PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
ITEM DESCRIPTION UNIT QTY RATE
EXCAVATION & EARTHWORK
1
Clearing site including grubbing up roots,
2 Setting Out Item
3
4
5
6
m2
Excavation in trenches for columnfootings in depth not exceeding 1.5m,backfilled into excavation and removesurplus material from site
m3
Filling in making up levels with importedmaterial well watered and compacted inlayers
m3
Filling in making up levels with importedmaterials well watered and cpmpacted inlayers for the internal roadwayconstruction
m3
Hardcore filling in under floors, well ram& compacted in layers, thickness not
exceeding 150mm
m3
TOTAL FOR EXCAVATION &EARTHWORK CARRIED TO SUMMARY
8/8/2019 BOQ Puliyankulam
2/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
ITEM DESCRIPTION UNIT QTY RATE
CONCRETE WORK
Concrete
Work upto DPC
8
9
10 G25 reinforced cement concrete in tie be
11 G25 reinforced cement concrete in Plinth
Work upto Roof Level
12 G25 reinforced cement concrete column
Reinforcement
Tor steel (bars) and Mild steel
reinforcement (stirrups) in the following
13 Column footing Kg
14 Column shaft Kg
15
16 Tie beam Kg
17 Plinth beam Kg
G25 reinforced cement concrete incolumn footing and column shaft uptoDPC level
m3
75mm thick G25 reinforced cementconcrete in ground floor slab
m3
m3
m3
m3
One layer of A142 welded mesh under
ground floor slab area includingnecessary laps
m2
8/8/2019 BOQ Puliyankulam
3/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
Formwork
ply wood formwork to the following
18 Column footing
19 Column shaft
20 Ground floor slab
21Tie beam
22 Plinth beam
Miscellanneous Concrete Work
23m
24Nos
m2
m2
m2
m2
m2
150150mm high reinforced concrete
lintels including 2nos 3/8" dia rods atbottom and necessary form work
250250250mm size column Footingsincluding GI pipes for verandah coumns
TOTAL FOR CONCRETE WORKCARRIED TO SUMMARY
8/8/2019 BOQ Puliyankulam
4/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
MASONRY WORK
Work upto DPC
Random rubble masonryin wall
25
Work upto Rooflevel
26
foundation in cement and sand 1:5 using150mm to 225mm size broken stone m3
150mm thick hollow block wall in cementand sand 1:5 m2
TOTAL FOR MASONRY WORKCARRIED TO INSTALLATION
8/8/2019 BOQ Puliyankulam
5/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
ASPHALT WORK
1000 gauge polythene damp proof
27
28
memberane laying under concrete floorwith minimum 150mm end & side laps m2
Waterproofing in bathroom floors & wallsupto 1.5m height with approved typewaterproofing compound m2
TOTAL FOR ASPHALT WORKCARRIED TO SUMMARY
8/8/2019 BOQ Puliyankulam
6/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
DOORS & WINDOWS
29 Nos
30 Nos
31 Nos
32 Fanlight size 600mm600mm,including f Nos
Single sash, side hung, Plywood doorincluding door frame, type D1, size750mm2100mm
Single sash side hung, PVC doorincluding door frame, type D2, size700mm2100mm
Double sash, side hung, timber louvered
window including timber frame size1200mm1200mm
8/8/2019 BOQ Puliyankulam
7/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
ROOF & ROOF PLUMBING
33
34
35 m
36 m
Roof covering with corrugated asbestossheets & ceilling m2
Timber framework including ridging, wallplates, ridge plate, rafters, battens,valence and barge boards m2
PVC eaves gutter 41/2" square type fixedto valence board with PVC brackets
PVC downpipes 31/2" dia. Fixed to wallwith PVC clips
TOTAL FOR ROOF & ROOF
PLUMBING CARRIED TO SUMMARY
8/8/2019 BOQ Puliyankulam
8/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
FINISHES
37
38 m
39 5/8" thick plastering to block walls
TOTAL FOR FINISHES CARRIED TO SUMMARY
1/2" thick rendering in cement and sand1:3 in floors m2
Skirting 4"1/2" thick in cement and san
m2
8/8/2019 BOQ Puliyankulam
9/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
PAINTING
40
external weather shield paint of twocoats and a primer undercoat includingpreparation of surfaces to receive paintto external plastered walls m2
8/8/2019 BOQ Puliyankulam
10/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
41
Water supply system
internal paint emulsion finish with twocoats paint and suitable under coatincluding preparation of surfaces ofinternal plastered walls m2
TOTAL FOR PAINTING WORKCARRIED TO SUMMARY
SYSTEM
8/8/2019 BOQ Puliyankulam
11/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
42 Nos
Supply and installation of
43 12mm pipe m
44 20mm pipe m
45 32mm pipe m
46 Gate valves 20mm Nos
47 Gate valves 12mm Nos
Sanitary fittings and toilet accessories
supply and fixing(including all connections) of
48 Wash basin Nos
49 water closet with hand shower Nos
50 head shower Nos
51 piller tap Nos
52 Towel rack Nos
53 soap holder Nos
Water disposal system
54 Nos
55 90mm Pipe m
56 110mm pipe m
57 Gullies Nos
58 Manholes Nos
Water storage tank 1000litres includingall necessary fixing accessaries andplaced in position and complete withfloat switch and all connections
Floor traps with stainless steel grating ontop including water seal fix completewith all connections
8/8/2019 BOQ Puliyankulam
12/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
59 NosConstruction of Brick septic tankincluding all connections
TOTAL FOR PLUMBING, DRAINAGEAND DISPOSAL SYSTEM CARRIED TO
SUMMARY
8/8/2019 BOQ Puliyankulam
13/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
ELECTRICAL WORK
60 Nos
61 Wall bracket lamp points Nos
62 Fan points Nos
63 5A socket outlet points Nos
Supply and Installation of
64 Fans Nos
65 Lamps Nos
Supply and installation of DB consistingall connection and all cables complete toworking order
Point wiring including for an cables,wiring, conducting, clips, earth cables,draw wires, brackers,ceiling roses, wiring
wooden blocks, junction boxes, switchboxes, 3 core flexible cord, bulb holders,accessories, switches, socket outletbases, hardware fixing and insulatingmaterials, cuyying holes and chases andmaking good to walls for the following
TOTAL FOR ELECTRICAL WORKCARRIED TO SUMMARY
8/8/2019 BOQ Puliyankulam
14/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
AMOUNT
8/8/2019 BOQ Puliyankulam
15/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
AMOUNT
8/8/2019 BOQ Puliyankulam
16/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
17/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
18/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
19/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
20/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
21/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
22/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
23/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
24/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
25/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES
8/8/2019 BOQ Puliyankulam
26/26
PROPOSED QUARTERS FOR CECB AT ANURADHAPURABILL OF QUANTITIES