Quick-ResponseManufacturing Systems
Quick-responsemanufacturing
system
Quick-responsemanufacturing
systemComputer Integrated
Manufacturing System (CIM)
Physicalmanufacturing
system
Physicalmanufacturing
system
Manufacturingresource planning
(MRP II)
Manufacturingresource planning
(MRP II)
CADDCADD CAMCAM MRPMRP
DistributeddatabasesDistributeddatabases
DistributeddatabasesDistributeddatabases
Advanced Integration Technologies
Computer-basedinformation
system
Computer-basedinformation
system
EDIEDIAutomatic
identificationAutomatic
identification
The Physical Manufacturing System
Two subsystems directly support thephysical manufacturing system.
CADD (computer-aided design and drafting)
CAM (computer-aided manufacturing)
Computer-Aided Designand Drafting (CADD)
Solids modeling
Finite element analysis
Automated drafting
Computer-AidedManufacturing (CAM)
Industrial robot
Statistical process control
Flexible manufacturing systems
The Manufacturing Resource Planning (MRP II) System
The MRP II system comprises thematerials requirements planning
(MRP) system and the related systemsfor sales, billing, and purchasing.
Materials RequirementsPlanning (MRP)
MRPMRP
Costaccounting
Costaccounting
Productionplanning
Productionplanning
ProductionschedulingProductionscheduling
ReportingReporting
Advanced Integration Technologies
Production Planning
Production planning involves thedetermination of which products
to produce and the schedulingof production to make optimaluse of production resources.
Production Planning
Demand for a product
Production requirements
Production resources available
Production Planning
Productionplanning
Productionplanning
Bill ofmaterials
Masteroperations list
MarketingMarketing 1
Inventorycontrol
Inventorycontrol
2
3 Productiondepartments
Productiondepartments
4
5
1 Sales forecast2 Finished goods status3 Raw materials status4 Factor availability report5 Production schedule
Production Planning
Productionplanning
program(s)
Masteroperations
file
Productionstatus
file
Bill-of-materials
file
Masterproduction
plan
Production Planning
Updatedproduction
statusfile
Productionorders
Materialrequisitions Routings
Production Scheduling
Productionstatusupdate
Productionstatus
file
Routingfile
Summaryreport
Updatedproduction
statusfile
Productionloading
file
Production Scheduling
Productionschedulingprogram
Summaryreport
Productionschedules
Productionloading
file
Production-Loading File
This is the major input to theproduction-scheduling application.
Cost Accounting
Cost accounting program(s)
Productionstatus file
Productiondata file
• Material requisition data• RTG data
Summaryreport
Updatedproductionstatus file
Completedproductionorder file
Resourceusage
file
Reporting
InventoryupdateInventory
file
Completedproductionorder file
Inventory Processing
Updatedinventory
file
Finished goodsstock status
report
Completedproductioncost report
Summaryreport
Reporting
Resourceusage
file
Reportgenerator
Resourceusage
reports
Resource Usage Reporting
Activity-Based Costing
Traditional cost accounting techniquesmay be inadequate in a computer
integrated manufacturing environment.
Because CIM reduces directlabor and increases overhead.
Variable costs decreaseand fixed costs increase.
Activity-Based Costing
Activity-based costing (ABC) calculatesseveral overhead rates, one for
each manufacturing activity.
Activity-Based Costing
What are some examples of activities?
Machine centers Material handling
Inspection stations
A single department may containseveral different activities.
Manual assembly
Major Processing Modules in MRP II
MRP IIMRP II
Bill-of-materialsmodule
Bill-of-materialsmodule
Routings filemodule
Routings filemodule
Inventory controlmodule
Inventory controlmodule
Productionactivity control
module
Productionactivity control
module
Master productionscheduling
module
Master productionscheduling
module
Production ordermodule
Production ordermodule
Implementing JIT in aMRP II/CIM Environment
Less emphasis might be placedon a complete MRP II system.