Applied Structural Drying
Applied Structural Drying (ASD) & Agent Loss Ratio Sheet
WATER
WIND
Applied Structural Drying (ASD) & Agent Loss Ratio Sheet
BACKING
SUBSTRATE (PLYWOOD)
PAD
FAN
DEHUMIDIFIER
Science
Freeze H2O0-32º F
Boil 212º F
ASD Primary LawHigh Heat + Agitation
WATER SURFACE TENSION WIND
HEATTHERMOCLINE
Science
CARPET
SUBSTRATE (PLYWOOD)
PAD
Science
H2O ÷ ASD = H2 / O
Heat – causes the violent agitation of molecules
Motion – breaks surface tension of standing water
Science - Water Travels In 2 Directions
1. The path of least resistance
2. From wet to dry
LIVINGROOM CARPET
BATHTUB
WATERFALL
RIVER
LAKE
The Path of Least Resistance
SIDING
JOIST
PLYWOOD
CARPET PAD
FRAMING
INS
DRY
BASE
From Wet To Dry
Qualified Measurements Relative humidity Temperature Grains per pound Relative material
standard
HEAT 105 º
WET
DRY
+
-
STRAW EFFECT
Goal
ASD is a method to reverse natural occurrence to restore a structure to pre-loss condition.
Standard Water Damage Operation Remove Wet
Materials Extract Porous
Material 1 Fan per 8-12’ ?? Dehumidification per
8F ratio
10 x 15 = 1,500 sf10’
15’
DEHU
Standard Water Damage Operation
Restoration Construction Emergency Temp
2’ Drywall $1,800
Reset Base $150
Pad $400
Re-stretch $100
Paint $1,200
Clean $100
$2,660
Profit/Over 10/10 $500
TOTAL $3,160
(5) Fans @ $25 day @ 4days $500
(1) Dehu. @ $100 day $400
Remove Pad @ 1,500 sf $750
Emergency Response – day $150
WTR Tech @ 4days $300
TOTAL $2,100
Standard Water Damage Operation
Average Loss has 2-3 rooms E-Temp Constrution
( 2 room loss) $4,200 $6,320
Loss
$10,520
(MN/Dry + MN/PNT) Plus intrusion $1,350
$11,750
Extract porous materials
Dehumidification by G.P.P. in air
Fans – water tension & dew point
Meet 72 hr dry time
A.S.D. Standard Water Loss
10’
15’
HEAT
105º
DEHU
A.S.D. Standard Water Loss
Restoration Construction Emergency Temp
Dry – MN $150
Paint Walls $1,200
TOTAL $1,350
(6) Fans @ 72 hrs $450
(1) Dehu. @ 72 hrs $300
Heat @ 72 hrs $450
Extraction $350
Emergency Response $150
WTR – Tech @ 72 hrs $250
TOTAL $2,050
A.S.D. Standard Water Loss
Construction at Intrusion Pt. $1,350
Emergency Temp $2,050
2SD Room Loss $1,650
$5,050
Water Standard $1,750
ASD Standard $5,050
$6,700 diff
57%TOTAL LOSS
Thank You!