apse have been replaced and the western most truss is original. Large holes were cut in both
the north and south walls to replace the trusses, but the interior does not seem to have suffered
greately from this practice. The majority of the damage to this room is cosmetic, not
structural.
South WallWindow 1Starting from theEast(fig 20)
The Southeast corner
of the nave shows signs of severe waterand termite damage. The spackle
repair below the window is not well
done and detracts from the appearance
of the windows. There is also a vertical
crack above the window, which may
indicate foundation settlement. Window
2 and 3 had no problems.
8/22/2019 Chapel 2 HSR
36/47
36
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Window 4(fig 21)
Duct tape covers holes in the windows.
Otherwise
is in fairly good condition.
Window 5(fig 22)
Unidentifiable repair around window
molding appears to be failing. Closer
inspection is warranted.
8/22/2019 Chapel 2 HSR
37/47
37
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
North Wall
Window 6starting from theentrance(fig 23)
This photo taken from the floor of the
chapel up towards the ceiling shows how
the dropped ceiling of the additionpartially conceals the window. Paint is
peeling from the molding and a board has
been placed on the window that is
perpendicular to the sill.
Window 7(fig 24)
Vertical crack above the window may
indicate foundation settlement.
8/22/2019 Chapel 2 HSR
38/47
38
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Third Truss afterwindow 8(fig 25 & 26)
There is some surface damage to the wall
to the walls around the window,
especially in the corner between thesecond truss for the west wall and this
window. There are also some gauge
marks along the length of the wainscoting.
Vertical cracking along third truss may
indicate further settling of the building
since 2006 when three of the trusses were
replaced. (This is a replacement truss.)
Northeast corner(fig 27)
The northeast corner of the nave show
signs of water and termite damage. There
is a great deal of cracking along this
corner.
8/22/2019 Chapel 2 HSR
39/47
39
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Arch on eastwall(fig 29 & 30)
Vertical cracks on both sides of the arch
that enters
into the apse on the West wall. This may
be indicative of foundation
settlement. There is also water damage
above the arch but the source
of the water is unclear
Ceiling(fig 31 & 32)
The paint has peeled off the majority of
the ceiling. The southeast corner of the
ceiling is the only section that
has retained most of the paint. This might
be due to water penetrating the roof or
just general aging of the paint
8/22/2019 Chapel 2 HSR
40/47
40
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Apse
Crack in the wood of the tread of the
step. The crack follows the grain of the
wood.
Paint is peeling in a number of locations
due to the lack of conditioning in the
space.
Fungus growth on the window sash.
8/22/2019 Chapel 2 HSR
41/47
41
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Blessed
Sacrament
Chapel
There are holes in the original ceiling
above the suspended ceiling where there
were light fixtures that are now missing.
Missing molding and wall paneling around
the window. This was rebuilt.
Missing ceiling tiles in suspended ceiling.
The paint is peeling from the ceiling
above. Conduit is hanging down from
above the suspended ceiling through the
hole.
The back side of the door into the chapel
is unfinished and the door knob is
missing.
8/22/2019 Chapel 2 HSR
42/47
42
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Maintenance RequirementsPrioritized maintenance issuesCritical
Critical maintenance required for the preservation of the Chapel building includes the stabilizationof the building and the restoration of the exterior. The goal of stabilization is to stop further
deterioration from taking place and essentially protecting those remaining elements of the building
that contribute to integrity or are character defining features. Working from the condition
assessment completed for the property, a structural analysis should be carried out to determine
where structural stabilization is required. Structural stabilization would involve the rebuilding of
portions of the walls that are deteriorated with a focus on the interior framing of the building and
the extermination of termites.
Further critical maintenance includes the restoration of the buildings weather envelope, including,
at a minimum, the installation of a vapor/moisture barrier, new roof, and new gutters. As far asrestoration, siding must be replaced and the exterior of the building repainted. The loss of a
significant amount of original fabric on the exterior warrants this treatment. Historically sensitive
materials and treatments would help to restore the integrity of the buildings feeling and
association. Along with any repairs/restoration, the building must be property ventilated and the
plumbing should be winterized. The largest threat to original fabric is the infiltration of water and
termites. By addressing the weather envelope, the original fabric of the building will be protected,
as well as the remaining character defining features. After all work is completed, a long-term
maintenance plan should be developed with includes scheduled insect treatments.
Serious
After all critical maintenance is completed, focus can be shifted to the restoration of the interior of
the building. The restoration of the interior would include the replacement of wall finishes where
damaged, painting of the walls, new molding, and a new finish on the floor. Replacement of
interior elements should be undertaken as needed, with a priority given to retaining as much
original fabric as possible. The north corner of the addition should be rebuilt and bathrooms added,
depending on code requirements for intended use.
Minor
Once all maintenance deemed critical or serious is completed, specific actions would be undertakento make the Chapel compatible with the chosen use.
8/22/2019 Chapel 2 HSR
43/47
43
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Mothballing ChecklistMothballing is the temporary closure of a building to protect it from the weather and secure it from
vandalism. This process can be a necessary and effective means of protecting the building while
planning the property's future, or raising money for a preservation, rehabilitation or restoration
project. If basic stabilization is needed before implementing any restoration work, the following
checklist may help to ensure that work items are not inadvertently omitted. 22
MOISTURE
Is the roof watertight? Do the gutters retain their proper pitch and are they clean? Are downspout joints intact? Are drains unobstructed? Are windows and doors and their frames in good condition?
Are masonry walls in good condition to seal out moisture? Is wood siding in good condition? Is site properly graded for water run-off? Is vegetation cleared from around the building foundation to avoid trapping moisture?PESTS
Have nests/pests been removed from the building's interior and eaves? Are adequate screens in place to guard against pests? Has the building been inspected and treated for termites, carpenter ants, rodents, etc.? If toxic droppings from bats and pigeons are present, has a special company been brought in for its
disposal?
HOUSEKEEPING
Have the following been removed from the interior: trash, hazardous materials such as flammableliquids, poisons, and paints and canned goods that could freeze and burst?
Is the interior broom-clean? Have furnishings been removed to a safe location? If furnishings are remaining in the building, are they properly protected from dust, pests, ultraviolet
light, and other potentially harmful problems?
Have significant architectural elements that have become detached from the building been labeled andstored in a safe place?
Is there a building file?SECURITY
Have fire and police departments been notified that the building will be mothballed?22 National Park Service, Preservation Brief 31: Mothballing Historic Buildings, National Park Service, Washington DC, 1993,http://www.nps.gov/history/hps/tps/briefs/brief31.htm.
8/22/2019 Chapel 2 HSR
44/47
44
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Are smoke and fire detectors in working order? Are the exterior doors and windows securely fastened? Are plans in place to monitor the building on a regular basis? Are the keys to the building in a secure but accessible location? Are the grounds being kept from becoming overgrown?UTILITIES
Have utility companies disconnected/shut off or fully inspected water, gas, and electric lines? If the building will not remain heated, have water pipes been drained and glycol added? If the electricity is to be left on, is the wiring in safe condition?VENTILATION
Have steps been taken to ensure proper ventilation of the building? Have interior doors been left open for ventilation purposes?
Has the secured building been checked within the last 3 months for interior dampness or excessivehumidity?
Maintenance Schedule1-3 MONTHS; PERIODIC
regular drive by surveillance check attic during storms if possible monthly walk-around check entrances check window panes for breakage mowing as required check for graffiti or vandalism enter every 3 months to air out check for musty air check for moisture damage check battery packs and monitoring equipment check light bulbs check for evidence of pest intrusionEVERY 6 MONTHS; SPRING AND FALL
site clean-up; pruning and trimming gutter and downspout check check crawlspace for pests clean out storm drains
8/22/2019 Chapel 2 HSR
45/47
45
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
EVERY 12 MONTHS
maintenance contract inspections for equipment/utilities check roof for loose or missing shingles termite and pest inspection/treatment exterior materials spot repair and touch up painting remove bird droppings or other stains from exterior check and update building file
Recordation of MaintenanceFiles should be kept detailing the work that was undertaken on Chapel. A standardized format that
describes the date of the intervention, contractor or other entity that conducted the intervention,
and reason for the intervention should be included. These files should be updated any time an
intervention is undertaken.
8/22/2019 Chapel 2 HSR
46/47
46
HistoricStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Appendix: Works CitedAllen, Jane E. Frigate Program Coming Here. The Post and Courier. October 4, 1982. From the Naval
Base: 1980-1989 vertical file accessed at the South Carolina Room, Charleston County Library,Charleston, SC.
Augustin, Jim. Director of Community Revitalization, Sustainability, Noisette Company. Interview.January 27, 2009.
Carolina Arts. The 2005 North Charleston Arts FestivalTakes Place in North Charleston, SC, from Apr. 29 -May 7, 2005. April 2005 Issue. http://www.carolinaarts.com/405nchas.html.
Cassavetes, Nick. Director ofThe Notebook (motion picture) New Line Cinemas, June 2004. EmailInterview. January 28 & 31, 2009.
Charleston Naval Shipyard Best in the Nation. Charleston Evening Post. January 1, 1984. From the Naval
Base: 1980-1989 vertical file accessed at the South Carolina Room, Charleston County Library,Charleston, SC.
Cupp, Ruth. Corner Stone Opened at Chapels Last Service. News and Courier. September 6, 1995.
Cupp, Ruth. Final Farewell. Post and Courier. October 9, 1995.
HABS/HAER inventory.
Harky Jr., W. Hugh. Greetings from Charleston: A Pictorial Postcard History of Charleston, South Carolina .Asheboro, NC: Down Home Press, 1994.
Hill, Ian and Power, Tracy. Preservation and the Charleston Naval Base, Preservation News & Notes 5, no. 3(Autumn 1994). From the Naval Base: 1990-1999 vertical file accessed at the South CarolinaRoom, Charleston County Library, Charleston, SC.
Johnson, Clyde. Yard Site bought in 1901. The News and Courier/Charleston Evening Post, May 15-19,1972. From the Naval Base: 1970-1972 vertical file accessed at the South Carolina Room,Charleston County Library, Charleston, SC.
McIntyre, Joe. Member of St. Johns Catholic Church who helped move the piece of art to the EternalFather of the Sea. Interview. March 2009.
McNeil, Jim. Charlestons Navy Yard: A Picture History. CokerCraft Press: Charleston, S.C., 1985.
Morgan, Kenneth. "The Organization of the Colonial American Rice Trade." The William and MaryQuarterly. Third Series. Vol. 52. No. 3 (July 1995).
8/22/2019 Chapel 2 HSR
47/47
cStructuresRepo
rt:EternalFatheroftheSea
Chapel|5/1/2009
Piedmont, Gail A. and James R. A Small Church Called Saint John Catholic Church located in NorthCharleston, S.C. http://www.saintjohncatholicsc.org/parish/history.htm (accessed March 13,2009).
R. Christopher Goodwin and Associates, Inc. Inventory, Evaluation, and Nomination of Military
Installations: Naval Base Charleston, Final Report. U.S. Army Corps of Engineers BaltimoreDistrict. April 19, 1995.
Seabrook, Charles T. Congress Authorized Navy Yard in 1900. News & Courier/Charleston Evening Post,March 31, 1970. From the Naval Base: 1970s vertical file accessed at the South Carolina Room,Charleston County Library, Charleston SC.
Top Related