Report of Activities for WASCOHORANY Site Metering Station
A staff meeting has been held in WASCO/ HORANY Site on 1/9/2015 to finalize
The pressure transmitter of branch”2” and FCA keypad issues.
So,The following activities have been done as follows:
1- Change the pressure transmitter by another one and adjust its range to be “1-
101 Bara”.
2- Replace the FCA keypad by another one without any change at the
configuration.
3- Check the value of the new pressure transmitter at the two flow computers.
WASCO GASCO