Download - BLMBI

Transcript
Page 1: BLMBI

BLMBI

Q11 to Q11 – 2 monitors: BLMQI.E and BLMQI.D ( slot name) shifted to different direction to the nearest IC (interconnection) QBBI (or QBEI for empty cryostat)

DS (Q7/Q8 – Q10)– 1 monitor :BLMQI.I20 or BLMQI.E20 ( expert name) shifted to IC:- In collided beam IP the incoming beam monitor to IP beam to IC except, where walkway installed: - In IP where beam not change the side – the nearest monitor to QBBI - In injection area – we leave this monitor (not shifted) BLMQI.D(7,8,10) L8 BLMQI.E9L8

BLMQI.D(7,8,9,10) R8 BLMQI.D(7,8,10) L1 BLMQI.E9L1BLMQI.E(7,8,10) R1 BLMQI.D9R1BLMQI.D(7,8,9,10) R7 BLMQI.E (9,10) L6 BLMQI.D8L6BLMQI.E(7,8,10) R5 BLMQI.E9R5BLMQI.D(7,8,9,10) L5 BLMQI.E(7,8,9,10) R4 BLMQI.E(8,9,10) L4 BLMQI.D7L4BLMQI.E(7,8,9,10) R3 BLMQI.E(7,8,9,10) L3 BLMQI.D(7,8,9,10) R2 BLMQI.D(7,8,10) L2 BLMQI.E9L2