Download - CEDAR FALLS CSD HANSEN ELEMENTARY WATER MAIN …...ex elec ex fiber ex cable geothermal well supply w property line ex cw ex cw exa 6" cw 6" cw 6" cw 6" cw m002 3 m002 2 property line

Transcript
  • T

    E

    D

    S

    S

    D

    T

    FOOTBALL FIELD

    SOCCER FIELD(S)/PARK

    RESIDENTIAL PROPERTY

    RESIDENTIAL PROPERTY

    RESIDENTIAL PROPERTY

    RESIDENTIAL PROPERTY

    4TH STREET 4TH STREET

    RESIDENTIAL PROPERTY RESIDENTIAL PROPERTY

    BERM

    BERM

    REMOVE CURB STOP

    ON ABANDONED MAIN

    PROPERTY LINE

    PROPERTY LINE

    EX CHAIN LINK FENCE

    EX CHAIN LINK FENCE

    EX ELEC

    EX FIBER

    EX CABLE

    EX ELEC

    EX FIBER

    EX CABLE

    GEOTHERMAL

    WELL SUPPLY

    W

    PROPERTY LINE

    EX C

    W

    EX CW

    EXA 6" CW

    6" CW

    6" CW

    6" CW

    M002

    3

    M002

    2

    PROPERTY LINE

    2

    EX CURB STOP

    3

    3

    4

    4

    6" CW

    EX 6" CW

    EX 6" CW

    6

    7

    RESIDENTIAL PROPERTY

    BERM

    PROPERTY LINE

    EX G

    EXA C

    WCW

    4TH STREET

    RESIDENTIAL PROPERTY

    PARK

    1

    3

    6" CW BY CEDAR

    FALLS UTILITIES

    NEW CITY WATER MAIN

    INSTALLED BY CITY DURING

    THE TIMEFRAME OF THIS

    PROJECT.

    CURB STOP BY CEDAR

    FALLS UTILITIES

    SIDE WALK

    6" CW

    6

    BY M.C.

    EX G

    EXA 6" CW

    EX ELECTRICITY

    EX FIBER OPTIC

    EX CABLE

    EX CABLE

    RESIDENTIAL PROPERTY

    EX CHAIN LINK FENCE

    PROPERTY LINE

    EX G

    EXA C

    W

    EX E

    LEC

    EX F

    IBER

    EX C

    ABLE

    EX CONCRETE

    EX CURB STOP

    CURB STOP ON 2" CW.

    CAP PIPE FOR FUTURE

    USE

    5

    6" CW2" CW

    REMOVE CURB STOP ON

    PIPE TO BE ABANDONED

    CURB STOP ON 6" CW

    REMOVE AND REPLACE

    FIRE HYDRANT

    EX 6" CW

    67

    EX CONCRETE

    GENERAL NOTES:

    A.

    B.

    C.

    D.

    E.

    F.

    G.

    UTILITIES SHOWN ARE INDICATED SCHEMATICALLY. CONTRACTORS

    SHALL VERIFY ALL DEPTHS AND ALL LOCATIONS/ DIMENSIONS PRIOR TO

    EXCAVATING. ALL UTILITIES MAY NOT BE SHOWN.

    ALL UNDERGROUND UTILITIES, PIPING, ETC. SHALL BE

    SURVEYED/LOCATED EXACTLY BEFORE DIGGING.

    ANY BACKFILL SHALL BE TAMPED AND COMPACTED TO PREVENT FUTURE

    SETTLING. ALL EXCESS DIRT SHALL BE CLEARED FROM THE AREA AND

    DISPOSED OF.

    MECHANICAL CONTRACTORS SHALL REPAIR ALL DISTURBED SURFACES

    SUCH AS SIDEWALKS, DRIVEWAYS, STREETS, GRASS, AND CONCRETE.

    REPLACED SURFACES SHALL MATCH EXISTING.

    INVERT ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR TO

    CALCULATE REQUIRED INVERTS.

    CONTRACTOR IS RESPONSIBLE FOR DOING ALL WORK PER LOCAL

    RESPECTIVE UTILITY REQUIREMENTS.

    VERIFY EXACT LOCATIONS OF UTILITY CONNECTIONS, PRIOR TO START

    OF WORK.

    REFERENCED NOTES:

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    (NOT ALL NOTES MAY BE APPLICABLE TO THIS SHEET)

    COORDINATE TIMEFRAME OF NEW CONNECTION TO NEW CITY MAIN

    WITHIN STREET WITH THE CITY. 4TH STREET WILL BE

    RECONSTRUCTED AND A NEW CITY WATER MAIN WILL BE INSTALLED

    IN THE STREET AS SHOWN BY THE CITY DURING THE TIMEFRAME OF

    THIS PROJECT.

    REMOVE CURB STOP ON EXISTING WATER MAIN TO BE ABANDONED.

    PIPING BELOW BERM SHALL BE HORIZONTALALLY BORED. BERM MUST

    BE REPLACED OR REPAIRED TO EXISTING SIZE AND SHAPE UPON

    COMPLETION OF WORK. PIPE MUST MAINTAIN A MINIMUM OF 60" OF

    COVER ON ALL SIDES. RESEED GRASS AS REQUIRED.

    PIPE UNDER PLAYGROUND CONCRETE SHALL BE HORIZONTALLY BORED.

    REPLACE EXISTING FIRE HYDRANT WITH NEW HYDRANT. SEE DETAILS

    FOR CONNECTION REQUIREMENTS.

    PERFORM FINAL GRADING AND SEEDING AROUND ALL DISRUPTED

    AREAS. FINAL GRADING SHALL MATCH EXISTING LAY OF THE LAND AND

    BERM LOCATED ALONG SIDE OF CITY PARK MUST BE REPLACED AS

    REQUIRED TO MATCH EXISTING.

    REPLACE ALL DISRUPTED CONCRETE ALONG SIDE OF WATER MAIN

    REPLACEMENT IN THIS AREA. MATCH EXISTING FILL DEPTH, REBAR,

    AND CONCRETE THICKNESS.

    NOTE:

    UTILITIES SHOWN ARE INDICATED SCHEMATICALLY.

    CONTRACTORS SHALL VERIFY ALL DEPTHS AND ALL

    LOCATIONS/DIMENSIONS PRIOR TO EXCAVATING. ALL

    UTILITIES MAY NOT BE SHOWN.

    O

    F

    ER

    OT

    N

    P

    A

    TC

    TOR

    C N SR

    U

    OI

    N

    YR

    IIL M N

    DATE:

    SHEET NAME:

    SHEET:

    DA

    TE

    VE

    RS

    ION

    BID

    SE

    T

    SITE PLAN

    M002

    CE

    DA

    R F

    ALLS

    CS

    D H

    AN

    SE

    N E

    LE

    ME

    NT

    AR

    Y

    WA

    TE

    R M

    AIN

    IM

    PR

    OV

    EM

    EN

    TS

    616 H

    OLM

    ES

    DR

    , C

    ED

    AR

    FA

    LLS

    , IA

    50613

    02/1

    3/2

    018

    17-055 CEDAR FALLS CSD HANSEN ELEMENTARY WATER MAIN IMPROVEMENTS

    N

    1" = 50'-0"1

    SITE PLAN

    N

    1" = 20'-0"2

    SITE PLAN - 4TH STREET CONNECTION

    N

    1" = 20'-0"3

    SITE PLAN - ORIGINAL SERVICE

    CONNECTION AND FIRE HYDRANT

    NOTE: REPLACEMENT OF WATER MAIN

    SHALL BE COMPLETED IN A TIMELY

    MANNER TO MINIMIZE DOWN TIME OF

    SCHOOL WATER SUPPLY. COORDINATE

    TIMEFRAME WITH THE CITY ON WHEN

    NEW CITY WATER MAIN ON 4TH

    STREET WILL BE COMPLETE AND LIVE.

    aoltmannHighlight

    aoltmannHighlight

    aoltmannHighlight

    aoltmannHighlight

    aoltmannText BoxCFCSD HANSEN ELEMENTARY SCHOOL

    aoltmannText Box4TH STREET

    aoltmannRectangle

    aoltmannBuilding Section - Up

    aoltmannLine

    aoltmannPolygon

    aoltmannFreeTextN

    aoltmannFreeTextN

    17-055 CF CSD Hansen Elementary Water Main Replacement MODUS Central (R17)_aoltmannM002 - SITE PLAN