UCI MEDICAL CENTERUCI MEDICAL CENTERBLDG 1ABLDG 1A –– 22NDND & 3& 3RDRD FLOOR RENOVATIONFLOOR RENOVATIONBLDG 1A BLDG 1A 22 & 3& 3 FLOOR RENOVATION FLOOR RENOVATION
KICK ‐OFF MEETING7.2.08
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Agenda
Planning & Design Process– Major Activities
– Committee Structure
– Work Plan / Meeting Schedule
CommunicationCommunication
Site Visits
Preview of Key Programming Issues y g g
JULY 2 2008UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 2
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Planning & Design Process – Major ActivitiesCurrent
ProgrammingProgrammingPlanningPlanning DesignDesign
Progress
Construction /Construction /OccupancyOccupancy
Strategic Strategic PlanningPlanning
Demand Demand AnalysisAnalysis
Functional Functional ProgrammingProgramming
Space Space ProgrammingProgramming
SDSD DDDD CDCDSite Site VisitsVisits
PermitPermitBidBid
AwardAward
Construction Construction AdministrationAdministration
Learn From Recent Projects
Set Vision & Service Organization
Determine Volume
Locate All Spaces
Design internal room components
Concept Pl d
Determine Volume Projections and Key Space Drivers
Establish Operations, Flow, Physical Design Elements, Priorities
Equipment
p(casework, equipment, finishes, m/e/p, commun, etc.)
Plan Determine spaces and sizes
Phasing
A
Field Investigation (As‐Builts)Cost l
Cost
Planning
Detailed Phasing
UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 3JULY 2 2008
Agency (if needed)
Analysis Estimates
Agency
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Committee Structure
Goals– Effective and Timely Decision Making to Keep Process Moving Forward
TeamMember Continuity– Team Member Continuity– Obtain Extensive Ownership & Buy‐In
Committee MembersPh i i Ad i i t t N Q lit M t t– Physicians, Administrators, Nurses, Quality Mgmt, etc.
– Representatives• Labor & Delivery• PostpartumPostpartum• Well‐Baby Nursery• Neonatology• Infection Control• Materials Mgmt• EVS• Pharmacy• Dietary• Dietary• Others
JULY 2 2008UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 4
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Draft Meeting Schedule (for discussion)
P D iPre‐Design
– July 2 (Wed) Kick‐Off Meeting
– Week of July 21 Site Visits
– July 30 (Wed) Programming Round #1
– August 6 (Wed) Programming Round #2
Program ApprovalProgram Approval
Schematic Design
– August 20 (Wed) Schematic Design Round #1
S t 3 (W d) S h ti D i R d #2– Sept 3 (Wed) Schematic Design Round #2
SD Approval
Design Development
– Sept 24 (Wed) Design Development Round #1
– Oct 8 (Wed) Design Development Round #2
– Oct 22 (Wed) Design Development Round #3Oct 22 (Wed) Design Development Round #3
DD Approval
JULY 2 2008UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 5
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Communication
Contacts– UCI Medical Center
• Leon Roach, Dir of Construction (714) 456‐5454 [email protected]
– Caruana & Associates3633 Long Beach Blvd, Suite 200 Long Beach, CA 90807 (562) 595‐5666
• David Chartier Principal In Charge dchartier@caruana com• David Chartier, Principal‐In‐Charge [email protected]
• Guy Jimenez , Project Manager [email protected]
• Eileen Amano‐Peterman , Interior Designer ea‐[email protected]
– Healthcare Planning Inc2046 Armacost Ave Los Angeles, CA 90025 (310) 447‐7660
• Kevin Adams, Principal Cell: (818) 458‐1833 kadams@healthcare‐planning.com
• Holly Northrop, Principal Cell: (310) 733‐8693 hnorthrop@healthcare‐planning.com
JULY 2 2008UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 6
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Site Visits
JULY 2 2008UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 7
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Preview of Key Programming Issues
2007 CA Building Code– The previous code requirement of a 1:12 ratio of C‐Section rooms
to Postpartum beds is now not required if LDR’s or LDRP’s are provided.
– LDR’s or LDRP’s may be substituted for Labor Rooms.
– LDR’s or LDRP’s may be substituted for Recovery Rooms.
– Area requirements for LDR’s & C‐Section/Delivery rooms have increased.
– Nursery exam room is no longer required however a lactation/pump room is required nearby.
– Support areas may be shared for the C‐Section area and the rest pp yof the department provided there is separate access.
JULY 2 2008UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 8
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Preview of Key Programming Issues
Infant Stabilization / NICU
LDR’s to be Licensed Beds
Gynecology Beds
Private vs. Semi‐Private Rooms
Showers
Labor Rooms & Recovery Room
O t ti t F t l T tiOutpatient Fetal Testing
Labor Evaluation
Well Baby NurseryWell Baby Nursery
JULY 2 2008UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 9
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Existing Floor Plans
JULY 2 2008UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 10
NK9k, PerinatalUCI Mtg Minutes 070208.pdf
Previously Proposed Plans
JULY 2 2008UCI MEDICAL CENTER BLDG 1A 2nd & 3rd FLOOR RENOVATION C&A + HPI 11