THE CHANG SCHOOLRYERSON UNIVERSITY
Heaslip House O’KEEFE BREWING 297 VICTORIA ALFRED.H 1939COMPANY STREET
BUILDING CLIENT LOCATION ARCHITECT YEAR
CHANG SCHOOL
SITE VIEW
This art deco building style designed for chapman forO’KEEFE brewing company. The O’KEEFE BREWERY hadthe important 3-acre site just east of Yonge from late1800s. 297 Victoria street company become headofficeIn 1996 Ryerson purchased the property on both sidesof Victoria street and became Ryerson’s own radiostation. The building redeveloped retaining the originalfaçade.Part of city fabric Of Ryerson complex. In 2006 building won an award from Ontario Association of Architecture for design.
EXISTING BUILDING ORIGINAL BUILDING
• CLASSIFICATION• OCCUPANCYGENERAL BUILDING
COMPLIANCES
• PROVISIONS FOR FIREFIGHTINGFIRE SAFETY
• UNPROTECTED OPENINGSPATIAL SEPARATION
• MEANS OF EGRESS• TRAVEL DISTANCESAFETY WITHIN FLOORS
CO
DE
AND
REG
ULA
TIO
N
GENERAL DESCRIPTION
Area :573 Sq mBuilding Height: 7 StoreysHeight :25.8 MMajor Occupancy : Offices
Building SprinkleredNon Combustible ConstructionNon Combustible and Combustible Cladding
CLASSIFICATIONS
CO
DE
AND
REG
ULA
TIO
N
FIRE SAFETY
CO
DE
AND
REG
ULA
TIO
N
Floors Occupancy Classification Sprinklered N C / C Supporting elements FRR
Floor AssemblyFRR
Basement D 3.2.2.49 yes NC 2 hrs 2 hrs
Floors 1-6 D 3.2.2.49 yes NC 2 hrs 2 hrs
7th Floor A2 3.2.2.23 Yes NC 2 hrs 2 hrs
Roof - 3.2.2.17(a) - - - 0 hrs
Fire safety
The building is of non-combustible construction and is fully sprinklered. All floor assemblies are fire separation and has fire resistance rating of 2H. (Complies with: 3.2.2.49(b)) Roof need not be fire rated as the building is sprinklered in compliance with 3.2.2.17(a), but it is a fire separation.
CO
DE
AND
REG
ULA
TIO
N INTERCONNECTED FLOORS
Interconnected space which has been created between first and second floor. As the whole building is sprinkleredand has a Group D occupancy it is in compliance with 3.2.8.2(6) (b). An exit lobby is provided in area that contains 2-storey interconnected floor space. A 2-storey high space is in the third floor is separated from the fourth floor with a FRR rating 2 hrs.
Floor Occupancy Area Area per person
Occupant Load
Basement D 101 9.3 10F3 160 46 3
First Entrance lobby 265 8
Second D 448 9.3 48Third D 515 9.3 55
Fourth D 448 9.3 48Fifth D 448 9.3 48Sixth D 448 9.3 48
Seventh A2 150 0.95 157425
Occupant load is calculated based on 3.1.17.1 (1) and table 3.1.17.1
OCCUPANT LOAD
CODE AND REGULATIONSPATIAL SEPARATION
DISTANCE AREA UPO CONSTRUCTION CLADDING FRR CODESOUTH 0.0 - 0% NC NC 1 HR 3.2.3.5NORTH 44 645 100% NC C/ NC 0 T. 3.2.3.1.D
EAST Elevation
(First Floor) 8 98.50 100% NC C/NC 0 T. 3.2.3.1.D
East Elevation
East Elevation (2 -
7)
17 805.8 100% NC C/NC 0 T. 3.2.3.1.D
WEST 18 120.00 100% NC C/NC 0 T. 3.2.3.1.D
SAFETY WITHIN FLOOR AREAS
CODE AND REGULATION
LOCATION OF EXITS & DISTANCE BETWEEN EXITS
MEANS OF EGRESS:All above grade floors are served by two exit stairs at the end of the building. So it is in compliance with 3.3.1.5.
It is in compliance with 3.4.2.3(1). The distance between the two exits should be one-half the maximum diagonal dimension of the floor area and not less than 9 m.
Location of exit is in compliance with 3.4.2.5.(1)(c) .
CODE AND REGULATION
TRAVEL DISTANCE
Travel Distance to an Egress doorway is less than 45 meters and is in compliance with code 3.4.2.5(c).The floor area is more in than the area given in the table 3.3.1.5.B , So it has two doorways.
In compliance with 3.4.5.1(1), exit signs are provided with every exit door.In compliance with 3.4.5.2(1) exit signs within exist stairs indicates the continuity of exit facility to the street level exit.
EXIT SIGNS
As per 3.2.9.1 (b), a standpipe system is installed in each floor of the building.
STANDPIPE SYSTEM
EXITS
CODE AND REGULATION
Width and heights of exitsThe minimum width of the stairs is in compliance with 3.4.3.2.(7)(c) and is 1100 mm.
Fire separation of exitsFire separation of exits are in compliance with 3.4.4.1(1). The exits in Chang School building is in compliance with 3.4.4.4(1) and (2) . Exits within scissors stairs are separated from each other by a smoke-tight fire separation having a fire resistance rating not less than 2h.
Fire resistance rating of exit separation Egress stairs has 2H fire rating and doors of egress stairs has 1.5 fire rating. And are in compliance with 3.4.4.1(1)
CO
DE
AND
REG
ULA
TIO
N
Summary: Building codes are enforced to ensure that the structure created are safe for occupants. Thisbuilding is in compliance with all applicable codes. Required number of firefighting access routes areprovided and accessible. Egress and Exits are adequate and operational
BARRIER FREE ACCESS
According to 3.8.2.1(3) a barrier free path need not extend to basement and Roof spaces. Based on 3.3.1.7 every floor area above or below the first-storey that has Barrier Free Path shall be served by an elevator is in compliance as all the floors are served by two elevators. There is one Barrier Free Water Closet for Male and female, each is in compliance with Table 3.8.2.3.B
BUILDING ENVELOPE
WALL SYSTEM FLOOR SYSTEM ROOF SYSTEM
STRUCTURAL SYSYTEM • FOUNDATION• FRAMING SYSTEM
MAT
ER
IAL
AND
MET
HO
DS
MAT
ER
IAL
AND
MET
HO
DS
BUILDING ENVELOPE
The Chang building is an interesting mix of both historical restoration and contemporary construction. This seven storey building designed by Rounthwaite Dick & Hadley Architects associated with Lett Architects in 2005 measures 42,000 sq. ft in area. The four distinct materials used on the facade are
• limestone • copper sheets • glass • aluminum
Where black aluminum spine wall separates the copper and glass elements of the building.
MA TERIAL AND METHODS
WALL SYSTEM
Stick system
Unitized system
COPPER CLADDING
ALUMINUM PANEL
Exterior wall and Fenestrations
The curtain wall system used here are both Stick system and Unitized system. In stick system the curtain wall frames and glass are installed and connected together piece by piece. Where as in the Unitized, the wall is composed of large units that are assembled and glazed in the factory and erected on site.Aluminum panels used has a very high Thermal Conductivity. Thermal performance of opaque areas of the curtain wall is a function of insulation and air vapor barrier. Water penetration resistance is a function of glazing frame construction apart from being giving a glazing appearance.Copper cladding another important material used for this building apart from aluminum and glass. This material is strong, light weight, malleable, highly corrosive resistant. Apart from being durable and long lasting it is completely recyclable without losing its physical attributes.
MA TERIAL AND METHODS
COPPER CLADDING AND GLAZINGDETAIL
WALL AND FLOOR SECTIONDETAIL
MA TERIAL AND METHODS
FLOOR SYSTEM INTERIOR WALL
General interior wall system used is concrete blocks and gypsum board. The flooring in all floors are carpeted except in ground floor where tiles and in the basement vinyl is used. In work zone areas, the box effect is avoided by drop ceilings, where mechanical services, which are hidden by the ceiling, are painted black.
MAT
ER
IAL
AND
MET
HO
DS
TOP SOIL
FILTER FABRIC
19mm CLEAR CRUSHED STONE
POURED IN PLACE CONCRETE SEAT WALL AND FOOTING
FIBROUS EXPANSION JOINTPRECAST CONCRETE PAVING ON CONCRETE BASE
CLEAR CRUSHED STONE
UNDISTURBED SUB GRADE
100mm DIA PERFORATEDPVCSUBDRAIN WRAPPED IN FILTER SOCK
NEW UNDERPINNING
15 400 *600 DOWELS FASTEN TO CONCRETE
REMOVED EX STRUCTURE IN ORDER TO BUILT NEW ONE
MATT FOOTING
BASEMENT FLOOR
DRY PACK FOE WATER PROOFING
EXISTING FOOTING
MAT
ER
IAL
AND
MET
HO
DS
FOUNDATION DETAIL
ISOLATED FOOTING DETAIL
The foundation wall system of the below grade building enclosure is designed and constructed to support both vertical and lateral loadings.
The first line of control is the upper screen at the exterior surface. Here the upper screen consists pavers and concrete or asphalt surface that shed the majority of surface moisture.
MAT
ER
IAL
AND
MET
HO
DS
Framing system in a building comprises of columns, beams and shear walls that support the structure.This building is with a frame assembly of steel beams and steel columns. Where steel beams are designed to act compositely with the concrete on the steel deck floor.The shear wall, reinforced concrete framed structure encases the shafts of elevator and stairwell providing the required stability.
STRUCTURAL SYSYTEM
BU
ILD
ING
INFO
RM
ATIO
N
MO
DEL
ING
(R
EVIT
)Building Information
Modeling
COLLABORATION
PROJECT PROCESS
• WORK SHARING• WORK SETS• VIEW TEMPLATES• PHASING
Uses and Benefits of BIM
BU
ILD
ING
INFO
RM
ATIO
N
MO
DEL
ING
(R
EVIT
)PEOPLE
HARDWARESOFTWARE
Bim Tools
Uses of Bim
“It is the process of designing a building collaboratively using one coherent system of computer models rather than as separate sets of drawings”
BUILDING INFORMATION MODELING (REVIT)
COLLABORATION
WORKSHARING
“to work on a project in a workshared environment”
is a method of collaboration that allows multiple team members to work on the same project model simultaneously.
WORK SETSIt is the collection of elements in a workshared environment.
Worksets Eugene Azadeh Yassir Shantha Poulia
Building Envelope
Structures
Site Components
Interiors
Furnitures & Fixtures
Presentations
FILTERING with WorksetsUsing filters in graphic overrides will give you more controls.
BUILDING INFORMATION MODELING (REVIT)
In this report we explored on how View Templates can really aid our productivity rate when using Revit. There is a huge variety of parameters that control the look and “style” of the views that we created within Revit.
View Templates Phasing
Within Revit, Phases are distinct, separate time periods (or “milestones”) within the life of the project. They can represent either the time periods themselves or the status of the project at specified points in time.
Project Process
Interior Wall and Ceiling
Furniture & Fixtures
Building Envelope
Site Components
Structural Components
BUILDING INFORMATION MODELING (REVIT)
BUILDING INFORMATION MODELING (REVIT)
BUILDING INFORMATION MODELING (REVIT)
Top Related