Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
1
Decisions for the Week Ending 25th May 2019
Alresford Parish Council No Determinations Ardleigh Parish Council
19/00500/FUL Approval - Full 23.05.2019 Delegated Decision
Dr Kristoff & Mr Giles Thorpe
Proposed new roof & associated remedial works following fire damage.
Blue Barns Cottage Old Ipswich Road Ardleigh Colchester Essex CO7 7QL
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans, drawing numbers 52825/B/02, 52825/B/01, 52825/B/05, 52825/B/03 Revision A, 52825/B/04 and the documents titled 'Schedule of Works' and 'Heritage Asset Assessment'.
Reason - For the avoidance of doubt and in the interests of proper planning.
19/00501/LBC Approval - Listed Building Consent 23.05.2019 Delegated Decision
Dr Kristoff & Mr Giles Thorpe
Proposed new roof & associated remedial works following fire damage.
Blue Barns Cottage Old Ipswich Road Ardleigh Colchester Essex CO7 7QL
01 The works hereby permitted shall begin before the expiration of three years from the date of
this consent. Reason - To comply with the requirements of Section 18(1) of the Planning (Listed Buildings and
Conservation Areas) Act 1990, as amended by the Planning and Compulsory Purchase Act 2004.
02 The development hereby permitted shall be carried out in accordance with the following
approved plans, drawing numbers 52825/B/02, 52825/B/01, 52825/B/05, 52825/B/03 Revision A, 52825/B/04 and the documents titled 'Schedule of Works' and 'Heritage Asset Assessment'.
Reason - For the avoidance of doubt and in the interests of proper planning. 03 No development or preliminary ground-works can commence until a programme of historic
building recording has been secured and undertaken in accordance with a Written Scheme of Investigation, which has been submitted by the applicant, and approved by the Local Planning Authority. The building record shall be undertaken with a Level 3 Record as outlined in
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
2
Decisions for the Week Ending 25th May 2019
Historic England Guidance Understanding Historic Buildings. Reason - To preserve the record of an important Listed Building. 04 Before any work is commenced drawings to a scale of not less than 1: 20 fully detailing the
new windows, rooflights, doors and their surrounds to be used and indicating; materials, cross sections for glazing bars, sills, heads etc at a scale of 1:20, method of opening and method of glazing shall be submitted to and approved in writing by the Local Planning Authority. The approved works shall be installed/carried out in complete accordance with the approved details.
Reason - The application relates to a listed building and therefore such details are necessary in order
to preserve and enhance the historic character and integrity of that building. 05 Full details of the locations of services and external vents shall be submitted to, and agreed in
writing by, the Local Planning Authority. Works shall be carried out in accordance with the approved details.
Reason - The application relates to a listed building and therefore such details are necessary in order
to preserve and enhance the historic character and integrity of that building. 06 Full details of timbers to be replaced, details of new timber and how the fire damaged timbers
to be retained are to be treated, shall be submitted to, and agreed in writing by, the Local Planning Authority. Works shall be carried out in accordance with the approved details.
Reason - The application relates to a listed building and therefore such details are necessary in order
to preserve and enhance the historic character and integrity of that building.
19/00643/NMA Approval Non Material Amendment 21.05.2019 Delegated Decision
Mr & Mrs Tunmore
Non-material amendment to approved application 18/00334/FUL - First floor wall finish changed to James Hardie Plank and roof finish changed to Marley Edgemere.
Kuranda Colchester Road Ardleigh Colchester Essex CO7 7NS
01 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing no's. PL05, PL02, PL03 and PL04 Revision C. Reason - For the avoidance of doubt and in the interests of proper planning. Beaumont Parish Council
19/00371/FUL Approval - Full 20.05.2019 Delegated Decision
Mr Michael Welham
Change of use of agricultural land for the siting of 1 No. Mongolian yurt and associated unmade track and parking area.
Ratcliffs Farm Wix Road Beaumont-cum-moze Essex CO16 0AT
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
3
Decisions for the Week Ending 25th May 2019
Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans, drawing numbers RF1, RF5 and the document titled 'Amended Landscaping Plan'.
Reason - For the avoidance of doubt and in the interests of proper planning. 03 Prior to the commencement of any above ground works, a scheme of hard and soft
landscaping works for the site shall be submitted to and approved, in writing, by the Local Planning Authority. The scheme shall include any proposed changes in ground levels and also accurately identify spread, girth and species of all existing trees, shrubs and hedgerows on the site and indicate any to be retained, together with measures for their protection which shall comply with the recommendations set out in the British Standards Institute publication "BS 5837: 2012 Trees in relation to design, demolition and construction.
Reason - To enhance the visual impact of the proposed works. 04 All changes in ground levels, hard landscaping, planting, seeding or turfing shown on the
approved landscaping details shall be carried out during the first planting and seeding season (October - March inclusive) following the commencement of the development or in such other phased arrangement as may be agreed in writing by the Local Planning Authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to a variation of the previously approved details.
Reason -To enhance the visual impact of the proposed works. 05 The mongolian yurt shall be occupied for holiday purposes only and shall not be occupied as
a person's sole or main place of residence. The owners/operators of the site shall maintain an up to date register of the names of all owners/occupiers of the Mongolian yurt on site and of their main home addresses. The register shall be made available at all reasonable times for inspection by the Local Planning Authority.
Reason - To ensure that the accommodation remains in holiday use in support of planning policies
aiming to encourage tourism and does not become a permanent residential use. Bradfield Parish Council No Determinations Brightlingsea Town Council
19/00508/FUL Approval - Full 21.05.2019 Delegated Decision
Mr Earl Variation of Condition 2 of application 18/00991/FUL - To keep the host dwelling single storey element.
77 Seaview Road Brightlingsea Essex CO7 0PR
01 The development hereby permitted shall be begun before 11 September 2021.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
4
Decisions for the Week Ending 25th May 2019
Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: 18/00991/FUL: Drawings titled 'Proposed Elevations' revised 21 August 2018, and 'External Material Finishes
Schedule for New 2 Bedroom Dwelling' Revision B 21 August 2018. 19/00508/FUL Drawing numbers FB.002.PL-101 and FB.002.PL-102. Reason - For the avoidance of doubt and in the interests of proper planning. 03 No above groundworks shall take place until there has been submitted to and approved, in
writing, by the Local Planning Authority a scheme of hard and soft landscaping works for the site, which shall include any proposed changes in ground levels and also accurately identify spread, girth and species of all existing trees, shrubs and hedgerows on the site and indicate any to be retained, together with measures for their protection which shall comply with the recommendations set out in the British Standards Institute publication "BS 5837: 2012 Trees in relation to design, demolition and construction.
Reason - To enhance the visual impact of the proposed works. 04 All changes in ground levels, hard landscaping, planting, seeding or turfing shown on the
approved landscaping details shall be carried out during the first planting and seeding season (October - March inclusive) following the commencement of the development or in such other phased arrangement as may be agreed in writing by the Local Planning Authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to a variation of the previously approved details.
Reason -To enhance the visual impact of the proposed works. 05 Notwithstanding the provisions of Article 3, Schedule 2 Part 1 Classes A, B and E of the Town
and Country Planning (General Permitted Development) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), no provision of buildings, enclosures, swimming or other pool shall be erected in the garden of either the proposed dwelling or Number 77 Seaview Road except in accordance with drawings showing the design and siting of such building(s) which shall previously have been submitted to and approved, in writing, by the Local Planning Authority.
Reason - To ensure adequate private amenity space is retained for both dwellings. Clacton-on-Sea
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
5
Decisions for the Week Ending 25th May 2019
19/00318/FUL Approval - Full 24.05.2019 Delegated Decision
Mr Mills Proposed external lift for use by disabled persons to access dwelling.
2 Queens Court Kings Parade Holland On Sea Essex CO15 5JD
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans, documents titled 'Site Location Plan', 'Site Block Plan' and drawing number 101 Rev B.
Reason - For the avoidance of doubt and in the interests of proper planning.
19/00481/FUL Approval - Full 24.05.2019 Delegated Decision
Christopher Peck Single storey rear extension.
87 Hereford Road Holland On Sea Clacton On Sea Essex CO15 5SU
01 No conditions.
19/00490/FUL Approval - Full 20.05.2019 Delegated Decision
Mr Chris O'Neil Proposed removal of existing entrance doors and replace with automatic bi-fold doors.
51 Pier Avenue Clacton On Sea Essex CO15 1QQ
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing Number: 8699 Sheet No 001.1 Reason - For the avoidance of doubt and in the interests of proper planning.
19/00492/FUL Approval - Full 21.05.2019 Delegated Decision
Mr Vasyl Mateychuk
Single storey rear extension.
14 Granville Road Clacton On Sea Essex CO15 6BX
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
6
Decisions for the Week Ending 25th May 2019
01 The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing number: DRWG CO-30 Revision: V2. Reason - For the avoidance of doubt and in the interests of proper planning.
19/00535/FUL Approval - Full 24.05.2019 Delegated Decision
Mrs Jean Hodgkinson
Proposed single storey side extension.
11 Prince Charles Close Clacton On Sea Essex CO15 1AE
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing no. 001. Reason - For the avoidance of doubt and in the interests of proper planning.
19/00540/FUL Approval - Full 20.05.2019 Delegated Decision
Mr & Mrs Adams Single Storey rear and side extension with 2 no. glazed roof lanterns, widening of porch and provision of render to main dwelling (rear elevation of extension to comprise of cedar boarding).
64 Hereford Road Holland On Sea Clacton On Sea Essex CO15 5SY
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing No 1C. Reason - For the avoidance of doubt and in the interests of proper planning. Elmstead Market Parish Council
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
7
Decisions for the Week Ending 25th May 2019
No Determinations Frating Parish Council No Determinations Frinton & Walton Town Council
18/02063/FUL Approval - Full 21.05.2019 Delegated Decision
Mr & Mrs S & K Watcham
Variation of condition 20 of application 15/00984/FUL (demolition of existing nursery buildings and erection of two dwellings) to substitute amended plans altering the design of the properties.
Great Holland Nurseries Church Lane Great Holland Essex CO13 0JS
01 The approved scheme of landscaping shown on drawing no. 77 A shall be implemented not
later than the first planting season following commencement of the development (or within such extended period or phased arrangement as the Local Planning Authority may allow) and shall thereafter be retained and maintained for a period of five years. Any plant material removed, dying or becoming seriously damaged or diseased within five years of planting shall be replaced within the first available planting season and shall be retained and maintained.
Reason - To ensure the effective implementation of the approved landscaping scheme, in the
interests of visual amenity. 02 The approved screen walls and fences, as shown on drawing no. 77 A, shall be erected prior
to the dwellings to which they relate being first occupied and thereafter be retained in the approved form.
Reason - To ensure a satisfactory development of the site in the interests of amenity and the
conservation area setting. 03 Prior to the first occupation of the proposed dwellings, the proposed vehicular access shall be
reconstructed to a width of 5.5m and shall be provided with an appropriate dropped kerb vehicular crossing of the footway/highway verge to the specifications of the Highway Authority.
Reason - To ensure that all vehicles using the private drive access do so in a controlled manner and
to ensure that opposing vehicles may pass clear of the limits of the highway, in the interests of highway safety.
04 No unbound materials shall be used in the surface treatment of the proposed vehicular access
within 6m of the highway boundary. Reason - To ensure that loose materials are not brought out onto the highway, in the interests of
highway safety. 05 Prior to the proposed access for any dwelling on the proposed development being brought
into use, a 1.5m. x 1.5m. pedestrian visibility splay, relative to the highway boundary, shall be provided on both sides of that access and shall be maintained in perpetuity free from obstruction clear to ground. These splays must not form part of the vehicular surface of the
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
8
Decisions for the Week Ending 25th May 2019
access. Reason - To ensure adequate intervisibility between drivers of vehicles using the proposed access
and pedestrians in the adjoining highway, in the interests of highway safety. 06 Prior to the occupation of the proposed development the vehicular turning/parking areas, as
shown on approved drawing no. 71 C, shall be provided within the site and shall be maintained free from obstruction in perpetuity.
Reason - To ensure that vehicles using the site access may enter and leave the highway in a forward
gear and adequate parking provision is provided, in the interests of highway safety. 07 Any gates erected at the vehicular access shall be inward opening only and shall be recessed
a minimum of 6m. from the nearside edge of carriageway of the existing road. Reason - To ensure that vehicles using the access may stand clear of the carriageway whilst those
gates are being opened/closed, in the interests of highway safety. 08 Prior to first occupation of the proposed development, a (communal) recycling/bin/refuse
collection point shall be provided within 25m of the highway boundary or adjacent to the highway boundary and additionally clear of all visibility splays at accesses.
Reason - To minimise the length of time a refuse vehicle is required to wait within and cause
obstruction of the highway, in the interests of highway safety. 09 Construction work shall be carried out in accordance with the Construction Method Statement
document (dated 31st October 2016) and within associated drawing no. 78, as approved under planning reference 17/00031/DISCON.
Reason - To ensure that on-street parking of these vehicles in the adjoining streets does not occur, in
the interests of highway safety. 10 At the completion of the construction phase, the adjacent PRoW, Footpath No 4 (Great
Holland) shall be resurfaced and compacted with recycled road planings or a similar material and all obstructing vegetation removed from site to provide a minimum clear width of 1.5m and also clear to a height of 2.0m across the entire sites western boundary to the footpath.
Reason - To ensure the continued safe passage of pedestrians on the definitive right of way. 11 The removal of any vegetation from the site shall only be carried out outside of the bird
nesting season (March to August inclusive). Reason - To ensure the protection of birds potentially nesting on site. 12 All external illumination shall only be installed in accordance with the details stipulated in
sections 3.18 to 3.21 of the 'Ecological Management and Mitigation Plan', as prepared by Liz Lord Ecology and approved under planning reference 17/00031/DISCON.
Reason - To ensure adequate safeguarding of the amenity of nearby properties, protected species
and prevent the undesirable, disruptive and disturbing effects of light pollution. 13 The development shall be carried out in accordance with the protection species mitigation
measures/recommendations as set out in the submitted 'Ecological Management and Mitigation Plan', as prepared by Liz Lord Ecology and approved under planning reference 17/00031/DISCON.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
9
Decisions for the Week Ending 25th May 2019
Reason - To preserve and enhance the biodiversity of the site. 14 The hereby approved development shall take place fully in accordance with the tree/hedgerow
protection measures set out in the submitted Arboricultural Impact Assessment and the accompanying Tree Protection Plan (Ref no. - TPSarb5161214 TSCP) (prepared by Tree Planning Solutions dated 9th May 2015).
Reason - In order to suitably protect the existing trees/hedges on the boundaries of the site for the
benefit of the character and appearance of the surrounding area and the ecology of the site. 15 Notwithstanding the provisions of Article 3, Schedule 2 Part 2 Class A of the Town and
Country Planning (General Permitted Development) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), no provision of fences, walls or other enclosures, shall be erected on the site except in accordance with drawings showing the design and siting of such enclosures which shall previously have been submitted to and approved, in writing, by the Local Planning Authority by way of a planning application.
Reason - In the interests of visual amenity and to preserve the character of the surrounding area and
the setting of the adjacent Grade II* Listed All Saints Church. 16 Notwithstanding the provisions of Article 3, Schedule 2 Part 1 Classes A, B and E of the Town
and Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), there shall be no additions to the dwellings, nor shall any buildings, enclosures, swimming or other pool be erected except in accordance with drawings showing the design and siting of such additions or building(s) which shall previously have been submitted to and approved, in writing, by the Local Planning Authority.
Reason - It is necessary for the Local Planning Authority to be able to consider and control further
development in order to ensure that development would not adversely impact on the setting of the conservation area and the Grade II* Listed All Saints Church.
17 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing No's. 71C, 77A, 74A, 75B, 76B, 82A, 83A, 84B, 85B, 81B, 73B, 72B, 80, 75, 76 and 78.
Reason - For the avoidance of doubt and in the interests of proper planning.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
10
Decisions for the Week Ending 25th May 2019
19/00267/DETAIL Approval - Reserved Matters/Detailed 22.05.2019 Delegated Decision
Lynmore Homes LLP
Proposed erection of five detached bungalows following demolition of existing storage building (16/02067/OUT allowed on appeal). Variation to previously approved reserved matters 18/00828/DETAIL considering appearance, scale and landscaping only to allow for a garage to be added to each plot and minor changes to the appearance and layout of the development.
Sunnyside 64 The Street Kirby Le Soken Frinton On Sea Essex CO13 0EF
01 The development hereby permitted shall be carried out in accordance with the following
approved plans and materials: Drawing no. 1A, Drawing no. 5, Drawing no. 6A, Drawing no. 7, Drawing no. 8A-WIP, Drawing no. 9, Drawing no. 10A, Drawing no. 11, Drawing no. 12A, Drawing no. 13, Drawing no. 14A and Drawing no. 15.
Reason - For the avoidance of doubt and in the interests of proper planning. 02 All changes in ground levels, hard landscaping, planting, seeding or turfing shown the
approved landscaping details drawing no. 1A shall be carried out during the first planting and seeding season (October - March inclusive) following the commencement of the development or in such other phased arrangement as may be agreed in writing by the Local Planning Authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to a variation of the previously approved details.
Reason - To ensure the implementation of the approved scheme and adequate maintenance of the
landscaping for a period of five years in the interests of the character of the conservation area. 03 The development shall not be occupied until such time as the road, turning, driveways,
parking bays and garages have been provided in accordance with the approved plans and shall be retained in this approved form thereafter.
Reason - To ensure that on-street parking of vehicles in the adjoining streets does not occur, in the
interests of highway safety. 04 The approved Construction Method Statement received on 2nd April 2019 shall be adhered to
throughout demolition and construction unless otherwise agreed in writing by the Local Planning Authority.
Reason - To ensure that on-street parking of these vehicles in the adjoining streets does not occur, in
the interests of highway safety.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
11
Decisions for the Week Ending 25th May 2019
19/00482/FUL Approval - Full 20.05.2019 Delegated Decision
D and A (2173) Ltd
Variation to condition 2 on approval 18/01116/FUL - Amendment to approved drawings.
95-97 Connaught Avenue Frinton On Sea Essex CO13 9QA
01 The development hereby permitted shall be begun before the expiration of three years from
10.09.2018 (approval date of 18/01116/FUL). Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: DRAWING NO. 1916/06 REV. B and DRAWING NO. 1916/05 REV.B. Reason - For the avoidance of doubt and in the interests of proper planning. 03 The extension, alterations and new boundary wall hereby approved shall be constructed in
facing brickwork and roofing materials to match the host building. Reason - In the interests of visual amenity and the character and appearance of the conservation
area. 04 The A1 Retail use hereby permitted shall only be open during the hours of 9:00am to 6:00pm
Monday to Saturday and 10:00am to 4:00pm Sundays and Bank Holidays. Reason - To ensure the use of the site is appropriate to the locality and to safeguard the amenities of
local residents. 05 Prior to the occupation of the flats, the cycle store, bin store and yard areas shall be provided
and enclosed in accordance with the approved plans and retained in this approved form in perpetuity.
Reason - In the interests of residential amenities.
19/00525/COUNOT Determination prior approval not required 23.05.2019 Delegated Decision
Mr and Mrs Lambert
Conversion of warehouse storage building into two residential dwelling units.
26A Station Street Walton On The Naze Essex CO14 8DW
01 The proposal constitutes permitted development as defined in Schedule 2, Part 3, Class P of
the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) and may therefore be carried out providing that it is wholly in accordance with the legislation.
02 Prior to the first occupation of the hereby approved dwelling the parking spaces / vehicular
hardstanding shall be constructed to minimum dimensions of 6.0m x 2.9m and retained thereafter.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
12
Decisions for the Week Ending 25th May 2019
Reason: To encourage the use of off-street parking, in the interests of highway safety. 03 Prior to first occupation of the hereby approved dwellings, a 1.5m. x 1.5m. pedestrian visibility
splay, relative to the highway boundary, shall be provided on both sides of the access and shall be retained and maintained free from obstruction clear to ground thereafter. These splays must not form part of the vehicular surface of the access.
Reason - To ensure adequate inter-visibility between drivers of vehicles using the proposed access
and pedestrians in the adjoining highway, in the interests of highway safety. 04 No unbound materials shall be used in the surface treatment of the vehicular access
throughout. Reason - To ensure that loose materials are not brought out onto the highway, in the interests of
highway safety.
19/00563/FUL Refusal - Full 20.05.2019 Delegated Decision
Mr David Ursell Proposed two storey & single storey side extension with addition of front porch & new vehicular access.
24 Village Close Kirby Cross Frinton On Sea Essex CO13 0PF
01 The National Planning Policy Framework attaches great importance to the design of the built
environment and confirms good design is a key aspect of sustainable development, is indivisible from good planning, and should contribute positively to making places better for people. It is important to plan positively for the achievement of high quality and inclusive design for all development, including individual buildings. Permission should be refused for development of poor design that fails to take the opportunities available for improving the character and quality of an area and the way it functions.
Saved Policy QL9 states that all new development should make a positive contribution to the quality
of the local environment, new buildings must be well designed and maintain local character, and development must relate well to its site and surroundings particularly in relation to its scale, massing, form and design. These sentiments are carried forward in Draft Policy SPL3 of the Tendring District Local Plan 2013-2033 and Beyond Publication Draft (June 2017).
Due to the dwellings corner plot location the side and front elevations of the existing house appear
prominently within two different streetscenes which vary in appearance and character due to the difference in property designs. The properties to the west create a relatively strong building line whilst the dwellings to the south and south east have open frontages with only one having a visible side extension. The proposal by virtue of its size and bulk would appear prominently within both of these streetscenes over dominating the existing house and not conforming to any of these existing characters. This would further be exacerbated by the interruption of the existing building line and open character of its corner plot location.
The proposed development by virtue of its size and scale will result in an incongruous form of
development to the main dwelling, detrimental to visual amenity and the overall character of the area contrary to the aforementioned national and local policies.
Great Bentley Parish Council
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
13
Decisions for the Week Ending 25th May 2019
No Determinations Great Bromley Parish Council
19/00240/OUT Approval - Outline 21.05.2019 Delegated Decision
Mr Dodds Vary condition 24 of approved planning application 16/00782/OUT. The condition requests a footway of 2.5m, see drawing for alternative proposal.
Park 2 Land at Badley Hall Farm Badley Hall Road Great Bromley Essex CO7 7HU
01 The development should proceed in accordance with findings of submitted Archaeological
Written Scheme of Investigation approved under reference 18/01946/DISCON. Within 2 months of the date of this permission the required post excavation report shall be submitted
to and approved, in writing, by the Local Planning Authority. Reason - The Tendring Historic Environment Characterisation Project and Essex HER show that the
proposed development is located within an area with known potential for below ground archaeological deposits.
02 The development shall be constructed in accordance with the noise and emission control
measures outlined in the document titled 'Measures to Control Emissions of Dust, Dirt and Noise' as approved under planning reference 18/01946/DISCON.
Reason - In the interests of residential amenity. 03 The hereby permitted development shall not be occupied until a fibre optic broadband
connection installed on an open access basis and directly accessed from the nearest British Telecom exchange, incorporating the use of resistant tubing, has been installed at the site, in accordance with details that shall be submitted and approved in writing by the Local Planning Authority. If the applicant is unable to achieve this standard of connection, and can evidence through consultation with British Telecom, that this would not be possible, practical or economically viable an alternative superfast (i.e. will provide speeds greater than 24mbps) wireless service will be considered acceptable.
Reason - In the interests of achieving sustainable development for this scheme. 04 Prior to the first occupation of the residential development, the proposed estate road, at the
bellmouth junction with Mary Lane North shall be provided with 10.5m. radius kerbs returned to an access road carriageway width of 6.0m throughout and flanking footways 2m. in width returned around the radius kerbs. The new road junction shall be constructed at least to binder course prior to the commencement of any other development including the delivery of materials.
Reason - To ensure that all vehicular traffic using the junction may do so in a controlled manner and
to provide adequate segregated pedestrian access, in the interests of highway safety. 05 Prior to the proposed access onto Mary Lane North being brought into residential use,
minimum vehicular visibility splays of 95m easterly by 2.4m by site maximum westerly as measured along, from and along the nearside edge of the carriageway, shall be provided on both sides of the centre line of the access and shall be maintained in perpetuity free from
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
14
Decisions for the Week Ending 25th May 2019
obstruction clear to ground. Reason - To ensure a reasonable degree of intervisibility between drivers of vehicles using the
proposed access and those in the adjoining highway, in the interests of highway safety. 06 The estate roads and footways (including layout, levels, gradients, surfacing and means of
surface water drainage) shall be constructed in accordance with those details shown on drawing no's. C-006 Revision P2, C-100 Revision P1 and CA-105 Revision P1 as approved under planning reference 18/01946/DISCON.
Reason - To ensure that roads and footways are constructed to an acceptable standard, in the
interests of highway safety. 07 Each internal estate road junction shall be provided with a clear to ground level visibility splay
with dimensions of 25m by 2.4m by 25m on both sides. Such visibility splays shall be provided before the road is first used by vehicular traffic and shall be retained free from obstruction clear to ground.
Reason - To ensure a reasonable degree of intervisibility between drivers of vehicles at and
approaching the road junction, in the interests of highway safety. 08 Prior to the first occupation of each dwelling on the proposed development, the individual
proposed vehicular access for that dwelling shall be constructed at right angles to the highway boundary and to a width of 3.7m and each shared vehicular access shall be constructed at right angles to the highway boundary and to a width of 5.5m and shall be provided with an appropriate dropped kerb vehicular crossing of the footway/highway verge to the specifications of the Highway Authority.
Reason - To ensure that vehicles using the site access do so in a controlled manner, in the interests
of highway safety. 09 All carriageways should be provided at 5.5m between kerbs or 6.0m where vehicular access
is taken but without kerbing. Reason - To ensure that roads and footways are constructed to an acceptable standard, in the
interests of highway safety. 10 All footways on site should be provided at no less than 2.0m in width. Reason - To ensure that roads and footways are constructed to an acceptable standard, in the
interests of highway safety. 11 No unbound materials shall be used in the surface treatment of the proposed vehicular
accesses within 6m of the highway boundary throughout the development. Reason - To ensure that loose materials are not brought out onto the highway, in the interests of
highway safety. 12 All off street car parking shall be in precise accord with the details contained within the current
Parking Standards including at the proposed car parking facility. Reason - To ensure that on-street parking of vehicles in the adjoining streets does not occur, in the
interests of highway safety. 13 Any garage provided with its vehicular door facing the highway or proposed highway, shall be
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
15
Decisions for the Week Ending 25th May 2019
sited a minimum of 6m from the highway boundary. Reason - To ensure that the vehicle to be garaged may be left standing clear of the highway whilst
the garage door is opened and closed, in the interests of highway safety. 14 The bicycle storage facilities, as shown within the document titled 'Cycle Storage Schedule'
approved under planning reference 18/01946/DISCON, shall be provided prior to the first occupation of the proposed development hereby permitted and shall be maintained free from obstruction at all times for that sole purpose in perpetuity.
Reason - To promote the use of sustainable means of transport. 15 The development shall be constructed in full accordance with the details shown within the
submitted 'Construction Method Statement' approved under planning reference 18/01946/DISCON.
Reason - To ensure that on-street parking of these vehicles in the adjoining streets does not occur, in
the interests of highway safety. 16 The vehicular turning facility shall be constructed in accordance with the details shown on the
document titled 'Vehicular turning facility for service and delivery vehicles' as approved under planning reference 18/01946/DISCON.
Reason - To ensure that vehicles using the site access may enter and leave the highway in a forward
gear, in the interests of highway safety. 17 Prior to first occupation of the proposed development, a (communal) recycling/bin/refuse
collection point shall be provided adjacent to the highway boundary and additionally clear of all visibility splays at accesses.
Reason - To minimise the length of time a refuse vehicle is required to wait within and cause
obstruction of the highway, in the interests of highway safety. 18 Any new or proposed boundary hedge or trees shall be planted a minimum of 2m back from
the highway boundary and 2m behind any visibility splays which shall be maintained clear of the limits of the highway or visibility splays in perpetuity.
Reason - To ensure that the future outward growth of the hedge does not encroach upon the highway
or interfere with the passage of users of the highway, to preserve the integrity of the highway and in the interests of highway safety.
19 Prior to occupation of the proposed development, the Developer shall be responsible for the
provision and implementation of a Residential Travel Information Pack for sustainable transport, approved by Essex County Council.
Reason - In the interests of reducing the need to travel by car and promoting sustainable
development and transport. 20 The proposed access to the car park area should be provided at 6.0m in width and shall be
provided with an appropriate dropped kerb vehicular crossing of the footway/highway verge to the specifications of the Highway Authority.
Reason - To ensure that vehicles using the site access do so in a controlled manner, in the interests
of highway safety.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
16
Decisions for the Week Ending 25th May 2019
21 Prior to the occupation of any of the proposed dwellings the footway from the tangent with Mary Lane North (northern side) along Brook Street north and north westerly over the junction with St Georges Close and to the pedestrian gate at St Georges school shall be extended to the full width of the highway wherever possible or to a maximum of 1.8 metres in width and being provided entirely at the Applicant/Developer's expense including tactile paving, pram crossings, new kerbing, surfacing, drainage, any adjustments in levels and any accommodation works to the footway and carriageway channel and making an appropriate connection in both directions to the existing footway to the specifications of the Highway Authority as per the proposed footpath widening drawing (Drawing. No. PA_04).
Reason - To make adequate provision for the additional pedestrian traffic generated within the
highway as a result of the proposed development. 22 Prior to the occupation of any of the proposed dwellings the applicant shall provide 2 x new
bus stops or upgrade the existing bus stops in Brook Street adjacent to and in the vicinity to St Georges School to current Essex County Council specifications by the provision of level entry kerbing, new posts and flags, timetables, any adjustments in levels, surfacing and any accommodation works to the footway and carriageway channel being provided entirely at the applicant/Developers expense to the specifications of the Highway Authority.
Reason - To make adequate provision for the additional bus passenger traffic generated as a result
of the proposed development. 23 The surface water strategy shall be constructed in accordance with the details shown on the
following plans/documents approved under planning reference 18/01946/DISCON; - C-005 Revision P2 - C-100 Revision P1 - CA-106 Revision P1 - C-007 Revision P1 - SW Network 2_Basin_Rev (Dated 31 October 2018) - SW Network 1_TANK_REV B (Dated 1 November 2018) Reasons - To prevent flooding by ensuring the satisfactory storage of/disposal of surface water from the site.
- To ensure the effective operation of SuDS features over the lifetime of the development. - To provide mitigation of any environmental harm which may be caused to the local water environment.
24 The off-site flooding scheme shall be implemented in accordance with the details shown on
the following plans/documents approved under planning reference 18/01946/DISCON; - C-005 Revision P2 - C-100 Revision P1 - CA-106 Revision P1 - C-007 Revision P1 - SW Network 2_Basin_Rev (Dated 31 October 2018) - SW Network 1_TANK_REV B (Dated 1 November 2018) Reason - To mitigate increased flood risk to the surrounding area during construction there needs to
be satisfactory storage of/disposal of surface water and groundwater. 25 The maintenance of the approved surface water drainage strategy shall be undertaken in
accordance with the details shown in the document titled 'SUDs Management and
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
17
Decisions for the Week Ending 25th May 2019
Maintenance (dated November 2018) as approved under planning reference 18/01946/DISCON.
Reason - To ensure appropriate maintenance arrangements are put in place to enable the surface
water drainage system to function as intended to ensure mitigation against flood risk. 26 The applicant or any successor in title must maintain yearly logs of maintenance which should
be carried out in accordance with any approved Maintenance Plan. These must be available for inspection upon a request by the Local Planning Authority.
Reason - To ensure the SuDS are maintained for the lifetime of the development as outlined in any
approved Maintenance Plan so that they continue to function as intended to ensure mitigation against flood risk.
27 The foul water strategy shall be constructed in accordance with the details shown on the
following plans/documents approved under planning reference 18/01946/DISCON; - C-005 Revision P2 - C-100 Revision P1 - CA-106 Revision P1 - C-007 Revision P1 - SW Network 2_Basin_Rev (Dated 31 October 2018) - SW Network 1_TANK_REV B (Dated 1 November 2018) Reason - To prevent environmental and amenity problems arising from flooding. 28 The final market dwelling provided on the site shall not be occupied until the proposed church
and school overflow car park, as identified on drawing number PD/03A has been fully constructed and laid out within the site.
Reason - To ensure this facility is provided on site. 29 The development hereby permitted, in respect of the highway footpath works, shall be carried
out in accordance with the following approved plan: PA_04. Reason - For the avoidance of doubt and in the interests of proper planning. Great Oakley Parish Council
19/00498/FUL Approval - Full 24.05.2019 Delegated Decision
Mr & Mrs B Woods
Proposed extension to Curtilage, new secure garage/garden store & stables.
3 Skighaugh Clacton Road Stones Green Harwich Essex CO12 5BY
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
18
Decisions for the Week Ending 25th May 2019
02 The development hereby permitted shall be carried out in accordance with the following approved plans, drawing numbers P03, P01c and P02c.
Reason - For the avoidance of doubt and in the interests of proper planning. 03 There shall be no burning of horse manure on the site at anytime. Reason- The site is in the proximity of residential dwellings and therefore suitable control is
necessary in order to protect the amenities of residents of such properties. 04 The stable building and paddock land hereby approved shall be used solely in connection with
the private stabling of horses and no business or commercial use including livery or riding school activities shall be carried on from the site whatsoever.
Reason - In the interests of local amenity and highway safety. 05 No floodlighting or other means of external lighting shall be installed at the site except in
accordance with details (to include position, height, aiming points, lighting levels and a polar luminous diagram) which shall have previously been submitted to and agreed in writing by the Local Planning Authority.
Reason - To secure an orderly and well designed development sympathetic to the character of the
area and in the interests of residential amenity. 06 Prior to the occupation of the hereby approved buildings a vehicular turning facility of a design
to be previously approved in writing by the Local Planning Authority shall be constructed, and retained free from obstruction within the site at all times for that sole purpose.
Reason - To ensure that vehicles can enter and leave the highway in a forward gear in the interest of
highway safety. 07 Any gates provided at the vehicular access shall be inward opening only and shall be set back
a maximum of 0.5 metres from the back edge of the verge or where no provision is present, the carriageway.
Reason - In the interest of highway safety. 08 Notwithstanding the details on drawing number P01c, prior to the commencement of any
above ground works, a scheme of hard and soft landscaping works for the site shall be submitted to and approved, in writing, by the Local Planning Authority. The scheme shall include any proposed changes in ground levels and also accurately identify spread, girth and species of all existing trees, shrubs and hedgerows on the site and indicate any to be retained, together with measures for their protection which shall comply with the recommendations set out in the British Standards Institute publication "BS 5837: 2012 Trees in relation to design, demolition and construction.
Reason - To enhance the visual impact of the proposed works. 09 All changes in ground levels, hard landscaping, planting, seeding or turfing shown on the
approved landscaping details shall be carried out during the first planting and seeding season (October - March inclusive) following the commencement of the development or in such other phased arrangement as may be agreed in writing by the Local Planning Authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to a variation of
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
19
Decisions for the Week Ending 25th May 2019
the previously approved details. Reason -To enhance the visual impact of the proposed works. 10 Notwithstanding the provisions of Article 3, Schedule 2 Part 2 Class A of the Town and
Country Planning (General Permitted Development) (England) Order 2015 (or any Order revoking and re-enacting that Order with or without modification), there shall be no erection of a gate, fence, wall or other means of enclosure except in accordance with drawings showing the design and siting which shall previously have been submitted to and approved, in writing, by the Local Planning Authority.
Reason - To protect the semi-rural landscape and in the interests of visual amenity. Harwich Town Council
19/00399/ADV Approval - Advertisement Consent 20.05.2019 Delegated Decision
Miss Cassie Greenhill - Galloper Wind Farm Ltd
Proposed 1no. hoarding sign.
Land at Bay Roundabout Harwich Essex
01 All advertisement consents are subject to five standard conditions specified in Schedule 2 of
the Town and Country Planning (Control of Advertisements) (England) Regulations 2007 which are as follows: -
1. No advertisement is to be displayed without the permission of the owner of the site or any other
person with an interest in the site entitled to grant permission. 2. No advertisement shall be sited or displayed so as to (a) endanger persons using any highway, railway, waterway, dock, harbour or aerodrome (civil or
military); (b) obscure, or hinder the ready interpretation of, any traffic sign, railway signal or aid to navigation by
water or air; or (c) hinder the operation of any device used for the purpose of security or surveillance or for
measuring the speed of any vehicle. 3. Any advertisement displayed, and any site used for the display of advertisements, shall be
maintained in a condition that does not impair the visual amenity of the site. 4. Any structure or hoarding erected or used principally for the purpose of displaying advertisements
shall be maintained in a condition that does not endanger the public. 5. Where an advertisement is required under these Regulations to be removed, the site shall be left in
a condition that does not endanger the public or impair visual amenity. Additionally all advertisement consents are for a fixed term of 5 years unless this period is varied on
the formal decision notice. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: GALLOPER NEW ACCESS SIGN DRAWING NUMBER REV A and FILE NAME: 70654 REV 1.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
20
Decisions for the Week Ending 25th May 2019
Reason - For the avoidance of doubt and in the interests of proper planning. Lawford Parish Council No Determinations Little Bentley Parish Council No Determinations Little Bromley Parish Council No Determinations Little Clacton Parish Council No Determinations Little Oakley Parish Council
19/00479/FUL Approval - Full 24.05.2019 Delegated Decision
Mr and Mrs Palmer
Proposed side extension and first floor extension above existing ground floor extension.
Oswestry 125 Harwich Road Little Oakley Essex CO12 5EB
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing no's. 102 and 103. Reason - For the avoidance of doubt and in the interests of proper planning. Manningtree Town Council No Determinations Mistley Parish Council No Determinations Ramsey & Parkeston Parish Council
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
21
Decisions for the Week Ending 25th May 2019
19/00521/FUL Approval - Full 23.05.2019 Delegated Decision
Miss Amanda Parker
Proposed conversion of double garage into bedroom and bathroom.
10 Mayes Lane Ramsey Essex CO12 5EH
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing 4, Drawing 3 and Drawing 2. Reason - For the avoidance of doubt and in the interests of proper planning. St Osyth Parish Council
18/01436/FUL Approval - Full 24.05.2019 Delegated Decision
Mr D Gibbons Erection of replacement dwelling following demolition of existing.
26 Tower Estate St Osyth Clacton On Sea Essex CO16 8NG
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plan: DWG No. P01e Reason - For the avoidance of doubt and in the interests of proper planning. 03 Prior to occupation of the hereby approved development a Flood Warning and Evacuation
Plan shall have been submitted to and approved in writing by the Local Planning Authority. Development shall only be carried out in accordance with the approved details and the Flood Warning and Evacuation Plan shall remain a live document and be updated where required.
Reason - The site is at risk from flooding and a detailed evacuation plan is essential to safeguard
future occupiers of the development. 04 The development shall not be occupied until such time as the car parking area, indicated on
the approved plans, has been hard surfaced and sealed. The car parking area shall be retained in this form at all times and shall not be used for any purpose other than the parking of vehicles related to the use of the development thereafter.
Reason - To ensure that on-street parking of vehicles in the adjoining streets does not occur, in the
interests of highway safety.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
22
Decisions for the Week Ending 25th May 2019
05 Notwithstanding the provisions of Article 3, Schedule 2, Part 1 of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any Order revoking and re-enacting that Order with or without modification), the two windows proposed on the south easterly elevation serving both bathrooms to the promenade level and first floor level shown on Drawing No. P01e shall be non opening and glazed in obscure glass and shall thereafter be permanently retained in this approved form.
Reason - To protect To protect the privacy and amenities of the occupiers of adjoining property.
18/01938/FUL Approval - Full 22.05.2019 Delegated Decision
Mr & Mrs K Williams
Demolition of existing dwelling and erection of replacement dwelling.
22 Tower Estate St Osyth Clacton On Sea Essex CO16 8NG
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans and documents: Drawing No. 2421/08 C, Drawing No. 1109/01, Drawing No. 2421/01 C, Drawing No. 2421/03 C, Drawing No. 2421 04C, Drawing No. 2421/05 C, Drawing No. 2421/ 06 C, Drawing No. 2421/07 C, Design and Access Statement dated 17th November 2018 and Flood Risk Assessment scanned 20th November 2018.
Reason - For the avoidance of doubt and in the interests of proper planning. 03 The hereby approved development shall only be implemented in full accordance with the
agreed Flood Risk & Evacuation Plan (prepared by MLM Consulting Engineers Limited scanned - 07 May 2019). The Flood Warning Evacuation Plan shall remain in force for the duration of the occupation period and shall remain a live document and be updated where required.
Reason - The site is at risk from flooding and a detailed evacuation plan is essential to safeguard
future occupiers of the development. 04 The development shall not be occupied until such time as the car parking area, indicated on
the approved plans, has been hard surfaced and sealed. The car parking area shall be retained in this form at all times and shall not be used for any purpose other than the parking of vehicles related to the use of the development thereafter.
Reason - To ensure that on-street parking of vehicles in the adjoining streets does not occur, in the
interests of highway safety.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
23
Decisions for the Week Ending 25th May 2019
19/00018/FUL Approval - Full 23.05.2019 Delegated Decision
Mr C Cook- CE Cook Developments Ltd
Erection of 1 new dwelling and garage.
The Old Cottage Daltes Lane St Osyth Clacton On Sea Essex CO16 8RZ
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 Prior to the commencement of any above ground works precise details of the manufacturer
and types and colours of the external facing and roofing materials to be used in construction shall have been submitted to and agreed, in writing, by the Local Planning Authority. Such materials as may be agreed shall be those used in the development.
Reason - This is a publicly visible building adjacent to listed buildings where sympathetic materials
are a visually essential requirement. 03 No above ground works shall take place until there has been submitted to and approved, in
writing, by the Local Planning Authority a scheme of hard and soft landscaping works for the site, which shall include any proposed changes in ground levels and also accurately identify spread, girth and species of all existing trees, shrubs and hedgerows on the site and indicate any to be retained, together with measures for their protection which shall comply with the recommendations set out in the British Standards Institute publication "BS 5837: 2012 Trees in relation to design, demolition and construction."
Reason - In the interest of visual amenity and the character of the area. 04 All changes in ground levels, hard landscaping, planting, seeding or turfing shown on the
approved landscaping details shall be carried out during the first planting and seeding season (October - March inclusive) following the commencement of the development or in such other phased arrangement as may be agreed in writing by the Local Planning Authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to a variation of the previously approved details.
Reason - In the interest of visual amenity and the character of the area. 05 The hereby approved development shall take place fully in accordance with the tree protection
measures set out in the submitted Arboricultural Impact Assessment and the accompanying Tree Protection Plan (prepared by Landscapes of Change dated August 2015).
Reason - In order to suitably protect the root systems of existing trees on the site for the benefit of the
character and appearance of the surrounding area and the ecology of the site. 06 No unbound materials shall be used in the surface treatment of the proposed vehicular access
within 6m of the highway boundary. Reason - To ensure that loose materials are not brought out onto the highway, in the interests of
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
24
Decisions for the Week Ending 25th May 2019
highway safety. 07 Prior to first occupation of the dwelling the vehicular access for the proposed dwelling shall be
constructed at right angles to the highway boundary and to the existing carriageway. The access shall be constructed in accordance with the details shown on approved plan no. 1507/02C and shall be provided with an appropriate crossing of the verge.
Reason - To ensure that vehicles can enter and leave the highway in a controlled manner in the
interest of highway safety. 08 No development shall take place until a Construction Method Statement (CMS) has been
submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for:
i. the parking of vehicles of site operatives and visitors ii. loading and unloading of plant and materials iii. storage of plant and materials used in constructing the development iv. wheel and under body washing facilities vi. hours of working Reason - To ensure that on-street parking of these vehicles in the adjoining streets does not occur, in
the interests of highway safety. 09 Prior to first occupation of the development, the access at its centre line shall be provided with
a clear to ground visibility splays with dimensions of 2.4 metres by 105 metres westwards (to the junction) and 2.4 metres to the maximum site boundary eastwards, as measured from and along the northern edge of the carriageway. Such vehicular visibility splays shall be provided before the access is first used by vehicular traffic and retained free of any obstruction above 600mm at all times.
Reason - To provide adequate inter-visibility between vehicles using the access and those in the
existing public highway in the interest of highway safety. 10 There shall be no discharge of surface water onto the Highway. Reason - To prevent hazards caused by water flowing onto the highway and to avoid the formation of
ice on the highway in the interest of highway safety. 11 Prior to occupation of the proposed dwelling, the Developer shall be responsible for the
provision and implementation of a Residential Travel Information Pack for sustainable transport, approved by Essex County Council, to include six one day travel vouchers for use with the relevant local public transport operator.
Reason - In the interests of reducing the need to travel by car and promoting sustainable
development and transport. 12 Any new boundary planting shall be planted a minimum of 1 metre back from the highway
boundary and any visibility splay. Reason - To ensure that the future outward growth of the planting does not encroach upon the
highway or interfere with the passage of users of the highway, to preserve the integrity of the highway and in the interests of highway safety.
13 The development hereby permitted shall be carried out in accordance with the following
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
25
Decisions for the Week Ending 25th May 2019
approved plans: 1507/02C, 1507/05D, 1507/04C and 1507/03. Reason - For the avoidance of doubt and in the interests of proper planning.
19/00272/FUL Approval - Full 24.05.2019 Delegated Decision
Mr Matthew Low Proposed steel framed portal building with fibre cement roof and clad in steel sheeting.
St Osyth Lodge Farm Clacton Road St Osyth Essex CO16 8HF
01 The development hereby permitted shall be carried out in accordance with the following
approved plan: Drawing No. DB19015/002a, Drawing No. G[2], Drawing No. G [1], Low lighting plan scanned 29th April 2019.
Reason - For the avoidance of doubt and in the interests of proper planning.
19/00455/FUL Approval - Full 20.05.2019 Delegated Decision
Mr Billy Abbott Proposed rear extension, loft conversion, alterations to front elevation, internal alterations and construction of self-contained annexe.
243 Point Clear Road St Osyth Clacton On Sea Essex CO16 8JL
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Ref: 009, Ref: 003, Ref: 004 dated 15.05.19, Ref: 005 dated 15.05.19, Ref: 006, Ref: 007 and email dated 16 May 2019 confirming details of materials for the annexe.
Reason - For the avoidance of doubt and in the interests of proper planning.
19/00733/FUL Application Withdrawn 20.05.2019 Delegated Decision
Proposed change of use of first floor store into dwelling (Flat).
Boathouse opposite 8 Eastern Promenade Mersea View St Osyth Essex CO16 8LE
Tendring Parish Council
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
26
Decisions for the Week Ending 25th May 2019
19/00389/LBC Approval - Listed Building Consent 22.05.2019 Delegated Decision
Mr Wayne Turner Painting exterior dwelling, doors and window frames.
Thatch Cottage The Green Tendring Clacton On Sea Essex CO16 0BU
01 The works hereby permitted shall begin before the expiration of three years from the date of
this consent. Reason - To comply with the requirements of Section 18(1) of the Planning (Listed Buildings and
Conservation Areas) Act 1990, as amended by the Planning and Compulsory Purchase Act 2004.
02 The masonry paint to be used on the exterior walls shall be breathable and in accordance with
an email received on 9th May 2019 stating it to be Silicate Paint by SecilTEK in White. Reason - To ensure the historic integrity of the listed building is retained. Thorpe-le-Soken Parish Council
18/01348/FUL Approval - Full 24.05.2019 Delegated Decision
Ms L Jones Proposed erection of no.2 houses.
Land adjacent The Coach House Colchester Road Thorpe Le Soken Clacton On Sea Essex CO16 0LA
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plans: Drawing No JJCR-01 Revision E. Reason - For the avoidance of doubt and in the interests of proper planning. 03 Prior to the commencement of any above ground works, full details/samples of the external
facing and roofing materials to be used in the construction of the development shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details unless otherwise agreed in writing by the Local Planning Authority.
Reason - In the interests of visual amenity as insufficient information has been submitted within the
application for full consideration of these details. 04 No unbound materials shall be used in the surface treatment of the proposed vehicular access
within 6m of the highway boundary.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
27
Decisions for the Week Ending 25th May 2019
Reason - To ensure that loose materials are not brought out onto the highway, in the interests of
highway safety. 05 Prior to the first occupation of the proposed dwellings, the proposed vehicular access shall be
constructed to a width of 5.5m and shall be provided with an appropriate dropped kerb vehicular crossing of the footway/highway verge to the specifications of the Highway Authority.
Reason - To ensure that all vehicles using the private drive access do so in a controlled manner and
to ensure that opposing vehicles may pass clear of the limits of the highway, in the interests of highway safety.
06 Prior to the proposed access being brought into use, a 1.5m. x 1.5m. pedestrian visibility
splay, relative to the highway boundary, shall be provided on both sides of that access and shall be retained and maintained free from obstruction clear to ground thereafter. These splays must not form part of the vehicular surface of the access.
Reason - To ensure adequate intervisibility between drivers of vehicles using the proposed access
and pedestrians in the adjoining highway, in the interests of highway safety. 07 The existing access shown on the submitted plan shall be suitably and permanently closed in
a manner to be previously approved in writing by the Local Planning Authority, incorporating the re-instatement to full height of the highway verge/footway/kerbing to the specifications of the Highway Authority, immediately the proposed new access is brought into use.
Reason - To ensure the removal of and to preclude the creation of un-necessary points of traffic
conflict in the highway and to prevent indiscriminate access and parking on the highway, in the interests of highway safety.
08 The development shall not be occupied until such time as the car parking and turning area,
has been provided in accord with the details shown in Drawing No JJCR-01 Revision E. The car parking area shall be retained in this form at all times and shall not be used for any purpose other than the parking of vehicles related to the use of the development thereafter.
Reason - To ensure that on-street parking of vehicles in the adjoining streets does not occur, in the
interests of highway safety. 09 No development shall take place, including any ground works or works of demolition, until a
Construction Method Statement (CMS) has been submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for:
i. the parking of vehicles of site operatives and visitors ii. loading and unloading of plant and materials iii. storage of plant and materials used in constructing the development iv. wheel and under body washing facilities Reason - To ensure that on-street parking of these vehicles in the adjoining streets does not occur, in
the interests of highway safety. 10 All new hardstanding and parking areas shall be made of porous materials, or provision shall
be made to direct run-off water from the hard surface to a permeable or porous area or surface within the site.
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
28
Decisions for the Week Ending 25th May 2019
Reason - In the interests of sustainable development and to ensure that run-off water is avoided to minimise the risk of surface water flooding.
11 The removal of any vegetation for site access/site clearance shall only be carried out outside
of the bird nesting season (March to August inclusive). Reason - To ensure the protection of birds potentially nesting on site. 12 Notwithstanding the provisions of Article 3, Schedule 2 Part 2 Class A of the Town and
Country Planning (General Permitted Development) England Order 2015 (or any Order revoking and re-enacting that Order with or without modification), no provision of fences, walls or other enclosures, shall be erected on the boundaries of the site or any part of the site forward of the front elevation of the dwelling hereby approved except in accordance with details that shall previously be approved in writing by the Local Planning Authority.
Reason - To retain the open aspect of the locality in the interests of visual amenity. 13 Prior to the commencement of any above ground works, a scheme of hard and soft
landscaping works for the site shall be submitted to and approved, in writing, by the Local Planning Authority. The scheme shall include any proposed changes in ground levels and also accurately identify spread, girth and species of all existing trees, shrubs and hedgerows on the site and indicate any to be retained, together with measures for their protection which shall comply with the recommendations set out in the British Standards Institute publication "BS 5837: 2012 Trees in relation to design, demolition and construction.
Reason - In order to enhance the visual appearance of the proposed dwellings. 14 All changes in ground levels, hard landscaping, planting, seeding or turfing shown on the
approved landscaping details shall be carried out during the first planting and seeding season (October - March inclusive) following the commencement of the development or in such other phased arrangement as may be agreed in writing by the Local Planning Authority. Any trees or shrubs which, within a period of 5 years of being planted die, are removed or seriously damaged or seriously diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to a variation of the previously approved details.
Reason - To ensure that the landscaping scheme is suitably implemented within an appropriate
timescale. 15 Prior to the commencement of any above ground works, a plan indicating the positions,
design, materials and type of boundary treatment to be erected shall be submitted to and approved by the Local Planning Authority. The approved boundary treatments shall be implemented before the dwellings hereby permitted are occupied.
Reason - In the interests of providing adequate privacy for occupiers of the development and
neighbouring residential properties and in the interests of visual amenity. Thorrington Parish Council No Determinations Weeley Parish Council
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
29
Decisions for the Week Ending 25th May 2019
19/00558/FUL Approval - Full 20.05.2019 Delegated Decision
Mr and Mrs Farrant
Single storey rear extension.
18 Thornberry Avenue Weeley Clacton On Sea Essex CO16 9HN
01 The development hereby permitted shall be begun before the expiration of three years from
the date of this permission. Reason - To comply with the requirements of Section 91 of the Town and Country Planning Act 1990,
as amended by the Planning and Compulsory Purchase Act 2004. 02 The development hereby permitted shall be carried out in accordance with the following
approved plan FTA-01 Rev A. Reason - For the avoidance of doubt and in the interests of proper planning.
19/00722/NMA Approval Non Material Amendment 23.05.2019 Delegated Decision
Vaughan & Blyth Non-material amendment to Planning Application - 17/02080/DETAIL - minor substitution to plans. Omitting the Plinth construction from all but the front elevations of each dwelling; and Change the Bay window detail from a coined construction to a square design for House Types HT02, HT03 and HT04.
Land South of The Crematorium Colchester Road Weeley Essex CO16 9JP
01 The development hereby permitted shall be carried out in accordance with the following
approved plans: - 19.2006/HT01-1 - 19.2006/HT01-2 - 19.2006/HT02-1 - 19.2006/HT02-2 - 19.2006/HT03-1 - 19.2006/HT03-2 - 19.2006/HT04-1 - 19.2006/HT04-2 - 19.2006/HT04-3 Reason - For the avoidance of doubt and in the interests of proper planning. Wix Parish Council
Application No. Decision Date of Decision Conditions/Reasons
Applicant’s Name Proposal Location
30
Decisions for the Week Ending 25th May 2019
19/00213/FUL Application Withdrawn 24.05.2019 Delegated Decision
Mr and Mrs Andrew Thornton
Proposed dwelling. Land rear of Chapelfields Harwich Road Wix Essex CO11 2RY
Wrabness Parish Council No Determinations