1 Installed Generation Capacity of CSPGCL and Central sector shares as on 31.01.2020.
Ownership Thermal Hydel Solar Biomass/Others Total
State 3080.00 138.70 --- 6.00 3224.70
Central Allocation
(WR+ER+NR)1880.54 100.00 --- --- 1980.54
Total 4960.54 238.70 0.00 6.00 5205.24
STATION NAME UNIT NO. Unit CapacityInstalled
Capacity
Year of
Commissioning
THERMAL MW MW YEAR
5 120 27/04/1976
6 120 05/04/1981
1 210 21/06/1983
2 210 31/03/1984
3 210 26/03/1985
4 210 13/03/1986
KORBA WEST EXTN 5 500 500 05/09/2013
1 250 250 27/01/2008
2 250 250 30/11/2008
1 500 500 31/03/2016
2 500 500 31/07/2016
3080
STATION NAME UNIT NO. Unit CapacityInstalled
Capacity
Year of
Commissioning
HYDEL MW MW YEAR
1 40 21/03/1994
2 40 21/11/1994
3 40 11/01/1995
1 2.5 22/04/2004
2 2.5 29/06/2004
3 2.5 17/10/2004
4 2.5 05/11/2004
1 3.5 03/09/2006
2 3.5 03/09/2006
CSPGCL HYDEL 137 137
MINI/MICRO
1 0.85 12/01/2003
2 0.85 29/05/2007
TOTAL HYDEL
including Mini/Micro138.7
CO-GEN PLANT,
KAWARDHA1 6.00 6.00 04/09/2006
3224.70
DSPM.
ABVTPS
CSEB THERMAL.
INSTALLED CAPACITY : HYDEL : CSPGCL
BANGO 120
INSTALLED CAPACITY : THERMAL : CSPGCL
KORBA EAST
KORBA WEST
KORBA WEST
TOTAL CSPGCL THERMAL + HYDEL +
CO-GEN
240
420
420
GANGREL 10
SIKASAR 7
KORBA WEST 1.7
S.NO. POWER
STATIONUnit Capacity
Total Capacity
[MW]
Total Allocated
Share [MW]
1 KSTPS 3x200 + 3x500 2100 210.00
2 KSTPS-7 1X500 500 75.00
6x210 1260.00 0.00
2x500 1000 0.00
2X500 1000 105.00
2X500 1000 62.55
4 1X500 500 40.20
5 TAPP - 3 & 4 2x540 540 48.00
6 SIPAT-I 3x660 1980 313
7 SIPAT-II 2X500 1000 158.00
8 NSPCL 2x250 500 50.00
9 MSTPS-I 2x500 1000 62.55
10 MSTPS-II 2x500 1000 87.70
11 SSTPS 2x660 1320 158.89
12 GSTPP 1x800 800 77.83
13 LSTPP 1x800 800 400.00
11120 1848.72
1KhSTPP
840 31.82
840 31.82
1Kishanganga
HEP330 100.00
100.00
1 1848.72
2 31.82
3 100.00
1980.54
ER
NR
TOTAL
TOTAL
III. Share Of Chhattisgarh State From Central Sector Generating Stations In Northern Region In
Mw. (As On 31.01.2020)
TOTAL
IV. Total Share Of C.G. State
WR
I. Share Of Chhattisgarh State From Central Sector Generating Stations In Western
Region In Mw. (As On31.01.2020)
3VSTPS
TOTAL
II. Share Of Chhattisgarh State From Central Sector Generating Stations In Eastern Region In
Mw. (As On 31.01.2020)
2 CSPGCL generation (Ex-Bus) in Mus.
KTPS
HTPS
DSPMTPS
KWB Extn.
ABVTPS
Total Thermal
3 Water Level of Major Reservoirs for last day of the month in Mtrs.
Hasdeo Bango
Gangrel
Sikaser
Dec-19
Jan-20
Jan-19
Figure-3: Water level of reserviors of CSPGCL in Jan-2020
Figure-1: Thermal generation [Ex-Bus] of CSPGCL in Jan-2020
Figure-2: Hydel generation [Ex-Bus] of CSPGCL in Jan-2020
KTPS HTPS DSPMTPS KWB Extn. ABVTPS Total Thermal
Dec-19 113.78 395.55 310.53 306.29 444.97 1571.12
Jan-20 108.62 439.78 296.38 222.60 276.52 1343.90
Jan-19 91.60 423.32 185.91 312.50 254.51 1267.84
113.78
395.55
310.53306.29
444.97
1571.12
108.62
439.78
296.38222.60
276.52
1343.90
91.60
423.32
185.91312.50
254.51
1267.84
50.00
250.00
450.00
650.00
850.00
1050.00
1250.00
1450.00
1650.00
Mu
sThermal Generation in Jan 2020
.
Hasdeo Bango Gangrel Sikaser
Dec-19 357.49 347.69 406.26
Jan-20 357.49 347.49 405.74
Jan-19 353.75 345.6 404.01
357.49
347.69
406.26
357.49
347.49
405.74
353.75
345.6
404.01
310
330
350
370
390
410
MU
s
BANGO GANGREL SIKASER Total Hydel
Dec-19 3.85 0.00 0.00 3.85
Jan-20 15.041478 2.385014 0.34637 17.77
Jan-19 7.42 1.75 0.00 9.17
3.85
0.000.00
3.85
15.041478
2.3850140.34637
17.77
7.42
1.75
0.00
9.17
0.00
5.00
10.00
15.00
20.00
25.00
Mus
Hydel Generation in Jan-2020
4 Demand Pattern.
4.1 MonthMaximum
Demand Met
(MW)
Date Time Frequency
January-20 3860 30.01.2020 8:30 50.03
4.2 Month
Maximum Unrestricted Demand Met
(MW)
Date Time Frequency
January-20 3856 26.01.2020 2:15 49.99
4.3 MonthMinimum
Demand Met (MW)
Date Time Frequency
January-20 2194 02.01.2020 23:45 50.03
4.4 Availability during monthly peak demand met.
MW %
1586 41.1%
85 2.2%
91 2.4%
1671 43.3%
266 6.9%
160 4.1%
3860
Net Import(+) / Export (-)
OD(+) / UD(-)
Demand Met (MW)
Particulars
CSPGCL Thermal (Ex-bus)
CSPGCL Hydel
Injection (Solar,Biomass,unscheduled
power,open access,small hydro)
CS Share including BSP share in NSPCL
Figure-4: Load Curve on Peak Demand day.
3860 MW
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
MW
Time (hh:mm)
LOAD CURVE ON PEAK DEMAND DAY : 30.01.2020
Figure-5: Load Curve on Minimum Demand day.
2194 MW
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
MW
Time (hh:mm)
LOAD CURVE ON MINIMUM DEMAND DAY : 02.01.2020[ Reason for demand drop is widespread rainfall and bad weather. ]
Figure-6: Daily Maximum Demand Met in Dec-19, Jan-20 & Jan-19.
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
MW
Date
Daily Max Demand met in the month of Dec-19,Jan-20 & Jan-19. MAX 3860 MW on 30.01.2020 at 08:30 hrs.
JAN-
2020
DEC-
2019
JAN
2019
3858 on
17.01.2019
3860 on
30.01.2020
Figure-7: Daywise Maximum & Minimum Demand Met in Jan-20.
2000
2200
2400
2600
2800
3000
3200
3400
3600
3800
4000
4200
4400
4600
MW
Date
Daywise Min and Max Demand met in the month of Jan- 20 [ Difference : Max 1305 MW on 02.01.20 & Min 757 MW on 19.01.20
1305 MW
Figure-8: Daywise Maximum Restricted Vs Unrestricted Demand Met in Jan-20.
3300
3350
3400
3450
3500
3550
3600
3650
3700
3750
3800
3850
3900
MW
Date
Daywise Maximum Resrticted Vs Unrestricted Demand in the month of Jan-20
UNRESTRICTED DEMAND
RESTRICTEDDEMAND
Figure-9: Load Duration Curve for the month of April-19.
Figure-09: Load Duration Curve for the month of Jan-2020.
3860 MW
3260 MW
2194 MW
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
LOAD DURATION CURVE : JAN-2020
[ For 50% of time, Demand was 3065 MW ]
% OF TIME
DEM
AN
D(M
W)
[i] [ii] [iii]
Date <49.9
Hz 49.9 to
50.05 Hz>50.05
Hz
Frequency Variation
Index [FVI]
% of time Frequency
remained out of IEGC band.
No of hours during which frequency was out of range during
the day. {([i]/100)x24 Hrs}
Daily FDI=[ii]/
24
Max Min Average
% % % % Hours Hz Hz Hz
1-Jan-20 4.17 77.08 18.75 0.03 22.92 5.50 0.23 50.14 49.86 50.01
2-Jan-20 4.17 80.21 15.63 0.03 19.79 4.75 0.20 50.14 49.81 50.00
3-Jan-20 4.17 89.58 6.25 0.03 10.42 2.50 0.10 50.08 49.80 49.99
4-Jan-20 3.13 89.58 7.29 0.02 10.42 2.50 0.10 50.07 49.82 50.00
5-Jan-20 2.08 93.75 4.17 0.02 6.25 1.50 0.06 50.15 49.86 50.00
6-Jan-20 6.25 88.54 5.21 0.04 11.46 2.75 0.11 50.12 49.75 49.98
7-Jan-20 4.17 92.71 3.13 0.02 7.29 1.75 0.07 50.07 49.81 49.99
8-Jan-20 4.17 89.58 6.25 0.02 10.42 2.50 0.10 50.13 49.81 50.01
9-Jan-20 0.00 86.46 13.54 0.01 13.54 3.25 0.14 50.09 49.91 50.02
10-Jan-20 2.08 84.38 13.54 0.02 15.63 3.75 0.16 50.14 49.84 50.02
11-Jan-20 1.04 84.38 14.58 0.02 15.63 3.75 0.16 50.16 49.89 50.02
12-Jan-20 1.04 93.75 5.21 0.01 6.25 1.50 0.06 50.10 49.88 50.01
13-Jan-20 2.08 89.58 8.33 0.02 10.42 2.50 0.10 50.09 49.86 50.01
14-Jan-20 2.08 95.83 2.08 0.02 4.17 1.00 0.04 50.07 49.84 50.01
15-Jan-20 0.00 83.33 16.67 0.01 16.67 4.00 0.17 50.10 49.95 50.02
16-Jan-20 4.17 84.38 11.46 0.02 15.63 3.75 0.16 50.10 49.86 50.00
17-Jan-20 3.13 92.71 4.17 0.02 7.29 1.75 0.07 50.08 49.81 49.99
18-Jan-20 0.00 90.63 9.38 0.01 9.38 2.25 0.09 50.09 49.93 50.01
19-Jan-20 0.00 87.50 12.50 0.02 12.50 3.00 0.13 50.11 49.90 50.01
20-Jan-20 0.00 90.63 9.38 0.02 9.38 2.25 0.09 50.08 49.90 50.01
21-Jan-20 1.04 84.38 14.58 0.02 15.63 3.75 0.16 50.10 49.83 50.02
22-Jan-20 0.00 80.21 19.79 0.02 19.79 4.75 0.20 50.12 49.96 50.03
23-Jan-20 0.00 87.50 12.50 0.02 12.50 3.00 0.13 50.09 49.90 50.01
24-Jan-20 0.00 98.96 1.04 0.01 1.04 0.25 0.01 50.07 49.90 50.00
25-Jan-20 5.21 90.63 4.17 0.02 9.38 2.25 0.09 50.06 49.85 50.00
26-Jan-20 2.08 85.42 12.50 0.03 14.58 3.50 0.15 50.15 49.84 50.00
27-Jan-20 4.17 85.42 10.42 0.02 14.58 3.50 0.15 50.10 49.85 50.01
28-Jan-20 1.04 94.79 4.17 0.02 5.21 1.25 0.05 50.09 49.88 50.00
29-Jan-20 2.08 93.75 4.17 0.02 6.25 1.50 0.06 50.09 49.86 50.00
30-Jan-20 1.04 96.88 2.08 0.01 3.13 0.75 0.03 50.06 49.87 50.00
31-Jan-20 1.04 88.54 10.42 0.00 11.46 2.75 0.11 50.30 49.89 50.02
FREQUENCY (in % time) FREQUENCY (Hz)
5. Frequency Profile.
(As per block wise frequency recorded in SLDC Raipur)
FREQUENCY PROFILE FOR JAN-2020
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Figure-10: Frequency Profile for the month of Jan-2020.
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
55%
60%
65%
70%
75%
80%
85%
90%
95%
100%
January
1, 2020
January
2, 2020
January
3, 2020
January
4, 2020
January
5, 2020
January
6, 2020
January
7, 2020
January
8, 2020
January
9, 2020
January
10, 2020
January
11, 2020
January
12, 2020
January
13, 2020
January
14, 2020
January
15, 2020
January
16, 2020
January
17, 2020
January
18, 2020
January
19, 2020
January
20, 2020
January
21, 2020
January
22, 2020
January
23, 2020
January
24, 2020
January
25, 2020
January
26, 2020
January
27, 2020
January
28, 2020
January
29, 2020
January
30, 2020
January
31, 2020
<49.9 Hz 49.9 to 50.05 Hz >50.05 Hz
Figure-11: Frequency Duration Curve for the month of Jan-2020.
49.70
49.75
49.80
49.85
49.90
49.95
50.00
50.05
50.10
50.15
50.20
50.25
50.30
50.35
50.40
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
FREQUENCY DURATION CURVE : JAN-2020
% OF TIME
DEM
AN
D(M
W)
6. Voltage Profile.
6.1 Voltage Deviation Index [VDI] - 400 KV Substations for the month Jan-2020.
Maximum Minimum < 380 KV 380-420 KV > 420 KVNo. of hours
below IEGC < 380 KV [i]
No. of hours above IEGC > 420 KV [ii]
KV KV % % % Hours Hours Hours
1 Khedamara 423.02 409.82 0.00 87.57 12.43 0 92.50 92.50 0.12
2 Korba West 431.79 403.69 0.00 74.90 25.10 0 186.75 186.75 0.25
3 Marwa 434.48 423.37 0.00 0.00 100.00 0 744.00 744.00 1.00
4 Raita 430.24 416.7 0.00 11.19 88.81 0 660.75 660.75 0.89
5 Jagdalpur 433.41 412.43 2.15 21.47 76.38 16.00 568.25 584.25 0.79
6.2 Voltage Deviation Index [VDI] - 220 KV Substations for the month Jan-2020.
Maximum Minimum < 198 KV 198-245 KV > 245 KVNo. of hours
below IEGC < 198 KV [i]
No. of hours above IEGC > 245 KV [ii]
KV KV % % % Hours Hours Hours
1 Banari 241.07 231.46 0.00 100.00 0.00 0 0 0 0.000
2 Barsoor 241.23 226.22 0.00 100.00 0.00 0 0 0 0.000
3 Bhilai 237.17 227.61 0.00 100.00 0.00 0 0 0 0.000
4 Bhatapara 234.06 223.15 0.00 100.00 0.00 0 0 0 0.000
5 BEMETARA 236.32 223.35 0.00 100.00 0.00 0 0 0 0.000
6 Doma 238.21 228.51 0.00 100.00 0.00 0 0 0 0.000
7 DSPM 238.33 232.89 0.00 100.00 0.00 0 0 0 0.000
8 Gurur 236.14 223.34 0.00 100.00 0.00 0 0 0 0.000
9 Korba East 235.97 200.2 1.95 98.05 0.00 14.50 0 14.50 0.019
10 Korba West 239.78 233.86 0.00 100.00 0.00 0 0 0 0.000
11 MARWA 238.79 232.7 0.00 100.00 0.00 0 0 0 0.000
12 Mopka 243.28 233.31 0.00 100.00 0.00 0 0 0 0.000
13 Paraswani 235.86 221.92 0.00 100.00 0.00 0 0 0 0.000
14 RAIPUR 234.6 225.22 0.00 100.00 0.00 0 0 0 0.000
15 Raita 237.28 228.02 0.00 100.00 0.00 0 0 0 0.000
16 JAGDALPUR 241.91 209.98 1.58 98.42 0.00 11.75 0 11.75 0.016
NOTE :- 1 . (a)
(b)
2 .
3 .
Voltage of 400KV bus & 220KV bus at 400KV S/S JAGDALPUR was "0" on 30-01-2020 during shutdown period for LILO of 400KV RATIA - JAGDALPUR CKT at KURUD S/S. Hence voltage during the above period was below the IEGC range of <380 KV & < 198 KV respectively.
Constant voltage for span of certain period was observed on 220KV bus at 220KV S/S BANARI , 220KV S/S PARASWANI & 400KV S/S JAGDALPUR and 400 KV Bus at 400KV S/S JAGDALPUR i.e.data was out for this period.
Shutdown on 1P bus at 220KV KEB from 10:30 TO 21:02 hence voltage during the above peroid at 220KV bus was "0'. Hence voltage during the above period was below the IEGC range of <198 KV.
Total No. of hours out of IEGC range (HH:MM) [iii = I + ii]
VDI = [iii] / Total No. of hours in a
week.
Constant voltage of 227.77 on 220KV bus at 220KV S/S GURUR from 27-01-2020 time 1:30 to 31-01-2020 i.e.data was out for this period.
S.No.Sub station
name
Voltage (in Volts) Voltage (in % time) Voltage (in time)
Total No. of hours out of IEGC range (HH:MM) [iii = I + ii]
VDI = [iii] / Total No. of hours in a
month.
Sub station name
S.No.
Voltage (in Volts) Voltage (in % time) Voltage (in time)
400
JAGDALPUR
Figure-12: Voltage Profile of 400 KV Substations for the month of JAN-20.
Figure-13: Voltage Profile of 220 KV Substations for the month of JAN-20.
410
415
420
425
430
435
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Chart Title
Khedamara Marwa Raita Jagdalpur
Voltage Profile of 400 KV S/s : JAN-2020
DATE
VO
LTA
GE
(KV
)
190
200
210
220
230
240
250
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Chart Title
Doma DSPM Gurur Korba East
Voltage Profile of 220 KV S/s : JAN-2020
DATE
VO
LTA
GE
(KV
)
Figure-15: Voltage Profile of 220 KV Substations for the month of JAN-20.
190
200
210
220
230
240
250
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Chart Title
Korba West Mopka Parasawani Jagdalpur
Voltage Profile of 220 KV S/s : : JAN-2020
DATE
VO
LTA
GE
(KV
)
190
200
210
220
230
240
250
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Chart Title
Banari Barsoor Khedamara Bhatapara
Voltage Profile of 220 KV S/s : JAN-2020
DATE
VO
LTA
GE
(KV
)
Figure-16: Voltage Profile of 220 KV Substations for the month of JAN-20.
190
200
210
220
230
240
250
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Bemeatara Marwa Raita
Voltage Profile of 220 KV S/s : : JAN-2020
DATE
VO
LTA
GE
(KV
)
7. Addition of new grid elements during Jan-2020
DATE TIME [Hrs:Min] NAME OF SUB STATION NAME OF CHARGED EQUIPMENTS & LINES REMARKS
30-Jan-20 22:27 First time charged from Raita end.
30-Jan-20 22:30Synchronized from Kurud
[Dhamtari] end.
30-Jan-20 22:30 400 KV Main Bus-II First time charged.
30-Jan-20 23:02 400 KV Kurud [Dhamtari]-Jagdalpur Ckt along with 50 MVAR Reactor.
First time charged from Kurud [Dhamtari] end.
30-Jan-20 23:05 400 KV Kurud [Dhamtari]-Jagdalpur Ckt along with 80 MVAR Reactor [At Jagdalpur end].
Synchronized from Jagdalpur end.
31-Jan-20 14:30 400/220 KV, 315 MVA , ICT-IIFirst time charged from 400 KV
side.
31-Jan-20 16:02 400 KV Main Bus-I First time charged.
8. Units Decommissioned.
Capacity [MW] Withdrawn fromUnit
NIL
400 KV S/s Kurud [Dhamtari] [New S/stn]
400 KV Raita-Kurud Ckt
Station Unit #Installed
Capacity (In MW)
No. of Outages Outage Date & Time Syn. Date & Time Outage (HH:MM)Generation Loss
(In Mu)Reason
5 120 0 NIL NIL - -
6 120 0 NIL NIL - -
1 210 0 NIL NIL - -
2 210 0 NIL NIL - -
3 210 0 NIL NIL - -
4 210 0 NIL NIL - -
5 500 1 22/01/20 00:00 CONTD - -AOH
1 250 0 NIL NIL - -
2 250 0 NIL NIL - -
1 500 0 NIL NIL - -
2 500 0 NIL NIL - -
Total 3080 1 -
Station Unit #Installed
Capacity (In MW)
No. of Outages Outage Date & Time Syn. Date & Time Outage (hh::mm:ss)Generation Loss
(In Mu)Reason
5 120 122/01/20 00:39 23/01/20 18:56
42:17:00 5.074MILL 5A & 5C OUT
6 120
1 210 127/01/20 12:37 28/01/20 10:08
21:31:00 4.519AIR HEATER
PROBLAM
1 20/01/2020 19:02 22/01/20 05:48 34:46:00 7.301 BTL
1 28/01/20 12:43 30/01/20 11:08 46:25:00 9.747 BTL
3 210 1 31/01/20 15:45 - - BTL
4 210 1 14/01/20 16:40 15/01/20 11:14 18:34:00 3.899 BTL
5 500 0 NIL NIL NIL NIL
1 250 1 17/01/20 17:15 19/01/20 09:25 40:10:00 10.042 BTL
2 250 128/01/20 13:10 29/01/20 11:03
21:53:00 5.471 BTL
1 500 0 NIL NIL NIL NIL
1 08/01/20 11:54 08/01/20 16:58 5:04:00 2.5333GENERATOR TEMP.
HIGH
1 30/12/2019 18:20 04/01/2020 12:06 113:46:00 56.8833ASH EVACUATION
PROBLEM
1 09/01/20 17:02 - - -CASING TEMP.
GETTING HIGH
Total 3080 11 230:40 105.469
5002
ABVTPS
DSPM TPS
9. Planned Outages Of Generating Stations For The Month Of JAN-2020.
HTPS
KTPS
KTPS
DSPM TPS
ABVTPS
10. Forced Outages Of State Generating Stations For The Month Of Jan-2020
HTPS
2 210
11. Shutdown of Transmission Elements in JAN-2020.
S. No. DateVoltage
Level [KV]Name of the Transmission Elements
From [
(mm/dd/yy) hh:mm ]
To
[ (mm/dd/yy)
hh:mm ]
Outage Hours
(hh:mm)
1 01-Jan-20 220 220 KV RAITA - SILTARA CKT 11:32 16:54 5:22
2 01-Jan-20 220 220 KV CHHURI - BISHRAMPUR CKT NO. II 30/12/2019 10:27 01/01/2020 14:23 51:56
302-Jan-20
220220/132KV 100MVA Xmer NO. I AT 220KV S/S
KOTMIKALA12:42 17:56 5:14
4 02-Jan-20 132 132KV PATHALGAON - KANSABEL CKT. 10:04 11:15 1:11
5 02-Jan-20 132 132KV PATHALGAON - BATOULI CKT. 12:40 13:48 1:08
6 02-Jan-20 132 132KV AMBIKAPUR - PATHALGAON CKT. 13:56 15:15 1:19
7 02-Jan-20 132 132KV PATHALGAON - GHARGHODA CKT. 15:23 17:13 1:50
802-Jan-20
132 132KV LAFARJ BAY AT 132KV LAFARJ POOLING S/S 16:29 17:25 0:56
9 02-Jan-20 132 20MVA Xmer AT 132KV S/S PATHALGAON 15:30 17:45 2:15
10 03-Jan-20 400 400KV S/S MARWA MAIN BUS II 12:41 16:36 3:55
1103-Jan-20
132132/33KV 40MVA Xmer NO. II AT URLA (HEERA
POOLING )10:42 15:09 4:27
12 03-Jan-20 132 132/33KV 40MVA Xmer NO. II AT S/S NAWAGARH 12:47 16:02 3:15
13 04-Jan-20 220 220 KV SUHELA - BANARI CKT 14:20 17:15 2:55
14 04-Jan-20 220 220 KV DSPM - BANARI CKT 14:21 17:12 2:51
15 04-Jan-20 220 20 MVA XMER No.I AT 220 KV S/S KOTMIKALA 14:08 15:54 1:46
16 04-Jan-20 220 220 KV CHHURI - KOTMIKALA CKT No.I 16:08 18:50 2:42
17 04-Jan-20 220 220 KV CHHURI - KOTMIKALA CKT No.II 18:56 21:27 2:31
18 04-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT No.I 09:56 12:08 2:12
19 04-Jan-20 132 132 KV DOMA - MANA CKT No.II 12:42 17:35 4:53
20 04-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT No.II 12:13 14:01 1:48
21 05-Jan-20 132 40 MVA XMER No.I AT 132 KV S/S AMBIKAPUR 10:27 12:16 1:49
22 05-Jan-20 132 40 MVA XMER No.II AT 132 KV S/S AMBIKAPUR 12:18 13:28 1:10
23 05-Jan-20 132 40 MVA XMER No.III AT 132 KV S/S AMBIKAPUR 13:30 14:36 1:06
24 06-Jan-20 400 400 KV MARWA - KHEDAMARA CKT 09:32 18:02 8:30
25 06-Jan-20 400 400 KV RAITA - KHEDAMARA BKR 15:21 17:26 2:05
26 06-Jan-20 220 125 MVA X-MER AT 220 KV S/S BHATAPARA 14:42 14:56 0:14
27 06-Jan-20 220 220 KV CHHURI - MOPKA CKT -I 06/01/2020 12:25 07/01/2020 13:58 25:33
28 06-Jan-20 220 220 KV MOPKA - DHARDEHI CKT 12:00 12:18 0:18
29 06-Jan-20 132 132 KV SIMGA - CHAKARBHATA CKT 10:30 19:16 8:46
30 07-Jan-20 220 220 KV BANARI - MARWA CKT NO . I 08:54 11:22 2:28
31 07-Jan-20 220 220 KV MARWA - BANARI CKT NO. II 11:26 13:17 1:51
32 07-Jan-20 220 220 KV CHHURI - MOPKA CKT NO .I 06/01/2020 12:25 07/01/2020 13:58 25:33
33 07-Jan-20 220 160 MVA Xmer NO . I AT 220 S/S BANARI 13:21 16:02 2:41
34 07-Jan-20 220 160 MVA Xmer NO . II AT 220 S/S BANARI 16:06 18:33 2:27
35 07-Jan-20 132 63 MVA X mer AT 132/33 KV S/S BIRGAON 08:42 17:50 9:08
36 07-Jan-20 132 132 KV BISHRAMPUR - AMBIKAPUR CKT . NO I 10:55 13:10 2:15
37 07-Jan-20 132 132 KV BISHRAMPUR - AMBIKAPUR CKT . NO II 13:15 15:10 1:55
38 07-Jan-20 132 132 KV AMBIKAPUR - PATHALGAON CKT NO . I 10:36 17:48 7:12
39 07-Jan-20 132 33 KV MAIN BUS AT 132 KV S/S BISHRAMPUR 15:30 18:35 3:05
40 07-Jan-20 132 132 KV KACHANA - URLA CKT NO . I 08:10 09:25 1:15
41 07-Jan-20 132 132 KV URLA - HIRAPOOLING CKT 12:32 17:40 5:08
42 07-Jan-20 132 132KV PARASWANI - RAJIM CKT. 07/01/2020 10:43 09/01/2020 18:08 55:25
43 07-Jan-20 132 132KV PARASWANI - MAHASAMUND CKT. 07/01/2020 18:09 09/01/2020 18:09 48:00
44 08-Jan-20 400 400 KV MARWA - BANARI CKT NO. I 08/01/2020 8:51 09/01/2020 18:11 33:20
45 08-Jan-20 220 220 KV KEB - KWB I/C NO. II 08/01/2020 9:01 09/01/2020 13:24 28:23
46 08-Jan-20 220 40 MVA X-MER NO. I AT 220 KV S/S SILTARA 10:13 16:50 6:37
4708-Jan-20
132 40 MVA X-MER NO. I AT 132 KV S/S MANENDRAGARH 10:36 12:50 2:14
4808-Jan-20
132 40 MVA X-MER NO. I AT 132 KV S/S WADRAFNAGAR 11:48 14:56 3:08
4908-Jan-20
132 40 MVA X-MER NO. II AT 132 KV S/S MANENDRAGARH 12:55 14:47 1:52
50 08-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT NO. I 14:53 16:35 1:42
51 08-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT NO. II 16:39 17:41 1:02
52 08-Jan-20 132 132 KV BISHRAMPUR - AMBIKAPUR CKT NO. II 16:40 17:20 0:40
53 08-Jan-20 132 132 KV MANENDRAGARH RLY TRACTION NO. I 17:48 18:59 1:11
54 08-Jan-20 132 132 KV MANENDRAGARH RLY TRACTION NO. II 19:32 20:32 1:00
55 09-Jan-20 220 220 KV KEB - KWB I/C NO. II 08/01/2020 9:01 09/01/2020 13:24 28:23
56 09-Jan-20 220 220 KV BANARI - SUHELA CKT 15:16 17:17 2:01
57 09-Jan-20 132 132 KV BANARI - AKALTARA CKT 14:07 15:38 1:31
58 09-Jan-20 132 40 MVA X-MER NO. I AT 132 KV S/S SARANGARH 10:58 11:14 0:16
59 09-Jan-20 132 132 KV BANARI - CHAMPA CKT 10:09 11:53 1:44
60 09-Jan-20 132 132 KV HEERA POOLING - BIRGAON CKT 10:26 16:02 5:36
61 09-Jan-20 132 132 KV BANGO - MANENDRAGARH CKT 15:25 19:18 3:53
62 09-Jan-20 132 KV PARASWANI - RAJIM CKT 07/01/2020 10:43 09/01/2020 18:08 55:25
63 09-Jan-20 132 KV PARASWANI - MAHASAMUND CKT 07/01/2020 18:09 09/01/2020 18:09 48:00
64 09-Jan-20 132 132 KV MANENDRAGARH - BAIKUNTHPUR CKT 19:25 20:45 1:20
65 10-Jan-20 132 220KV KHEDAMARA - BSP CKT. NO. I 10:02 18:02 8:00
66 10-Jan-20 220 160MVA Xmer NO. II AT 220/132KV S/S SILTARA 13:05 14:26 1:21
67 10-Jan-20 220 160MVA Xmer NO. III AT220KV S/S GURUR 14:22 17:42 3:20
68 10-Jan-20 132 40MVA Xmer NO. I AT 132KV S/S BHILAI 09:20 15:47 6:27
69 10-Jan-20 132 40MVA Xmer NO. I AT 132KV S/S KURUD 10:07 15:18 5:11
70 10-Jan-20 132 40MVA Xmer NO. I AT 132KV S/S BAIKUNTH PUR 10:10 12:52 2:42
71 10-Jan-20 132 132KV KORBA - CHAMPA CKT. NO. I 10:44 12:44 2:00
72 10-Jan-20 132 40MVA Xmer NO. II AT 132KV S/S BAIKUNTH PUR 13:02 14:30 1:28
73 10-Jan-20 132 132KV KORBA - CHAMPA CKT. NO. II 12:48 14:49 2:01
74 10-Jan-20 132 132KV BAIKUNTHPUR - BISHRAMPUR CKT. 14:46 16:05 1:19
75 10-Jan-20 132 132KV BAIKUNTHPUR - MANENDRAGARH CKT. 16:14 17:25 1:11
76 11-Jan-20 220 100MVA Xmer NO. I AT 220KV S/S KOTMIKALA 09:32 13:53 4:21
11. Shutdown of Transmission Elements in JAN-2020.
S. No. DateVoltage
Level [KV]Name of the Transmission Elements
From [
(mm/dd/yy) hh:mm ]
To
[ (mm/dd/yy)
hh:mm ]
Outage Hours
(hh:mm)
77 11-Jan-20 220 100MVA Xmer NO. II AT 220KV S/S KOTMIKALA 15:48 21:42 5:54
78 11-Jan-20 220 220KV KHEDAMARA - BSP CKT. NO. II 09:50 16:49 6:59
79 11-Jan-20 220 63MVA Xmer AT 220KV S/S URLA 10:10 15:28 5:18
80 11-Jan-20 220 220KV CHHURI - MOPKA CKT. NO. I 11:30 12:25 0:55
81 11-Jan-20 220 20MVA Xmer NO. II AT 220KV S/S KOTMIKALA 13:55 15:40 1:45
82 11-Jan-20 132 132KV PARASWANI - BAGBAHRA CKT. 08:15 19:05 10:50
8311-Jan-20
132132KVPARASWANI - MAHASAMUNDTAP - KUHERA
CKT. 08:25 19:1310:48
84 11-Jan-20 132 MAIN BUS AT 132KV S/S AMBIKAPUR 09:26 12:42 3:16
85 11-Jan-20 132 132KV PATHALGAON - KASABEL CKT. 14:29 15:42 1:13
86 12-Jan-20 220 RLY TRACTION No.I AT 220 KV S/S KOTMIKALA 10:30 14:08 3:38
87 12-Jan-20 220 RLY TRACTION No.II AT 220 KV S/S KOTMIKALA 14:32 17:45 3:13
88 12-Jan-20 132 132 KV RAJPUR - BALRAMPUR CKT 10:05 13:49 3:44
89 13-Jan-20 220 220 KV MARWA - BANARI CKT No.II 13/01/2020 8:37 14/01/2020 17:31 8:54
90 13-Jan-20 220 40 MVA XMER No.I AT 220 KV S/S BHATAPARA 13/01/2020 10:11 31/01/2020 20:05 441:54
91 13-Jan-20 220 40 MVA XMER No.II AT 220 KV S/S THELKADIH 12:38 17:24 4:46
92 13-Jan-20 132 132 KV KACHNA - MAHASAMUND CKT 10:33 15:40 5:07
93 14-Jan-20 400 ICT - I AT 400 KV S/S KHEDAMARA 17:16 18:56 1:40
94 14-Jan-20 220 220 KV DSPM - KE LINE 10:30 13:30 3:00
95 14-Jan-20 220 160 MVA X-mer NO. II AT 220 KV S/S KUTHREL 11:15 19:27 8:12
96 14-Jan-20 220 220 KV KW - DSPM 14:47 16:33 1:46
97 14-Jan-20 220 220 KV DSPM - KWB 14:47 16:33 1:46
98 14-Jan-20 220 160 MVA X-mer NO . I AT 220 KV S/S SUHELA 11:46 16:25 4:39
99 14-Jan-20 220 220 MVA X-mer AT 132 KV BISHRAMPUR 17:36 19:20 1:44
100 14-Jan-20 132 132 KV SIMGA - CENTURY FDR 09:00 13:05 4:05
101 14-Jan-20 132 132 KV I/C NO - I AT BISHRAMPUR 09:28 13:02 3:34
102 14-Jan-20 132 40 MVA X-mer AT 132 KV S/S BISHRAMPUR 09:16 11:15 1:59
103 14-Jan-20 132 132/33 KV 40 MVA Xmer AT BARSOOR 10:19 15:44 5:25
104 14-Jan-20 132 132 KV CHAPLE - MONET CKT - I 10:35 17:40 7:05
105 14-Jan-20 132 132 KV BIRGAON - SECTOR (A) - HIRAPOOLING 10:48 17:21 6:33
106 14-Jan-20 132 132 KV INCOMING II AT 132 KV S/S BISHRAMPUR 13:07 15:12 2:05
107 14-Jan-20 132 132 KV BISHRAMPUR - AMBIKAPUR CKT NO. II 14:27 16:05 1:38
108 14-Jan-20 132132 KV RLY TRACTION NO . II AT 132 KV S/S
BISHRAMPUR16:23 17:00 0:37
109 14-Jan-20 132132 KV RLY TRACTION NO . I AT 132 KV S/S
BISHRAMPUR17:08 19:35 2:27
110 14-Jan-20 132 132 KV AMBIKAPUR - BISHRAMPUR CKT - II 16:07 17:33 1:26
111 15-Jan-20 400 ICT NO. III AT 400 KV S/S KHEDAMARA 09:35 17:13 7:38
112 15-Jan-20 220 160MVA X-mer AT 220 KV S/S BARSOOR 10:27 15:45 5:18
113 15-Jan-20 220 220 KV KW - CHHURI CKT - I 11:31 13:52 2:21
114 15-Jan-20 220 160 MVA X-mer NO. II AT 220 KV S/S BISHRAMPUR 14:34 17:03 2:29
115 15-Jan-20 220 220 KV CHHURI - BISHRAMPUR CKT NO. II 17:08 20:29 3:21
116 15-Jan-20 132 132 KV CHHURI - BISHRAMPUR CKT - I 10:45 13:22 2:37
117 15-Jan-20 132 132 KV SILTAR - KACHNA CKT - I 11:05 16:36 5:31
118 15-Jan-20 132 132 KV RAIGARH - SALASAR 15/01/2020 15:02 16/01/2020 15:40 24:38
119 16-Jan-20400
400/220 KV BHILAI ICT NO. III AT 400 KV S/S
KHEDAMARA09:30 16:27 6:57
120 16-Jan-20 220 40 MVA X-mer AT 220 KV S/S BISHRAMPUR 08:08 09:46 1:38
121 16-Jan-20 220 160 MVA X-mar NO . I AT 220 KV S/S BISHRAMPUR 14:22 16:53 2:31
122 16-Jan-20 132 132 KV BISHRAMPUR - WADRAFNAGAR CKT 10:13 11:36 1:23
123 16-Jan-20 132 132 KV SIMGA - BHILAI CKT 10:05 15:14 5:09
124 16-Jan-20 132 132 KV BANGO - BISHRAMPUR CKT 10:56 13:56 3:00
125 16-Jan-20 132 132 KV BISHRAMPUR - BAIKUNTHPUR CKT 16:56 17:58 1:02
126 17-Jan-20 220 132 KV MAIN BUS AT 220 KV S/S BANARI 13:15 15:48 2:33
127 17-Jan-20 220 220 KV KHEDAMARA - BHILAI CKT NO. II 13:23 16:06 2:43
128 17-Jan-20 132 40 MVA X-MER AT 132 KV S/S PRATAPPUR 10:10 12:00 1:50
129 17-Jan-20 132 132 KV SIMGA - CHAKARBHATA CKT 10:20 14:30 4:10
130 17-Jan-20 132 40 MVA X-MER NO. II AT 132 KV S/S DHAMTARI 11:10 12:08 0:58
131 17-Jan-20 132 132 KV PRATAPPUR - WADRAFNAGAR CKT 12:10 14:20 2:10
132 18-Jan-20 220 220KV KEB - DSPM CKT. 07:45 13:55 6:10
133 18-Jan-20 220 220KV KWB - DSPM CKT. 7:49 13:55 6:06
134 18-Jan-20 220 2P BUS AT 220KV KEB 09:52 13:30 3:38
135 18-Jan-20 220 40MVA Xmer NO. II AT 220KV S/S URLA 10:17 16:57 6:40
136 18-Jan-20 220 40MVA Xmer AT 220KV S/S DOMA 10:30 17:10 6:40
137 18-Jan-20 132 132KV RRVL CKT. AT 220KV S/S BISRAMPUR 13:20 14:35 1:15
138 18-Jan-20 132 132KV RAJIM - MAHASAMUND CKT. 08:32 19:21 10:49
139 18-Jan-20 132 132KV RAJIM - PARASWANI CKT. 08:57 19:28 10:31
140 18-Jan-20 132 132KV URLA-SECTOR A - HEERAPOOLING CKT. 10:42 16:54 6:12
141 19-Jan-20 132132KV BISHRAMPUR - RAJPUR CKT. AT S/S
BISHRAMPUR 09:08 10:301:22
142 20-Jan-20 132 40 MVA XMER No.I AT 132 KV S/S AMBIKAPUR 13:08 14:15 1:07
143 20-Jan-20 132 132 KV DHAMDHA - PARAMPUJAYA CKT No.I 17:42 19:59 2:17
144 21-Jan-20 132 132 KV SILTARA - KACHNA CKT No.II 11:32 13:36 2:04
145 21-Jan-20 132 132 KV DHAMDHA - PARAMPUJYA CKT No.II 17:06 20:46 3:40
146 21-Jan-20 132 40 MVA XMER No.I AT 132 KV S/S KAWARDHA 14/01/2020 11:18 21/01/2020 18:38 175:20
147 22-Jan-20 220 40 MVA X-MER - II AT 220 KV S/S SILTARA 12:29 15:34 3:05
148 22-Jan-20 132 40 MVA X-MER - II AT 132 KV S/S KAWARDHA 15:43 16:25 0:42
149 22-Jan-20 132 20 MVA X-MER- II AT 132 KV S/S JASHPUR 12:54 14:30 1:36
150 23-Jan-20 220 220 KV SUHELA - PARASWANI CKT - I 09:27 16:28 7:01
151 23-Jan-20 220 220KV 1 P BUS AT 220 KV KEB 12:25 15:40 3:15
152 23-Jan-20 132 132 KB MAIN BUS AT S/S JAIJAIPUR 09:35 10:30 0:55
11. Shutdown of Transmission Elements in JAN-2020.
S. No. DateVoltage
Level [KV]Name of the Transmission Elements
From [
(mm/dd/yy) hh:mm ]
To
[ (mm/dd/yy)
hh:mm ]
Outage Hours
(hh:mm)
153 23-Jan-20 132 63 MVA X-mer AT 132 KV S/S RUABANDHA 11:05 13:22 2:17
154 23-Jan-20 132 132 KV CHAMPA- JAIJAIPUR CKT 09:45 11:40 1:55
155 23-Jan-20 132 132 KV MAIN BUS AT 132 KV S/S GHARGHODA 12:03 14:02 1:59
156 24-Jan-20 220 220 KV MOPKA - CHHURI CKT NO. I 08:27 10:56 2:29
157 24-Jan-20 220 20 MVA X-MER NO. II AT 220 KV S/Y KEB 12:26 14:20 1:54
158 24-Jan-20 220 220 KV PGCIL RAIPUR - BHATAPARA CKT 11:46 16:49 5:03
159 24-Jan-20 220 160 MVA X-MER NO. I AT 220 KV S/S MOPKA 12:05 13:53 1:48
160 24-Jan-20 220 160 MVA X-MER NO. II AT 220 KV S/S SUHELA 13:47 15:04 1:17
161 24-Jan-20 220 220 KV BHILAI - GURUR CKT 15:30 20:16 4:46
162 24-Jan-20 132 132 KV MOPKA - BILASPUR CKT 10:34 11:45 1:11
163 24-Jan-20 132 132 KV BILASPUR - SILPAHRI CKT 11:59 12:59 1:00
164 24-Jan-20 132 132 KV BILASPUR - CHAKARBHATA CKT 13:03 14:18 1:15
165 24-Jan-20 132 40 MVA X-mer - I AT BILASPUR 14:50 15:59 1:09
166 24-Jan-20 132 132 KV WADRAFNAGAR - PRATAPPUR CKT 15:25 16:22 0:57
167 24-Jan-20 132 132 KV BILASPUR - PATHARIYA CKT 15:56 17:21 1:25
168 25-Jan-20 220 160 MVA X-MER NO. II AT 220 KV S/S URLA 10:19 17:14 6:55
169 25-Jan-20 220 220 KV KHEDAMARA - BSP CKT NO. II 11:15 11:52 0:37
170 25-Jan-20 132 132 KV BILASPUR RLY TRACTION NO. II 09:28 11:03 1:35
171 25-Jan-20 132 132 KV BILASPUR RLY TRACTION NO. I 11:23 12:44 1:21
172 25-Jan-20 132 132 KV CHAKARBHATA - BILASPUR CKT 13:05 14:21 1:16
173 25-Jan-20 132 132 KV CHAKARBHATA - SIMGA CKT 14:37 15:43 1:06
174 25-Jan-20 132 132 KV CHAKARBHATA - KOTA CKT NO. I 15:17 16:10 0:53
175 25-Jan-20 132 132 KV CHAKARBHATA - KOTA CKT NO. II 16:14 17:35 1:21
176 27-Jan-20 132 132KV RLY. TRECTION NO. I AT S/S BILASPUR 09:06 09:27 0:21
177 27-Jan-20 132 132KV MOPKA - BILASPUR CKT. 09:09 14:38 5:29
178 27-Jan-20 132 132KV SILPAHRI - BILASPUR CKT. 10:02 11:45 1:43
179 27-Jan-20 132 132KV RLY. TRECTION NO. II AT S/S BILASPUR 11:31 13:35 2:04
180 27-Jan-20 132 132KV BHATAPARA - BALODA BAZAR CKT. 10:30 12:28 1:58
181 27-Jan-20 132 132KV SILPAHRI - VANDNA CKT. 12:00 14:16 2:16
182 27-Jan-20 132 40MVA Xmer NO. I AT 132KV S/S SILPAHRI 13:26 17:50 4:24
183 28-Jan-20 220 160 MVA XMER No.I AT 220 KV S/S RAIGARH 10:51 15:00 4:09
184 28-Jan-20 220 220 KV KW - CHHURI CKT No.I 13:46 17:37 3:51
185 28-Jan-20 220 220 KV MAIN BUS No.II AT 220 KV S/S SUHELA 12:52 15:44 2:52
186 28-Jan-20 132 132 KV RAJIM - KURUD CKT 08:35 10:28 1:53
187 28-Jan-20 132 132 KV AKALTARA - BANARI CKT 10:08 11:24 1:16
188 28-Jan-20 132 40 MVA XMER No.II AT 132 KV S/S PANDARIYA 10:29 12:44 2:15
189 28-Jan-20 132 132 KV RAJIM - MAGARLOD CKT 10:36 12:50 2:14
190 28-Jan-20 132 132 KV AKALTARA - LAFARZE CKT 11:26 13:05 1:39
191 28-Jan-20 132 RLY TRACTION No.I AT 132 KV S/S AKALTARA 13:07 14:12 1:05
192 28-Jan-20 132 RLY TRACTION No.II AT 132 KV S/S AKALTARA 14:22 15:16 0:54
19328-Jan-20
132 40 MVA XMER No.II AT 132 KV S/S BHANUPRATAPPUR 14:15 15:25
1:10
194 28-Jan-20 132 132 KV AKALTARA - ARASMETA CKT 17:40 18:54 1:14
195 28-Jan-20 132 132 KV AKALTARA - KVK CKT 17:41 18:55 1:14
196 29-Jan-20 400 315 MVA ICT AT 400 KV S/S MARWA 29/01/2020 9:08 02/02/2020 12:39 99:31
197 29-Jan-20 220 1P BUS AT 220 KV SWITCH YARD AT KEB 10:30 21:05 10:35
198 29-Jan-20 220 40 MVA XMER No.II AT 220 KV S/S MOPKA 12:10 14:25 2:15
199 29-Jan-20 220 40 MVA XMER AT 220 KV S/S BANARI 14:11 15:50 1:39
200 29-Jan-20 220 40 MVA XMER No.I AT 220 KV S/S MOPKA 14:28 16:41 2:13
201 29-Jan-20 220 40 MVA XMER No.III AT 220 KV S/S MOPKA 16:45 18:05 1:20
202 29-Jan-20 132 132 KV KURUD - MAGARLOD CKT 08:05 10:25 2:20
203 29-Jan-20 132 132 KV BARSOOR - KIRANDUL CKT No.I 09:24 17:53 8:29
20429-Jan-20
132 132 KV KONI - MOPKA CKT AT 220 KV S/S MOPKA09:28 16:11
6:43
205 29-Jan-20 132 132 KV MOPKA - SWASTIK CKT 10:50 16:15 5:25
206 29-Jan-20 132 132 KV MOPKA - SILPAHARI CKT 12:40 13:50 1:10
207 30-Jan-20 400 400KV RAITA - JAGDALPUR CKT 9:36 23:05 13:29
208 30-Jan-20 220 220 KV CHHURI - KORBA EAST CKT NO.II 08:14 18:25 10:11
209 30-Jan-20 220 220 KV 2P BUS AT KEB 10:40 17:33 6:53
210 30-Jan-20 220 220 KV BY PASS BUS (BAY) AT KEB 09:40 17:50 8:10
211 30-Jan-20 220 160 MVA ICT- I AT 220 KV S/S MOPKA 09:40 11:35 1:55
212 30-Jan-20 220 160 MVA X-MER NO. III AT 220 KV S/S MOPKA 12:38 14:13 1:35
213 30-Jan-20 220 160 MVA X-MER NO. II AT 220 KV S/S MOPKA 14:14 17:30 3:16
214 30-Jan-20 220 220 KV CHHURI - MOPKA CKT- I 17:41 19:18 1:37
215 30-Jan-20 132 63 MVA X-MER NO. I AT 132 KV S/S KACHNA 10:26 17:48 7:22
216 31-Jan-20 220 160 MVA XMER No.II AT 220 KV S/S BEMETARA 11:10 17:30 6:20
217 31-Jan-20 220 220 KV BUS No.II AT BEMETARA 11:20 17:18 5:58
218 31-Jan-20 220 40 MVA XMER No.I AT 220 KV S/S BHATAPARA 13/01/2020 10:11 31/01/2020 20:05 441:54
219 31-Jan-20 132 132 KV AKALTARA - KVK CKT 10:17 11:20 1:03
220 31-Jan-20 132 40 MVA XMER AT 132 KV S/S KACHNA 10:05 16:05 6:00
221 31-Jan-20 132 132 KV AKALTARA - BANARI CKT 10:36 14:14 3:38
222 31-Jan-20 132 132 KV AKALTARA - ARASMETA CKT 11:23 12:17 0:54
223 31-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT No.II 13:09 14:17 1:08
S. No. DateVoltage
Level [KV]Name of the Transmission Elements
From [ (mm/dd/yy) hh:mm ]
To [ (mm/dd/yy)
hh:mm ]
Outage Hours
(hh:mm)1
02-Jan-20220
160MVA Xmer AT 220KV S/S
JAGDALPUR13:54 18:00 4:06
2 02-Jan-20 220 220KV BHILAI - GURUR CKT. 14:40 20:00 5:20
3 02-Jan-20 220 220KV KHEDAMARA - BHILAI CKT. 14:41 16:05 1:24
402-Jan-20
132132KV SIMGA - CENTURY CEMENT
CKT.14:17 14:35 0:18
502-Jan-20
132 132KV PIL CKT. AT 220KV S/S BANARI 15:42 15:50 0:08
602-Jan-20
132132KV URLA - BAJRANG POWER
CKT.16:05 19:47 3:42
702-Jan-20
132132KV NARAYANPUR - KONDAGAON
CKT.16:45 17:03 0:18
802-Jan-20
132132KV BALODA BAZAR - AMBUJA
CEMENT CKT.02/01/2020 18:40 03/01/2020 18:56 24:16
902-Jan-20
132132KV SIMGA - CENTURI CEMENT
CKT.18:47 20:00 1:13
10 02-Jan-20 132 132KV RAIGARH - ADBHAR CKT. 19:08 19:20 0:12
1103-Jan-20
220220KV SUHELA - BEMETARA CKT.
NO. I20:04 20:21 0:17
1203-Jan-20
132 132KV SIMGA - CHAKARBHATA CKT. 03:15 04:21 1:06
1304-Jan-20
220220 KV CHHURI - BISHRAMPUR CKT
No.I02:23 02:40 0:17
1404-Jan-20
132 132 KV KORBA - JAMNIPALI CKT No.II 04/01/2020 22:40 05-01-2020 09:51 11:11
1504-Jan-20
132132 KV BALODA BAZAR - KASDOL
CKT 04/01/2020 23:54 05/01/2020 0:10 0:16
16 07-Jan-20 132 132 KV BANGO - CHHURI CKT 13:45 14:31 0:46
1708-Jan-20
220220 KV SUHELA - PARASWANI CKT
NO. I16:58 19:05 2:07
1808-Jan-20
22040 MVA X-MER NO. I AT 220 KV S/S
URLA16:23 16:46 0:23
1908-Jan-20
22040 MVA X-MER NO. II AT 220 KV S/S
URLA16:23 16:40 0:17
2009-Jan-20
22020 MVA X-MER NO. II AT 220 KV S/S
KOTMIKALA11:18 15:35 4:17
2109-Jan-20
22020 MVA X-MER NO. I AT 220 KV S/S
KOTMIKALA11:18 11:31 0:13
2209-Jan-20
132132 KV BALODABAZAR - AMBUJA
CEMENT CKT01:55 03:00 1:05
2309-Jan-20
132132 KV DONGARGARH - KIRNAPUR
CKT03:55 04:19 0:24
24 09-Jan-20 132 132 KV SIMGA - BERLA CKT 05:15 05:35 0:20
25 09-Jan-20 132 132 KV CHAMPA - JAIJAIPUR CKT 07:44 07:56 0:12
26 09-Jan-20 132 132 KV SILTARA - VANDANA CKT 05:06 11:38 6:32
27 09-Jan-20 132 132 KV SILTARA - SKS CKT 05:05 12:48 7:43
28 11-Jan-20 400 400KV RAITA - JAGDALPUR CKT. 13:13 13:45 0:32
2911-Jan-20
132132KV SUHELA - BALODA BAZAR
CKT. NO. II22:17 22:35 0:18
3012-Jan-20
220100 MVA XMER No.II AT 220 KV S/S
KOTMIKALA 00:37 13:40 13:03
31 12-Jan-20 132 132 KV KANKER - NAGARI CKT 21:06 21:20 0:14
32 13-Jan-20 220 220 KV KE - KW I/C No.I 13/01/2020 21:43 14/01/2020 13:50 16:07
33 14-Jan-20 132 132 KV BANGO - BISHRAMPUR 02:43 03:26 0:43
34 16-Jan-20 132132 KV BANGO - MANENDRAGARH
CKT14/01/2020 2:42 16/01/2020 13:20 10:38
35 14-Jan-20 132132 KV SARANGARH - SARAIPALI
CKT - I14/01/2020 11:46 15/01/2020 2:32 14:46
36 16-Jan-20 400 400 KV KHEDAMARA - MARWA CKT 02:17 09:45 7:28
37 16-Jan-20 132 132 KV RAIGARH - MSP CKT 00:32 00:46 0:14
38 17-Jan-20 132132 KV BANGO - MANENDRAGARH
CKT16/01/2020 13:48 17/01/2020 0:35 10:47
12. Trippings in Transmission Elements in JAN-2020
12. Trippings in Transmission Elements in JAN-2020
39 17-Jan-20 132 132 KV KANKER - NAGRI CKT 22:30 22:45 0:15
40 18-Jan-20 220220KV SUHELA - PARASWANI
CKT.NO. I 02:53 04:501:57
41 18-Jan-20 220220KV SUHELA - PARASWANI
CKT.NO. II 21:31 21:500:19
42 18-Jan-20 220220KV SUHELA - PARASWANI
CKT.NO. II 22:35 22:590:24
43 18-Jan-20 132 40MVA Xmer NO. I AT S/S SILTARA 15:37 16:30 0:53
44 22-Jan-20 220220 KV PARASWANI - SUHELA CKT
NO . I19:57 20:22 0:25
45 22-Jan-20 13240 MVA X-MER NO - I & II AT 132 KV
S/S HIRAPOOLING09:20 10:02 0:42
46 23-Jan-20 220220 KV SUHELA - PARASWANI CKT
NO. II02:05 2:25 0:20
47 24-Jan-20 220 220 KV PGCIL RAIPUR - BHILAI CKT 15:47 20:10 4:23
48 24-Jan-20 132132 KV BHATAPARA - NAVAGARH
CKT15:56 16:22 0:26
4925-Jan-20
13240 MVA X-MER NO. II AT 132 KV S/S
KEB17:16 23:38 6:22
5026-Jan-20
220160MVA Xmer NO. II AT 220 KV S/S
DHARDEHI 10:45 11:050:20
51 26-Jan-20 220 220KV SARAIPALI CKT. NO. II 01:58 02:56 0:58
52 26-Jan-20 220 220KV GERWANI CKT. 01:58 03:00 1:02
53 26-Jan-20 220 220KV JSPL CKT. NO. I 01:58 03:04 1:06
54 26-Jan-20 220 220KV JSPL CKT. NO. II 01:58 03:05 1:07
55 26-Jan-20 220 220KV PGCIL CKT. NO. I 01:58 03:32 1:34
56 26-Jan-20 220 220KV PGCIL CKT. NO. II 01:58 03:34 1:36
57 26-Jan-20 220 220KV PGCIL CKT. NO. III 01:58 03:36 1:38
58 26-Jan-20 220 220KV JPL CKT. NO. I 01:58 03:49 1:51
59 26-Jan-20 220 220KV SARAIPALI CKT. NO. II 01:58 04:25 2:27
6026-Jan-20
220160MVA Xmer NO. I AT 220KV S/S
SARAIPALI 01:58 03:031:05
6126-Jan-20
220160MVA Xmer NO. II AT 220KV S/S
SARAIPALI 01:58 03:101:12
6226-Jan-20
22040MVA Xmer NO. I AT 220KV S/S
SARAIPALI 01:58 03:061:08
6326-Jan-20
22040MVA Xmer NO. II AT 220KV S/S
SARAIPALI 01:58 03:141:16
64 26-Jan-20 132 132KV CHAMPA - CSPL CKT. 08:30 08:35 0:05
65 26-Jan-20 132 132KV ADBHAR CKT. 01:58 03:02 1:04
66 26-Jan-20 132 132KV MSP CKT. 01:58 03:07 1:09
67 26-Jan-20 132 132KV GERWANI CKT. 01:58 03:41 1:43
68 26-Jan-20 132 132KV CHAPLE CKT. 01:58 03:46 1:48
69 26-Jan-20 132 132KV SALASAR CKT. 01:58 03:49 1:51
70 26-Jan-20 132 132KV S/S GHARGHODA 01:58 02:49 0:51
71 26-Jan-20 132 132KV S/S BARAMKELA 01:58 03:00 1:02
72 26-Jan-20 132 132KV S/S KONDATARAI 01:58 03:10 1:12
73 26-Jan-20 132 132KV S/S DABHRA 01:58 03:16 1:18
74 26-Jan-20 132 132KV S/S SARANGARH 01:58 03:16 1:18
75 26-Jan-20 132 132KV S/S BASNA 01:58 02:24 0:26
76 26-Jan-20 132 132KV S/S SANKRA 01:58 03:13 1:15
77 26-Jan-20 132 132KV SARANGARH CKT NO. I 01:58 04:27 2:29
78 26-Jan-20 132 132KV SARANGARH CKT NO. II 01:58 04:28 2:30
79 27-Jan-20 400 400KV JAGDALPUR - RAITA CKT. 14:01 14:37 0:36
80 27-Jan-20 400 400KV JAGDALPUR CKT. NO. I 14:01 14:37 0:36
8127-Jan-20 400
315MVA XmerNO. I AT 400 KV S/S
JAGDALPUR 14:01 14:530:52
82 27-Jan-20 220 220KV NAGARNAR CKT. NO. I 14:01 15:09 1:08
83 27-Jan-20 220 220KV NAGARNAR CKT. NO. II 14:01 15:10 1:09
8427-Jan-20 220
160MVA Xmer AT 220 KV S/S
JAGDALPUR 14:01 15:051:04
85 27-Jan-20 220 220KV GURUR - CKT. 14:01 15:12 1:11
86 27-Jan-20 220 220KV BARSOOR - CKT. NO. II 14:01 15:14 1:13
12. Trippings in Transmission Elements in JAN-2020
87 27-Jan-20 132 132KV RAIGARH - MSP CKT. 3:46 04:04 0:18
88 27-Jan-20 132 132KV RAIGARH - MSP CKT. 05:15 05:28 0:13
8927-Jan-20
13240MVA Xmer AT 132 KV S/S
JAGDALPUR 14:01 15:081:07
9028-Jan-20
13240 MVA XMER No.I AT 132 KV S/S
SILPAHARI 07:50 12:364:46
91 31-Jan-20 220 220 KV SUHELA - PARASWANI CKT 15:39 16:00 0:21
92 31-Jan-20 132 132 KV KANKER - NAGRI CKT 02:02 02:12 0:10
93 31-Jan-20 132 132 KV KANKER - NAGRI CKT 03:56 04:09 0:13
94 31-Jan-20 132 132 KV SIMGA - CHAKARBHATA CKT 09:16 09:24 0:08
S.N DATETIME OF
OCCURRENCE
CATEGORY GD-1 TO GD-5, GI-1 - GI -
2
BLACK OUT AT BUSRESTORATI
ON TIMEMW
AFFECTED
DURATION OF INTERUPTION (IN HRS: MIN)
ENERGY NOT SUPPLIED (MUs)
REMARKS
1 09-Jan-20 05:15 GD-1 132 KV S/S BERLA 05:35 8 0:20 0.0001TRIPPING AT 132 KV SIMGA
- BERLA CKT
2 22-Jan-20 09:20 GD-1 132 KV S/S HIRAPOOLING 10:02 42 0:42 0.001
TRIPPING AT 40 MVA X-
MER NO - I & II AT 132 KV
S/S HIRAPOOLING
3 26-Jan-20 01:58 GD-1 220KVS/S SARAIPALI 02:46 97.94 0:48 0.0033
TRIPPING AT 160MVA Xmer
NO. I & II AT 220KV S/S
SARAIPALI
4 26-Jan-20 01:58 GD-1 220KVS/SGERWANI 02:46 296.88 0:48 0.0099
TRIPPING AT 220 KV
RAIGARH-GERWANI CKT &
220KV GERWANI-JPL CKT.
5 26-Jan-20 01:58 GD-1 220KVS/SRAIGARH 02:46 32.04 0:48 0.0011TRIPPING OF FEEDERS AT
220KV S/SRAIGARH
13. Grid Disturbance in Jan-2020
DETAILS OF ENERGY NOT SERVED DUE TO GRID DISTURBANCE IN RESPECT OF CHHATTISGARH SYSTEM
DATE FROM TO GROUPAvg MW
ReliefDURATION
FREQUENCY
(Hz)
NIL
14. LOAD SHEDDING DONE IN JAN-2020
Sub Station ICT [MVA]N-1
Contingency
ICT
Overloaded
(% of time)
352 0.00
313.5 0.00
Barsoor 1 x 160+1X120 176 0.00
Bemetara 2 x 160 176 0.00
627 0.00
588.5 0.00
Borjhara 2 x 160 176 0.07
Gurur 3 x 160 352 0.00
Korba [East] 2 x 160 176 0.00
Mopka 3 x 160 352 0.00
Kotmikala 2 x 100 110 0.00
Paraswani 2 x 160 176 13.84
Raigarh 3 x 160 352 0.00
Siltara 3 x 160 352 0.00
Thelkadih 2 x 160 176 0.00
Urla 3 x 160 352 0.00
Suhela 2 x 160 176 0.00
Khedamara 3 x 315 693 0.00
Raita 2 x 315 347 19.29
1.Doma 2.Banari 3.Kuthrel
4.Dhardehi 5.Saraipalli 6.Bishrampur
Remarks :1. Data of following substations not available at SLDC SCADA:
15. Overloading of ICTs under N-1 Contingency.
Bhatapara 2 x 160+1X125