Project Name
Project LocationAtlanta, Georgia
Project Team
RetailMarkets
Owner: Oliver McMillanGeneral Contractor: Balfour Beatty ConstructionArchitects: Smallwood, Reynolds, Stewart, Stewart and Associates Inc. / Gensler / Papageorge Haymes Partners
Buckhead Atlanta CentralDistrict Water Plant
Engineer: Jordan & Skala EngineersContractor: McKenney’s, Inc.
Specializations
Pipe Shop PrefabSheet Metal Shop Prefab
Building Information Modeling
Mixed-use & MultifamilyCentral Plants
McKenney’s helped revive a multi-stage project—including a central district water plant—for the Buckhead Atlanta luxury destination.
The ChallengeAmong the many complexities involved with the project, the central water plant, ductwork and plumbing needed to serve three parcels spanning one-and-a-half blocks on a busy urban street, each with a different completion schedule. This was to be accomplished using equipment that had been stored for over three years.
The SolutionTo keep everything on track, McKenney’s enlisted Building Information Modeling technology for virtual construction, coordination and clash detection between the trades. The team then installed the water plant along with prefabricated plumbing and underground piping at various stages of the project to supply the infrastructure for the entire development. McKenney’s tested and evaluated the dormantequipment—and made updates and repairs—to return them to like-new performance.
The content of this document is not intended as an endorsement.
The ResultsDespite the change in owner and designs, staggered completion schedules and the multiple city blocks scope, the project isprogressing as scheduled, on budget and is operating per design expectations.
1056 Moreland Industrial BoulevardAtlanta, Georgia 30316P: 404-622-5000
3601 Performance RoadCharlotte, North Carolina 28214P: 704-357-1200
Atlanta Office:
Charlotte Office:
www.mckenneys.com
Top Related