User Guide
Admin Projects Reportingin the Finance Centre
End State
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 2/13
2
Contents Page
1 Process Overview 3
1.1.
Overview........................................................................................................................................................................................................3
1.2. Responsibility................................................................................................................................................................................................3
1.3. Triggers............................................................................................................................................................................................................3
1.4. Prerequisites.................................................................................................................................................................................................4
1.5. Output.............................................................................................................................................................................................................4
2 Admin Projects Reporting in the Finance Centre 5
2.1. Running reports in SAP R/3 .................................................................................................................................................................5
2.2.
Running reports in BW........................................................................................................................................................................... 5
3 Useful SAP Reports 8
3.1. Planning Reports ZRPAP05 .................................................................................................................................................................8
3.2. Budget Reports ZRPAP14................................................................................................................................................................. 10
4 Appendices 12
4.1. Glossary of Terms ..................................................................................................................................................................................12
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 3/13
3
1. Process Overview
1 1 Overview
This document covers the process that should be followed when there is a need for Admin Project
information. It is expected that the need for information could originate from the Finance Centre, the Business
or Embedded Finance and Reporting is the tool for supplying the information.
The projects can be monitored by running reports in SAP R/3 or in BW, however the Reports that are
available to users are dictated by the user ID.
The Project Reports may show some or all of the following:
Project budget
Plan versions
Actuals
Commitments
Reporting is the most important tool in monitoring capital projects.
1 2 Responsibility
Finance Centre is responsible for running Reports when information is required by the following communities:
Project Managers in the Business.
Finance Partners in the Business.
Finance Centre Planning and Reporting.
1 3 Triggers
The Business will request ad hoc reports. These requests will be mainly driven from the Business need for
Admin Projects information.
Month end – as part of the monthly process, the Finance Centre will include a selection of Admin Project
reports.
Year End – this is currently 31st March – The External Auditors will require a list of reports – this will be
agreed before the Audit commences.
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 4/13
4
1 4 Prerequisites
In order to complete the tasks outlined in this document it is imperative the user has a good working
knowledge of:
BW
SAP R/3
Excel
The following helpcards provide guidance on how to run reports:
Introduction to Using Reports in SAP
Printing SAP reports and running reports in Background
Reporting Functionality Exporting Reports
Reporting Buttons
Navigating around BW Web Reports.
1 5 Output
Accurate and complete user-friendly reports.
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 5/13
5
2. Admin Projects Reporting in the Finance Centre
2 1 Running reports in SAP R/3
Reporting in SAP R/3 has the ability to select data from either individual admin projects or ranges
of admin projects.
Admin projects can be selected using a range of criteria, such as status, profile, responsible
person, etc.
All standard reports have the option to drill down from WBS element to cost element to
financial period to source document.
Reports may also be downloaded to standard office applications, e.g. Excel.
For further information please find the attached helpcard for an introduction to using reports in SAP R/3.
Helpcards available:
Introduction to Using Reports in SAP
Printing SAP reports and running reports in Background
Reporting Functionality Exporting Reports
Reporting Buttons
2 2 Running reports in BW
When a report is built in BW the face or view of the report will be set at a simplistic representation of
the data included in the report in order to make the report user friendly to a larger, sometimes non
finance community. However behind the report there is usually a lot of further data which can be
unhidden and shown on the face of the report and the report then saved as a bookmark, or new view.
The user needs to identify the best fit report that includes the data that satisfies the request within the
criteria section at the top of the report.
The user will run the report in BW and adjust/drill down to the information being requested. The user
will then save the view as a bookmark with the new criteria and send the report to the request originator
via email.
Helpcard: Navigating around BW Web Reports.
The following BW Reports will be available to the Finance Centre Capital Accounting Team and can be
found on mybusiness portal under the Reporting > Management Reports>Project Reports
BBC Management Reports - WEB
:
:
BBC Project
Reports
Deleted: capital
Deleted:capital
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 6/13
6
:
:
Admin & Capital Project Reports
TECO / CLSD Projects With ETC
BPS Plan Comparison Report
Project Forecast Report
Divisional Capital Expenditure Report
Project Milestone Report
Project Milestones Progress Report
Cost & Revenue Plan / Actual Comparison
Admin Projects BW reports will be available in mybusiness portal once developed, and the link to the reports
is attached below:
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 7/13
7
Admin R/3 reports available in mybusiness portal:
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 8/13
8
3. Useful SAP Reports
Use SAP R/3 SRET transaction to produce report. You navigate to the report via the report tree. Available
standard reports can be found on the report tree and are grouped into subject areas which can be expanded
and collapsed.
The search criteria and screen options available in a report vary with the report function. You should select the
appropriate information for your report function.
mybusiness portal>Reporting>All Reports>SAP R/3 Reporting Tree>BBC Reports>Admin Projects
3 1 Planning Reports ZRPAP05
This report allows comparisons of project forecast, actual and commitments.
The database profile can be changed to enhance the search criteria. The most common DB profiles are
000000000001 Standard selection (structure) (This can be used for individual project numbers or ranges)
Select your project range.
Click on the execute button to run the report .
The data is then re-selected and appears as the report below.
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 9/13
9
Select range of projects AAA*
You have a drill down facility on the report by clicking on the ‘+’
Note, only historic plan will be available in SAP R/3. BW reports will have to be run for current plan.
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 10/13
10
3 2 Budget Reports ZRPAP14
The database profile can be changed to enhance the search criteria. The most common DB profiles are
000000000001 Standard selection (structure) (This can be used for individual project numbers or ranges)
Select your project range.
Click on the execute button to run the report .
The data is then re-selected and appears as the report below.
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 11/13
11
Select range of projects AAA*
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 12/13
12
4. Appendices
4 1 Glossary of Terms
Please refer to the glossary below for an explanation of the key terms used in this document.
Term Description
BPS The new planning system where all forecasting will occur after November 2006
DB Database
GRN Goods Received Notification
SAP R/3 Systems, Applications and Products - supplies integrated, business application
software. It offers a full range of functions, many of which can be directly applied
within the BBC, most notably, Trading, Project Accounting, Financial Management,
Reporting, Sales & Distribution and Human Resources.
TBA To be agreed projects
WBS Work Breakdown Structure
7/18/2019 Admin Project Reporting in the Finance Centre
http://slidepdf.com/reader/full/admin-project-reporting-in-the-finance-centre 13/13
13
Document Version Control
Document File Name and Path
Name and path
S:\Shared\Workstreams\Process Model\00 Process Team General\08 User Guides - Wave 4\05 2 Formatted Word Documents\Admin
Projects\Admin_Project_Reporting_in_the_Finance_Centre.doc
Document Revisions
Date
of change
Document
version
Details
of change
Author’s initials
22nd Sept 2006 V1.0 Final document HG
24 th Nov 2006 V1.1 Updated for user feedback LNP