2012 Gas Well Deliquification Workshop
Advances in Wireless Communication Technology Delivering:
Enhanced Personal Safety, Increased Profitability, and Reduced Operating Costs.
David J Southern, P. Eng.| Regional Manager | Schneider Electric.| Telemetry & Remote SCADA Solutions
Gas Well Deliquification Workshop
Sheraton Hotel, Denver, Colorado
February 19 – 22, 2012
2012 Gas Well Deliquification Workshop
Before we get started, remember….
….never upset a Backhoe Operator.
2012 Gas Well Deliquification Workshop
...and above all remember, never ever …
…..upset a Backhoe.
2012 Gas Well Deliquification Workshop
Within recent years several new technologies have come along which
truly deliver on the promise of:
Enhanced Personal Safety, Increased Profitability, and Reduced Operating Costs.
2012 Gas Well Deliquification Workshop
Game changing technology: Horizontal Drilling
Horizontal drilling was a real game changer, opening up new and old reservoirs previously thought unrecoverable and are now major producers. Horizontal drilling helped companies be safer, more profitable and reduce operating costs.
2012 Gas Well Deliquification Workshop
Multi-Stage Fracturing of horizontal formations is a real game changer, enabling companies to produce more energy through the same wellsite. Multi-Stage Fracturing helped companies be safer, more profitable and reduce operating costs.
Game changing technology: Multi-Stage Fracturing
2012 Gas Well Deliquification Workshop
By drilling several wells on the same pad site companies can reduce stress on surface roads, reduce operator travel, reduce construction costs, and greatly reduce Rig relocation costs. Multi-Well Pad Sites help companies be safer, more profitable and reduce operating costs.
Game changing technology: Multi-Well Pad Sites
2012 Gas Well Deliquification Workshop
Game changing technology: The Wireless Wellhead
The Wireless Wellhead is a game changing technology that enables Producers and Operators to bring wells on faster at less cost and at less risk to personnel. Well performance data starts streaming during flow-back and throughout the life of the well giving Reservoir Specialists the tools to produce more. The Wireless Wellhead makes life safer, increases profitability, and reduces costs to deploy and maintain remote assets.
Oil & Gas Extraction
2012 Gas Well Deliquification Workshop
•Wire is expensive to purchase
•Wire is expensive to install
•Wire gets stolen
•Wire gets dug through
•Wire can be unsafe
•Wire needs protection
Wire has it’s challenges
2012 Gas Well Deliquification Workshop
•Wire can be bad for the environment
•Wire takes up room
•Wire gets sabotaged
•Wire is restrictive
•Wire requires maintenance
•Wire can kill
Wire has it’s challenges
2012 Gas Well Deliquification Workshop
Wire and Conduit costs have doubled and doubled again….
2012 Gas Well Deliquification Workshop
Wire sometimes disappears …………
2012 Gas Well Deliquification Workshop
Wire is yummy….
2012 Gas Well Deliquification Workshop
Qualified Electricians can be hard to find….
Qualified Non-
2012 Gas Well Deliquification Workshop
……and if there is ever a reason to go wireless on Oil & Gas wellsites, this is it………..
2012 Gas Well Deliquification Workshop
Current Method – Trenching and Backfill
• Flammable, hazardous gases and fluids are buried in same trench just inches away from a potential source of ignition.
• More Labor Intensive • More Materials Required • Scheduling Issues • Project Delays • Frequent Cost Overruns • Heightened Safety Risks
2012 Gas Well Deliquification Workshop
Oil and Water Tanks
Separator
200-250 feet of trenching, metal
conduit, wire, seal-offs, labor
and time.
100-200 feet of trenching, metal conduit, wire, seal-offs, labor and time.
Real World Wireless Wellhead Oil & Gas-Economics
2012 Gas Well Deliquification Workshop
Separator/Treater
Oil and Water Tanks
Flowing or Pumped Well
Real World Wireless Wellhead Oil & Gas-Economics
2012 Gas Well Deliquification Workshop
Column A Column B Alternative Method Accutech Wireless Method Current Method (Wired I/O)
Bid Price Each QTY Extended Bid Price Bid Price Each QTY Extended Bid Price Casing Pressure Transmitter $1,300.00 1 $1,300.00 $500.00 1 $500.00
Tubing Pressure Transmitter $1,300.00 1 $1,300.00 $500.00 1 $500.00
Separator Pressure Transmitter $1,300.00 1 $1,300.00 $500.00 1 $500.00
Separator Temperature Transmitter $1,300.00 1 $1,300.00 $500.00 1 $500.00
Separator Level Transmitter $1,300.00 1 $1,300.00 $800.00 1 $800.00
Water Tank Dual Float Level Transmitter $3,500.00 1 $3,500.00 $1,600.00 1 $1,600.00
Oil Tank Submersible Level Transmitter $2,500.00 5 $12,500.00 $1,600.00 5 $8,000.00
Wireless Base Radio package $845.00 1 $845.00 $0.00 0 $0.00
Cabinet, term blocks, brackets, etc. $100.00 0 $0.00 $2,000.00 1 $2,000.00
Conduit, wire, fittings, seal-offs, brackets, etc. $0.00 0 $0.00 $10,000.00 1 $10,000.00
Installation Estimate w/ Contingency $1,573.00 1 $1,573.00 $10,725.00 1 $10,725.00
Total Remote Monitoring Installed Cost $24,918.00 $35,125.00
Potential Wireless Cost Savings Per Wellsite $10,207.00 Number of well installations in CY2011 25 Total Potential Wireless Cost Savings $255,175.00
Real World Wireless Wellhead Oil & Gas-Economics
2012 Gas Well Deliquification Workshop
Other Considerations.... Column A Column B
Additional Considerations Accutech Wireless Method Current Method (Wired I/O) Electrical Area Classification All Class 1, Division 1 Mix of Class 1, Div 2 and Class 1, Div 1 Intrinsically Safe Yes No Warranty 3 Year parts and labor 1 years parts only Number of Warranties One single manufacturer Around 10 separate manufacturer warranties
Battery Life expectancy Pressure 5 yr, Tank Level 10 yr 3-7 years weather dependant Replacement battery cost (total annualized) $41
Low Battery Warning Yes No Field Instrument Diagnostics from SCADA Host Yes No Operational Risks due to Adverse Weather NONE, no solar power systems Moderate, gray days will deplete batteries
Work Over RIG Issues Low, Easy removal of instrumentation High, Possible damage to instrumentation, conduit & wiring
Haul Truck Issues None None
Cost Escalation Risk due to Inflation Low, relatively inflation proof High, as metal prices and labor rates rise, so will installation costs
Safety Risks Low, relatively little time spent on site
Moderate, more installation time on site has intrinsic dangers and risks
Land Use Impact Low, fast installation Moderate, long installation time creates land use conflict Surface Owner Risks Low, no buried conduit High, due to buried conduit and wire
Real World Wireless Wellhead Oil & Gas-Economics
2012 Gas Well Deliquification Workshop
• Typical multi-well pad
Advances in Wireless Wellhead Communications Assists Oil & Gas Development
2012 Gas Well Deliquification Workshop
• Wireless field sensors at well report to base radio:
1. Casing pressures, 2. Tubing pressures and 3. Braden pressures 4. Plunger arrivals
Advances in Wireless Wellhead Communications Assists Oil & Gas Development
2012 Gas Well Deliquification Workshop
• Wireless field sensors at separator and vapor recovery unit report to base radio
1. Temperature 2. Level 3. Pressure
Advances in Wireless Wellhead Communications Assists Oil & Gas Development
2012 Gas Well Deliquification Workshop
• Wireless field sensors on oil and water tanks report to base radio:
1. Water tank levels 2. Oil tank levels
Advances in Wireless Wellhead Communications Assists Oil & Gas Development
2012 Gas Well Deliquification Workshop
• All wireless field data is collected for on-site control and optimization and then forwarded on to corporate offices for data processing, engineering, accounting, management, operations, etc.
Advances in Wireless Wellhead Communications Assists Oil & Gas Development
2012 Gas Well Deliquification Workshop
Oil Extraction
The Wireless Wellhead Assists Oil & Gas Development..............
Natural Gas
2012 Gas Well Deliquification Workshop
Wireless Oil Well in North Dakota
1. All Production Volumes, 2. Tubing Pressure, 3. No conduit nor wires. and 4. One day installation
2012 Gas Well Deliquification Workshop
Level Monitoring on Three Oil Tanks
Level Monitoring on Water Tank
(no more stairs to climb in -40F)
Base Radio and Ethernet Long Haul Radio
Casing &Tubing Pressure Monitoring
2012 Gas Well Deliquification Workshop
Drill Here Frac Here Flow-Back Here Produce Here
22 Well Pad in Piceance Basin with zero trenching to the wellheads Wireless Wellsite Monitoring makes SIMOPS safer, more productive, and more economical.
SIMOP: Simultaneous Operations
2012 Gas Well Deliquification Workshop
Single panel manages all pad instruments and measurements. Notice how few number of wires landed…near zero instrument commissioning.
2012 Gas Well Deliquification Workshop
Non-Line of site install to four tanks measuring interface, level and temperature.
2012 Gas Well Deliquification Workshop
Once completed the arrival sensor is installed.
2012 Gas Well Deliquification Workshop
When all wells are completed, the pad is left nice and clean having had zero
trenching to the wellheads. Later, when a well gets a work over, there is high probability the instrumentation will not be damaged – improving the cost of
ownership for this producer.
2012 Gas Well Deliquification Workshop
• Rapid deployment for new and retrofit applications • Plunger Arrival sensor, Pressure Sensor for Tubing, Casing and
Braden Head, Tank Level (produced volumes), Sales Valve Controller, Separator Temp/Pressure/Level.
• Sand erosion and valve positioning can be added
Application:
The Wireless Wellhead
Casing Pressure
Valve Controller with arrival sensor
Tubing Pressure
2012 Gas Well Deliquification Workshop
The Wireless Well - Single Well Solution
The Sales Valve can be located at the well or at the separator
2012 Gas Well Deliquification Workshop
The Wireless Well – Multi Well Solution
2012 Gas Well Deliquification Workshop
All EFM devices are welcome
No Charts, please.
The Wireless Well is GREEN Recycling existing gear
Wellhead Controller
2012 Gas Well Deliquification Workshop
Managing a multi-well pad just got a whole lot safer, smaller and less costly
The Wireless Well – Smaller, More Powerful
WIRED
Same Multi-Wellpad
WIRELESS
2012 Gas Well Deliquification Workshop
Equipment used:
• Variety of manufacturers to choose from. • Field Units are typically Class 1 Div 1, wireless
sensors, self-contained, battery-powered, temperature rated: -40 to +185°F (-40 to +85°C)
• Base radios may support up to 100 field sensors • Range: 600 to 5000 feet • Long battery life: 5-15 years
Advances in Wireless Communications Technology
2012 Gas Well Deliquification Workshop
For local access
For the Operators
For the WORLD
The Wireless Well – Part of the solution
2012 Gas Well Deliquification Workshop
SCADA Summary Screen
The Wireless Well – Part of the solution
2012 Gas Well Deliquification Workshop
The Wireless Well – Part of the solution
SCADA Detail Screen
2012 Gas Well Deliquification Workshop
These technologies include:
Horizontal Drilling, Multistage Fracturing, Multiple Well Pad, ..and now.. The Wireless Wellhead.
Within recent years several new technologies have come along which
truly deliver on the promise of:
Enhanced Personal Safety, Increased Profitability, and Reduced Operating Costs.
2012 Gas Well Deliquification Workshop
So who wants to cut the cord and go wireless?
WIRE
These guys do.
2012 Gas Well Deliquification Workshop
Feb. 19 – 22, 2012 2012 Gas Well Deliquification
Workshop Denver, Colorado
Copyright
Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Gas Well Deliquification Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the Southwestern Petroleum Short Course (SWPSC), rights to:
– Display the presentation at the Workshop.
– Place it on the www.alrdc.com web site, with access to the site to be as directed by the Workshop Steering Committee.
– Place it on a CD for distribution and/or sale as directed by the Workshop Steering Committee.
Other use of this presentation is prohibited without the expressed written permission of the author(s). The owner company(ies) and/or author(s) may publish this material in other journals or magazines if they refer to the Gas Well Deliquification Workshop where it was first presented.
2012 Gas Well Deliquification Workshop
Disclaimer The following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Gas Well Deliquification Web Site.
The Artificial Lift Research and Development Council and its officers and trustees, and the Gas Well Deliquification Workshop Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Gas Well Deliquification Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained.
The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials.
The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose.