CONTENTS
1
2 Excavationandearthwork
3 Concretework
4 Masonrywork
5 Thermalandmoistureprotection
6 Structuralsteel
7 Roofingwork
8 Metalwork,doorsandwindows
9 Floorwallandfinishing
10 Paintinganddecoration
11 Electricitywork
Bill No. 03 : Toilet Blocks
12 Excavationforsewagesanddrainage
13 Concretework
14 Masonrywork
15 Thermalandmoistureprotection
16 Structuralsteel
17 Roofingwork
18 Metalwork
19 Floorwallandfinishing
20 Painting
21 Plumbingandventilation
Bill No. 02 : Room Works
BILL OF QUANTITIES
PROPOSED RENOVATION OF MIN. LABOR AND PUBLIC SERVICES OFFICES
Bor, Joglei State
Bill No. 01
Preliminaries
7/24/2019 BOQ Sample 2
2/18
Amount Amount
USD ( Per SQ.M ) %
Bill No. 01
1 Preliminaries -
Bill No. 02 : Room Works
2 Excavation
and
earth
work
-
3 Concretework -
4 Masonry
work -
5 Thermal
and
moisture
protection -
6 Structural
steel -
7 Roofingwork -
8 Metal
work
,doors
and
windows -
9
Floor
wall
and
finishing
-
10 Paintinganddecoration -
11 Electricity
work -
-
Bill No. 03 : Toilet Blocks
12 Excavationforsewagesanddrainage -
13 Concrete
work -
14 Masonry
work -
15 Thermalandmoistureprotection -
16 Structural
steel -
17 Roofing
work -
18 Metal
work -
19 Floorwallandfinishing -
20 Painting
-
21 Plumbing
and
ventilation -
-
-
-
Total Gross Floor Area (m) 406
Price per SQ. m -
Summary of Bill Carried to Grand Summary
BILL OF QUANTITIESPROPOSED RENOVATION OF MIN. LABOR AND PUBLIC SERVICES OFFICES
Bor, Joglei State
SUMMARY
Item Description
7/24/2019 BOQ Sample 2
3/18
Item Description Qty Unit Rate$ AmountUSD
A. BillNo:01 PRELIMINARIES
Notes
Thecontractorshallprovideandmaintaintemporaryshedsforthestorage
ofmaterials,tools,andtheuseofallpersonsemployedontheSite. Those
usedforthestorageofcementandotherperishablematerialsandthelikeare
to be weather roofed at all times
1 item
ThecontractorshallProvide,maintainandkeepinacleancondition
adequatetemporarysanitaryaccommodationandfacilities,ANDAFirstAid
Boxinaccordancewithlocalregulationsforallpersonsemployedonthe
Works.
TheContractorshallProvide,maintainandkeepinacleancondition
adequatetemporarysanitaryaccommodationand
facilitiesinaccordancewithlocalregulationsforall
ersons em lo ed on the Works.
1 Item
ThecontractorshallProvideforsupplyingtemporaryelectricityforthe
Worksandfacilitiesofthecontractorincludingconnection,distribution
systemforthework,internalarrangementsandallpaymenttotheauthorities
forconnections.It
is
the
responsibility
of
the
Contractor
to
ensure
steady
and
uninterruptedpowersupplytoWorks. TheContractorshallnotbeentitledto
claimandtheEmployershallnotpaycostincurredbytheContractorfor
powersupplyorforusingelectricpowergeneratorsorforusingother
alternativepowersupplymethodsincasetherehappenstobeneedforsuch
powersupplyforwhateverreason.
1 Item
ThecontractorshallProvide forprovisionofwater fortheworksincluding
drinkingwater,andpayingallchargesandotherexpensesinconnectionwith
thesupplyfromwatermainsoranyotheralternativemethodofwatersupply,
storageanddistribution. Itisthesoleresponsibilityofthecontractorto
ensuresteady,uninterruptedadequatesupplyofwaterrequiredformain
contractandnominatedsubcontractwork.
1 Item
A.1 Allowforprovidingandmaintenanceofnameboard(advertisingboard) to
thespecificationsandasdirectedbytheEngineer. 1 Item
A.2
Allowfor mobilizationIncluding:AlltheContractor'splant,machinery,other
equipments,workforceetc tothesite,settingout,establishingbench
marks,andallpreliminaryworksincludingthoseNotedabove
1 Item
A.3 Allowfor providingThree(3)MetallicFlagPolesandMasonryFlagarea
PlatformtothespecificationsandasdirectedbytheEngineer. 1 Item
ToSummary
A SubTotalBill01:Preliminaries
BILLOFQUANTITIES
PROPOSEDRENOVATIONOFMIN.LABORANDPUBLICSERVICESOFFICESBor,JogleiState
7/24/2019 BOQ Sample 2
4/18
B BillNo02Roomwork
B.1 EXCAVATIONSANDEARTHWORKS
Unlessotherwisestated,Rateshallincludefor
a)backfillingwithselectedexcavatedmaterial&consolidating;compaction
beforebackfillingaround thefoundationplinthwall
b)disposal
of
surplus
soil
as
directed
&
keeping
all
excavations
free
from
waterunlessotherwisemeasuredseparately.
c)anyadditionalexcavationforworkingspace.
d)excavatinginanymaterial,includingrunningsandandrock,commencing
excavationatanydepth,excavatingbelowthenormalwatertable,excavating
aroundexistingservicesandmains,supportingtheverticalsidesof
excavations and fillin soft s ots.
Excavation&EarthworkSupports
B.1 Clearingandpreparationofthesiteincludingremovaloftopsoiluptoa
depthof150mmanddisposedoffasdirected.2800 m
B.2
Excavationforstripfoundationstrench;0.60mwideby1.2mdeep fromthe
strippedlevelinanymaterialexceptrock:includeremovalofsurplusas
directed,andbackfillingaroundthestripfoundationwithslectedexcavated
material: ram and com act well .
217 m
B.2a
ExcavationforColumnFootings;1.0mwideby1.0mby1.8mdeep fromthe
strippedlevelinanymaterialexceptrock:includeremovalofsurplusas
directed,andbackfillingaroundthestripfoundationwithslectedexcavated
material: ram and com act well .
79 m
B.2b
ExcavationforSplashApron0.45mwideby0.9mdeep fromthestrippedlevel
inanymaterialexceptrock:includeremovalofsurplusasdirected,and
backfillingaroundthestripfoundation,andfillingwithslectedexcavated
material;leveled,rammedandcompactedwell.
56 m
Filling
B.3 Fillingunderfloorswith300mmThick HardcoreLayerofsize80mmto
150mm.S readin waterin andwellrammin in50 m
B.4
Fillingunderfloorswith300mmthickMurramLayer.Spreading,wateringand
wellrammingin.Murramshallbeplacedinlayersof notmorethan150mm
andwellcompactedbeforeaddingthenextlayer.
190 m
B.4a DittoforSplashApronFillingunderfloorswith150mmthickMurram.
Spreading,wateringandwellrammingin37 m
B.5 50mmthickSandblinding 6.00 m
B.6
Anti termitetreatmenttofillingsandtopsoffoundations:as"Aldrex"or
equalandapprovedinsecticidetreatment:appliedinaccordancewiththe
manufacturer'sprintedinstructions:includefor10yearswarranty period.
635 m
B ExcavationandEarthWorks ToSummary
7/24/2019 BOQ Sample 2
5/18
C CONCRETEWORKS
a RateshallincludeforallthenecessaryFormworkandaccessories,including
wrinches nails etc.Note
b
RateshallincludeforFormworkdepositing&shutteringincluding
wrinches,nails,handling,hoistingintoposition,vibrating,curingetc.and
makin oodafterremovalofformworketc.
Note
b Reinforcementsarepaidseparatelyunlessotherwisespecifiedintheitem Note
c
Rateshallincludeforsupplyingandlayingofgauge1000polytheneonground
whereconcreteisindirectcontactwithground,beforepouringconcrete
unless otherwisemeasuredseparately.
Note
d Rateshallincludeforcuringthreetimesadayfor7days. Note
InSituConcrete:
Insituconcreteclass20/20mmaggregates asdescribed.
C.1 SupplyingandplacingofC.20screedconcreteasspecifiedto200mmthick
concretestripfoundationfootings24.00 m
Ditto:100mmthickblindingunderstripfoundation 12.00 m
C.1a Ditto:100mmthickSplashApron 6.00 m
Ditto:100mmthickblindingundercolumnsfooting 4.40 m
Insituconcrete
class
25/20mm
aggregates
as
described:
C.2
SupplyingandplacingofC.25concreteasspecifiedto250mmthickconcrete
Columnfootings11.00 m
C.2a
Ditto:to100mmthickfloorSlab 64.00 m
C.2b
Ditto:toColumns 5.00 m
C.2c
Ditto:toshortcolumns 4.00 m
C.2d Ditto:to(250mmx200mm)GroundBeams 15.00 m
Ditto:toseptictanks200mmthickness 8.00 m
Dittoto:(250mmx200mm) RoofTieBeamsBeams 15 m
Reinforcement
Ratetoincludeforsupplying,cleaning,cutting,bending,fabricating,placing
andthe
provision
of
all
necessary
temporary
fixings
and
supports
etc.
includingbindingwires,bends,hooks,tyingwires,chairs,distanceblocks,
steel se arators s acers
C.3
Torsteel reinforcement(toBS4449andcharacteristicstrengthfy=
460N/mm2)andMildsteelreinforcement(toBS4449andcharacteristic
stren thf =250N/mm2
1000 kgs
C.4 R6mildsteelreinforcementbarsbStirrups
C.5 Highyieldreinforcementbars(Y12) 4000 kgs
Supplying& laying A142BRCnet for groundfloorslab:includelapsand
waste635 m
C.6
C.7
C.8
C ConcreteWorks ToSummary
7/24/2019 BOQ Sample 2
6/18
D MASONRYWORKS
a
Rateshallincludeforallthescaffolds,lifting,handling,weightingallroughand
faircutting,plumbingangles,normalstraightcutting,formingrebatedreveals
andrakingoutjointsforplastering,andcuringthreetimesadayfor7days.
b TheContractorisrequiredtousesolidprecastBlockwork. Note
MasonryWork
UptoDPClevel
D.1 Solidconcreteblockwallsincementsand(1:4)mortarinsteps
D.2 225mmthickSolidBlockPlinthwallsincementsand(1:4)mortarin
foundations483.00 m
Blockwork
D.3 200mmthickwallsinstandardprecastsolidcementblocks in1:4cement
sandmortarforthewalls. 906 m
D.3a Ditto.forSplashApron 110 m
`
D MasonryWork ToSummary
E THERMALANDMOISTUREPROTECTION
DampProofCourse
E.1 Horizontaldampproofcourse:bituminous:laidhorizontallyonscreeded200
mmthick(1:3)screededbedstoreceiveblock walls. 50 m
Dampproof membrane
E.2
Horizontaldampproofmembrane:1000gaugepolythenemembrane:laidon
compacted fillings(measuredseparately)ingroundfloor slab.(Therate
shallincludeforla s&wasta e .
635 m
E ThermalandMoistureProtection ToSummary
7/24/2019 BOQ Sample 2
7/18
F ST RUCT UR ALSTEELWORKS
Definitions
Weldingisdeemedtobeinaccordancewiththespecificationandforthe
materialtowhichitistobeused.Gussetplates,shoeplates,ends,caps,
cleats,brackets,stiffeners,bolts,etc.,havebeenincludedtotherateofthe
associated steel worksNote:
a] Forthedescriptionofmaterialsand workmanshipreferto"Specification
of works", "preambles"and"Drawings". Note
b] Rateshallincludefor Note
b.1] Allshopfabricationwork,marking,delivery,unloading,hoisting,erecting
andfixingasper detaildrawings. Note
b.2] Allweldsare6mmthickfilletweld&allowanceforrollingmargin. Note
b.3] Theweightofweldmetalinweldedconstructions. Note
b.4] Membersofanylength. Note
b.5] Cuttingtosizeandshapeandjointsintherunninglength. Note
b.6] Grindingtoasmoothfinish,unlessotherwiserequired. Note
b.7] Machinedrilledboltholes,bolts,nutsandwashers,cleats,shoeand
gussetplatesandallotherconnections. Note
b.8] Afterfabricationwirebrushedtocleantheallsteelsurfacesandspray
paintedwithtwocoatsofquickdryingmetalprimerzincphosphate&two
coatsofmattanticorrosivewithnecessaryaccessories.
Note
Fabricatinganderectingframedstructures Note
F.1a
RooftrusstypeT1;spanning15600mmwidex4500mmhigh,consistingof
80x60x6mm(doublebottommember)structuralrectangulartubemembers
weldedtogussetplateallasperdetaildrawing;Rateshallincludeforpainting
as s ecified.
86 No
F.1b
RooftrusstypeT2;spanning3000mmwidex2200mmhigh,consistingof
80x60x6mm(doublebottommember)structuralrectangulartubemembers
weldedtogussetplateallasperdetaildrawing;Rateshallincludeforpainting
as s ecified.
20 No
RooftrusstypeT3forthePorcharea;spanning7800mmwidex2500mm
high,consistingof 80x60x4mmstructuralrectangulartubememberswelded
togussetplateallasperdetaildrawing;Rateshallincludeforpaintingas
s ecified.
324 No
F
Purlins
Supplying&fixingofZedpurlins,100x50x2mm:weldedtorooftrusses(
measuredseparately)at850mmcentres:completewithalltherequiredpaint
worksandallnecessar su orts
620 m
G
StructuralSteelWorks ToSummary
7/24/2019 BOQ Sample 2
8/18
a.01
ROOFINGWORKS
a.02 Rateshallinclude;
All,rivets,nails,clips,stripsanddeliveringandfixinginposition. Note
G.1 Note
Roof plumbingshallbemeasured&groupedseparately;
RoofCovering Note
G.2
Supplying & fixing ofgauge28prepaintedIT4(SuperEcooritsequivalent)
profiled roofing sheetsofapprovedcolour:fixed withJboltsto100x50x
2mmzedpurlins(measuredseparately) andrubbercapingtotopsofbolts
648 m
Ridges
G.3
Supplying&fixingGauge28prepaintedridgecap;650mmgirth(average)in
positioncompletewithallnecessaryroofingscrewsorhooksasrequired. 120 m
G.4
FasciaBoard
G.5
30x200mm,high1.2mmthickSteelRoofFasciaBoardfixedtoedgesofrafters
includingnecessary
fittings
screws
etc.:
including
painting
as
specified
138 m
Supplying&fixingofPVCsquareeaveguttersofcrosssection200mmx
200mmorass ecified includin allnecessar accessories138 m
a.02
Supplying&fixingof110diaPVC rainwaterdownpipeswithmetalstrapsto
concreteblockworkasperdetailonDrawingat1000mmcentresvertically 50 m
a.03
CielingConstruction
G.5 ratesshallincludeandgavanizessteelnetworkasspecificationanddrawing
provide&fixingaluminumfalseceiling 638 m
G
H
a RoofingWorks ToSummary
b
METALWORKS DOORSANDWINDOWS
b.01
Theworkshallincludesupply,fabricateandinstallationofdoors,windows,
madeoutof steel tobefinishedaspertherespectivespecification&
drawin s.b.02
Doors &Windowsframesectionstobeof, Note
b.03
Outerframe&Innerframe 75mmx75mmminimum FinishSize,unless
otherwisestated.
b.04
Thecontractorshallsubmitshopdrawingsfortheapprovalofthe Engineer,
priortofabrication. Note
b.05
Thecontractorshallrefertoallrelevantspecificationsanddrawingspriorto
pricinganditshallbehisresponsibilitytocompletethesaidworkstothe
entiresatisfactionoftheEn ineeratnoadditionalcost
Note
c
AllsamplesshallbeprovidedforEngineer'sapprovalpriortopurchaseof
material.Note
c.01
Whereswingdoorshasbeenspecifiedpricesshallincludeforprovisionsof
floorhinges.Note
c.02
7/24/2019 BOQ Sample 2
9/18
Ratesshallinclude; Note
c.03
Hoistingandfixinginposition,drillingandmakinggood.
c.04
Alltheshopdrawings,asmayberequired,shopfabricationwork,marking,
deliver unloadin hoistin erectin andfixin in laceNote
c.05
Afterfabricationwirebrushedtocleanthesteelsurfacesandspraypainted
withtwocoatsofquickdryingmetalprimerzincphosphate&threecoatsof
mattanticorrosivewithnecessar accessories.
Note
d
Rateto
include
for
providing
sundry
items
related
to
the
door
&
windows
like
stoppersetc..Note
d.01
Rateshallincludefor5mmthickonewaytintedglassasappropriatetosuit
therespectivedoorsandwindowsasshowninthedrawings.Note
d.02
Sizes Note
e
ThesizesgiveninthedrawingsanddescriptionofBillofQuantitiesare
finished sizesandsubjecttosame permittedinthespecifications.
e.01
Thecontractorshallcheckthe measurementofopeningsphysicallyatthesite
beforefabricatin thedoors&windows.Note
e.02
Ironmongery Note
f
Allthelocksshallbeunion/Yaleorapprovedequivalentsuppliedby
authorizeddealer
appointed
by
the
manufacturer
&
approved
by
the
En ineer.f.01
AllironmongeryshallbeheavyqualitybrassofapprovedEuropean
manufacturesubject toapprovaloftheArchitect,ironmongerysamples
shouldbesubmittedfora roval.
Note
Painting/FinalFinish Note
H.1
Unlessotherwisestatedallsurfacesofmetaldoors andwindowsand
casementsanddoorsashesshallbefinishedwiththreecoatsofoilpaint,with
thecolourtobeapprovedonsitebytheEngineerpriortoapplication.
H.2
Metaldoors Note
H.3
Metaldoorset,typeD1,twoshuttersofsize1800x2200mmhighoverall,
comprisingof
100mm
steel
channel
frame
fully
welded
and
mitred
at
corners:
includefor5mmthickonewaytintedglassandallnecessarydoorlocks,iron
mongery,finalfinish,&fixingtoconcreteorblockwork
2 Nos.
H.4
Metaldoorset,typeD2,ofsize120x2200mmhighoverall,comprisingof
100mmsteelchannelframefullyweldedandmitredatcorners:includefor
5mmthickonewaytintedglassandallnecessarydoorlocks,ironmongery,
finalfinish,&fixingtoconcreteorblockwork
8 Nos.
H.5
Metaldoorset,typeD3,ofsize900x2100mmhighoverall,comprisingof
100mmsteelchannelframefullyweldedandmitredatcorners: includeforall
necessarydoorlocks,ironmongery,finalfinish,&fixingtoconcreteor
blockwork
20 Nos.
MetalWindows
H
Standardsteelcasementwindowset,typeW1,ofsize1200mmx100mmhigh
overallcompletewithstays,comprisingof 100mmsteelchannelframefully
weldedand
mitred
at
corners:
include
for
5mm
thick
one
way
tinted
glass
and
allnecessaryfastenersandironmongery,finalfinish,&fixingtoconcreteor
blockwork.Thewindowsaretobeprovidedwithbarglarproofingasper
drawingsandopeninginwards.
39 Nos.
SteelwindowGrilleset,typeG1,ofsize3360mmx1200mmhighoverall
completewithstays,comprisingof 50x50mmx3mmmmSquareHollow
Sectionsframefullyweldedandmitredatcorners:includefor4mmwelded
Mesh,infilledwithanintegralinsectscreen,finalfinish,&fixingtoconcreteo
blockworkasperdrawings.Provideforsun/rainshade/canopiesabovethe
30 Nos.
I
Metal Work Doors & Windows ToSummary
7/24/2019 BOQ Sample 2
10/18
a
b FLOOR,WALLANDCEILINGFINISHES
Therateshallincludeforalltemporaryrules,screeds,groundsetc.forraking
outjointsofnewbrickworkorhackingnewconcreteforkey,internal&
curvedangles,jointsbetweendifferentsurfacesarisesquirks,intersections
between curved or irre ular sections.I.1
AllsamplesshallbeprovidedforapprovalbytheEngineerpriortopurchaseof
materials. NoteI.2
WallFinishes Note
25mmthickcement&sand(1:5)plasterfinishedsemiroughwithwoodfloat
onexternalfaces,onblockwallsorconcretesurfaces.ProvideforPointing
Groovesinthefinishas erthedrawin s
906 m
20mmthickcementlimesand(1:1:5)plasterfinishedsmoothwithlimeputty
orapprovedequivalentoninternalfaces,onblockwallsorconcretesurfaces. 906 m
I.3
Floorfinishes
I.4
I.5
450mmx450mmPorcelainfloortilesinclusiveofskirting,100mmhigh.Rate
shall
include
the
necessary
screed,spacers
etc.(Samples
of
Tiles
to
be
approvedbytheengineer)
635 m
I.5a
DittoforthePorches 25 m
20mm.thickcementandsand1:3screedfinishedsmoothtoSplash
Apron:Sloped55 m
I.6
Ditto:Treadsandrisers 3 m
I PlinthPlaster
25mm.thickcementandsand1:3plinthplasterfinishedsmooth.
J 15 m
a Floor,Wall&CeilingFinishes ToSummary
bPAINTINGWORKS
Rateshallincludeforpreparationofsurfacecleaningdown,smoothing,
knotting,stoppingetc.protectionoffloorsandfittings,furniture,etcand
cleanin doorsandwindowsetc.u oncom letion.J.1
Paintshallbefromapprovedcolourwithapprovedmanufacturer. Note
J.2
Walls Note
J.3
Prepareandapplyonecoatofprimerandthreecoatsofweathershieldpaint
ofapprovedcolourandqualitytoexternalfacesofwalls906 m
J.4
PrepareandapplyonecoatofprimerandthreecoatsofVinylemulsionpaint
ofapprovedcolourandqualitytointernalfacesofwalls 906 m
J Ditto:Plinths 20 m
K
a PaintingWorks ToSummary
7/24/2019 BOQ Sample 2
11/18
b
ELECTRICAL INSTALLATIONS
K.1
Unlessotherwisestated,RatesinBillofQuantitiesshallincludeallnecessary
Hacking,provisionofholes,allmaterialsincluding;Cables,conduits,PVCsunk
box,bulbs,switchesetc.)andlabourrequiredtocompletetheelectrical
installation to ood workin order.
Note
Testingandcommissioningoftheelectricalinstallationistobecarriedoutby
thecontractorandCostofsuchtestingandreportstobeincludedintherates
unlessotherwise
mentioned
se aratel .
Note
MCCB,MCBshallbemanufacturedbyHarvels,Merlin Gerin,F&G,Moleror
equivalent &approvedbytheEngineer.
SupplyandinstallationofChangeoverswitchgear,controlpanelcubiclemade
outof(2mmthickness)sheetsteelenclosure,withallassociatedCircuit
BreakersfortheLights,SocketsandCielingFanstotheapprovalofthe
en ineer include for all associated wirin .Item
K.2
Note
K.3
providesockets,wires,switches,PVCsunkboxandinstallation 1 item
providelamps 31 No
K.4
SupplyandinstallationofapprovedtypeceilingFans,completewiththe
neccessar switchesandconcealedwirin .20 No
L
Airconditions
a theratesinlcudedprovidingandinstallationfortheairconditions 7 No
b
ElectricalWorks ToSummary
c
PROVISIONAL SUMS
L.1
Thework
to
be
done
and
or
materials
to
be
provided
which
is
covered
by
the
followingProvisionalSumsformpartoftheWorksandshallbecompleted
withintheTimeforCompletionfortheapplicableSectionorPortionofthe
Works.L
PaymentsagainsttheProvisionalSumsshallbesubjecttoawritten
instructionbytheEngineerforanyadditionalworksdeviatingfromthetender
documents
Note
Wherenoinstructionshavebeenissuedinrespectofadditionalworksagainst
theprovisionalsum,thevalueoftheprovisionalsumshallbedeductedfrom
thecontractor'scontractsum.
Note
B
Allowprovisionalsumtocoverpossibleadditionalcostsduetoanydeviation
fromthetenderissuedocuments.Paymentsagainstthisitemshallbesubject
toanEngineer'sinstructionforadditionalworks.Anysumsagaisnt thisitem,
forwhichnoinstructionhasbeenissuedshallbedeductedfromthefinal
certificateofpaymentduetothecontractor.
Note
PS
Provisional Sums 1
ToSummary
SubTotalBill02: Room Works
7/24/2019 BOQ Sample 2
12/18
BillNo.03ToiletBlock
EXCAVATIONSANDEARTHWORKS
Unlessotherwisestated,Rateshallincludefor
a)backfillingwithselectedexcavatedmaterial&consolidating. Surface
treatment;compactionbeforefilling/foundation
b)disposal
of
surplus
soil
as
directed
&
keeping
all
excavations
free
from
waterunlessotherwisemeasuredseparately.
c)anyadditionalexcavationforworkingspace.
d) Treeswillrequireprotection
B.1
e)keepingtheexcavationsfreeofwater(includingrainwater),plankingand
strutting,etc
f)excavatinginanymaterial,includingrunningsandandsoftrock,
commencingexcavationatanydepth,excavatingbelowthenormalwater
table,excavatingaroundexistingservicesandmains,supportingthevertical
sides of excavations and fillin soft s otsB.2
Excavation&Earthworks
B
Clearingandpreparationofthesiteincludingcuttingdown smalltreesand
shrubsandremovaloftopsoiluptoadepthof150mmandextendupto2m
beyondtheouterwallsofthebuilding&disposedoffasdirected.
32 m 0
Bulkexcavations
C
Excavationforseptictank(4.0mx2.5mx4.0m)deepfromthestrippedlevelin
anymaterialexcepthardrock:includeremovalofexcavatedmaterialand
de ositawa asdirected.ProvideforWorkin S ace
106 m
C
ExcavationandEarthWorks ToSummary
a
b ConcreteWork
CONCRETEWORKS
C.1 Rateshallincludeforformworkdepositing,handling,hoistingintoposition,
vibrating,curingetc.andmakinggoodafterremovalofformworketc.
C.2
Reinforcementsarepaidseparatelyunlessotherwisespecifiedintheitem Note
C.3
Note
C.4 Insituconcreteclass20/20mmaggregates asdescribed.
C.5 SupplyingandplacingofClass20,concreteasspecifiedon100mmthickbeds 2 m
Ditto:suspendedslabs:4.0mx2,5mwith200mmthick 4 m
Ditto100mmThick,(Ratio:1:3:6)PlainConcretetotheentrance 2.00 m
Supportcolumns150mmx150mmThick,(Ratio:1:3:6)Concrete 1.00 m
SupportmidlevelBeam200mmx200mmThick,(Ratio:1:3:6)Concrete 1.00 m
C.6
7/24/2019 BOQ Sample 2
13/18
Reinforcement:
C.6
Ratetoincludeforsupplying,cleaning,cutting,bending,fabricating,placing
andtheprovisionofallnecessarytemporaryfixingsandsupportsetc.
includingbindingwires,bends,hooks,tyingwires,chairs,distanceblocks,
steelseparators/spacers(designedlapsandm.s.chairsifanyincludedin
C.7
Torsteel reinforcement(toBS4449andcharacteristicstrengthfy=
460N/mm2)andMildsteelreinforcement(toBS4449andcharacteristic
strengthfy=250N/mm2)
Note
C Y12 highyieldreinforcementbars(standardlength12m) 500 kgs
R6mildsteelreinforcementbars(6mstandardlength).Stirrupstobeevery
200mmc/c.250 kgs
D
Lintelsoveropenings(size200x200mm)incrosssection:including 4No.T10
barsandR6linksat100mmcentres,completewithallformwork 24 m
a
ConcreteWorks ToSummary
D.1
MASONRYWORK
D.2
Rateshallincludeforlifting,handling,weightingallroughandfaircutting,
plumbingangles,
normal
straight
cutting,
forming
rebated
reveals
and
raking
outjointsforplastering.
UptoDPClevelSubstructure Note
D.3
225mmthickSolidBlock wallsincementsand(1:4)mortarforthe
substructurewall,6.3mhigh
50 m
D DittoforCurtainWall,0.6mDeep
10 m
Concreteblockwork
E
200mmthickSolidBlock wallsin1:4cementsandmortarforthewalls. 106 m
E.1 MasonryWork ToSummary
E THERMALANDMOISTUREPROTECTION
Dampproofcourse
F
Horizontaldampproofcourse:bituminous:laidhorizontallyonscreeded20
mmthick(1:3)screededbedstoreceiveblock walls.18 m
ThermalandMoistureProtection ToSummary
STRUCTURAL METALWORK
Definitions
Weldingis
deemed
to
be
in
accordance
with
the
specification
and
for
the
materialtowhichitistobeused.Gussetplates,shoeplates,ends,caps,
cleats,brackets,stiffeners,bolts,etc.,havebeenincludedtotherateofthe
associated steel work in which the occur.
Note: Note
a] Forthedescriptionofmaterialsand workmanshiprefer"Specificationof
works", "preambles"and"Drawings".
b] Rateshallincludefor Note
b.1] Allshopfabricationwork,marking,delivery,unloading,hoisting,erecting
andfixingasper detaildrawings.Note
7/24/2019 BOQ Sample 2
14/18
b.2] Allweldsare6mmthickfilletweld&allowanceforrollingmargin. Note
b.3] Theweightofweldmetalinweldedconstructions. Note
b.4] Membersofanylength. Note
b.5] Cuttingtosizeandshapeandjointsintherunninglength. Note
b.6] Grindingtoasmoothfinish,unlessotherwiserequired. Note
b.7] Machinedrilledbolt,holes,bolts,nutsandwashers,cleats,shoeand
gussetplatesandallotherconnections.Note
F.1
b.8] Afterfabricationwirebrushedtocleantheallsteelsurfacesandspray
paintedwithtwocoatsofquickdryingmetalprimerzincphosphate&two
coatsofmattanticorrosivewithnecessaryaccessories.
Note
F.2 Fabricatinganderectingframedstructures Note
Roof structures
F
Rooftruss,T.4,spanning1700mmwide;tapperedallasperDrawing.
7/24/2019 BOQ Sample 2
15/18
Purlins 6 No
G
Supplying&fixingofZedpurlins,100x50x2mm:weldedtorooftrusses(
measuredseparately)at900mmcentres:completewithalltherequiredpaint
worksandallnecessar su orts
30 m
a.01 StructuralMetalWorks ToSummary
a.02
ROOFCOVERINGSANDROOFDRAINAGE
a.03
Rateshallinclude;
a.04
All,rivets,nails,clips,stripsanddeliveringandfixinginposition. Note
AlltimbershallapplyPrimingbacks&applyingtwocoatsofanapproved
woodpreservativebeforefixing.Note
G.1
Alltimbershallhavefinalfinish;Twocoatofwoodpreservative,twocoatsof
primer,twocoatsofwoodsheenspraypaint.Note
Roof drainageshallbemeasured&groupedseparately Note
G.2
RoofCovering Note
G
Supplying & fixing ofgauge28prepaintedIT4profiledroofing sheetsof
approvedcolour:fixed withJboltsto100x50x2mmzedpurlins(measured
se aratel
andrubber
ca in
to
to s
of
bolts
24 m
FasciaBoard
H
30x200mm,high1.2mmthickSteelRoofFasciaBoardfixedtoedgesofrafters
includingnecessaryfittingsscrewsetc.:includingpaintingasspecified
a 16 m
b RoofCoverings&Roof Drainage ToSummary
b.01
METALWORK DOORSANDWINDOWS
b.02
Theworkshallincludesupply,fabricateandinstallationofdoors,windows,
madeoutof steel tobefinishedaspertherespectivespecification&
drawin s.
b.03Doors &Windowsframesectionstobeof, Note
b.04
Outerframe&Innerframe 75mmx75mmminimum FinishSize,unless
otherwisestated.
c
Thecontractorshallsubmitshopdrawingsfortheapprovalofthe Engineer,
priortofabrication.Note
c.01
Thecontractorshallrefertoallrelevantspecificationsanddrawingspriorto
pricinganditshallbehisresponsibilitytocompletethesaidworkstothe
entiresatisfactionoftheEn ineeratnoadditionalcost
Note
c.02
AllsamplesshallbeprovidedforEngineer'sapprovalpriortopurchaseof
material.Note
c.03
Ratesshallinclude; Note
c.04
Hoistingand
fixing
in
position,
drilling
and
making
good.
c.05
Allshopfabricationwork,marking,delivery,unloading,hoisting,erectingand
fixinginplace.Note
d
Afterfabricationwirebrushedtocleanthesteelsurfacesandspraypainted
withtwocoatsofquickdryingmetalprimerzincphosphate&twocoatsof
mattanticorrosivewithnecessar accessories.
Note
d.01
Ratetoincludeforprovidingsundryitemsrelatedtothedoor&windowslike
stoppersetc..Note
d.02
Rateshallincludefor4mmthicksteelplateasappropriatetosuitthe
respectivedoorsandwindowsasshowninthedrawings.Note
7/24/2019 BOQ Sample 2
16/18
e
Sizes Note
e.01
ThesizesgiveninthedrawingsanddescriptionofBillofQuantitiesare
finished sizesandsubjecttosame permittedinthespecifications.
e.02
Thecontractorshallcheckthe measurementofopeningsphysicallyatthesite
beforefabricatingthedoors&windows.Note
f
Ironmongery Note
f.01
Allthelocksshallbeunion/Yaleorapprovedequivalentsuppliedby
authorizeddealerappointedbythemanufacturer& approvedbythe
En ineer.
AllironmongeryshallbeheavyqualitybrassofapprovedEuropean
manufacturesubject toapprovaloftheArchitect,ironmongerysamples
shouldbesubmittedfora roval.
Note
H.1
Painting/FinalFinish Note
H.2
Unlessotherwisestatedallsurfaceoftimberdoors andwindowsand
casementsandplywooddoorsashesshallbefinishedwithtwocoatofwood
preservative,twocoatsofprimer,twocoatsofwoodsheenspraypaint.
H Doors Note
Metaldoor
set,
type
D4,
of
size
800x2100mm
high
overall,
comprising
of
100mmsteelchannelframefullyweldedandmitredatcorners:includeforall
necessarydoorlocks,ironmongery,finalfinish,&fixingtoconcreteor
blockwork
10 Nos.
I
Flyscreenstoallventilationopenings 1 Item
a
b Metal Work Doors & Windows ToSummary
c
FINISHES
0
Thecontractorisadvisedtorefertothespecificationpriortopricingforthis
sectionofwork
I.1
Therateshallincludeforalltemporaryrules,screeds,groundsetc.forraking
outjoints
of
new
brick
work
or
hacking
new
concrete
for
key,
internal
&
curvedangles,jointsbetweendifferentsurfacesarisesquirks,intersections
betweencurvedorirregularsurfaces,etc.andallmakinggoodaroundpipes,
sanitar fittin s & the like
Note
I.2
AllsamplesshallbeprovidedforapprovalbytheEngineerpriortopurchaseof
materials.Note
Wall Finishes Note
I.3 15mmthickcementandsand(Ratio1:5)renderonconcreteorblockwork:
woodfloatedhardandsmooth:toSubstructurewalls100 m
15mmthickcementandsand(Ratio1:5)renderonconcreteorblockwork:
woodfloatedhardandsmooth:tobothexternalandinternal walls
140 m
I.4
Floorfinishes
I 50mmThick cementandsand(1:3)screed:steeltrowelled hardandsmooth
tointernalfloors18 m
PlinthPlaster
J
20mmThickcementandsand(1:3)render:woodfloatedhardandsmoothto
plinths:externally6 m
a
b Finishes ToSummary
7/24/2019 BOQ Sample 2
17/18
PAINTING
J.1
Rateshallincludeforpreparationofsurfacecleaningdown,smoothing,
knotting,steppingetc.protectionoffloorsandfitting,removing&replacing
doorandwindow,furniture,andcleaningwindowsetc.uponcompletion.
J.2
Paintshallbefromapprovedcolorwithapprovedmanufacturer. Note
J.3
WallPainting Note
J Prepare
and
apply
one
coat
of
primer
and
three
coats
of
weather
shield
paint
ofapprovedcolourandqualitytoexternalfacesofwalls18 m
Ditto:renderedplinthsurfaces 10 m
K
PrepareandapplyonecoatofprimerandthreecoatsofVinylemulsionpaint
ofapprovedcolourandqualitytointernalfacesofwalls 20 m
a Painting ToSummary
b
VENTILATIONANDOTHERACCESSORIES
c AllProvisional
e PlumbingWorks
Unplasticizedpolyvinyl
chloride
(uPVC)
pipes
shall
be
used
in
the
plumbing
installationandtheymustconformineveryrespecttotherequirementsofBS
4514.
Note
e.01
Allfittingsandpipespecialsusedintheplumbinginstallationshallbesuitable
andcompatiblewithallrespectstothepipelinetowhichfittingsandspecials
arefixed.
Note
e.02
e.03 Allsanitaryfittings&fixturesshallbeAmericanStandardsorapproved
equivalent.Note
e.04 Ratesforsanitaryfittingsshallincludefor:
e.05
Fittingssuchastaps,wastewateroutlet,internaloverflowsetc.and
supportingbrackets,incidentalmaterialsforfixing,unlessotherwise
measuredse aratel .
Note
e.06
Assembling,jointingtogetherfixingcomponentsparts,andjointingtopipes
includingnecessary
coupling
and
for
leaving
perfectly
clean
and
in
perfect
workin orderoncom letion.
Note
Jointingandconnectingofpipestosanitaryfittings.
e.07
Testingandcommissioningoftheinstallation. Note
Makinggoodoftheworkdisturbed. Note
SubmittingsamplesfortheapprovaloftheEngineer. Note
K.1
Protectingtheworks. Note
K.2
7/24/2019 BOQ Sample 2
18/18
VentPipes Note
PVCpipewithallnecessaryfittingsandfixings
K
100mmdiameter Ventpipe 150 m
100mmDiameterVentCowl
40 No
ratwsincludewatertanktower,tankandinstallation 1 item
Ventilation ToSummary
SubTotalBill03: ToiletBlock
Bill01:Preliminaries
Bill02: RoomWorks
Bill03: ToiletBlock
SubTotal
GrandTotal