Welcome VIPs visit Becamex IDC (4/11/2009)
Main Contents
• BinhDuong Province• Becamex IDC and its key projects
• Binh Duong New City
HanoiHanoi
TayTay NinhNinh
Binh PhuocBinh Phuoc
Binh DuongBinh Duong
Dong Dong NaiNaiHCMCHCMC
PopulationPopulationViet Nam: 86 mil., add. of 1.2 mil./year. 70% of population is under 35 yrs old.Ha Noi (expansion): 6.5 mil.Ho Chi Minh: 7.5 mil.Binh Duong: 1.5 mil.
§ Area : 2,695,5 Km2
§ Industrial land : 15, 000 ha
§ Population (people): 1,500,000 (as April.1,09)- Working forces : 700,000
§ Admin units : - Capital town, 06 districts, 89 communes & wards.
§ GDP growth per annum (1997-2007): 15%• 1st 6 months of Year 2009: ~ 7.1 %§ Domestic investment: ~ 8,000 projects with capital of VND 55,000 Bil.
§ Foreign investment : 1,940 projectswith capital of ~ US$ 12.8 Bil from 34 countries & territories .
By 8/2009: 3,555 By 8/2009: 3,555 expatsexpats working inside working inside IPsIPs..
BÌNH DÖÔNG PROVINCE
Industrial: 64,8%
Agri: 5.5%Services:
29,7%
15 Industrial 15 Industrial ParksParks
Economic Statistics 2008
13 Industrial 13 Industrial ParksParks
By 2020, 39 By 2020, 39 IPsIPs with total with total land of 20,000 haland of 20,000 ha
Gross Output of Industry at Constant Price Gross Output of Industry at Constant Price ( VND Billion)( VND Billion)--Southern Key Economic ZoneSouthern Key Economic Zone
375.892375.892328.781328.781TotalTotal168.927150.710Ho Chi MInh50.57049.274Ba Ria-Vung Tau76.32762.919Dong Nai80.06865.878Binh Duong
Year 2008Year 2008Year 2007Year 2007City/ProvinceCity/Province
Export/ Export/ InportInport( VND Billion)( VND Billion)--Southern Key Economic ZoneSouthern Key Economic Zone
46.794/ 33.49938.136/ 27.020Total
22.334/ 18.32618.342/ 27.020Ho Chi Minh
11.437/ 1.1539.258/ 1.024Ba Ria- Vung Tau
6.849/ 8.1465.475/ 6.360Dong Nai
6.173/ 5.8745.060/ 4.668Binh Duong
Year 2008Year 2008Year 2007Year 2007City/ProvinceCity/Province
ac
b
d
2
5
6
4
3
6 Main Districts:1. CENTER DIST.2. THỦ DẦU MỘT DIST.3. THUẬN AN DIST.4. DĨ AN DIST.5. BẾN CÁT DIST.6. TÂN UYÊN DIST.
4 Suburban Districts:a. DẦU TIẾNG DIST.b. PHÚ GIÁO DIST.c. BÀU BÀNG DIST. d. NORTHERN TÂN UYÊNDIST.
Year 2020Year 2020
Binh Duong ProvinceBinh Duong Province
Binh Duong CityBinh Duong City
1
12
5
4
3
6
MAJOR ROAD SYSTEM OF MAJOR ROAD SYSTEM OF BINH DUONGBINH DUONG
1 – NATIONAL ROAD 132 – HIGHWAY MYPHUOC -TANVAN3 – RING ROAD N4 4 – HOI NGHIA-ANTAY ROAD5 – HOCHIMINH ROAD6 – RING ROAD N5 Binh Duong New CityBinh Duong New City
GOOD TRANSPORTATION SYSTEM
1 – NATIONAL ROAD 13
2 – HIGHWAY MYPHUOC-TANVAN
3 – RING ROAD N3
4 - RING ROAD N4
5 – HOCHIMINH ROAD
6 – HOI NGHIA-ANTAY ROAD
1 2
5
3
46
HEÄ THOÁNG XE ÑIEÄN TRAMWAY
MyPhuoc-TanVanexpressway
Upgrade Hwy 13
TRANSPORTATIONTRANSPORTATION INFRASTRUCTURE INFRASTRUCTURE DEVELOPMENT
MY PHUOC – TAN VAN EXPRESS WAY
- 30 KMs
- VND 3,500 BIL., ( include 1,800 BIL. for construction cost)
- Aug.7,2009: Ground Breaking Ceremony, and will be finished in 4 years
BOT PROJECT HIGHWAY 13
•- 62 KM
•- VND 700 BIL
•- IPO in April 2007
•- COMPLETED IN 2007
MyPhuoc-TanVan highway ground breaking cermony_Aug. 7, 2009
Success : The trademark of VSIP has become the brand name of Vietnam and gained the prestige in the world market.
Development orientation: VSIP will continuously invest & developinto other provinces.
DEVELOPMENT ORIENTATION -VSIP
Marking the success : On 2006, VSIP organized the 10th anniversary of establishment with the presence of two Prime Ministers: Nguyen Tan Dung & Ly Hien Long.
LýQuang Diệu visited BinhDuong New City on April 14 .09
Bac Ninh Province (2)700 Ha Integrated Township and Industrial Park (launched in 2007)
Haiphong City (3)1,200 Ha Integrated Township and Industrial Park (MOU in Aug 2007)
VIET NAM - SINGAPORE INDUSTRIAL PARK
Binh Duong Province (1)VSIP I : 500 Ha (launched in 1996)VSIP II: 344 Ha (launched in 2005)VSIP II Exp: 1,000 Ha (launched in 2007)
Establishment year : 2005
VIETNAM - SINGAPORE INDUSTRIAL PARK 2Total area : 344 Ha (Phase 1) & 1,000 Ha (Phase 2)
Location : In Binh Duong New Township
Investment : 127 projects & USD 600 mil
PROFILE & ACTIVITIES
BECAMEX IDC CORPORATION
PROCESS & MANUFACTURING
CIVIL ENGINEERING, INDUSTRIAL CONSTRUCTION & TRANSPORTATION
INFRASTRUCTURE, INDUSTRIAL PARKS AND RESIDENTIAL AREAS
- JOINT VENTURE, JOINT STOCK & INVESTMENT
- BANKING & FINANCE
- SECURITIES AND STOCK EXCHANGE
- HEALTH CARE, EDUCATIONAL, CULTURAL & SPORTS PROJECTS
- COMMUNITY PROJECTS
FORM OF BUSINES : HOLDING INC.
SUBSIDIARIES/AFFILIATES : 30
REGISTERED CAPITAL : VND 2,500 BIL
EQUITY : VND 25,000 BIL
EMPLOYEE : 2, 500 STAFFs
CHAIRMAN & CEO : MR. NGUYEN VAN HUNG
SYSTEM OF SUBSIDIARIESBECAMEX IDC CORP.
FINANCIAL FIELD:1. The First Securities JS Company (FSC)2. Phương Nam commercial JS Bank (HCM City)CONSTRUCTION– TRADING–REAL SESTATE –
SERVICES FIELD:3. Construction & Transportation JS Company (BCC)4. Trading & Development JS Company (TDC)5. Trading & Development JS Company (ITC)6. Mineral & Construction Company 7. BD Environmental & Water Supply Company8. Urban development JS Company (Becamex UDJ)9. Technical-infra Development JS Co.,(Becamex IJC)10.Technology & telecommunication JS Co.(VNTT) 11.Investment consultant services JS Co.(Becamex ISC)12.Lien Viet JS company 13.Anh Sao Duong Communications JS companyPHARMACERTICAL FIELD :1. Binh Duong Pharmacertical & Health Material JS Co.,2. Savi pharmacertical JS Company (Savipharm)HEALTHCARE – EDUCATION:1. Binh Duong Hospital JS Company2. University of South-Eastern Region.
SUBSIDIARIES–JOINT EFFORT
Capital contribution of Becamex on Subsidiaries
913916
1,829
Becamex Share Other share holders
Total
SYSTEM OF SUBSIDIARIES
BECAMEX IDC CORP.
Projects – Subsidiaries
1. Viet Nam – Singapore IP
Residential & Industrial development
2. My Phuoc Industrial City3. Thoi Hoa Residential & IP4. Bau Bang Residential & IP5. Binh Duong New Township 6.Tan Uyen Residential & IP
844
3,429
2,200
956
4,196
1,850
VSIP MPIP Thoi Hoa BauBang
BD Township TanUyen
8234BAU BANG RESIDENTIAL & IP
5,049798TOTAL:
2604AN THANH INDUSTRIAL ESTATE
7807AN PHU INDUSTRIAL ESTATE
6316BINH CHUAN INDUSTRIAL ESTATE
2,800380MY PHUOC INDUSTRIAL CITY
2,000357VIETNAM-SINGAPORE IP
INVESTMENT CAPITAL
(MIL. USD)
NUMBER OF PROJECTS
FOREIGN INVESTMENT PROJECTS
INDUSTRIAL PARKS
Whole BinhDuong: 1,910 FDI projects,11,5 bil USD registered capital
INVESTMENT ATTRACTION OF BECAMEX IDC CORP.,
MY PHUOC RESIDENTIAL & INDUSTRIAL PARKMY PHUOC RESIDENTIAL & INDUSTRIAL PARK
1. Geography :
Located in Ben Cat District, 20 km northeast of TDM Town, 42 km north of HCMC.
2. Total area:+ Industry: 1,848 ha
+ Residential & Service: 2,500 ha
3. Investor :
Investment & Industrial Development Co. (BECAMEX IDC CORP.)
4. Establishment date: 12 / 06 / 2002
Location:
Master plan:Phase 1 :
Industry: 377 HaService : 53 Ha
Phase 2 :Industry : 471 HaService : 328 Ha
Phase 3: Industry : 1,000 Ha Service : 1,200 Ha
Phase 4 : Industry : 200 Ha Service : 756 Ha
KCN &ÑT MP2
KCN &ÑT MP3
KCN &ÑT MP1
KCN &ÑT THÔÙI HOØA
INVESTMENT CAPITAL (MIL USD)
NUMBER OF PROJECTS
2,252301TOTAL17115OTHER COUNTRIES10
82FRANCE92205THAILAND8103HOLLAND7
33613USA6201ENGLAND5
16053VIETNAM420527JAPAN360574KOREA2487108TAIWAN 1
TIL 05/2008
NATION
RESULTS IN INVESTMENT ATTRACTION OF MPIPRESULTS IN INVESTMENT ATTRACTION OF MPIP
SAFETY SAFETY INVESTMENTINVESTMENT
STABILITY & SUSTAINABLE
DEVELOPMENT FOR INVESTORS & LOCAL
PEOPLE
THE DEVELOPMENT OF MY PHUOCTHE DEVELOPMENT OF MY PHUOC
Myõ Phöôùc caùch ñaây 04 naêm
AIF – USA BONFIGLIOLI - ITALYSAB-MILLER - USA
ORION - KOREAECS - HOLLAND COLGATE PALMOLIVE - USA
TA TUNG -TAIWAN SUPOR – CHINAAPI – Japan & Indonesia
YAZAKI EDS – JAPAN XERIUM – USA MIDEA –CHINA
BECAMEX CITY CENTER- 6ha- 2,500 bil. VND project
ECOLAKES, My PhuocSetiaBecamex@Ecolake
• 226 ha development at My Phuoc -Value of 839 mil. USD( 10,000 units of all kinds)
• Villas, link house, condominium, commercial center, medical center, water features…
New Projects in Binh Duong ProvinceNew Projects in Binh Duong Province
MyPhuoc
EASTERN INTERNATIONAL UNIVERSITY EASTERN INTERNATIONAL UNIVERSITY (26 HA(26 HA-- 24,000 STUDENTS INSIDE BINHDUONG TOWNSHIP)24,000 STUDENTS INSIDE BINHDUONG TOWNSHIP)
BECAMEX INTERNATIONAL HOSPITAL-1,000 BEDS/ 12.7 HA OF LAND
(금호타이어 MOU 체결식) (오리온제과 투자 계약식)
GS RETAIL DEPARTMENT STORE & SERVICE ( 9ha)
7
INDUSTRIALINDUSTRIAL
1. DONG AN 2: 158 Ha
2. PHU GIA: 133 Ha
3. VSIP 2: 344 Ha
4. KIM HUY: 237 Ha
5. SONG THAN 3: 533 Ha
6. DAI DANG: 274 Ha
7. BINH DUONG NEW CITY 7. BINH DUONG NEW CITY
1,011 Ha1,011 Ha8. SERVICES : 567 ha
-GOLF - HORSE RACING- MOVIE STUDIO- UNIVERSITIES
TOTAL: 4,196 Ha
12
3
4
5
6
8
BinhDuongBinhDuong New Township (4,196 ha)New Township (4,196 ha)
2.000Ha:IP Development
900 Ha : Services Development
1.000Ha: New BinhDuong city
IP Area
Residential Area
Services Area
BinhDuong New Township (4,196 ha)
fr design research 2008
MASTER PLAN
.Binh Duong New City, Vietnam ▪ master plan review and urban design | BECAMEX IDC
binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008
MASTER PLANMASTER PLAN
Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
You are here
binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008
MASTER PLANMASTER PLAN
Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
Political & Admin Centre
Commercial / Mixed Devt
Central Biz / Financial District
High Tech Biz Park
Residential -Apartments
Residential -Low Rise
Residential –Street Row
Houses
Cultural Centre
Eastern International
University (EIU)
Sports Centre
Central Park
Commercial (Office & Retail) :
1.25 mil sqm (excl High Tech Biz Park)
Residential :
4.25 mil sqm
Admin Centre, Public / Residential Facilities :
1.2 mil sqm
YEAR 2020YEAR 2020
600,000 to 1 Million 600,000 to 1 Million PeoplePeople
(working & living)(working & living)
binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008
GREEN AND BLUE PLANGREEN AND BLUE PLANurban design analysis
Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
PEDESTRIAN NETWORK PLANPEDESTRIAN NETWORK PLAN
urban design analysis
binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
arcaded walkway
cantilevered walkway
covered galleria
COMMUNICATION CENTRECOMMUNICATION CENTRE
binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
•Under construction:•IJC Aroma hi-rise apartments ( 17-20
stories- ~ 80,000 m2 GFA; 499 units)
OnOn--going projects in BDNCgoing projects in BDNC
OnOn--going projects in BDNCgoing projects in BDNC•Under construction:
•TDC Plaza- hi-rise apartments ( 18-20 stories,
133,740 m2 GFA, 799 units)
•Under construction: • BCC Shopping/House
complex-73,157 m2 GFA; 168
units of 4-5 stories
OnOn--going projects in BDNCgoing projects in BDNC
•Under Construction• Eastern International University( 26 ha, 24,000 students,
~ 250,000 m2 GFA). Ground Breaking on Aug.13, 2009
OnOn--going projects in BDNCgoing projects in BDNC
•Under Arch. Design Selection process:• Admin. and Political Centre( City Hall of BinhDuong
Province/City); ~ 240,000 m2 GFA
OnOn--going projects in BDNCgoing projects in BDNC
•Under Arch. Design process ( 1/500 approved)• High Tech City by MapleTree of Singapore ( 75 ha), ~ 710.000
GFA (m2), up to 20 stories
OnOn--going projects in BDNCgoing projects in BDNC
•Under Arch. Design:• International School- KinderWorld Singapore- SIS
(Kindergarten to High School)- 2.6 ha
•Opening in Aug. 2010( phase 1)
OnOn--going projects in BDNCgoing projects in BDNC
•Under detailed arch. Design:• Office, commercial, entertainment, subway• Designed by Ong & Ong (Singapore)
OnOn--going projects in BDNCgoing projects in BDNC
•Under detailed Arch. Design:•Cultural Centre project ( 7 ha)•Designed by Cendes International (Singapore)
OnOn--going projects in BDNCgoing projects in BDNC
Need more joint efforts/cooperation from international and local
investors and partners to make this BinhDuong New City come true SOONSOON
binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
PERSPECTIVESCEREMONIAL AXIS
binh duong new city, vietnam ▪ master plan review and urban design | nus centre for design research 2008 Note: All building footprints do not represent the final footprint of each lot.Each building shall be designed by final investors following the guidelines.
PERSPECTIVESCIVIC AXIS
THANK YOUTHANK YOU
the New Destination for Allthe New Destination for All……
Contact: Le Simon Contact: Le Simon QuocQuoc--Hung; BusinessHung; Business Development Director. Email: Development Director. Email: [email protected]@becamex.com.vn. . 09176622880917662288
Top Related