ACQUATICS FACILITY STUDYCity of Vincennes
Department of Parks & Recreation
• Overall image is poor, facility is tired and no longer an attraction. The facility lacks vitality.
• Visitors are being lost to other venues.
• The condition of the bathhouse is substandard.
• Without shade, the oversized concrete pool deck is oppressive in the summer heat.
• Pool mechanical system is antiquated and is past its life expectancy.
• The concrete deck all around the pools has an irregular surface at expansion joints and settlement cracks.
• Water from both the competition and wading pools is circulated through a single circulation pump violating current swimming pool codes.
• Maintaining chemical balance for this pool is difficult.
• It is reported that the pool loses approximately 1”-2” of water overnight due to leaks in the pool system located under the concrete pool shell.
City of Vincennes – Aquatic Facility Study
Concerns and Problems with Rainbow Beach
1. Slides and / or Diving Boards
2. Play Apparatus / Structure for all ages
3. Zero Depth Entry
4. Competition / Recreation Combination – Uniqueness of 50 Meter Pool
5. Upgraded Bathhouse
6. Improved Concessions
7. ADA Accessibility
8. Variety of Experiences – Water Basketball, Water Volleyball, Etc.
9. Shade Structures and Lounge Seating
10. Sound System and Wi-Fi
11. Planned Activities and Programs
City of Vincennes – Aquatic Facility StudyCity of Vincennes – Aquatic Facility StudyCity of Vincennes – Aquatic Facility Study
Recommendations
City of Vincennes – Aquatic Facility Study
Pool Amenities
Slides
City of Vincennes – Aquatic Facility Study
Zero Depth Entry
City of Vincennes – Aquatic Facility Study
Shade Structures
City of Vincennes – Aquatic Facility Study
Play Apparatus
City of Vincennes – Aquatic Facility Study
Spray Parks
City of Vincennes – Aquatic Facility Study
Recreation/Competition Combination
City of Vincennes – Aquatic Facility Study
Bathhouse, Locker Facilities and Party Facilities
City of Vincennes – Aquatic Facility Study
City of Vincennes – Aquatic Facility Study
Options for Rainbow Beach
Option A: Addition of a spray park to the existing facility
City of Vincennes – Aquatic Facility Study
Description and Cost
•Existing Recreation Pool and Bathhouse to Remain…………………….....................….......
•Remove existing Wadding Pool and Deck………………………………………………………….….
•Create New Splash Park………………………..……………………………………………………………
•Provide Associated Site Improvements…………………….…………………………………….…....
Shade Structures, Pavement, Fencing, Etc.
•Contractor General Conditions/Overhead & Profit…………………………………………..………..
Construction Range of Magnitude Budget………………..…………………………….….……..
•Add new deck around the existing pool…………………………………………………………….…….
$
$
$
$
$
$
0
10,000
140,000
85,000
22,000
257,000
?????
City of Vincennes – Aquatic Facility Study
Option A: Addition of a spray park to the existing facility
City of Vincennes – Aquatic Facility Study
Option B: Renovation of the existing facility
Description and Cost
•Minor Renovations to Existing Bathhouse.……………….….........................................
•Renovation Existing 10 Lane 50 Meter Lap Pool………………....………………….............
•Infill Diving Well, Create New Slide Well, Create Zero Depth Entry,
New Pool Filtration & Chemical Systems, Piping & Equipment
•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &
Shade Structures……………….…………….………………………………………………..…......…
•Provide New Water Slide………………………………………………………………………….......
•New Water Features/Play Apparatus……………………….………………………………...…..
•Contractor General Conditions/Overhead & Profit.………………………………………..….
Construction Range of Magnitude Budget……….………………………………….........…
$
$
$
$
$
$
$
100,000
1,800,000
810,000
175,000
165,000
305,000
3,355,000
-$300,000
-$3,480,000
City of Vincennes – Aquatic Facility Study
Option B: Renovation of the existing facility
City of Vincennes – Aquatic Facility Study
Option B.1: Renovation of the existing facility
Description and Cost
•Minor Renovations to Existing Bathhouse………………….….....................................
•Renovation Existing 10 Lane 50 Meter Lap Pool………………....………………….........
•Infill Diving Well, Create New Slide Well, Create Zero Depth Entry,
New Pool Filtration & Chemical Systems, Piping & Equipment
•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &
Shade Structures……………………………………………………………………………………...
•Provide New Water Slide…………………………………………………………………………...
•New Water Features/Play Apparatus.………………………………………………………....
•Add Spray Park and Associated Site Improvements……………………………………….
•Contractor General Conditions/Overhead & Profit…………………………………..……
Construction Range of Magnitude Budget………………………………………..…….…
$
$
$
$
$
$
$
$
100,000
1,800,000
810,000
175,000
165,000
160,000
321,000
3,531,000
-$300,000
-$3,656,000
City of Vincennes – Aquatic Facility Study
Option B.1: Renovation of the existing facility
City of Vincennes – Aquatic Facility Study
Option C: Construction of a replacement facility
Description and Cost
•Minor Renovations to Existing Bathhouse…………………………….….....................
•Create New Pool………………………………………………………………....………..........
•Eight Lane – 25 Yard Lap Pool, Zero Depth Entry,
Slide Well, New Pool Filtration & Chemical Systems,
Piping & Equipment
•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &
Shade Structures, etc…………………………………………………………..………………...
•Provide New Water Slide……………………………………………………….....................
•New Water Features/Play Apparatus……………….…………………….………………...
•Contractor General Conditions/Overhead & Profit………………….………............
Construction Range of Magnitude Budget……………………………....................
$
$
$
$
$
$
$
100,000
1,250,000
740,000
175,000
165,000
243,000
2,673,000
-$300,000
-$2,798,000
City of Vincennes – Aquatic Facility Study
Option C: Construction of a replacement facility
City of Vincennes – Aquatic Facility Study
Option C.1: Construction of a replacement facility
Description and Cost
•Minor Renovations to Existing Bathhouse…………………………….….....................
•Create New Pool………………………………………………………………....………………
•Eight Lane – 25 Yard Lap Pool, Zero Depth Entry,
Slide Well, New Pool Filtration & Chemical Systems,
Piping & Equipment
•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &
Shade Structures, etc…………………………………………………………..………………..
•Provide New Water Slide………………………………………………………...................
•New Water Features/Play Apparatus…..………………………………….………………..
•Add Spray Park and Associated Site Improvements……………………………………
•Contractor General Conditions/Overhead & Profit………………….…………………
Construction Range of Magnitude Budget……………………………....................
$
$
$
$
$
$
$
$
100,000
1,250,000
740,000
175,000
165,000
160,000
259,000
2,849,000
-$300,000
-$2,974,000
City of Vincennes – Aquatic Facility Study
Option C.1: Construction of a replacement facility
City of Vincennes – Aquatic Facility Study
Option C.2: Construction of a replacement facility
City of Vincennes – Aquatic Facility Study
Description and Cost
•Minor Renovations to Existing Bathhouse…………………………….…............
•Create New Pool………………………………………………………………....………
•Eight Lane – 50 Meter Lap Pool, Zero Depth Entry,
Slide Well, New Pool Filtration & Chemical Systems,
Piping & Equipment
•Demolition, New Equipment Building, MEP, Pool Deck, Fencing &
Shade Structures, etc…………………………………………………………..………..
•Provide New Water Slide………………………………………………………...........
•New Water Features/Play Apparatus…..………………………………….………..
•Add Spray Park and Associated Site Improvements…………………………..
•Contractor General Conditions/Overhead & Profit………………….………..
Construction Range of Magnitude Budget……………………………..........
$
$
$
$
$
$
$
$
100,000
2,300,000
810,000
175,000
165,000
160,000
371,000
4,081,000
-$300,000
-$4,206,000
Option C.2: Construction of a replacement facility
City of Vincennes – Aquatic Facility Study
Option C.3: Construction of a replacement facility
City of Vincennes – Aquatic Facility Study
Description and Cost
•Create New Pool………………………………………………………………....…………
•Eight Lane – 50 Meter Lap Pool, Zero Depth Entry,
Slide Well, New Pool Filtration & Chemical Systems,
Piping & Equipment
•New Equipment Building, MEP, Pool Deck, Fencing &
Shade Structures, etc…………………………………………………………..…………..
•Provide New Water Slide……………………………………………………….............
•New Water Features/Play Apparatus………………..………………………………..
•Add Spray Park and Associated Site Improvements……………………………..
•Add New Bathhouse with Concessions……………………………………………….
•Contractor General Conditions/Overhead & Profit………………….…………..
Construction Range of Magnitude Budget…………………………….............
2,300,000
810,000
175,000
165,000
160,000
625,000
423,000
4,658,000
$
$
$
$
$
$
$
$
-$300,000
-$4,783,000
Option C.3: Construction of a replacement facility
City of Vincennes – Aquatic Facility Study
Cost Comparison
Cost Comparison of Other Facilities
Year Built
Pool S.F.
Original Pool Cost
2012 Pool Cost
Description
Baker Park PoolNew Castle, Indiana
2007 7,546 $999,000 $1,158,00025 yard pool, zero depth entry, small participatory
feature, slide
City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities
Year Built
Pool S.F.
Original Pool Cost
2012 Pool Cost
Description
Rochelle-Landers PoolEvansville, Indiana
2009 7,966 $1,152,000 $1,258,00025 yard pool, zero depth entry, large participatory play feature, tot slide, medium sized slide, spray
park features in zero depth entry
City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities
Year Built
Pool S.F.
Original Pool Cost
2012 Pool Cost
Description
Bethel Park Aquatic CenterIndianapolis, Indiana
2011 6,691 $1,146,000 $1,180,00025 yard pool, zero depth entry, large participatory
play feature, “run-out” slide
City of Vincennes – Aquatic Facility Study