The Problem
On very cold daysWe are over the limit
When the temperature drops
Our energy use SOARS
WHY ?
Load
, MW
80.4 MW @ 8:45 am
Morning Time of Day Evening
72.5 MW @ 5:15 pm
A Cold Day in December
75 MW
Is This the Solution?
A 4th Substation
estimated cost $6 -10 M
THERE IS A BETTER WAY !
u
WE CAN MAKE A DIFFERENCE!WE CAN MAKE A DIFFERENCE!
The cheapest, greenest energy is the energy you save!
PSE Demand Management 1-877-287-3461
“If every household on Bainbridge Island reduced its energy usage by 4%, we will have solved our peak load problem!”