• SARE Group represents a global investment fund focused on investing in the high growth residential real estate segment in India.
• SARE is an international real estate company with a
market capitalization of US$0.5bn, focused on developing residential real estate in India. It is managed by a select team of leading professionals drawn from all across the globe, with offices in London, Mumbai and New Delhi.
• SARE's mission is to become the leading vertically integrated real estate developer of mixed-use residential housing communities in India. With a strategic vision to embark on multiple projects on a pan India basis, the company is focused on developing large canvas projects in Tier I city suburbs as well as in Tier II cities. Till date the company has invested and acquired over 800 acres for development in the following Major high growth cities; Ghaziabad, Amritsar, Chennai, Manesar, Indore and plans to increase land under development to 2,000 acres over the next year.
• SARE combines local understanding with innovative design, modern project management and construction methods to build homes offering a quality lifestyle at excellent value for money.
ABOUT SARE
SARE’s PRESCENCE PAN INDIA
Crescent ParC, NH-24 , Ghaziabad Crescent ParC, Sector92 , Gurgaon
Crescent ParC , Amritsar Crescent ParC , OMR Road, Chennai
About Gurgaon
• Gurgaon is the sixth largest city in the Indian state of Haryana.
• Gurgaon is the industrial and financial center of Haryana. An important town in ancient Hindu mythology.
• Gurgaon is one of Delhi's four major satellite cities and is part of the National Capital Region of India.
• Over the past 10 years the city has undergone rapid development and construction. A wave of Multinational companies choose to locate their centers in Gurgaon.
• Gurgaon is regarded as the best city in India to work and one of the best city in India to live according to a survey by Business Today magazine. The per capita income in Gurgaon is the 3rd highest in India after Chandigarh and Mumbai
• Real estate in Gurgaon has sky rocketed to levels comparable with international cities like London.
Location Map
Crescent ParC with all facilities
Lifts
24 Hrs Security
Power Backup
Professional Facility Management Services
Proposed International High School
Proposed Primary & Nursery School
ISBT & Metro Connectivity
KMP Highway
Pollution Free Environment
Indoor Games
Gymnasium
Swimming Pool
Plan Layout – 3BHK (S+4)
Size:1314 Sq. ft.
Plan Layout – 3BHK+3T+S (S+4)
Size:1482 Sq. ft.
Plan Layout – 4BHK + 4T (S+4)
Size:1620 Sq. ft.
Plan Layout – 3BHK + 3T+S (S+14)
Size:1516 Sq. ft.
Plan Layout – 4BHK + 4T+S (S+14)
Size:1850 Sq. ft.
Living / Dining Flooring Vitrified Tiles
Bedrooms Flooring Vitrified Tiles / Imported Laminated Wooden Floorings
Wall Finish Oil bound distemper in pleasing shades
Toilet Wall Finish Combination of Ceramic Tiles,Oil Bound Distemper & Mirror
Counter Polished Granite in Master Bedroom Toilet
Flooring Ceramic Tiles
FittingsISI standard Washbasin and WC's. Conventional Chromeplated of standard make with shower
KitchenFlooring & Dado Ceramic Tiles
Platform Granite Counter
Wall FinishCeramic Tiles 2ft. Above the counter and oil bound distemper in pleasing shades in the balance area
Other Stainless Steel sink with drain board
Main Door Polished Hardwood Frame with Moulded Skin Door
Internal Door Painted Hardwood Frame with Moulded Skin Door / Flush Doors
Electrical Copper Wiring with modular switches. Circuits with MCB's of standard make.
Power Backup Adequate Power Back Up
BHK- 3 KVA , 4BHK- 4 KVA
Security Gated Complex
INDULGENT SPECIFICATION
Price List
Flat Type Building type Basic Rate Per (Sq. Ft)
Area (Sq.ft)
Basic Cost (Rs.)
InauguralDiscount
Basic Rate After Discount
Booking Amount (Rs.) 10%
(Rs.) (Rs.)
3BHKLow Rise
(S+4) 1697 1314 2229858 61758 2168100 216810
3BHK+ Study
Low Rise (S+4) 1697 1482 2514954 69654
2445300244530
4BHKLow Rise
(S+4) 1697 1620 2749140 76140 2673000 267300
3BHK + SQT
High Rise (S+14) 1597 1516 2421052 71252 2349800 234980
4BHK + SQT High Rise
(S+14) 1597 1859 2968823 87373 2881450 288145
Preferential Location Charges (PLC) S + 4 Floors (Floor PLC) S + 14 Floors (Floor PLC)
• First Floor Rs. 75/- Per Sq. Ft. First Floor Rs. 75/- Per Sq. Ft
• Second & Third Floor NIL Second Floor Rs. 50/-Per
Sq. Ft • Fourth Floor Rs. 150/- Per Sq. Ft. Third Floor Rs. 25/-Per
Sq. Ft • PLC (Corner, Club OR Park Facing)• Single PLC Rs. 50/- Per Sq. Ft. • Double PLC Rs. 75/- Per Sq. Ft.
**Allied Charges
• **EDC + IDC (External Development Charges & Infrastructure Development Charges) Rs. 375/- Per Sq. Ft
**Car Parking – Covered (One parking mandatory) Rs. 175000/-• **Club Membership Rs. 65000/- • **Power Back-up (3BHK) Rs. 45000/- (3 KVA)• (4BHK) Rs. 60000/- (4 KVA)• **Facilities Charges Rs. 50/- Per Sq. Ft.• ** Fire Fighting Charges (only on S+14) Rs. 30/- per Sq Ft
Price List
PLAN "Construction Link Installment" Percentage
1 At the time of booking 10
2 On Commencement of Construction 10
3On Start of Plinth level of Tower in which unit is
booked10 + 25% Allied charges
4On Start of First Floor Roof Slab of Tower in which
unit is booked10 + 25% Allied charges
5On Start of Second Floor Roof Slab of Tower in
which unit is booked10
6On Start of Third Floor Roof Slab of Tower in which
unit is booked10 + 25% Allied charges
7On Start of Fourth Roof Slab of Tower in which unit
is booked10
8 On Completion of Super Structure frame works 10
9 On Completion of Plumbing, Flooring & Tiles works 10+ 25% Allied charges
10 On Offer of Possession 10
Payment Plan (S+4)
Payment Plan (S+14)
Plan “Construction Link Installment” Percentage
1 At the time of booking 10
2 On Commencement of Construction 10
3 On Start of Plinth level of Tower in which unit is booked 7.5+ 25% Allied charges
4On Start of First Floor Roof Slab of Tower in which unit is
booked 7.5 + 25% Allied charges
5On Start of Second Floor Roof Slab of Tower in which unit is
booked 7.5
6On Start of Third Floor Roof Slab of Tower in which unit is
booked 7.5+ 25% Allied charges
7 On start of Fifth Roof Slab of Tower in which unit is booked 7.5
8 On start of Sixth Roof Slab of Tower in which unit is booked 7.5
9On start of Seventh Roof Slab of Tower in which unit is
booked 5
10 On start of Ninth Roof Slab of Tower in which unit is booked 5
11On start of Eleventh Roof Slab of Tower in which unit is
booked 5
12On start of Fourteen Roof Slab of Tower in which unit is
booked 5
13 On Completion of Super Structure frame works 5
14 On Completion of Plumbing, Flooring & Tiles works 5+ 25% Allied charges
15 On Offer of Possession 5
Thank You.
Queries Welcome
Top Related