Signage
Solution 380 of dimmable Tetra PowerMax LEDs with GE OptiLens technology installed, operated by an extra low voltage supply to provide a very even and bright illumination across the face of each Ring
Key Benefits90% less energy than conventionallighting technology
Even and bright illumination acrossthe face of each Ring
Very low energy usageDimmable lighting systemOptiLens technology
ChallengeIlluminate the 2012 Olympic Rings on the control tower at Birmingham Airport, at a height of 37m, providing outstanding visual effect while ensuring very low energy usage
Birmingham Airport UK
PowerMax ChainPowerMAX Single Module
3 GE Title or job number
04/10/2023
GE’s solution provides
Easy maintenance
Luminaire type Signage solution
MAINCARACTERISTICS
NEW INSTALLATION
Light source LED Tetra PowerMax
System wattage 3.6W
CCT 4100
Service life (hours) 50.000LEDs/module 3
Maintanance Cost 0
90%very lowenergyusage
less energythan conventionallighting technology
dimmable lighting system
PowerMax ChainPowerMAX Single Module
Signage Birmingham Airport UK
David Williamson, Regional Sales Manager - Western Europe, GE Lighting Solutions
“The beauty of LEDs is not only their robustness and ability to operate in harsh environments, with extreme temperatures, but also their very low energy usage. As a committed Sustainability Partner and Olympics 2012 Sponsor, GE Lighting is proud to have contributed to such an historic project and to Birmingham Airport’s sustainability agenda."
light quality& sustainability
Top Related