By E-mail
PRASAR BHARTI (BROADCASTING CORPORATION OF INDIA)
DOORDARSHAN MAINTENANCE CENTRE FAIZABAD DDMC: FAIZABAD Phone/Fax: 05278-222093 E-mail: [email protected] Month : JUNE-2011 Date: 11-07-2011 No. 3(2)/2011-2012/TMT/DMC/FZD/ The Chief Engineer (NZ), (Kind Attn.Smt. Pinki Munsi, DE) Akashvani & Doordarshan, Jamnagar House, Shahjahan Road, New Delhi-110001.
Sub: CONCISE MONTHLY REPORT on the working of LPT under DMC FAIZABAD. Sir, Kindly find enclosed the technical monthly report of DMC Faizabad as mentioned above in respect of following relay centres. 1. SULTANPUR DD-I 2. SULTANPUR DD-II 3. RAEBAREILY 4. GAURIGANJ 5. JAGDISHPUR 6. LALGANJ (PRATAPGARH) DD-II 7. RUDAULI 8. MANAKAPUR (VLPT)
Yours Faithfully (K.K. Gupta)
Station Engineer
2
MONTHLY REPORT
OF DMC FAIZABD
for the month of… JUNE -2011…
1. GENERAL
1.1 DETAILS OF IMPORTANT TECHNICAL WORK DONE AT LPTs / VLPTs
DURING THE MONTH
Name of Station Details of the important technical work done
REMARKS
LPT SULTANPUR
DD I 1. 2. 3.
DD II 1. 2. 3.
LPT RAIBARELY
1. 2. 3.
LPT GAURIGANJ
1. 2. 3.
LPT JAGDISHPUR
1. 2. 3.
LPT LALGANJ,
(Pratapgarh)
1. 2. 3.
LPT RUDAULI
1. 2. 3.
VLPT MANKAPUR
1. 2. 3.
3
1.2 DETAILS OF OFFICERS / STAFF RELIEVED / JOINED FROM / AT
DURING THE MONTH
DETAILS OF OFFICERS / STAFF JOINED DURING THE MONTH
Name Designation Emp. No.
Relieved from
Station
Relieving Date
Joined at Joining date
Transfer order No. and Date
DETAILS OF OFFICERS / STAFF RELIEVED DURING THE MONTH
Name Designation Emp. No.
Relieved from Station
Relieving Date
To join at Transfer order No. and Date
Sh. B.P. Tiwari Sr. Tech. 21932 LPT RAEBARELI
30.06.2011 21/2011 A-19/15(2)/2011/EPC dt 09.05.2011
Sh. Ram Pratap Sr. Tech. 22181 LPT GAURIGANJ
30.06.2011 21/2011 A-19/15(2)/2011/EPC dt 09.05.2011
1.3 TOUR / LEAVE DETAILS OF ENGG. HEAD OF OFFICE / CONTROLLING OFFICERS DURING THE MONTH
NAME OF OFFICER
TOUR DETAILS PERIOD OF E.L. / MEDICAL LEAVE ALONGWITH ITS NATURE PERIOD PLACE
1.4 TRAINING DETAILS OF ENGG. HEAD OF OFFICE / STAFF DURING THE MONTH
NAME OF OFFICER / STAFF
DESIGNATION PERIOD PLACE NAME OF COURSE
From To
4
1.5 DETAILS OF NEW EQUIPMENTS RECEIVED AT DMC / LPTs / VLPTs
DURING LAST SIX MONTHS
Name of Station
Name of equipment
Date of receipt of equipment
Received from
Whether put in to circuit
Performance of equipment
Remarks
SULTANPUR 1. Surge-protection System
RAEBARILY GAURIGANJ 1. Surge-protection
System
JAGDISHPUR
1. Agile Modulator make sharp vision
2. Automatic Gain Control Amplifier, Sharp
3. Surge-protection System
LALGANJ RUDAULI VLPT MANKAPUR
1.6 DETAILS OF SCROLLER
Name of Station
Working Status of Scroller-1
Working Status of Scroller-2
Revenue generated in
current month
Progressive revenue generated in current
financial year LPT
SULTANPUR Ok Diverted to
HPT Faizabad Nil Nil
LPT RAEBARILY
Ok Def 596 596
1.7 ELECTRIC CONNECTION DETAILS
Name of Station
Availability of Electricity
Whether Single Phase / Three
Phase
Sanctioned Load
Power Factor
SULTANPUR Yes 3Ø 20 KVA RAEBARILY Yes 3Ø 10 KVA 0.85 GAURIGANJ Yes 3Ø 08 KVA 0.87 JAGDISHPUR Yes 3Ø 14 KVA 0.88 LALGANJ Yes 3Ø 11 KVA RUDAULI Yes 3Ø 26.9 KVA 0.85 VLPT MANKAPUR
Yes Provided free of cast by ITI Mankapur
5
1.8 LAND / BUILDING DETAILS
Station
Name of Owner
of Land
Category of Owner (Deptt. / Govt. / Private)
Type of Building
(Porta Cabin / Permanent)
Is Buildin
g / Porta Cabin constructed
departmentally
Rent of Setup
(Rs. p.m.)
Availability of
Lease Deed
Due Date of
Renewal of Lease
Deed
Due Date of
Revision of Rent
Remarks
SULTANPUR GOVT GOVT PERMANENT - Rent free No - - -
RAEBARILY GOVT GOVT PERMANENT - Rent free No - - -
GAURIGANJ GOVT GOVT PERMANENT - Rent free No - - -
JAGDISHPUR GOVT GOVT PERMANENT - Rent free No - - -
LALGANJ GOVT GOVT PERMANENT - Rent free No - - -
RUDAULI PRIVATE PRIVATE PERMANENT - 7000/- Yes 15/02/12 16/02/07 -
VLPT MANKAPUR
GOVT ITI Ltd. MANKAPUR GONDA
PERMANENT - Rent free No - - -
6
2. TECHNICAL 2.1 DETAILS OF WORKING OF TRANSMITTER FOR THE MONTH – JUNE 2011
LPT SULTANPUR
LPT RAIBARELY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
DD II
LPT RUDAULI
VLPT MANKAPUR
DD I DD II 1 Test Hours 15.0 15.0 15.0 5.0 5.0 5.0 5.0 0
2 Scheduled Prog. Hours
573.75 540 573.66 573.78 572.60 540 573.32 720
3 Gear Breakdown Hrs.
- - - - - - - 0
4 Power Supply Breakdown Hrs.
1.20 1.17 1.92 1.06 1.98 - - 0
5 Other Causes Breakdown Hrs.
- - - - - - - 0
6 Total Breakdown Hrs. (3+4+5)
1.20 1.17 1.92 1.06 1.98 - - 0
7 Prog. Hours Radiated (2-6)
572.55 538.83 571.74 572.72 570.62 540 573.32 720
8 Total Hours of Working (1+7)
587.55 553.83 586.74 577.72 575.62 545 578.32 720
9 % B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)}
0.21% 0.22% 0.33% 0.18% 0.35% 0 0 0
10 Year of Commissioning XTR Make/ Power XTR Type Channel of operation
05/10/2005 BEL-500W MUV 199 CH#34(+) 45M.-SS
31/3/2002 BEL-500W MUV 199 CH#28(-) 45M.-SS
28/7/2005 GCEL-500W 12U 500 CH#31(-) 45M.-SS
9/10/2002 BEL-500W MUV 199 CH#26 45M.- SS
Sept./1989 BEL -100W MUV 150 CH#25(+) 45M.- SS
28-01-2011 WML-12U 500W 11-V.2 UHF CH#30(.) 45M.- SS
13/81998 GCEL 300W UHF300 CH#22 45M. - SS
10/3/1988 GCEL -126 10W CH# 12 30M. gaiye
7
2.2 PROGRESSIVE TOTAL FROM APRIL OF CURRENT FINANCIAL YEAR 2011-2012
LPT
SULTANPUR LPT
RAIBARELY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR
DD I DD II
1 Test Hours 45.50 45.50 45.17 15.17 17.70 15.16 15.17 0
2 Scheduled Prog. Hours 1716.96 1638.02 1716.31 1715.04 1716.52 1638 1715.67 2184
3 Gear Breakdown Hrs. - - - - - - - 0
4 Power Supply Breakdown Hrs. 1.20 1.17 1.92 1.06 1.98 - - 0
5 Other Causes Breakdown Hrs. - - - - - - - 0
6 Total Breakdown Hrs. (3+4+5) 3.76 3.73 5.79 3.04 6.96 - - 0
7 Prog. Hours Radiated (2-6) 1713.20 1634.29 1710.52 1712 1709.56 1638 1715.67 2184
8 Total Hours of Working (1+7) 1758.70 1679.79 1755.69 1727.17 1726.26 1653.16 1730.84 2184
9 % B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)}
0.22% 0.23% 0.34% 0.18% 0.41% 0 0 0
8
2.3 DETAILS OF POWER OF TRANSMITTER FOR THE MONTH – JUNE 2011
LPT SULTANPUR
LPT RAIBAREL
Y
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR
DD I DD II
1 Rated Power of Transmitter (in KW / Watts)
500 Watt
500 Watt 500 Watt 500 Watt 100 Watt 500 Watt 300 Watt 10 Watt
2
Forward Peak Power of Transmitter
Video 500 Watt
500 Watt 500 Watt 500 Watt 100 Watt 167 Watt 300 Watt 10 Watt
Audio
3
Reflected Power
Video 2 Watt 3 Watt 3 Watt 3 Watt 1 Watt 2 Watt 1 Watt 0 Audio
4 Since when Transmitter is on less than rated power (if applicable)
5 Reasons for less than rated power
6 Reasons for high reflection, if any
9
2.4 DETAILS OF LOW POWER RADIATION FROM TRANSMITTER (Sync Peak Video Power less than rated power)
LPT
SULTANPUR LPT
RAIBARELY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR
DD I DD II
1 Dates
29.03.11
2 Duration
540 Hrs.
3 Power (Radiation)
167W
4 Reasons Both the P.A. has
gone to Low Power
5 Total duration of
Low Power in hours during
the month
540 Hrs.
6 No. of occurrences
1
7
Progressive total of
occurrences of Low Power Radiation
1
8 Progressive
total of duration of Low
Power Radiation
1688 Hrs.
9 Complaints of
reception, if any & Reason of complaints
NO
10
2.5 DETAILS OF MAJOR BREAKDOWN DURING THE MONTH (More than 15 minutes)
LPT ‘S Date Duration Period Reasons
for B/D Action
taken to solve the
B/D
Preventive action taken to avoid such breakdown in future From To
VLPT-MANKAPUR
Date Duration Period Reasons for B/D
Action taken to solve the
B/D
Preventive action taken to avoid
such breakdown in future
From To
2.6 CATEGORY-WISE BREAKDOWN DURING THE MONTH- MAY 2011
LPT’S
NAME OF LPT
GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.
SULTANPUR
DD I - - - - - - 72 1.20 - - - -
DD II -
-
-
-
-
- 70 1.17 -
-
-
-
RAEBAREILY -
-
-
-
-
- 112 1.92 -
-
-
-
GAURIGANJ - - - - - - 64 1.06 - - - - JAGDISHPUR -
-
-
-
-
- 119 1.98 -
-
-
-
LALGANJ -
-
-
-
-
- 0 0 -
-
-
-
RUDAULI - - - - - - 0 0 - - - -
11
VLPT - MANAKAPUR
GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor
No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. 0 0 0 0 0 0 0 0 0 0 0 0
2.7 CATEGORY-WISE PROGRESSIVE BREAKDOWN FROM MAY OF
CURRENT FINANCIAL YEAR 2011-2012
LPT’S
NAME OF LPT GEAR POWER SUPPLY OTHER CAUSES
Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.
SULTANPUR DD I -
-
-
-
-
-
225
3.76
-
-
-
-
DD II -
-
-
-
-
-
223
3.73
-
-
-
-
RAEBAREILY -
-
-
-
-
-
344
5.79
-
-
-
-
GAURIGANJ -
-
-
-
-
-
183
3.04
-
-
-
-
JAGDISHPUR -
-
-
-
-
-
419
6.96
-
-
-
-
LALGANJ -
-
-
-
-
-
0
0
-
-
-
-
RUDAULI -
-
-
-
-
-
0
0
-
-
-
-
12
VLPT-MANKAPUR
GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor
No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. 0 0 0 0 0 0 0 0 0 0 0 0
2.8 PERFORMANCE FIGURES OF TRANSMITTER LPT
SULTANPUR
LPT REBAREILY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR Remark
DD I DD II
Frequency of Vision Carrier
Frequency of Aural Carrier
K Factor
(1) K-Bar
(2) K Pulse to Bar
(3) K2T
Differential Gain
Differential Phase
Signal to Noise Ratio
Vision Peak Power
13
2.9 VIDEO FREQUENCY RESPONSE
NAME OF LPT Freq (MHz) Gain in dB
-1.25 -0.75 0.0 1.0 1.5 2.0 3.0 4.43 5.0 5.30 5.50
SULTANPUR DD I
DD II
RAEBAREILY
GAURIGANJ
JAGDISHPUR
LALGANJ
RUDAULI
VLPT- MANKAPUR
2.10 AUDIO PERFORMANCE FIGURES
LPT
SULTANPUR
LPT
RAIBARELY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR DD I DD II
Aural Carrier
Frequency response 50 Hz to 15 KHz
Distortion
Factor
F.M. Noise level
Frequency Deviation at 100% Modulation
14
2.11 WORKING STATUS OF 500W AUTO MODE TRANSMITTERS
(Wherever applicable)
S.No. Name of LPT Xtr. Make, Model,
Channel Whether
Operating on Auto / Manual Mode
Details of Fault
occurred
Current Working Status
(in detail)
Remarks
2.12 WORKING STATUS OF VLPTs (Wherever applicable) Sr. No.
Name of VLPT
Ch. No.
Type of Transmitter
Rated Power
O/P Power
Reflected Power
Ex-1
Ex-2
PA1 PA2 ASU
Sr. No.
Name of VLPT
Batteries (In circuit)
Solar Panel Battery Charger
Charge Controller
Installed Damaged Remark Installed Damaged Remark
2.13 EARTH RESISTANCE (in Ohms)
Station TX
EARTH PS
EARTH DG Set PDA-1 PDA-2 TOWER
Date of measurem
ent
Make, Model and type of Instrument
used for measurement
SULTANPUR 0.78 3.53 4.43 1.48 - 0.81 10.09.09 Waco
Digital earth Resistance Meter
RAEBARILY 0.86 1.1 - - - 1.0 15.09.09 Waco
Digital earth Resistance Meter
GAURIGANJ 0.84 1.4 1.6 - - 2.4 20.09.09 Waco
Digital earth Resistance Meter
JAGDISHPUR 0.48 0.46 0.41 0.39 0.47 0.49 12.07.09 Waco
Digital earth Resistance Meter
LALGANJ 0.74 0.68 1.24 0.92 1.73 0.51 11.08.09 Waco
Digital earth Resistance Meter
RUDAULI 0.78 - 1.6 1.0 1.0 - 25.09.09 Waco
Digital earth Resistance Meter
VLPT MANKAPUR - - - - - - - -
15
3. EQUIPMENTS & SPARES
3.1 REQUIREMENT OF SPARE COMPONENTS
Station Name of LPT
Name of Compon
ent
Part No. Name of Unit of
transmitter for which required
Quantity Required
Qty available
at Station
Qty issued to Station during
last six months
Justification for
requirement
SULTANPUR DD I TPV 8100B - PA 06 0 0 DD II
RAEBARILY GAURIGANJ TPV 8100B PA 06 0 0 JAGDISHPUR LALGANJ RUDAULI VLPT MANKAPUR
3.2 REQUIREMENT OF SPARE EQUIPMENTS / CARDS / MODULES
Station Name of LPT
Name of Equirpm
ent /Card/
Module
Part No. Name of Unit of
transmitter for which required
Quantity Required
Qty available
at Station
Qty issued to Station during
last six months
Justification for
requirement
SULTANPUR DD I DD II
RAEBARILY GAURIGANJ JAGDISHPUR LALGANJ RUDAULI VLPT MANKAPUR
16
3.3 AVAILABILITY OF SPARE -- COMPONENTS / MODULES /
TRANSMITTER UNITS
Spare Components
Station Name of LPT
Name of Spare Component
Qty. in Stock Working Status
SULTANPUR DD I DD II
RAEBARILY GAURIGANJ
JAGDISHPUR LALGANJ RUDAULI
VLPT MANKAPUR
Spare Transmitter Modules
Station Name of LPT
Name of Spare Component
Qty. in Stock Working Status
SULTANPUR DD I DD II
RAEBARILY GAURIGANJ
JAGDISHPUR LALGANJ RUDAULI
VLPT MANKAPUR
Spare Transmitter Units
Station Name of LPT
Name of Spare Component
Qty. in Stock Working Status
SULTANPUR DD I DD II
RAEBARILY GAURIGANJ
JAGDISHPUR LALGANJ RUDAULI
VLPT MANKAPUR
17
3.4 DETAILS OF DEFECTIVE TRANSMITTER EQUIPMENT
STATION Make &
Model of Transmitt
er
Name of defective
Tx equipment
Since when it is
defective
Action taken by Station for the repair
Shortcoming if any, being
faced by station for the repair
Remarks
SULTANPUR DD I
DD II RAEBARILY GAURIGANJ
JAGDISHPUR LALGANJ RUDAULI
VLPT MANKAPUR
3.5 WORKING STATUS OF AVR FOR TRANSMITTER
Station Capacity
of AVR Make and Type Working
Condition ( Auto/Manual/def)
Action Taken for repair, if defective
SULTANPUR DD I 10 KVA Sylvan o2 Auto - DD II 10 KVA Stabline 01 XDEL01 Auto -
RAEBARILY 10 KVA Delta Power 01 AutoGAURIGANJ 10 KVA Toshniwal 02 Auto
JAGDISHPUR 10 KVA Cybox 01 AutoLALGANJ 10 KVA Sylvan AutoRUDAULI - - -
VLPT MANKAPUR
3.6 WORKING STATUS OF DIESEL / PETROL / KEROSENE GENERATOR
SETS AT LPTs / VLPTs
Station Capacity of
Generator Make, Model and
Type Working Condition
Action
Taken for repair, if defective
SULTANPUR DD I 15 KVA, 10 KVA Kilosker HA294 OK
DD II 15 KVA Kilosker HA294 OK RAEBARILY 15 KVA 02 No. Kilosker HA294 OK GAURIGANJ 15 KVA, 10 KVA Kilosker HA294 OK JAGDISHPUR 12.5 KVA, 10 KVA Kilosker HA294 OK
LALGANJ 10 KVA Kilosker HA294 OK RUDAULI 15 KVA 02 No. Kilosker HA294 OK
VLPT MANKAPUR
- - -
18
3.7 TVRO ELECTRONICS
Station Make & Type
of IRDs Total No. available
Total No. Defective
Action taken by
Station for repair
Remarks
SULTANPUR DD I Scopus 2800 04 02
DD II
RAEBARILY Scopus 2800
Thamson DSR100T
0301 0
GAURIGANJ Scopus 2800 03 JAGDISHPUR Scopus 2800 03 01 LALGANJ Thamson
DSR100T 01 0
RUDAULI Scopus 2800 Thamson DSR100T
0301 0
VLPT MANKAPUR Scopus 2800 01
3.8 UPS
Station Make, Model and Rating of
UPS
Total No. available
Total No. Defective
Action taken by
Station for repair
Remarks
SULTANPUR DD I
DD II RAEBARILY GAURIGANJ JAGDISHPUR LALGANJ RUDAULI UPS - 6KVA One def. Communicate
to CE (NZ) VLPT MANKAPUR
19
3.9 AIRCONDITIONERS & AVRs
Station Total
No. at Station
Defective Nos.
Make and Model of defective
Date from
which defective
Reason for
Being defective
Action taken
by Station for the repair
Airconditioner
SULTANPUR 07 01 - - - Under
rep.
RAEBARILY 04
Split 02 - - - - -
GAURIGANJ 02
Split 02 - - - - -
JAGDISHPUR 03 - - - - -
LALGANJ 03 - - - - -
RUDAULI 04 01 - - - -
VLPT MANKAPUR
01 - - - - -
AVRs for ACs
SULTANPUR 06 - - - - -
RAEBARILY 05 - - - - -
GAURIGANJ 03 - - - - -
JAGDISHPUR
02 - - - - -
LALGANJ 03
-
-
-
-
-
RUDAULI 02 - - - - -
VLPT MANKAPUR
- - - - - -
20
3.10 DETAILS OF DEFECTIVE INPUT / MONITORING AND MEASURING EQUIPMENTS
Station Name of defective
equipment
Make and model of defective
equipment
Date from which
defective
Action taken by Station for the repairing
SULTANPUR
RAEBARILY
GAURIGANJ
JAGDISHPUR
LALGANJ
RUDAULI
VLPT MANKAPUR
3.11 WORKING FIGURES OF DIESEL GENERATORS
For LPTs only LPT
SULTANPUR
LPT REBAREILY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
DD I
DD II
Make Kirloskar HA294 HA294 HA294 HA294 HA394 HA294 HA294 HA294
Capacity 15 KVA 15 KVA 15 KVA 15 KVA
15 KVA 10 KVA
12.5 KVA 10 KVA 25 KVA 15 KVA
15 KVA Utilization for transmission during the month 118.01 116.87 134.92 361.33 234.68 146.70 304.08
Test Hrs. for the month 2.5 2.5 3.99 - 8.0 5.50 5.0
Total Working Hrs. for the month 12051 119.37 138.91 361.33 242.68 152.20 309.08
Progressive utilization 410.96 408.88 419.72 1175.36 1058.18 594.03 896.26
Occasion of utilization during the month 72 70 122 110 119 122 113
Progressive Utilization 226 224 389 359 419 414 363
Breakdown in service due to failure of D/G during the month
- - - - - - -
Average consumption of Diesel 2.13L/H 2.11 L/H 2.05L/H
2. 05L/H 2.31L/H 2.51L/H
2.0L/H 2.20L/H 2.31L/H 2.41L/H
3.04L/H Date of commissioning of DG set
Total Hours of working since date of commissioning
Reading of Hour Meter installed at DG Set at the end of month
Reading of Hour Meter installed at LT Panel at the end of month
21
4. CABLE OPERATORS MONITORING REPORT
MONITORING REPORT FOR THE IMPLEMENTATION OF CABLE TV NETWORK REGULATION ACT ZONE: NORTH ZONE DMC: FAIZABAD MONTH: JUNE -2011
S.N
o
State & Name of
Monitoring Station
Name & Address of
MSOs
DD CHANNELS TO BE CARRIED ON CABLE NETWORK Remarks/ Action Taken
(Identifying defaulter MSOs, Details about
complaints lodged with law enforcing agencies etc.)
Prime Band Channels
NON Prime Band Channels
DD
-Nat
iona
l
DD
-New
s
DD
-Reg
./ B
h art
i D
D-S
port
s
DD
-Urd
u
DD
-RS
Gay
an
Dar
shan
DD
-Bha
rti (
if no
t cov
erd
in P
rime
Ban
d)
1 U.P.
Faizabad Central Shakti Cable Network
YES YES NO YES YES NO NO NO Both the cable operators are going to increase their channel capacity shortly then they will provide other channel also.
2 U.P. Faizabad
Central Cable Network
YES YES NO YES NO NO NO NO
3
♣♣♣♣♣♣