PROJECTLEAFLETKEMI, AJOS, FINLAND MONPILE, OFFSHORE WIND POWER TURBINE FOUNDATION
Terramare Oy
Laurinmäenkuja 3 A
PO Box 14, FI–00441 HELSINKI, FINLAND
P +358 9 613 621 | F +358 9 6136 2700
www.terramare.fi PAGE 1/4
FEATURES
Client PVO–Innopower Oy (Since 2011, Innopower Oy)
Location Kemi, Ajos, Finland
Period Year of completion 2009
Contractor Terramare Oy
SCOPE
Monopile – a wind power turbine test foundation project, including dredging of overburden, drilling, blasting and dredging of the foundation pit, and transportation, installation and concrete casting of the steel foundation cylinder. The contract also included supporting services for the installation of the actual wind power turbine tower utilizing the multi-purpose platform Playmate.
INTRODUCTION | MAIN PLANT >
A Installation of a power plant test tower into the Monopile foundation.
A
B Northern sea and winter conditions were analyzed in a Monopile foundation test.
B
PAGE 2/4
MONOPILE STRUCTURE
Mon
opile
foun
datio
n cy
linde
r 17
.5 m
+ 3.
0 m
Con
cret
e 8.
0 m
Pow
er p
lant
test
tow
er +
80.
0 m
Rock
INTRODUCTION
In the Gulf of Bothnia, near the port of Ajos a research project has been initi-ated in which a new solution for off-shore wind farm foundations is being piloted in 2009–2010. The applicabil-ity of the new technology, particularly in northern sea and winter conditions,
will be analyzed in a test foundation called Monopile. The ob-jective of the project is to develop a cost-effective foundation solution for extensive offshore wind power farms.
Dredging of Overburden, Drilling and Blasting
The project was commenced by dredging the overburden. The sediment layer covering the bedrock surface was removed with a backhoe dredger at level –7 metres. After this phase,
C
PAGE 2/4
C Installation of the 80 metre power plant test tower was executed by utilizing the upgraded Playmate, a specialized multi-purpose drill platform with a bearing capacity of 1,000 tonnes.
a cylinder-shaped pit was blasted in the sea bottom. The diameter of the pit was 5 metres and its depth 8 metres. The emptying of the pit was executed with a grab bucket and an airlift pump.
Installation of the Monopile Foundation Cylinder
The 100-tonne steel Monopile foundation cylinder was transported with the fl oating crane Nosto-Pekka. The cyl-inder was erected in the excavated pit to exact tolerances, after which it was cast in concrete both inside and outside.
LOCATION OF THE MONOPILE FOUNDATION
0 500 m
Ajos Harbour, Kemi
Location of Monopile
Kemi Wind Farm
D E
F G PR
OJE
CT
LEA
FLET
— M
ON
OPIL
E, O
FFSH
OR
E W
IND
PO
WER
TU
RB
INE
FOU
ND
ATI
ON
TER
RA
MA
RE
OY
— W
WW
.TER
RA
MA
RE.
FI
PAGE 3/4
G
F
E
D The backhoe dredger Marika was used in dredging the overburden of the Monopile foundation.
The drill platform Pora-Eero was used for underwater drilling and blasting and for installation support of the foundation cylinder.
The tower body tubes and concrete elements were transported with the work platform Paalu.
The floating crane Nosto-Pekka was used for transportation of the foundation cylinder and for hoisting it into position.
>
KEMI, AJOS, FINLAND MONPILE, OFFSHORE WIND POWER TURBINE FOUNDATION
This
info
rmat
ion
cont
aine
d in
this
dat
a le
afl e
t is
for
guid
ance
pur
pose
s on
ly a
nd m
ay b
e su
bjec
t to
chan
ges.
© C
opyr
ight
Ter
ram
are.
All
right
s re
serv
ed.
Terramare Oy
Laurinmäenkuja 3 A
PO Box 14, FI–00441 HELSINKI, FINLAND
P +358 9 613 621 | F +358 9 6136 2700
www.terramare.fi PAGE 4/4
The top of the Monopile foundation cylinder was at a level of +3 metres above sea level after casting.
Power Plant Tower Installation
On the Monopile foundation a power plant tower constructed of three body tubes was installed. The tubes were transported on a towable work platform to the foundation area. Tower tubes and concrete elements corresponding in weight to an actual engine room were lifted up to 80 metres. The installation work was done from Playmate, a specialized multipurpose drill plat-form.
Multi-Purpose Drill Platform Playmate
The upgraded multi-purpose drill platform Playmate, which has a bearing capacity of 1,000 tonnes, was used as the crane base in the installation of the tower tubes and elements. The versatile Playmate, which has been technically fully upgraded, also serves as a platform for piling and concreting as well as a drill platform for underwater drilling and blasting.
MAIN PLANT IN MONOPILE PROJECT
Backhoe Dredger Marika
Self propelled barges Adam and David
Floating Crane Nosto-Pekka
Drill Platform Pora-Eero
Work Platform Paalu
Multi-Purpose Platform Playmate
H
H Installation of the concrete elements on top of a test tower.