Download - CENTRO CONTROLLO

Transcript
Page 1: CENTRO CONTROLLO

ROAD CONTROL CENTERValencia

PROYECTOS IV - Taller HProf. Josè Manuel Barrera Puigdollers - Ana Maria Lozano

ETSAV 07 | 08

Page 2: CENTRO CONTROLLO

* GENERAL FRAMEWORK

CV 31

PATERNA

VALENCIA

PATERNA

VALENCIA

alfafar

mislata

burjassot

godella

alboraya

m

The project objective is to recover a residual space, consisting in two empty areas resulting from the road infrastructural system.The considered area consists in two spaces included between the urban border of Paterna and the CV31, and bounded to the south by the railway elevated passage.By the realization of a building for the road network control, the intention is to activate the two separated areas and transform them from empty space to a space of relation and a link between two urban parts.The functional program of the control center is then supported by a wider scale program, that coulf connent the two city parts, building a new urban front and becoming a place of relation with the existing infrastructure.A new cycle and pedestrian way overpasses the road and reconnects the urban areas, organizing a new accesibility to the sport facilities, the bikeway and the existing metro stops.A path that gradually regains the encountered marginal spaces and organizes them into a sequence of new public spaces, from the simple shaded restplace to the new public park with the square, cafè and auditorium.

ROAD NETWORK CONTROL CENTERValencia

01 \ architecture

road

railway

water

road bridge

pedestrian bridge

Page 3: CENTRO CONTROLLO

* ACCESSIBILITY

suburban pedestrian connection

urban border

city / infrastructureN / E N / O

highway

urban

metro

section O / E

Page 4: CENTRO CONTROLLO

N / E N / O

* STRATEGY AND PROJECT

CITY

PARK

CONTROL CENTER

SPORT

m

m

URBAN SYSTEM

ELEMENTS

city

building

tunnel

metro

bridge

citizens

personal

park

+

+

+

+

+

+

=

masterplan

Page 5: CENTRO CONTROLLO

garage / workrooms

offices

common spaces

1

3

2

4

5

6

7

8

* CONTROL CENTER

section A

section B

section C

section D

pedestrian bridge vehicular accesspedestrian way / center entrance

B

A

C

1. patio2. dormitory3. gym4. garage5. lockers6. workrooms7. stores8. plants

Page 6: CENTRO CONTROLLO

1. plants2. offices3. director4. control room5. meeting room6. dining room7. kitchen8. cafeteria9. living

1

2

3

4

5

6

7

8

9

9

offices terrace southeast view night view

front O

D

living

patio

dormitory / gym

garage

workrooms

vehicular area

outdoor spaces

offices

common spaces

public route

Page 7: CENTRO CONTROLLO

B

tablones de madera de pino 200/30 mm mortero por formacion de pendientemembrana impermeable bituminosa aislamiento termico en poliestireno 80 mmbarrera de vaporhormigon 80 mm sobre chapa grecadaperfil de acero IPE 400paneles de carton-yeso blanco 20 mm

1

paneles de carton-yeso blanco 100 mmbarrera de vaporaislante termico en poliestireno 80 mm paneles hormigon prefabricado 150 mm

hormigon 100 mm superficie acabado con pavimento de arena de quarzolamina aislanteplatea de cimentacion en hormigon armado 400 mmestrato aislante en bentonite 50 mmestrato de hormigon 100 mm

2

2

3

1

3

4

capa de grava blanca 50 mmmembrana impermeable bituminosa

aislamiento termico en poliestireno 80 mmbarrera de vapor

hormigon 80 mm sobre chapa grecadaperfil de acero IPE 400

paneles carton-yeso blanco 20 mm

4

5

paneles hormigon prefabricado 150 mmaislamiento termico en poliestireno 80 mmbarrera de vaporperfil de acero HEB 300 paneles carton-yeso 100 mmrecubrimiento en paneles madera 20mm

5

capa vegetal

capa drenaje

fieltro geotextil antiraiz

lamina impermeabilizante

aislante termico

mortero

chapa grecada

perfil acero

panel hormigon

AC

detail TERRACEdetail SKYLIGHTdetail INTERIORS

ABC

* DETAILS