6.1.1
SOUTHERN RAILWAY
Particulars Capital CF DRF. DF SF TOTAL
11 () New Lines (Construction) .. .. .. .. 75,37,00 75,37,00
14 Gauge Conversion .. .. .. .. 344,00,00 344,00,00
15 Doubling 530,19,01 .. .. .. .. 530,19,01
16 -
Traffic Facilities-Yard
Remodelling & Others
8,78,20 .. 1,20,00 17,55,94 .. 27,54,14
17 Computerisation 5,05,00 .. 3,50,00 4,56,41 .. 13,11,41
21 Rolling Stock 29,57,79 .. 27,23,69 5,25,37 .. 62,06,85
22 -
Leased Assets - Payment
of Capital Component
.. 483,90,00 .. .. .. 483,90,00
29 - Road Safety Works-Level Crossings.
.. .. .. .. 38,68,80 38,68,80
30 -/
Road Safety Works-Road
Over/Under Bridges.
.. .. .. .. 252,71,20 252,71,20
31 Track Renewals .. .. 219,48,38 .. .. 219,48,38
32 Bridge Works .. .. 60,17,00 .. .. 60,17,00
33 Signalling and Telecommunication
.. .. 34,30,00 20,50,06 .. 54,80,06
36 -
Other Electrical Works
excl TRD
.. .. 4,70,87 1,08,16 .. 5,79,03
37 Traction Distribution Works
16,40,63 .. 8,64,81 25,79 .. 25,31,23
41 Machinery & Plant 5,33,70 .. 18,83,40 2,60,03 .. 26,77,13
42 - Workshops including Production Units
22,13,51 .. 15,05,10 14,09,47 .. 51,28,08
51 Staff Quarters 1,23,00 .. 27,70,51 .. .. 28,93,51
52 Amenities for Staff 1,10,00 .. 11,59,55 17,84,44 .. 30,53,99
53 Passenger Amenities .. .. 13,68,46 49,68,43 .. 63,36,89
64 Other Specified Works 7,97,60 .. 1,54,64 11,73,02 .. 21,25,26
65 / Training/HRD .. .. .. 40,00 .. 40,00
71 Stores Suspense 829,41,46 .. .. .. .. 829,41,46
72 Manufacture Suspense 1096,56,32 .. .. .. .. 1096,56,32
73 Miscellaneous Advances 27,30 .. .. .. .. 27,30
Total Gross 2554,03,52 483,90,00 447,66,41 145,57,12 710,77,00 4341,94,05
Credits or Recoveries
() (a) For Released Materials .. .. 231,90,00 .. .. 231,90,00
() (b) Other Credits .. .. .. .. .. ..
() (c) Stores Suspense 855,46,23 .. .. .. .. 855,46,23
() (d) Manufacture Suspense 1096,86,71 .. .. .. .. 1096,86,71
() (e) Miscellaneous
Advances
30,77 .. .. .. .. 30,77
Total - Credits or
Recoveries
1952,63,71 .. 231,90,00 .. .. 2184,53,71
() Plan Outlay (Net) 601,39,81 483,90,00 215,76,41 145,57,12 710,77,00 2157,40,34
2016-17 ,
Assets-Acquisition, Construction and Replacement for 2016-17
(Figures in thousand of Rupees)( . )
6.2.1
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
1 - (35 ) Cap. 132,71,00 25,56,03 9,17,22 ..Tirunnavaya-Guruvayur (35 km) . S.Fund 5,00,00 .. .. 5,00,00
2 - (85 ) Cap. 224,87,73 805,24,99 35,06,30 ..Karur-Salem (85 km) . S.Fund 5,00,00 .. .. 5,00,00
3 - (116 ) Cap. 1525,99,00 167,15,19 18,51,21 ..Angamali-Sabarimala (116 km) . S.Fund 20,00,00 .. .. 20,00,00
() EBR(P) 20,00,00 .. .. 20,00,00
4 -- (70 ) Cap. 217,40,58 67,87,71 3,34,60 ..Tindivanam-Gingee-Tiruvannamalai (70 km) . S.Fund 10,00,00 .. .. 10,00,00
5 - (179.2 ) Cap. 572,83,00 195,99,72 8,00,00 ..Tindivanam-Nagari (179.2 km) . S.Fund 10,00,00 .. .. 10,00,00
6 - (88.30 ) Cap. 517,27,42 2,95,64 11,00 ..Attipattu-Puttur (88.30 km) . S.Fund 10,00 .. .. 10,00
() EBR(IF) 10,00,00 .. .. ..
7 - (91.05 ) Cap. 603,21,00 1,63,35 5,00 ..Erode-Palani (91.05 km) . S.Fund 1,00 .. .. 1,00
8 - ; (179.28 ) Cap. 1195,00,00 2,18,11 25,00 ..Chennai-Cuddalore via Mahabalipuram (179.28 km) . S.Fund 5,00,00 .. .. 5,00,00
9 - ; (143.5 ) Cap. 90,70,40 3,26,35 60,00,10 ..Madurai-Tuticorin via Aruppukkottai (143.5 km) DRF 2,00,00 .. .. ..
. S.Fund 20,00,00 .. .. 20,00,00
() EBR(IF) 10,00,00 .. .. ..
10 # - ; , - - (60 )
Cap. 838,75,00 13,90 50,00 ..
Sriperambudur-Guduvanchery; with spur to Irun, Kattukotti - Avadi -
Sriperambudur (60 km). S.Fund 25,00 .. .. 25,00
- / Total-Works in Progress . S.Fund .. .. .. 75,36,00
() EBR(P) .. .. .. 20,00,00
11 # - (36 ) Cap. 66,99,00 .. .. ..Morappur - Dharmapuri (36 km) . S.Fund 1,00 .. .. 1,00
() EBR(P) 67,00,00 .. .. 1,00
- / Total-New Works . S.Fund .. .. .. 1,00
() EBR(P) .. .. .. 1,00
- () / . S.Fund .. .. .. 75,37,00
Total - New Lines (Construction) () EBR(P) .. .. .. 20,01,00
#
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
() / NEW LINES (CONSTRUCTION) - / A - Works in Progress
/ .Expenditure/commitment on this project will be made only after following all due processes/mandatory approvals and sanctions.
- / B - New Works
/ Allocation
( . ) (Figures in thousand of Rupees)
6.2.2
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
12 - - ; -- - (23 )
Cap. 366,61,47 342,47,03 19,81,50 ..
Tiruchchirappalli-Nagore-Karaikal with extension of Nagapattinam-
Velankani-Tiruthiraipundi incl. new material modification of Karaikal -
Peralam (23 km) new line
C.Fund 106,41,37 246,37,26 .. ..
DRF 17,63,74 11,15,94 .. ..
(4) DF(4) 2,65,18 1,98,00 .. ..
. S.Fund 40,00,00 .. .. 40,00,00
. R. 23,76
( ) EBR(Dep) 1,00,00
13 -- - (357 ) Cap. 678,04,91 906,47,42 88,63,56 ..Quilon-Tirunelveli-Tiruchendur & Tenkasi-Virudhunagar (357 km) DRF 40,64,54 18,55,52 .. ..
(4) DF(4) 16,17,25 .. .. ..
. S.Fund 101,00,00 .. .. 101,00,00
. R. 54,28
14 - (161 ) Cap. 218,78,31 181,80,65 1,17,13 ..Madurai-Rameswaram (161 km) C.Fund 171,39,04 169,55,59 .. ..
DRF 19,11,93 19,11,93 .. ..
(4) DF(4) 5,30,90 .. .. ..
. S.Fund 1,00,00 .. .. 1,00,00
EBR 25,00,00 .. .. ..
15 - (192 ) Cap. 697,53,94 22,83,07 .. ..Thanjavur-Villupuram (192 km) DRF 34,51,70 34,51,69 .. ..
. R. 96,62
( ) Dep (RVN) 64,64,25 64,64,25 .. ..
EBR 1,00,00 .. .. ..
16 -; (191 ) Cap. 422,95,52 27,54,07 .. ..Cuddalore-Salem via Vriddhachalam (191 km) DRF 24,96,48 24,96,28 .. ..
(4) DF(4) 3,92,53 .. .. ..
. S.Fund 5,00,00 .. .. 5,00,00
( ) Dep (RVN) 97,09,82 97,09,82 .. ..
EBR 1,00,00 .. .. ..
17 - (150 ) Cap. 176,49,07 90,61,46 77,21 ..Trichy-Manamadurai (150 km) C.Fund 304,64,88 280,74,01 .. ..
DRF 22,84,68 22,84,21 .. ..
. R. 60,11
18 - (161 ) Cap. 311,42,29 333,50,48 13,08,74 ..Villupuram-Katpadi (161 km) C.Fund 297,11,95 301,81,92 .. ..
DRF 25,88,10 25,88,10 .. ..
. S.Fund 5,00,00 .. .. 5,00,00
. R. 1,11,89
19 - (66.55 ) Cap. 124,55,36 163,07,40 7,57,79 ..Manamadurai-Virudhunagar (66.55 km) C.Fund 41,44,35 41,44,36 .. ..
DRF 9,43,99 9,40,58 .. ..
(1) DF(1) 75,01 .. .. ..
. S.Fund 2,00,00 .. .. 2,00,00
. R. 7,24
/ GAUGE CONVERSION - / A - Works in Progress
6.2.3
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
20 -- - (224.88 ) Cap. 418,45,93 807,88,84 109,03,75 ..Dindigul-Polachi-Palghat & Polachi-Coimbatore (224.88 km) C.Fund 54,19,82 54,18,62 .. ..
DRF 38,85,12 50,12,22 .. ..
(1) DF(1) 6,10,34 .. .. ..
. S.Fund 80,00,00 .. .. 80,00,00
. R. 38,15
() EBR(IF) 10,00,00 .. .. ..
21 -- -; - : - - (47.2 )
Cap. 583,54,62 491,17,97 125,00,00 ..
Mayiladuturai-Tiruvarur-Karaikkudi & Tiruturaipundi-Agastiyampalli,
incl restoration of Needamangalam-Mannargudi line and Mannargudi-
Pattukottai, with new material modification of Thanjavur-Pattukottai
(47.2 km)
. S.Fund 85,00,00 .. .. 85,00,00
22 - (90.41 ) Cap. 220,98,99 21,08,10 5,07,93 ..Madurai-Bodinayakkanur (90.41 km) DRF 13,26,47 81,79 .. ..
(4) DF(4) 1,46,54 .. .. ..
. S.Fund 25,00,00 .. .. 25,00,00
- / Total-Works in Progress . S.Fund .. .. .. 344,00,00
- / . S.Fund .. .. .. 344,00,00
Total - Gauge Conversion
23 - (221 ) Cap. 642,96,88 586,85,16 79,13 2,00,00 Calicut-Mangalore (221 km) DRF 6,64,98 11,64,00 .. ..
(1) DF(1) 4,00,18 3,60,00 .. ..
(2) DF(2) 69,16 .. .. ..
(4) DF(4) 6,53,80 2,36,93 .. ..
24 - (17.70 ) Cap. 37,94,54 46,62,43 2,60,00 2,98,00 Irugur-Coimbatore (17.70 km) C.Fund 49,47,92 49,17,90 .. ..
DRF 57,84 57,84 .. ..
EBR 1,60,80 1,60,80 .. ..
25 - - 3 (18 ) Cap. 37,30 8,29,89 1,00 1,00 Attipattu-Korukkupettai - 3rd line (18 km) DRF 1,24,31 1,24,31 .. ..
( ) Dep (RVN) 149,29,80 149,29,80 .. ..
() EBR(IF) 55,00,00 .. 54,00,00 ..
26 - - 3 (4.1 ) Cap. 105,08,88 7,81,70 1,00 10,00,00 Chennai Beach-Korukkupet - 3rd line (4.1 km) C.Fund 20,09 20,09 .. ..
() EBR(IF) 33,50,00 .. 62,50,00 50,00,00
27 - (7.76 ) Cap. 25,89,87 30,32,24 3,38,76 10,00 Cheppad-Kayanakulam (7.76 km) DRF 34,27 34,27 .. ..
28 - - (12.30 ) Cap. 49,64,60 55,99,92 2,79,74 50,00 Mavelikara-Chengannur - Patch doubling (12.30 km) DRF 18,33 18,32 .. ..
29 - - (5.28 ) Cap. 17,14,42 23,36,89 1,12,33 10,00 Cheppad-Haripad - Patch doubling (5.28 km) DRF 22,22 22,22 .. ..
/ GAUGE CONVERSION
/ DOUBLING - / A - Works in Progress
6.2.4
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
30 - - 4 (22.1 ) Cap. 57,59,43 58,18,63 1,00 5,00,00 Chennai Beach-Attipattu - 4th line (22.1 km) C.Fund 16,19 16,19 .. ..
() EBR(IF) 50,20,11 .. 36,20,11 50,10,00
31 - ( - ) (62.05 ) Cap. 113,62,91 55,24,54 3,23,72 10,00,00 Madurai-Dindigul (incl. Ambaduturai-Kodaikannal Road) (62.05 km) C.Fund 166,48,55 166,48,55 .. ..
DRF 11,20,64 11,20,64 .. ..
EBR 39,00,00 .. .. ..
32 - (24 ) Cap. 197,50,35 185,21,58 53,57,71 25,00,00 Mulanturutti-Kurruppantara (24 km) C.Fund 20,86,14 20,85,14 .. ..
DRF 11,14,92 .. .. ..
() EBR(IF) 2,00,00 .. .. 2,00,00
EBR 9,96,12 9,96,12 .. ..
33 - (26.5 ) Cap. 150,04,98 209,78,65 53,97,70 30,00,00 Chinganur-Chingavanam (26.5 km) DRF 1,67,21 .. .. ..
() EBR(IF) 40,00,00 .. 40,00,00 5,00,00
34 - - (19 ) Cap. 176,41,83 73,48,07 1,00 25,00,00 Kankanadi-Panambur - Patch doubling (19 km) DRF 36,34 .. .. ..
() EBR(IF) 49,81,63 .. 48,81,63 75,00,00
35 - (103 ); - - 3 (30 )
Cap. 43,00,03 452,77,26 1,00 25,00,00
Chengalpattu-Villupuram (103 km) with new material modification for
Tambaram-Chengalpattu - 3rd line by GC of existing MG line
alongwith electrification (30 km)
C.Fund 341,29,30 73,01,30 .. ..
DRF 25,95,91 30,98,36 .. ..
(4) DF(4) 4,42,72 .. .. ..
() EBR(IF) 65,27,78 .. 64,27,78 25,00,00
EBR 94,00,00 93,19,28 .. ..
36 - (26.54 ) Cap. 190,14,00 61,51,87 25,00,00 160,00,00 Kurruppanthara-Chingavanam (26.54 km) () EBR(IF) 80,00,00 .. 80,00,00 5,00,00
37 - (18.13 ) Cap. 100,91,61 58,94,23 55,00,00 73,00,00 Ambalapuzha-Haripad (18.13 km) () EBR(IF) 5,00,00 .. .. 5,00,00
38 - ( ) (273 ) Cap. 1345,98,00 83,66 .. 1Villupuram-Dindigul (with electrification) (273 km) C.Fund 2,00 57 .. ..
( ) Dep (RVN) .. .. .. ..
() EBR(IF) 280,00,00 .. 280,00,00 480,00,00
39 - - 4 (26.83 ) Cap. 218,44,82 .. .. 1,00 Tiruvallur-Arakkonam - 4th line (26.83 km) ( ) Dep (RVN) 37,83,31 37,83,31 .. ..
() EBR(IF) 128,50,00 .. 128,50,00 ..
EBR 1,00,00 .. .. ..
40 - - (7.71 ) Cap. 184,00,00 3,97,42 10,00,00 25,00,00 Ernakulam-Kumbalam - Patch doubling (7.71 km) () EBR(IF) 5,00,00 .. .. 5,00,00
41 - - (29.03 ) Cap. 105,29,25 12,39,78 15,93,00 10,00,00 Omalur-Mettur Dam - Doubling with electrification (29.03 km) () EBR(IF) 80,00,00 .. .. 80,00,00
EBR 346,00,00 .. .. ..
42 - - (15.59 ) Cap. 245,00,00 4,16,58 25,00,00 30,00,00 Kumbalam-Thuravur - Patch doubling (15.59 km) () EBR(IF) 5,00,00 .. .. 5,00,00
/ DOUBLING
6.2.5
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
43 - - (1.13 ) (46.96 )
Cap. 302,43,16 41,53,97 36,41,39 10,00,00
Thanjavur-Ponmalai - Doubling (46.96 km) with bypass line before
Ponmalai (1.13 km)() EBR(IF) 148,00,00 .. .. 148,00,00
44 - . - 5 6 Cap. 28,53,16 2,25,05 19,50,00 6,48,00 Chennai Central-Basin Bridge Jn - 5th & 6th line () EBR(IF) 1,93,00 .. .. 1,93,00
45 # - (85 ) Cap. 30,00,00 .. .. 30,00,00 Trivandrum - Kanyakumari (85 km) () EBR(IF) 870,00,00 .. 65,10 290,00,00
46 # - - (80 ) Cap. 30,00,00 .. .. 30,00,00 Madurai - Maniyachi - Tuticorin (80 km) () EBR(IF) 730,00,00 .. 60,00 70,00,00
47 # - (50 ) Cap. 10,00,00 .. .. 10,00,00 Turavur - Ambalapuzha (50 km) () EBR(IF) 990,00,00 .. 20,10 90,00,00
48 # - (170 ) Cap. 10,00,00 .. .. 10,00,00 Maniyachi - Nagercoil (170 km) () EBR(IF) 1690,00,00 .. 60,10 110,00,00
- / Total-Works in Progress Cap. .. .. .. 530,18,01
() EBR(IF) .. .. .. 1497,03,00
49 # - Cap. 9,46,50 .. .. 1,00 Netravati - Mangalore Central (1.5 km) () EBR(IF) 9,46,50 .. .. 1,00
- / Total-New Works Cap. .. .. .. 1,00
() EBR(IF) .. .. .. 1,00
- / Cap. .. .. .. 530,19,01
Total - Doubling () EBR(IF) .. .. .. 1497,04,00
50 - (-II) (3) DF(3) 34,68,24 22,95,56 2,03,27 1,00,00 Kochuveli - 2nd coaching terminal (Stage-II)
51 - ,
(3) DF(3) 7,06,00 5,97,37 3,53 1
Nagercoil - One single face platform, one stabling line and
simultaneous despatch & reception facilities from Trivandrum side
52 - (3) DF(3) 8,34,10 5,41,76 84,60 40,00 Chennai Beach - Addl platform
53 - 1 2 .1, 2 3 24
Cap. 48,82 .. 2,34,00 5,00,00
Arakkonam - Straightening of raods 1 & 2 and extension of platform
No 1, 2 & 3 to 24 bogies (3) DF(3) 24,57,18 24,57,18 .. ..
54 - (3) DF(3) 33,28,08 12,64,29 11,06,61 10,63,78 Tambaram - Development as coaching terminal
55 - Cap. 11,50,00 12,59,99 1,03,04 30,00 Korukkupet Goods Yard - Addl. terminl facilities
56 - Cap. 6,39,88 2,16,86 1,00,00 9,00 Tirupur - Direct reception & despatch facilities for goods line EBR 50,00 .. .. ..
57 - Cap. 3,78,74 2,01,23 .. 1,10,00 West Hill - Addl goods shed line
#
/ DOUBLING
- / B - New Works
- / TRAFFIC FACILITIES-YARD REMODELLING & OTHERS - / A - Works in Progress
/ .Expenditure/commitment on this project will be made only after following all due processes/mandatory approvals and sanctions.
6.2.6
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
58 - (3) DF(3) 13,78,25 2,00,28 3,70,25 4,00,00 Ernakulam - One addl pit line & two stabling lines
59 - - 2- (3) DF(3) 7,69,00 4,00 1 1Tirunelveli-Sengulam - 2-line crossing station
60 - 20 (3) DF(3) 5,43,67 2,88,80 1,27,89 25,00 Nilambur Road - Rake unloading facilities for 20 BCN wagons
61 - .4, 5 6 ( ) (3) DF(3) 3,97,61 10,88 32,50 50,00
Karuppur - Increasing clear standing length of roads 4, 5 & 6 (down
lines)
62 - -,- - -
Cap. 7,84,05 .. 1,00 2,00,00
SA Division - Augmentation of line capacity of saturated sections &
Bommidi - Lokur, Vijayamangalam-Uttukuli & Vanjipalaiyam- Somanur -
IBS
63 2.5 Cap. .. .. .. 17,20 Works costing below Rs.2.5 crore each DRF .. .. .. 1,10,00
(2) DF(2) .. .. .. 5,00
(3) DF(3) .. .. .. 61,14
(4) DF(4) .. .. .. 1,00
- / Total-Works in Progress Cap. .. .. .. 8,66,20
DRF .. .. .. 1,10,00
(2) DF(2) .. .. .. 5,00
(3) DF(3) .. .. .. 17,39,94
(4) DF(4) .. .. .. 1,00
64 - - Cap. 3,04,00 .. .. 1,00 Tikkotti - Vadakara - Intermediate block section
65 - - Cap. 2,91,00 .. .. 1,00 Vakara - Mahe - Intermediate block section
66 2.5 Cap. .. .. .. 10,00 Works costing below Rs.2.5 crore each DRF .. .. .. 10,00
(3) DF(3) .. .. .. 10,00
- / Total-New Works Cap. .. .. .. 12,00
DRF .. .. .. 10,00
(3) DF(3) .. .. .. 10,00
- - / Cap. .. .. .. 8,78,20
Total - Traffic Facilities-Yard Remodelling & Others DRF .. .. .. 1,20,00
(2) DF(2) .. .. .. 5,00
(3) DF(3) .. .. .. 17,49,94
(4) DF(4) .. .. .. 1,00
- / B - New Works
- / TRAFFIC FACILITIES-YARD REMODELLING & OTHERS
6.2.7
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
67 - (3) DF(3) 3,35,42 .. .. 20,41 Southern Railway - Implementation of meterial management
inforamation system
68 - - (1) DF(1) 36,38,63 29,10,68 2,15,49 4,30,00
Southern Railway - Extension of unreserved ticketing system to E-
category stations
69 - Cap. 23,61,00 1,45,68 6,68,00 5,00,00 Southern Railway - Extension of automatic ticket vending machines
70 2.5 Cap. .. .. .. 5,00 Works costing below Rs.2.5 crore each DRF .. .. .. 2,50,00
(1) DF(1) .. .. .. 6,00
- / Total-Works in Progress Cap. .. .. .. 5,05,00
DRF .. .. .. 2,50,00
(1) DF(1) .. .. .. 4,36,00
(3) DF(3) .. .. .. 20,41
71 2.5 DRF .. .. .. 1,00,00 Works costing below Rs.2.5 crore each
- / Total-New Works DRF .. .. .. 1,00,00
- / Cap. .. .. .. 5,05,00
Total - Computerisation DRF .. .. .. 3,50,00
(1) DF(1) .. .. .. 4,36,00
(3) DF(3) .. .. .. 20,41
72 -
C.Fund 483,90,00 .. 479,31,00 483,90,00
Leased Assets - Payment of Capital component of lease charges to
Indian Railway Finance Corporation
- / Total-Works in Progress C.Fund .. .. .. 483,90,00
- - / C.Fund .. .. .. 483,90,00
Total - Leased Assets - Payment of Capital Component
73 , , , - (120 )
Cap. 4,49,18 .. .. ..
Chennai, Palghat, Trivandrum, Tiruchchirappalli & Madurai Divisions -
Lifting barriers in lieu of swing gates on double & multiple lines (120
Nos)
. S.Fund 4,90,52 6,76,65 2,67 55,00
74 - (3 ) (25 )
Cap. 2,00,00 .. .. ..
Palghat Division - Manning (3 Nos) & interlocking (25 Nos) of level
crossings. S.Fund 5,61,90 3,73,49 .. 1
- / ROAD SAFETY WORKS-LEVEL CROSSINGS. - / A - Works in Progress
/ COMPUTERISATION - / A - Works in Progress
- / B - New Works
- / LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT - / A - Works in Progress
6.2.8
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
75 - (9 ) (58 )
Cap. 4,80,78 .. .. ..
Tiruchchirappalli & Madurai Divisions - Manning (9 Nos) & interlocking
(58 Nos) of level crossings. S.Fund 6,36,77 4,13,91 1,00 1
76 - (9 ) (50 )
Cap. 3,62,10 .. .. ..
Trivandrum Division - Manning (9 Nos) & interlocking (50 Nos) of level
crossings. S.Fund 13,08,00 10,37,17 1,00 1
77 - (23 ) (6 )
. S.Fund 4,37,78 4,09,70 .. 1
Palghat Division - Interlocking of level crossing (23 Nos) & manning of
unmannned level crossings (6 Nos)
78 - (17 ) . S.Fund 7,10,90 2,85,21 .. 1
Salem Division - Manning of unmanned level crossing (17 Nos)
79 - (30)
. S.Fund 3,19,84 3,38,26 .. 50,00
Palghat Division - Repl of accessories & standardisation of level
crossings (30 Nos)
80 - (181)
. S.Fund 39,45,88 17,13,22 1,54,00 3,45,00
Southern Railway - Manning of unmanned level crossings (181 Nos)
81 - (120 )
. S.Fund 19,82,62 11,60,26 1,11,00 3,55,00
Southern Railway - Manning of unmanned level crossing gates (120
Nos)
82 - (13 ) . S.Fund 4,63,71 1,76,59 1,43,05 1,89,80 Thiruvananthapuram Division - Interlocking of level crossing gates (13
Nos)
83 - - (10 )
. S.Fund 3,80,00 .. 2,00,00 2,00,00
Tiruchchirappalli-Villupuram - Interlocking of level crossings (10 Nos)
and remote terminal units to mid-section interlocked level crossings
84 - - (59)
. S.Fund 3,18,76 1,72,18 60,00 1,00,00
Mayiladuthurai-Tiruchchirappalli - Repl. of lifting barriers with modified
ones (59 level crossings)
85 - (18 ) . S.Fund 5,69,59 .. 30,00 1,00,00 Salem Division - Interlocking of level crossing gates (18 Nos)
86 - (19 ) . S.Fund 5,07,18 .. 30,00 1,00,00 Salem Division - Interlocking of level crossing gates (19 Nos)
87 - -
. S.Fund 6,19,86 .. 20,00 2,00,00
Southern Railway - Solar panel power supply arrangements for mid-
section level crossing gates
88 -- - (395 )
. S.Fund 5,16,99 .. 10,00 2,00,00
Trivandrum-Ernakulam-Trichur - Improvements to communication
arrangements at all level crossings (395 km)
- / ROAD SAFETY WORKS-LEVEL CROSSINGS.
6.2.9
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
89 -- - (85)
. S.Fund 4,50,00 .. 12,96 2,00,00
Shoranur-Kozhikode-Mangalore - Improvements to communication
arrangements at all level crossings (85 km)
90 - / (70 )
. S.Fund 46,93,94 10,00 1,00,00 2,00,00
Madurai Division - Elimination of unmanned level crossings by
diversion of road traffic to adjacent manned level crossings / subways
(70 Nos)
91 -- - (42 ) . S.Fund 15,22,18 .. 50,00 4,00,00
Ernakulam-Alappuzha-Kayankulam - Interlocking of level crossing
gates (42 Nos)
92 - (26 ) . S.Fund 8,86,82 .. 90,00 4,00,00 Chennai Division - Interlocking of manned level crossing gates (26
Nos)
93 - (8 ) . S.Fund 2,74,05 .. 50,00 1,50,00 Chennai Division - Interlocking of level crossing gates (8 Nos)
94 - . 63,51,39,88, 26 . S.Fund 2,63,66 .. 1,00 75,00
Trivandrum Division - Interlocking of level crossing gate Nos.63, 51,
39, 88 & 26
95 - - - ( . 19,21,35,43,44,47,48, 56,57,79) (10)
. S.Fund 3,29,81 .. 1,00 1,00,00
Chengalpattu-Arakkonam & Chennai Egmore - Villupuram -
Interlocking of level crossings (gate Nos 19, 21, 35, 43, 44, 47, 48 &
56, 57, 79 respectively) (10 Nos)
96 2.5 . S.Fund .. .. .. 3,49,00 Works costing below Rs.2.5 crore each
- / Total-Works in Progress . S.Fund .. .. .. 37,68,85
97 - (3)
. S.Fund 15,33,40 .. .. 1
Tiruchirappalli Division - Manning of unmanned level crossings (78
Nos)
98 - - (3)
. S.Fund 3,77,77 .. .. 1
Palakkad - Pollachi - Manning of unmanned level crossing (3 Nos)
99 - (160 ) . S.Fund 7,30,00 .. .. 1
Chennai Central - Improvement to communication facilities for level
crossing gates (160 Nos)
100 -
. S.Fund 2,82,03 .. .. 1
Salem Division - Remote terminal unit at interlocked level crossing
gates and strengthening of networking to central data logger server
101 -
. S.Fund 5,00,00 .. .. 1
Salem Division - Integrated power supply for non-blanking of signals
and earth leakage detectors at level crossings
- / ROAD SAFETY WORKS-LEVEL CROSSINGS.
- / B - New Works
6.2.10
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
102 - (19)
. S.Fund 3,78,10 .. .. 1
Tiruchchirappalli Division - Manning of unmanned level crossings (19
Nos)
103 2.5 . S.Fund .. .. .. 99,89 Works costing below Rs.2.5 crore each
- / Total-New Works . S.Fund .. .. .. 99,95
- - / . S.Fund .. .. .. 38,68,80
Total - Road Safety Works-Level Crossings.
104 - - .71
. S.Fund 7,42,10 8,90 50 4,00,00
Shoranur-Ernakulam - Road over bridge in lieu of level crossing No.71
near Idappalli
105 - - . 201 . S.Fund 6,79,43 8,40,94 74,74 10,00 Elattur-Quilandi - Road over bridge in lieu of level crossing No 201
106 - - .49 . S.Fund 4,30,09 82,59 4,50 1,00,00
Polachi Pudunagaram-Palghat Town - Road over bridge in lieu of level
crossing No 49( ) EBR(Dep) 5,20,00
107 - - .541 . S.Fund 9,13,13 2,62,09 27,25 50,00 Quilon-Mayyanad - Road over bridge in lieu of level crossing No 541 ( ) EBR(Dep) 9,13,13
108 - - .439 . S.Fund 6,01,13 1,42,95 4,17,26 20,00
Virudhunagar-Vanchimaniyachchi - Road under bridge inlieu of level
crossing No.439( ) EBR(Dep) 6,00,74
109 - - .216 . S.Fund 7,46,86 5,13,27 .. 1Mayiladuturai-Thanjavur - Road over bridge in lieu of level crossing
No.216( ) EBR(Dep) 7,46,74
110 - - .76- . S.Fund 5,24,32 5,12 5,00 10,00 Ernakulam-Tirunettur - Road over bridge in lieu of level crossing
No.76-T
111 - - .2 . S.Fund 12,32,75 7,88 50,38 2,00,00 Ernakulam-Quilon - Road over bridge in lieu of level crossing No.2
112 - - .174 . S.Fund 9,38,38 4,90,88 1,03,24 50,00 Shoranur-Mangalore - Road over bridge in lieu of level crossing No.174
113 - - .54 . S.Fund 2,92,91 2,86,52 2,71,38 20,00 Shoranur-Ernakulam - Road over bridge in lieu of level crossing No.54
114 - - .45 . S.Fund 3,21,66 3,26,73 60,00 20,00 Irinjalkuda-Chalakkudi - Road over bridge in lieu of level crossing No 45 ( ) EBR(Dep) 3,21,50
115 - ( ) - .52 . S.Fund 3,51,59 4,24,12 33,69 20,00
Chalakudi-Karukkutti (Divine Nagar) - Road over bridge in lieu of level
crossing No 52
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. - / A - Works in Progress
- / ROAD SAFETY WORKS-LEVEL CROSSINGS.
6.2.11
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
116 - - .261 . S.Fund 12,24,12 10,72,46 1,16 10,00 Payyanur-Thrikkarippoor - Road over bridge in lieu of level crossing
No 261( ) EBR(Dep) 12,26,12
117 - - .172 . S.Fund 11,63,55 7,42,62 3,51,39 1,00,00 Tirur-Tanur - Road over bridge in lieu of level crossing No 172 ( ) EBR(Dep) 11,63,53
118 - () - .217 . S.Fund 5,17,68 2,32,62 5,00,00 2,50,00 Badagara-Mahe (Kunjipally) - Road over bridge in lieu of level crossing
No 217
119 - - .59 . S.Fund 3,63,59 7,05,16 99,57 20,00 Karukutti-Angamali - Road over bridge in lieu of level crossing No 59
120 - - .14 . S.Fund 6,55,27 5,44,50 35,06 20,00 Punkunnam-Mulagunnathukavu - Road over bridge in lieu of level
crossing No.14
121 - .170 . S.Fund 4,93,29 6,79,96 2,51,39 10,00 Thirunavaya - Road over bridge in lieu of level crossing No 170
122 - ( ) - .185 . S.Fund 5,50,84 19,65 1,00 10,00
Calicut-West Hill (Amalapuri) - Road over bridge in lieu of level
crossing No 185
123 - () - .216 . S.Fund 4,48,64 3,81,05 40,00 10,00 Badagara-Mukali (Kinaiti) - Road over bridge in lieu of level crossing
No 216
124 - - .268 Cap. 1,20,00 85 .. ..Cheravattur-Nileshwar - Road over bridge in lieu of level crossing No
268. S.Fund 9,26,73 7,08,94 1,30,00 10,00
125 - - .274 . S.Fund 6,07,70 9,70 5,16 10,00 Kanhangad-Pallikere - Road over bridge in lieu of level crossing No
274
126 - - .4 . S.Fund 5,63,20 2,22,66 3,95,20 2,00,00 Villivakkam-Korratur - Road under bridge in lieu of level crossing No.4 ( ) EBR(Dep) 5,63,20
127 - - .6 . S.Fund 4,74,18 20,26 6,50 50,00 Wimco Nagar-Tiruvottiyur - Road under bridge in lieu of level crossing
No 6( ) EBR(Dep) 6,95,69
128 - - .33 . S.Fund 6,51,30 1,32,97 .. 50,00 Perungalathur-Vandalur - Road under bridge in lieu of level crossing
No.33( ) EBR(Dep) 6,50,76
129 - - .39 . S.Fund 5,06,44 3,11,56 5,00 50,00 Chinnababusamudram-Pondicherry - Road over bridge in lieu of level
crossing No 39
130 - - .3 . S.Fund 6,99,45 33,82 6,87,14 1,48,21 Tondiarpet-Tiruvottiyur - Road over bridge in lieu of level crossing No 3 ( ) EBR(Dep) 7,48,83
131 - - .1 . S.Fund 7,35,20 57,86 50 10,00 Perambur-Villivakkam - Road over bridge in lieu of level crossing No 1
132 - - . 1 . S.Fund 4,84,31 3,63,98 50 1Vyasarpadi-Korukkupet - Road over bridge in lieu of level crossing No
1( ) EBR(Dep) 9,58,65
133 - - . 2 . S.Fund 5,16,20 8,36 .. 50,00 Basin Bridge-Korukkupet - Road under bridge in lieu of level crossing
No 2( ) EBR(Dep) 5,12,60
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.12
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
134 - - 5 . S.Fund 6,70,60 5,81,45 1,00 1Chennai Beach-Washermanpet - Road under bridge in lieu of level
crossing No 5( ) EBR(Dep) 3,84,20
135 - - .36 . S.Fund 7,73,58 4,05,15 2,80,16 50,00 Kottayam-Chingavanam - Road over bridge in lieu of level crossing No
36
136 - - .50 . S.Fund 3,14,00 2,07,15 30,00 1Chalakkudy-Karukutty - Road under bridge in lieu of level crossing No
50( ) EBR(Dep) 3,14,00
137 - - . 575- . S.Fund 14,05,78 3,54,09 40,24 1
Murkkumpuzha-Trivandrum - Road over bridge in lieu of level crossing
No 575-A( ) EBR(Dep) 17,79,97
138 - - .578 . S.Fund 10,91,74 7,53,48 15,93 1Kochuveli-Trivandrum - Road over bridge in lieu of level crossing No
578
139 - - .33 . S.Fund 7,12,12 3,32,98 73,21 50,00 Ettumannur-Quilon - Road over bridge in lieu of level crossing No.33 ( ) EBR(Dep) 7,12,12
140 - - .280 . S.Fund 5,47,90 9,50 5,16 1,00,00 Kottikulam-Kasargod - Road over bridge in lieu of level crossing No
280( ) EBR(Dep) 5,47,90
141 - - .289 . S.Fund 5,47,90 8,94 5,16 10,00 Uppala-Majeshwar - Road over bridge in lieu of level crossing No 289 ( ) EBR(Dep) 5,47,90
142 - - .-518 . S.Fund 1,92,89 87,08 1,21,39 30,00 Edamann-Punalur - Road under bridge in lieu of level crossing No V-
518( ) EBR(Dep) 1,92,89
143 - - .2 . S.Fund 5,47,90 4,33 50 1,00,00 Trivandrum Central-Nemom - Road over bridge in lieu of level
crossing No 2( ) EBR(Dep) 5,47,90
144 - - .554 . S.Fund 5,67,45 5,62 50 50,00 Paravoor-Quilon - Road over bridge in lieu of level crossing No 554 ( ) EBR(Dep) 5,67,45
145 - - .14 . S.Fund 5,62,57 4,95,96 75,00 50,00 Tiruninravur-Tiruvallur - Road over bridge in lieu of level crossing No
14( ) EBR(Dep) 5,62,30
146 - - .4 . S.Fund 7,31,96 7,59 5,00 1,50,00 Tiruvottiyur-Ennore - Road under bridge in lieu of level crossing No 4 ( ) EBR(Dep) 7,31,29
147 - - .257 . S.Fund 8,12,70 11,30 97,72 2,00,00 Kannapuram-Pavangadi - Road over bridge in lieu of level crossing No
257( ) EBR(Dep) 5,47,90
148 - - .230 . S.Fund 5,47,90 7,56 5,03 50,00 Tellicherry-Dharmadam - Road over bridge in lieu of level crossing No
230( ) EBR(Dep) 5,47,90
149 - . - .118 . S.Fund 5,45,82 2,67,72 44,96 50,00 Gomangalam-Pollachi Jn - Road over bridge in lieu of level crossing
No 118( ) EBR(Dep) 7,49,23
150 - - .21 . S.Fund 5,95,32 3,50,81 5,00 50,00 Coimbatore-Pathanur - Road over bridge in lieu of level crossing No 21 ( ) EBR(Dep) 5,95,20
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.13
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
151 - - .6 . S.Fund 5,45,12 15,46 5,00 50,00 Irugur-Pilamedu - Road over bridge in lieu of level crossing No 6 ( ) EBR(Dep) 5,44,87
152 - . - .32 . S.Fund 10,71,46 7,68,61 59,41 10,00 Eraniel-Nagercoil Jn - Road over bridge in lieu of level crossing No 32 ( ) EBR(Dep) 13,79,29
153 - - .135 . S.Fund 7,64,03 47,86 2,50,00 2,00,00 Serandanur-Penrotti - Road over bridge in lieu of level crossing No 135 ( ) EBR(Dep) 8,95,11
154 - - .21 . S.Fund 6,88,50 22,04 2,00 2,00,00 Kadambattur-Tiruvalangadu - Road over bridge in lieu of level crossing
No 21( ) EBR(Dep) 6,88,50
155 - - .366 . S.Fund 9,60,07 6,92,76 3,29,70 25,00 Madurai-Tiruparankundaram Siding - Road over bridge in lieu of level
crossing No 366( ) EBR(Dep) 7,58,50
156 - - .166 . S.Fund 8,42,90 9,06,17 1,09,53 20,00 Cuddalore Port-Copper Quarry - Road over bridge in lieu of level
crossing No 166( ) EBR(Dep) 10,83,02
157 - - .7 . S.Fund 10,72,03 3,70,76 3,11,71 1,00,00 Ambattur-Avadi - Road over bridge in lieu of level crossing No 7 ( ) EBR(Dep) 17,73,12
158 - - .9 . S.Fund 13,44,92 8,08 1,00 10,00 Avadi-Pattabiram - Road under bridge in lieu of level crossing No 9 ( ) EBR(Dep) 17,73,12
159 - - .95 . S.Fund 5,32,14 3,99,27 2,19,58 50,00 Udumalaipettai-Gomangalam - Road over bridge in lieu of level
crossing No 95( ) EBR(Dep) 5,31,98
160 - - .47 . S.Fund 9,79,43 8,11,80 30,96 80,00
Maraimalai Nagar - Singaperumal Koil - Road over bridge in lieu of
level crossing No 47( ) EBR(Dep) 1,17,39
161 - - .40 . S.Fund 7,95,41 4,56,38 5,15,77 1,89,02 Urappakkam-Guduvancheri - Road under bridge in lieu of level
crossing No 40( ) EBR(Dep) 8,46,13
162 - - (10 )
Cap. 1,00,00 .. .. ..
Chennai-Gudur - Limited height subways in lieu of unmanned level
crossings (10 level crossings). S.Fund 15,91,47 7,79,81 60,00 50,00
163 - - .146 . S.Fund 6,97,61 2,51,22 52,02 50,00 Irugur-Podanur - Road over bridge in lieu of level crossing No.146 ( ) EBR(Dep) 6,97,22
164 - - .18 . S.Fund 5,84,46 44,21 8,77 2,00,00 St. Thomas Mount-Pallavaram - Pedestrian subway in lieu of level
crossing No.18( ) EBR(Dep) 5,83,92
165 - .58 . S.Fund 13,56,61 9,41,42 6,50 1Puttur - Road over bridge in lieu of level crossing No.58 ( ) EBR(Dep) 16,76,22
166 - - .248 . S.Fund 8,73,82 13,22,69 1,45,47 1
Srirangam-Tiruchchirappalli Town - Road over bridge in lieu of level
crossing No.248( ) EBR(Dep) 17,35,40
167 - .81 . S.Fund 5,45,00 49,63 1,00 10,00 Vaniyambadi Yard - Road under bridge in lieu of level crossing No.81 ( ) EBR(Dep) 5,45,00
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.14
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
168 - - .14 . S.Fund 6,10,91 18,26 25,33 2,00,00 Guindy-St Thomas Mount -Pedestrian subway in lieu of level crossing
No.14( ) EBR(Dep) 6,10,37
169 - - .133 . S.Fund 8,96,73 6,99,38 46,52 1,00,00 Uthukuli-Tirupur - Road under bridge in lieu of level crossing No.133 ( ) EBR(Dep) 8,95,99
170 - - .228 . S.Fund 7,82,63 4,91,74 18,72 1,00 Kattur-Lalgudi - Road over bridge in lieu of level crossing No.228 ( ) EBR(Dep) 5,96,00
171 - - .11 . S.Fund 6,37,58 1,33,25 3,41,85 1,00,00 Pilamedu-Coimbatore North - Road over bridge in lieu of level crossing
No.11( ) EBR(Dep) 6,37,19
172 - .304 . S.Fund 8,76,68 7,18,19 76,00 1,00,00 Thanjavur Yard - Road over bridge in lieu of level crossing No.304 ( ) EBR(Dep) 8,76,14
173 - - .9 . S.Fund 7,73,29 2,94,62 5,61 1,00,00 Pilamedu-Coimbatore North - Road over bridge in lieu of level crossing
No.9( ) EBR(Dep) 18,01,71
174 - - .132 . S.Fund 6,19,54 1,43,70 1,91,25 99,98 Uthukuli-Tirupur - Road over bridge in lieu of level crossing No.132 ( ) EBR(Dep) 6,19,23
175 - - .5 . S.Fund 6,55,78 4,17,50 27,78 1,00,00 Irugur-Pilamedu - Road over bridge in lieu of level crossing No.5 ( ) EBR(Dep) 6,55,02
176 - - .13 . S.Fund 10,41,10 2,16,82 8,03,42 1,50,00 Ennore-Attipattu - Road over bridge in lieu of level crossing No.13 ( ) EBR(Dep) 12,95,61
177 - - .36 . S.Fund 5,40,00 3,84,78 2,33,97 2,00,00 Vandalur-Gudivancheri - Road over bridge in lieu of level crossing
No.36( ) EBR(Dep) 5,40,00
178 - - .370 . S.Fund 9,12,09 7,01,29 68,22 20,00 Madurai-Tiruparankundram - Road over bridge in lieu of level crossing
No.370( ) EBR(Dep) 12,59,96
179 - - .486 487 . S.Fund 7,44,33 2,77 7,00 20,00
Milavattan-Tuticorin - Road over bridge in lieu of level crossing No.486
& 487( ) EBR(Dep) 7,43,88
180 - - .13 . S.Fund 7,41,86 20,93 10,53 2,00,00 Pilamedu-Coimbatore North - Road under bridge in lieu of level
crossing No.13( ) EBR(Dep) 7,40,91
181 - - .15 . S.Fund 6,85,00 1,08,34 2,60,26 2,00,00 Tiruninravur-Tiruvallur - Road over bridge in lieu of level crossing
No.15( ) EBR(Dep) 6,86,00
182 - - .94 . S.Fund 5,47,00 5,49 10 50,00 Olakkur-Tindivanam - Road over bridge in lieu of level crossing No.94 ( ) EBR(Dep) 5,48,00
183 - - . 168 . S.Fund 7,78,60 10,31,84 1,00 1Puvanur-Virudachalam - Road over bridge in lieu of level crossing
No.168( ) EBR(Dep) 7,78,20
184 - - . 206 . S.Fund 5,96,00 3,27 10 1,00,00 Silakkudi-Kallagam - Road over bridge in lieu of level crossing No.206 ( ) EBR(Dep) 5,96,00
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.15
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
185 - - .93 . S.Fund 5,47,00 1,30,32 1,90,89 2,00,00 Olakkur-Tindivanam - Road over bridge in lieu of level crossing No.93 ( ) EBR(Dep) 5,48,00
186 - . 69 . S.Fund 8,44,76 18,64,08 84,00 50,00 Vallathur Yard - Road over bridge in lieu of level crossing No.69 ( ) EBR(Dep) 9,31,83
187 - .66 . S.Fund 7,85,40 4,83,75 2,32,43 1Melalathur Yard - Road under bridge in lieu of level crossing No.66 ( ) EBR(Dep) 8,83,69
188 - - .181 . S.Fund 11,23,57 9,15,94 51,99 1,50,00 Pennadam-Mathur - Road over bridge in lieu of level crossing No.181 ( ) EBR(Dep) 11,23,11
189 .- . - .113 . S.Fund 7,36,40 5,55,66 68,87 10,00 Magnasite Jn-Salem Jn - Road under bridge in lieu of level crossing
No.113( ) EBR(Dep) 7,35,80
190 - - .201 . S.Fund 5,73,40 3,21 .. 1,00,00 Ariyalur-Sillakudi - Road over bridge in lieu of level crossing No.201 ( ) EBR(Dep) 5,73,40
191 - - .38 . S.Fund 6,88,20 5,73,58 1,89,10 30,00 Elavur-Akkampet - Road over bridge in liue of level crossing No.38 ( ) EBR(Dep) 6,88,20
192 - - .106, 113 53
Cap. 1,00,00 5 .. ..
Chennai Egmore-Villupuram - Limited height subways in lieu of level
crossing No.106, 113 & 53. S.Fund 2,75,00 2,36 4,77 1
193 - . 92, 93, 94, 95, 97 98 (-I)
Cap. 1,00,00 .. .. ..
Palghat Division - Limited height subways in lieu of level crossing
No.92, 93, 94, 95, 97 & 98 (Phase-I). S.Fund 2,63,10 2,21,17 .. 1,00
194 - . 101, 103, 104, 106, 106- 107 (-II)
Cap. 1,00,00 .. .. ..
Palghat Divsion - Limited height subways in lieu of level crossing
Nos.101, 103, 104, 106, 106-A & 107 (Phase-II). S.Fund 2,68,40 1,00,00 .. 1
195 - .9- ( )
. S.Fund 26,50,00 5,33 1,00 1
Basin Bridge - Reconstruction of road over bridge in lieu of level
crossing No.9-R (Elephant Gate)
196 - - .96 . S.Fund 6,38,22 5,61,19 14,00 10,00 Kagankari-Samalpatti - Road under bridge in lieu of level crossing
No.96
197 - - .2 . S.Fund 9,33,11 3,13,54 .. 1,00,00 Irugur-Pilamedu - Road over bridge in lieu of level crossing No 2 ( ) EBR(Dep) 9,32,37
198 - - .403 . S.Fund 5,60,77 70 22,65 50,00 Virudunagar-Tulukkapatti - Road over bridge in lieu of level crossing
No 403( ) EBR(Dep) 5,59,78
199 - - .371 . S.Fund 6,41,81 1,92,88 2,88,33 20,00 Madurai-Tiruparankindram - Road over bridge in lieu of level crossing
No 371( ) EBR(Dep) 6,41,07
200 - - .281 . S.Fund 7,17,53 3,86,52 1,60,37 20,00 Manapparai-Chettipatti - Road over bridge in lieu of level crossing No
281( ) EBR(Dep) 7,15,49
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.16
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
201 - - .302 . S.Fund 4,84,22 4,55,57 50 1Titte-Thanjavur - Road over bridge in lieu of level crossing No 302 ( ) EBR(Dep)
202 - - .128 . S.Fund 7,16,61 18,48 7,22 1,00,00 Vellore-Katpadi - Road over bridge in lieu of level crossing No 128 ( ) EBR(Dep) 7,17,64
203 - - .98 . S.Fund 6,41,71 4,51,37 15,00 20,00 Samalpatti-Dasampatti - Road under bridge in lieu of level crossing No
98( ) EBR(Dep) 7,43,93
204 - - .89 . S.Fund 6,07,89 2,21,12 3,11,59 1Jolarpettai-Tirupathur - Road over bridge in lieu of level crossing No 89 ( ) EBR(Dep) 6,07,17
205 - - .86 . S.Fund 10,71,20 4,06,40 6,00 1Kettandapatti-Jolarpettai - Road over bridge in lieu of level crossing No
86( ) EBR(Dep) 10,71,20
206 - - .82 . S.Fund 6,71,83 2,16,49 8,00 1Vaniyambadi-Kettandapatti - Road over bridge in lieu of level crossing
No 82( ) EBR(Dep) 6,71,10
207 - - 2- .380- 4-
. S.Fund 13,87,80 1,72,32 59,99 2,00,00
Srirangam-Tiruchchirapalli Town - 4-lane road over bridge in lieu of 2-
lane bridge No.380-A( ) EBR(Dep) 11,53,80
208 - - . 2- .1136 4-
. S.Fund 18,57,07 8,88,69 3,20,00 2,00,00
Tiruchchirappalli-Dindigul - 6-lane road over bridge in lieu of 2-lane
bridge No.1136 near Tiruchchirapalli Jn( ) EBR(Dep) 24,05,44
209 - - - 2- .-21 11- 4-
. S.Fund 11,33,53 10,84,75 2,41,33 1,00,00
Basin Bridge-Korukkupet & Korukkupet-Vysarpadi - 4-lane road over
bridges in lieu of 2-lane road over bridge No.NE-21 and 11-R
respectively
( ) EBR(Dep) 23,84,00
210 - - .30 . S.Fund 6,21,00 1,82 9,91 1,00,00 Ettumanur-Kottayam - Road over bridge in lieu of level crossing No.30 ( ) EBR(Dep) 6,22,00
211 - .18 . S.Fund 5,12,00 2,80,93 22,00 10,00 Tirunelveli Yard - Road over bridge in lieu of level crossing No.18
212 - - .16 . S.Fund 11,70,15 1,87 1,98,36 2,50,00 Chennai-Arakkonam - Road over bridge in lieu of level crossing No 16 ( ) EBR(Dep) 11,69,42
213 - - .124 . S.Fund 12,46,62 6,91,13 2,52,00 1,00,00 Erode-Coimbatore - Road over bridge in lieu of level crossing No 124 ( ) EBR(Dep) 12,45,94
214 - - .2 . S.Fund 6,85,14 89 3,37,86 1,50,00 Villupuram-Katpadi - Road over bridge in lieu of level crossing No 2 ( ) EBR(Dep) 8,87,00
215 - - .2 . S.Fund 9,17,00 68 1,00 1,00 Chennai-Arakkonam - Road over bridge in lieu of level crossing No 2 ( ) EBR(Dep) 9,17,00
216 - - .4 . S.Fund 9,20,35 1,47,11 17,00 50,00 Irugur-Pilamedu - Road over bridge in lieu of level crossing No 4 ( ) EBR(Dep) 15,75,16
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.17
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
217 - - .7 . S.Fund 10,47,47 2,98,66 5,00 50,00 Irugur-Pilamedu - Road over bridge in lieu of level crossing No 7 ( ) EBR(Dep) 25,54,91
218 - - .10 . S.Fund 9,17,00 1,60 1,00 50,00 Irugur-Coimbatore - Road under bridge in lieu of level crossing No 10 ( ) EBR(Dep) 9,17,00
219 - - .131 . S.Fund 10,73,23 1,72,16 67,70 50,00 Irugur-Coimbatore - Road over bridge in lieu of level crossing No 131 ( ) EBR(Dep) 10,72,57
220 - - .309 . S.Fund 12,35,01 2,16 2,45,01 1,50,00 Tiruchchirappalli-Dindigul - Road over bridge in lieu of level crossing
No 309( ) EBR(Dep) 12,33,98
221 - - . 22 . S.Fund 5,49,64 2,62,42 25,00 1Thanjavur-Tiruvarur - Road over bridge in lieu of level crossing No 22
222 - - .75
. S.Fund 21,16,18 2,42 4,77 1,00,00
Pakkam-Acharapakkam - Road over bridge in lieu of level crossing
No.75 near Acharapakkam( ) EBR(Dep) 21,15,38
223 - - .78 . S.Fund 17,42,00 1,40 5,03 50,00 Ambur-Vinnamangalam - Road over bridge in lieu of level crossing
No.78( ) EBR(Dep) 17,42,00
224 - - .80 . S.Fund 18,96,34 1,33 1,18,47 2,00,00 Vinnamangalam-Vaniyambadi - Road over bridge in lieu of level
crossing No.80( ) EBR(Dep) 18,95,88
225 - - .13 . S.Fund 17,92,53 2,71 1,69,66 2,50,00 Thiruninravur-Veppambattu - Road over bridge in lieu of level crossing
No.13( ) EBR(Dep) 17,91,52
226 - - .2- . S.Fund 17,42,00 1,32 1,00 1,00,00 Korukkupet-Veysarpadi - Road over bridge in lieu of level crossing
No.2-B( ) EBR(Dep) 17,42,00
227 - - .16 . S.Fund 19,51,31 6,81 2,00 1,00,00 Minjur-Anuppambattu - Road over bridge in lieu of level crossing No.16 ( ) EBR(Dep) 19,50,82
228 - - .3 . S.Fund 17,12,00 1 2,00 1,00,00 Irugur-Pilamedu - Road over bridge in lieu of level crossing No.3 ( ) EBR(Dep) 17,12,00
229 - - .32 . S.Fund 17,74,59 70 1,25,07 2,00,00 Tambaram-Vandalur - Road over bridge in lieu of level crossing No.32
at Perungalathur( ) EBR(Dep) 19,36,49
230 - - .2- . S.Fund 17,72,00 1,44 1,00 1,00,00 Korukkupet-Veysarpadi - Road over bridge in lieu of level crossing
No.2-A( ) EBR(Dep) 17,72,00
231 - .126 - - .127-
. S.Fund 21,70,00 6,15 2,00 1,00,00
Vellore Yard - Road over bridge in lieu of level crossing No.126 and
Vellore Cantt-Katpadi - Road under bridge in lieu of level crossing
No.127-M
( ) EBR(Dep) 21,70,00
232 - - .59
. S.Fund 18,07,20 1,69 2,50,34 2,00,00
Chengalpet-Ottivakkam - Road over bridge in lieu of level crossing
No.59 near Ottivakkam( ) EBR(Dep) 18,06,55
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.18
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
233 - - .64 . S.Fund 18,91,57 66,00 4,49,73 1,00,00
Padalam-Karunguzhi - Road over bridge in lieu of level crossing No.64
near Karunguzhi( ) EBR(Dep) 18,91,57
234 - - .88 . S.Fund 19,54,47 1,47 1,31,33 2,00,00
Chennai Beach-Villipuram - Road over bridge in lieu of level crossing
No.88 in Olakkur Yard( ) EBR(Dep) 19,54,47
235 - - .102 . S.Fund 17,66,19 45,54 3,50,00 2,00,00
Chennai Beach-Villipuram - Road over bridge in lieu of level crossing
No.102 in Mailam Yard( ) EBR(Dep) 17,65,11
236 - - .111
. S.Fund 17,72,00 1,76 54,49 2,00,00
Perani-Mundiyampakkam - Road over bridge in lieu of level crossing
No.111 near Vikaravandi( ) EBR(Dep) 17,72,00
237 - - (.308), - (.27) - (.2)
. S.Fund 39,89,93 5,88 1,80,13 2,00,00
Tamaraipadi-Dindigul - Road over bridge in lieu of level crossing
(No.308), Eriodu-Dindigul (No.27) & Dindigul-Akaraipatti (No.2)( ) EBR(Dep) 40,73,10
238 - - .473
. S.Fund 18,54,30 2,07 10,91,54 1,50,00
Sudiyur-Paramakudi - Road over bridge in lieu of level crossing
No.473 near Paramakudi( ) EBR(Dep) 18,53,42
239 - - 184 . S.Fund 16,42,19 10,12 60,00 1,00,00 Salem Market-Salem Town - Road over bridge in lieu of level crossing
No.184( ) EBR(Dep) 16,92,05
240 - - .183
. S.Fund 17,12,08 3,27 1,00,00 1,00,00
Ayodhyapattanam-Salem Town - Road over bridge in lieu of level
crossing No.183 near Salem Town( ) EBR(Dep) 17,11,65
241 - - . .187
. S.Fund 17,31,08 2,40 2,09,51 2,00,00
Salem Market-Salem Jn - Road over bridge in lieu of level crossing
No.187 near Salem Jn( ) EBR(Dep) 18,08,00
242 - - .118
. S.Fund 12,26,12 3,09 71,85 2,00,00
Melappaliyam-Sengulam - Road over bridge in lieu of level crossing
No.118 near Sengulam( ) EBR(Dep) 20,27,42
243 - - .70 . S.Fund 18,58,84 64 2,00 50,00
Melpatti-Valathoor - Road over bridge in lieu of level crossing No.70
near Valathoor( ) EBR(Dep) 18,58,28
244 - - .10
. S.Fund 17,89,94 5,61 2,00 1,00,00
Coimbatore North-Karaimadai - Road over bridge in lieu of level
crossing No.10 near Karaimadai( ) EBR(Dep) 17,89,35
245 - - .3
. S.Fund 16,44,71 2,49,34 2,25,00 50,00
Pollachi-Annaimalai Road - Road under bridge in lieu of level crossing
No.3 near Pollachi( ) EBR(Dep) 17,24,88
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.19
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
246 - - .441
. S.Fund 10,32,23 1,72,29 85,50 1
Sivagangai-Melakonnakulam - Road over bridge in lieu of level
crossing No.441 near Sivagangai( ) EBR(Dep) 17,72,00
247 - - .162 . S.Fund 22,12,87 2,13 52,26 1,00,00
Podanur-Pollachi - Road over bridge in lieu of level crossing No.162
near Podanur( ) EBR(Dep) 22,12,28
248 - .25 ( )
. S.Fund 3,06,00 1,63,85 1,50,00 1,50,00
Ollur Yard - Limited use subway in lieu of level crossing No.25 (Traffic
Gate)
249 - - (-)
. S.Fund 2,55,00 1,11,84 .. 1
Podanur-Palghat - Under bridge for safe passage of crossing of wild
elephants (B-line)
250 - - .61
. S.Fund 4,50,00 2,14 50 1,50,00
Shoranur-Ernakulam - Subway in lieu of level crossing No.61 in
Angmali for Kaladi yard
251 - .7 . S.Fund 4,84,00 3,41 1,25,83 3,00,00 Angadipuram - Road over bridge in lieu of level crossing No.7 ( ) EBR(Dep) 45,90,00
252 - .314 2-
. S.Fund 14,20,00 1,58 .. 50,00
Sankaridurg Yard - Addl. 2-lane road under bridge to road under bridge
No.314( ) EBR(Dep) 14,20,00
253 - - .7, 8, 25, 5 19
. S.Fund 13,95,18 3,47,15 4,50,00 5,00
Karur-Dindigul - Limited use subway in lieu of level crossing No.7, 8,
25, 5 & 19
254 - - .17 . S.Fund 18,62,00 1,19 4,04 50,00 Kumbalam-Turavur - Road over bridge in lieu of level crossing No.17 ( ) EBR(Dep) 18,62,00
255 - - .249 . S.Fund 17,27,56 2,00 50 75,00
Srirangam-Tiruchchirappalli Town - Road over bridge in lieu of level
crossing No.249( ) EBR(Dep) 17,26,68
256 - - .526 . S.Fund 18,62,00 10,07 50 50,00 Ehzukone-Kundara - Road over bridge in lieu of level crossing No.526 ( ) EBR(Dep) 18,62,00
257 - - .45 . S.Fund 18,62,00 2,53 2,00 20,00 Chinnababu Samudram-Puducherry - Road over bridge in lieu of level
crossing No.45( ) EBR(Dep) 18,62,00
258 - - .501 . S.Fund 18,62,00 12 50 1,00,00 Ramanathapuram-Uchippuli - Road over bdige in lieu of level crossing
No.501( ) EBR(Dep) 35,43,00
259 - - .547 . S.Fund 18,62,00 1,84 50 1,00,00 Quilon-Mayanad - Road over bridge in lieu of level crossing No.547 ( ) EBR(Dep) 18,62,00
260 - .346 . S.Fund 16,72,96 1,08 7,13 1,00,00 Sholvandan Yard - Road over bridge in lieu of level crossing No.346 ( ) EBR(Dep) 16,72,38
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.20
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
261 - - .4 . S.Fund 18,62,00 1,95 5,00 1,00,00 Shoranur-Angadipuram - Road over bridge in lieu of level crossing
No.4( ) EBR(Dep) 18,62,00
262 - - .14 . S.Fund 18,62,00 1,13 20,75 1,00,00 Punkunam-Guruvayur - Road over bridge in lieu of level crossing
No.14( ) EBR(Dep) 18,62,00
263 - - .555 . S.Fund 18,62,00 1,84 50 1,00,00 Kappil-Edavai - Road over bridge in lieu of level crossing No.555 ( ) EBR(Dep) 18,62,00
264 - - .8 . S.Fund 15,60,08 7 5,16 1,00,00 Dindigul-Akkaraippatti - Road over bridge in lieu of level crossing No.8 ( ) EBR(Dep) 16,94,04
265 - - .557 . S.Fund 18,62,00 2,68 50 50,00
Edavali-Varkala Shivagiri - Road over bridge in lieu of level crossing
No.557( ) EBR(Dep) 18,62,00
266 - - .138 . S.Fund 15,91,37 2,11 50 75,00 Panruti-Melpattambakkam - Road over bridge in lieu of level crossing
No.138( ) EBR(Dep) 17,48,07
267 - - .6 . S.Fund 21,12,11 7 50 50,00 Palayankottai-Seydinganallur - Road over bridge in lieu of level
crossing No.6( ) EBR(Dep) 21,11,64
268 - - .3 . S.Fund 10,62,93 1,64 2,95,26 2,00,00 Ernakulam-Tirupunithura - Road over bridge in lieu of level crossing
No.3( ) EBR(Dep) 10,62,93
269 - - .34 . S.Fund 18,62,00 1,81 5,00 1,00,00 Chinnababu Samudram-Puducherry - Road over bridge in lieu of level
crossing No.34( ) EBR(Dep) 18,62,00
270 - . 37 . S.Fund 19,70,73 1,43 10,00 1,00,00 Anavardikhanpettai - Road over bridge in lieu of level crossing No.37 ( ) EBR(Dep) 19,70,17
271 - - . 43- 4-
. S.Fund 36,00,00 2,48,29 1,15,56 50,00
Chinnababu Samudram-Puducherry - 4-lane road over bridge in lieu of
level crossing No.43-A( ) EBR(Dep) 60,62,00
272 - - . 416, 470, 471 496
. S.Fund 4,23,20 1,57,28 2,00,00 2,50,00
Virudunagar-Tenkasi - Limited use subway in lieu of level crossing
No.416, 470, 471 & 496
273 - - . 1, 2 26 - - .119 124
. S.Fund 3,70,20 2,60,67 1,50,00 10,59
Palakkad-Pollachi - Limited use subway in lieu of level crossing No.1,
2 & 26 and Pollach-Podanur - level crossing No.119 & 124
274 - - . 70, 71, 73 75
. S.Fund 3,37,93 2,16 97,06 1,50,00
Dindigul-Pollachi - Limited use subway in lieu of level crossing No.70,
71, 73 & 75
275 - - .89, 92, 96 99
. S.Fund 4,18,81 2,16 1,14,36 1,50,00
Dindigul-Pollachi - Limited use subway in lieu of level crossing No.89,
92, 96 & 99
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.21
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
276 - - . 110, 111, 113 115
. S.Fund 4,18,81 2,16 1,09,82 1,00,00
Dindigul-Pollachi - Limited use subway in lieu of level crossing No.110,
111, 113 & 115
277 - - . 64, 65, 67 69
. S.Fund 2,63,46 2,16 1,36,68 10,86
Dindigul-Pollachi - Limited use subway in lieu of level crossing No.64,
65, 67 & 69
278 - - . 78, 80, 82 86
. S.Fund 4,42,00 1,08 1,11,41 1,00,00
Dindigul-Pollachi - Limited use subway in lieu of level crossing No.78,
80, 82 & 86
279 - - .12 -- - .12 37
. S.Fund 4,09,36 77 1,48,62 3,00,00
Shoranur-Eranakulam - Limited height subway in lieu of level crossing
No.12 and Eranakulam-Kottayam-Quilon - level crossing No.12 & 37
280 - - .6 . S.Fund 8,73,69 6 5,16 1,00,00 Dindigul-Akkaraippatti - Limited height subway in lieu of level crossing
No.6( ) EBR(Dep) 8,73,09
281 - - . 100, 103, 104 109
. S.Fund 3,44,88 3 62,91 1,50,00
Dindigul-Pollachi - Limited use subway in lieu of level crossing No.100,
103, 104 & 109
282 - - . 90, 83, 77, 68, 66, 138, 146 147
. S.Fund 17,71,80 4,06,23 4,00,00 5,00
Salem-Vrdhachalam - Limited use subway in lieu of level crossing
No.90, 83, 77, 68, 66, 138, 146 & 147
283 - - .12 . S.Fund 18,62,00 2,99 24,77 1,00,00 Thripunithura-Mulamthuruthy - Road over bridge in lieu of level
crossing No.12( ) EBR(Dep) 18,62,00
284 - - . 82, 84 86 . S.Fund 7,06,28 19,74 1,00,00 3,00,00 Salem-Vriddhachalam - Subways in lieu of level crossing Nos.82, 84 &
86
285 - - .14, 16 26 . S.Fund 4,50,00 14,74 .. 50,00 Karur-Dindigul - Subways in lieu of level crossing Nos.14, 16 & 26
286 - (54 ) (-I)
. S.Fund 97,77,24 .. 99,08 10,00,00
Madurai Division - Elimination of level crossings by limited use
subways (54 Nos) (Phase-I)
287 - .101 . S.Fund 7,01,62 21 3,82,43 20,00
Salem Division - Road over bridge in lieu of level crossing No.101 near
Thonganur Halt
288 - - (17 ) . S.Fund 44,93,90 23 50 1,00,00 Mayiladuthurai-Karaikkudi - Subways in lieu of level crossings (17 Nos)
289 - - . 14 2- . S.Fund 22,14,44 .. .. 1Attipattu - Minjur - 2-lane road over bridge in lieu of level Crossing
No.14( ) EBR(Dep) 22,14,44
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.22
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
290 - - .185 2-
. S.Fund 19,13,50 .. 4,95 20,00
Salem Town - Salem Market - 2-lane road over bridge in lieu of level
crossing No.185( ) EBR(Dep) 19,13,50
291 - - . 34 2- . S.Fund 18,80,50 .. 50 1,00,00
Kulikarai - Thiruvarur - 2-lane road over bridge in lieu of level crossing
No.34( ) EBR(Dep) 18,80,50
292 - - . 123 2-
. S.Fund 18,76,00 .. .. 1
Kaniyambadi - Vellore Cantt - 2-lane road over bridge in lieu of level
crossing No.123( ) EBR(Dep) 18,76,00
293 - - . 29 4- . S.Fund 24,33,50 56 1,44 1,00,00
Kanchipuram - Tirumalpur - 4-lane road over bridge in lieu of level
crossing No.29( ) EBR(Dep) 24,33,50
294 - - .82 2- . S.Fund 21,04,50 .. .. 1,00,00
Valliyur - Nanguneri - 2-lane road over bridge in lieu of level crossing
No.82( ) EBR(Dep) 21,04,50
295 - - .577- ( ) 2-
. S.Fund 18,46,10 25 1,00 10,00
Kazhakuttam-Kochuveli - 2-lane road over bridge in lieu of level
crossiing No.577-B (Clay Gate)( ) EBR(Dep) 18,46,10
296 - - .573 ( ) 2-
. S.Fund 17,07,65 30 50 10,00
Murukkampuzha-Kazhakuttam - 2-lane road over bridge in lieu of level
crossing No.573 (Kaniyapuram)( ) EBR(Dep) 17,07,65
297 - - .251 ( ) 2-
. S.Fund 11,28,66 93 3,05,00 2,00,00
Valapattanama-Pappinisseri - 2-lane road over bridge in lieu of level
crossing No.251 (Pappinisseri)( ) EBR(Dep) 11,28,66
298 - - .567 () 2-
. S.Fund 18,73,52 23 50 1,00,00
Chirayinkeezh-Murukkampuzha - 2-lane road over bridge in lieu of
level crossing No.567 (Sarkara)( ) EBR(Dep) 18,73,52
299 - - 2- .220- 4-
. S.Fund 18,45,49 33 1,00 1,00
Ernakulam Town-Ernakulam - Widening of 2-lane road over bridge
No.220-B to 4-lane( ) EBR(Dep) 18,45,49
300 - - .281 () 2-
. S.Fund 13,80,75 13 5,16 10,00
Kuttikulam-Kasaragod - 2-lane road over bridge in lieu of level
crossing No.281(Uduma)( ) EBR(Dep) 13,80,75
301 - - .569 () 2-
. S.Fund 18,96,54 18 50 10,00
Chirayinkeezh-Murukkampuzha - 2-lane road over bridge in lieu of
level crossing No.569 (Manjadimoodu)( ) EBR(Dep) 18,96,54
302 - - .22 () 2-
. S.Fund 20,38,37 17 1,00 1,00,00
Vaikam Road-Kuruppantara - 2-lane road over bridge in lieu of level
crossing No.22 (Kuruppantara)( ) EBR(Dep) 20,38,37
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.23
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
303 - - .41 () 2-
. S.Fund 20,78,04 17 49,54 1,00,00
Kayankulam-Ochira - 2-lane road over bridge in lieu of level crossing
No.41 (Mamparakannyil)( ) EBR(Dep) 20,78,04
304 - - .528 () 2- . S.Fund 18,10,41 .. 50 1,00,00
Kundhara-Kollam - 2-lane road over bridge in lieu of level crossing
No.528 (Kundhara)( ) EBR(Dep) 18,10,41
305 - - .24 () 2- . S.Fund 13,00,60 11 50 10,00
Thrisur-Ollur - 2-lane road over bridge in lieu of level crossing No.24
(Nedupuzha)( ) EBR(Dep) 13,00,60
306 - .56 () 2-
. S.Fund 12,82,32 18 1,00 10,00
Chalakudi-Karukutty - 2-lane road over bridge in lieu of level crossing
No.56 (Chirangaraa)( ) EBR(Dep) 12,82,32
307 - - .180 () 2-
. S.Fund 21,60,64 21 1,16 10,00
Kallayi-Kozhikode - 2-lane road over bridge in lieu of level crossing
No.180 (Vattampoyil)( ) EBR(Dep) 21,60,64
308 - - .566 () 2-
. S.Fund 16,03,75 15 50 1,00,00
Chirayinkeezh-Murukkampuzha - 2-lane road over bridge in lieu of
level crossing No.566 (Chirayinkil)( ) EBR(Dep) 16,03,75
309 - - - .16 108 . S.Fund 2,88,63 14,90 .. 10,00
Ernakulam-Alleppey-Kayankulam - Subways in lieu of level crossing
Nos.16 & 108
310 - - .22 23 . S.Fund 3,35,75 14,74 18 3,00,00 Chengannur-Mavelikara - Subways in lieu of level crossing Nos.22 &
23
311 - - .30 - - .67
. S.Fund 4,63,49 14,74 2,15,00 2,00,00
Pudukad-Irinjalakuda - Subway in lieu of level crossing No.30 and
Sasthankotta-Perinad - level crossing No.67
312 - - - .131, 143 8
. S.Fund 2,69,21 14,74 .. 50,00
Pollachi-Podanur & Palghat-Pollachi - Limited use subways in lieu of
unmanned level crossing No.131, 143 & 8
313 - - .6 . S.Fund 6,96,59 61 .. 1,00,00 Chennai-Arakkonam - Subway in lieu of level crossing No.6
314 .- - . - (12)
. S.Fund 30,46,71 1,19,16 1,58,53 5,00,00
Ernakulam Jn-Kottayam-Kayanakulam Jn - Subways in lieu of level
crossings (12 Nos)
315 .- - . - (12)
. S.Fund 21,12,37 1,09 1,00,00 1,33,00
Ernakulan Jn-Alleppey-Kayanakulam Jn - Subways in lieu of level
crossings (12 Nos)
316 - . - .5, 7, 8, 9, 18, 19 21
. S.Fund 14,69,97 1,59,72 5,18,00 2,00,00
Thiruvananthapuram-Nagercoil Jn - Subways in lieu of level crossing
Nos.5, 7, 8, 9, 18, 19 & 21
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.24
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
317 - (131 )
. S.Fund 393,00,00 .. 99,08 4,00,00
Madurai Division - Elimination of unmanned level crossings by limited
use subways (131 Nos)
318 - - . 273 2- . S.Fund 19,07,24 .. .. 10,00
Shoranur - Mangalore - 2-lane road over bridge in lieu of level crossing
No.273( ) EBR(Dep) 19,07,24
319 - . 293 . S.Fund 17,50,00 .. 1,00 10,00 Mangalore - Road over bridge in lieu of level crossing No.293 ( ) EBR(Dep) 17,50,00
320 - . 294 . S.Fund 18,20,00 .. 1,00 10,00 Mangalore - Road over bridge in lieu of level crossing No.294 ( ) EBR(Dep) 18,20,00
321 - - . 265 . S.Fund 20,30,41 .. 1,50 10,00 Shoranur - Mangalore- Road over bridge in lieu of level crossing
No.265( ) EBR(Dep) 20,30,41
322 - - . 267 . S.Fund 19,33,63 .. 1,50 10,00 Shoranur - Mangalore- Road over bridge in lieu of level crossing No.
267( ) EBR(Dep) 19,33,63
323 - - . 226 . S.Fund 20,21,50 .. 10 1Kattur-Lalgudi- Road over bridge in lieu of level crossing No. 226 ( ) EBR(Dep) 20,21,50
324 - - .154, 51 11 (3 )
. S.Fund 8,61,89 .. 23,92 1,50,00
Podanur-Palghat & Palghat Town - subways in lieu of level crossing
No. 154, 51 & 11 (3 Nos)
325 -- . 350 506 (2)
. S.Fund 5,83,50 .. .. 1,25,00
Tiruchchirappalli-Manamadurai -subway in lieu of unmanned level
crossing No. 350 & 506 (2 Nos)
326 - - . 205 . S.Fund 19,60,03 .. 1,50 10,00 Shoranur-Mangalore- Road over bridge in lieu of level crossing No.205 ( ) EBR(Dep) 19,60,03
327 - - . 55 . S.Fund 19,95,22 .. 50 1Kayankumam-Kollam - Road over bridge in lieu of level crossing No.55 ( ) EBR(Dep) 19,95,22
328 - - . 50 . S.Fund 19,16,04 .. 50 1Kayankumam-Kollam - Road over bridge in lieu of level crossing No.50 ( ) EBR(Dep) 19,16,04
329 - - . 81 . S.Fund 3,00,00 .. .. 50,00 Erode-Tiruchchirapalli Fort -subways in lieu of level crossing No. 81
330 - -- . 11 . S.Fund 18,72,05 .. 50 1
Ernakulam-Kottayam-Kayankumam- Road over bridge in lieu of level
crossing No.11( ) EBR(Dep) 18,72,05
331 -- .23, 25 28 (3 )
. S.Fund 8,75,25 .. .. 50,00
Dindigul-Pollachi-subway in lieu of unmanned level crossing No. 23,
25 & 28 (3 Nos)
332 - - . 26 . S.Fund 20,91,99 .. 26,50 1Shoranur - Ernakulam- Road over bridge in lieu of level crossing No.
26( ) EBR(Dep) 20,91,99
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.25
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
333 - - . 574 . S.Fund 19,16,04 .. 50 1Kollam - Thiruvananthapuram- Road over bridge in lieu of level
crossing No. 574( ) EBR(Dep) 19,16,04
334 - - . 67 . S.Fund 21,11,00 .. .. 1Gudiyattam-Valathoor- Road over bridge in lieu of level crossing No. 67 ( ) EBR(Dep) 21,11,00
335 - - .263,283 286 (3 ) . S.Fund 9,31,95 .. 75,00 3,00,00
Shoranur-Mangalore Central -subways in lieu of level crossing No.
263,283 & 286 (3 Nos)
336 - - . 291 . S.Fund 19,97,50 .. 1,50 10,00 Shoranur-Mangalore- Road over bridge in lieu of level crossing No. 291 ( ) EBR(Dep) 19,97,50
337 - - . 204 . S.Fund 19,33,63 .. 1,50 10,00 Shoranur-Mangalore- Road over bridge in lieu of level crossing No.204 ( ) EBR(Dep) 19,33,63
338 - - . 59 . S.Fund 26,03,50 .. .. 1Latteri-Virinchipuram- Road over bridge in lieu of level crossing No.59 ( ) EBR(Dep) 26,03,50
339 - - . 16 . S.Fund 19,13,50 .. 10 1Mayiladuthurai-Peralam- Road over bridge in lieu of level crossing
No.16( ) EBR(Dep) 19,13,50
340 - - . 15 . S.Fund 19,95,82 .. 50 1Nagercoil-Thiruvananthapuram- Road over bridge in lieu of level
crossing No. 15( ) EBR(Dep) 19,95,82
341 - . 377 . S.Fund 21,11,00 .. 50 1Tirumangalam- Road over bridge in lieu of level crossing No. 377 ( ) EBR(Dep) 21,11,00
342 - - . 83 . S.Fund 18,98,79 .. 50 1Tirunelveli-Sengottai - Road over bridge in lieu of level crossing No. 83 ( ) EBR(Dep) 18,98,79
343 - - . 10 . S.Fund 18,95,72 .. .. 1Omalur-Mecheri Road- Road over bridge in lieu of level crossing No.
10( ) EBR(Dep) 18,95,72
344 - . 18 . S.Fund 25,74,68 .. .. 1Mecheri Road Yard- Road over bridge in lieu of level crossing No. 18 ( ) EBR(Dep) 25,74,68
345 - - . 157 . S.Fund 20,86,00 .. 10 1
Nellikuppam-Tiruppadiripuliyur- Road over bridge in lieu of level
crossing No. 157( ) EBR(Dep) 20,86,00
346 -- . 449 . S.Fund 19,66,94 .. 50 1Virudunagar-Sengottai- Road over bridge in lieu of level crossing No.
449( ) EBR(Dep) 19,66,94
347 - - . 15 . S.Fund 19,53,68 .. .. 1Omalur- Mecheri Road- Road over bridge in lieu of level crossing No.
15( ) EBR(Dep) 19,53,68
348 - - . 26 . S.Fund 21,63,50 .. 50 1Ponneri-Kavaraipettai- Road over bridge in lieu of level crossing No. 26 ( ) EBR(Dep) 21,63,50
349 - - . 427 . S.Fund 19,71,00 .. 50 1Virudunagar-Sengottai - Road over bridge in lieu of level crossing No.
427( ) EBR(Dep) 19,71,00
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.26
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
350 - - . 21 . S.Fund 18,79,16 .. .. 1Mecheri Road-Metturdam- Road over bridge in lieu of level crossing
No. 21( ) EBR(Dep) 18,79,16
351 - . 20 . S.Fund 8,97,00 .. 10 1Nidamangalam Yard- Road over bridge in lieu of level crossing No. 20 ( ) EBR(Dep) 44,95,00
352 - - . 323 . S.Fund 20,38,50 .. 10 1Tiruverumbur-Ponmalai- Road over bridge in lieu of level crossing
No.323( ) EBR(Dep) 20,38,50
353 - - . 55 . S.Fund 21,64,50 .. 10 1Adichchanur-Tandarai- Road over bridge in lieu of level crossing No.55 ( ) EBR(Dep) 21,64,50
354 - - . 144 . S.Fund 21,34,50 .. 10 1
Tiruvennai Nallur Road-Parikkal- Road over bridge in lieu of level
Crossing No.144( ) EBR(Dep) 21,34,50
355 - - . 543 . S.Fund 19,16,04 .. 50 1Kollam-Thiruvananthapuram- Road over bridge in lieu of level crossing
No. 543( ) EBR(Dep) 19,16,04
356 - - . 142 . S.Fund 19,55,50 .. .. 1Somanur-Sulur Road- Road over bridge in lieu of level crossing No.
142( ) EBR(Dep) 19,55,50
357 - - . 48 . S.Fund 22,27,77 .. 4,95 1Nagappattinam-Nagore- Road over bridge in lieu of level crossing
No.48( ) EBR(Dep) 22,27,77
358 - - . 80 . S.Fund 27,51,00 .. .. 1Polur-Arni Road- Road over bridge in lieu of level crossing No.80 ( ) EBR(Dep) 27,51,00
359 - - . 11 . S.Fund 18,62,60 .. .. 1Karaimadai-Mettupalaiyam- Road over bridge in lieu of level crossing
No. 11( ) EBR(Dep) 18,62,60
360 - . 424 . S.Fund 20,90,14 .. 50 1Tiruttangal- Road over bridge in lieu of level crossing No. 424 ( ) EBR(Dep) 20,90,14
361 - - . 72 . S.Fund 19,04,00 .. .. 1Valathoor-Melpatti- Road over bridge in lieu of level crossing No. 72 ( ) EBR(Dep) 19,04,00
362 - - . 7 . S.Fund 19,04,00 .. .. 1Magnesite-Omalur- Road over bridge in lieu of level crossing No.7 ( ) EBR(Dep) 19,04,00
363 - - . 35, 36, 50 105 (4)
. S.Fund 11,67,00 .. .. 50,00
Dindigul-Pollachi- subway in lieu of unmanned level crossing No. 35,
36, 50 & 105 (4 Nos)
364 -- . 39 54 (2 )
. S.Fund 8,75,75 .. .. 1,00,00
Manamadurai-Virudunagar- subway in lieu of unmanned level crossing
No. 39 & 54 (2 Nos)
365 - . 127 12 (2 ) . S.Fund 5,88,23 .. .. 20,00
Vijayamangalam yard- subways in lieu of level crossing No. 127 & 12
(2 Nos)
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.27
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
366 - - . 38, 50, 73 , 75 87 (5 )
. S.Fund 14,58,76 .. .. 50,00
Tirunelveli-Tenkasi- subway in lieu of unmanned level crossing No. 38,
50, 73b, 75 & 87 (5 Nos)
367 - - .452, 463, 494 504 (4)
. S.Fund 11,67,00 .. .. 50,00
Virudunagar-Shengottai- subway in lieu of unmanned level crossing
No. 452, 463, 494 & 504 (4 Nos)
368 - . 95, 104,106 107 (4 ) . S.Fund 13,47,78 .. .. 2,00,00
Salem division- subways in lieu of level crossing No. 95, 104,106B &
107 (4 Nos)
369 - . 109,115 116 (3 ) . S.Fund 12,04,08 .. .. 1,00,00
Salem division-subways in lieu of level crossing No. 109,115A & 116E
(3 Nos)
370 -- . 24 ,34 93 (3 ) . S.Fund 6,39,77 .. 30,00 1,00,00 Chennai Central-Gudur- Subways in lieu of level crossing No. 24 ,34 &
93 (3 Nos)
371 - - . 1, 1, 4, 7, 11, 13, 15, 16, 17, 18, 19, 20, 20,21, 22 23 (16 )
. S.Fund 16,00,00 .. .. 2,00,00
Salem-Mettur Dam- subways in lieu of level crossing No. 1A, 1, 4, 7,
11, 13, 15, 16, 17, 18, 19, 20, 20A, 21A, 22 & 23 (16 Nos)
372 - - . 110 103 (2 ) . S.Fund 3,00,00 .. .. 30,00 Salem-Vriddhachalam- subways in lieu of level crossing No. 110 &
103 (2 Nos)
373 - - . 14 16 (23 )
. S.Fund 5,83,50 .. .. 1,00,00
Madurai-Manamadurai- subway in lieu of unmanned level crossing No.
14 & 16 (23 Nos)
374 - - . 35,52, 56 (3 ) . S.Fund 10,21,87 .. .. 1,25,00
Manamadurai-Virudunagar- Subway in lieu of level crossing No. 35, 52
& 56 (3 Nos)
375 - - . 409, 415, 418 432(4 )
. S.Fund 11,67,00 .. .. 1,25,00
Virudunagar-Shengottai- subway in lieu of unmanned level crossing
No. 409, 415, 418 & 432 (4 Nos)
376 -- - - .389, 407,410, 411 463 (5 )
. S.Fund 14,60,01 .. .. 1,00,00
Madurai-Virudunagar - Vanchi Maniyachchi section: subway in lieu of
unmanned level crossing No.389, 407, 410, 411 & 463 (5 Nos)
377 2.5 . S.Fund .. .. .. 30,00,00 Works costing below Rs.2.5 crore each
- / Total-Works in Progress . S.Fund .. .. .. 247,66,20
378 - - . 25, 29, 34 47 (4 ) . S.Fund 10,32,75 .. .. 5,00
Villupuram-Katpadi- Subways in lieu of level crossing No. 25,29,34 &
47 (4 Nos.)
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
- / B - New Works
6.2.28
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
379 - - . 85, 96, 99 104 (4)
. S.Fund 10,32,75 .. .. 5,00
Villupuram-Katpadi- Subways in lieu of level crossing No. 85,96,99
&104 (4 Nos.)
380 - - . 7,15,17 18 (4 ) . S.Fund 10,32,75 .. .. 5,00
Villupuram-Katpadi- Subways in lieu of level crossing No. 7,15,17 & 18
(4 Nos.)
381 - - . 17, 21 29 (3 ) . S.Fund 8,18,75 .. .. 5,00
Villupuram-Pondicherry- Subways in lieu of level crossing No. 17,21 &
29A (3 Nos.)
382 - - . 7 16 . S.Fund 5,00,00 .. .. 5,00 Tirunelveli-Tiruchendur- Subways in lieu of level crossing No. 7 & 16
383 - - . 432,443, 452 461 (4 )
. S.Fund 10,00,00 .. .. 5,00
Virudunagar-Vanchi Maniyachchi- Subways in lieu of level crossing
No. 432,443, 452 & 461 (4 Nos.)
384 - - . 343,360,361 369 (4 )
. S.Fund 10,00,00 .. .. 5,00
Tiruchchirappalli-Manamadurai- Subways in lieu of level crossing No.
343,360,361 & 369 (4 Nos.)
385 -- - .349 276 . S.Fund 5,00,00 .. .. 5,00
Tiruchchirappalli-Dindigul-Madurai- Subways in lieu of level crossing
No. 349 & 276
386 - - .62 89 . S.Fund 4,86,35 .. .. 5,00 Chennai Central-Gudur- Subways in lieu of level crossing No. 62 & 89
387 - - .71 . S.Fund 4,02,96 .. .. 5,00
Kayankulam-Quilon- Subway in lieu of level crossing No. 71 in Perinad
Yard
388 - - .59 63 . S.Fund 4,72,79 .. .. 5,00 Shoranur-Ernakulam- Suwbays in lieu of level crossing No. 59A & 63
389 - - .27 . S.Fund 3,02,55 .. .. 5,00 Ollur-Pudukad- Subway in lieu of level crossing No. 27A
390 - .36 . S.Fund 4,19,87 .. .. 5,00 Nagercoil Yard- Subway in lieu of level crossing No.36
391 - - .30 . S.Fund 2,83,83 .. .. 5,00 Chennai Egmore-Villupuram- Subway in lieu of level crossing No. 30
at Tambaram
392 - - .32 . S.Fund 3,38,77 .. .. 5,00
Chennai Egmore-Villupuram- Subway in lieu of level crossing No. 32
at Perungalathur
393 - - .4 11 . S.Fund 5,00,00 .. .. 5,00 Vanchi Maniyachchi-Tirunelveli- Subways in lieu of level crossing No.
4 & 11
-/ / ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
6.2.29
SOUTHERN RAILWAY
. /
Item
No.
/ Particulars /
Sanctioned
Cost
2015
/
Exp. at the
end of March
2015
2015-16
/
Revised
Outlay for
2015-16
2016-17
/
Outlay
proposed for
2016-17
2016-17 , / Assets-Acquisition, Construction and Replacement for 2016-17
/ Allocation
( . ) (Figures in thousand of Rupees)
394 - - - .12 19 . S.Fund 4,49,87 .. .. 5,00
Trichur-Guruvayur & Ernakulam-Kottayam - Subways in lieu of level
crossing No. 12 and 19 respectively
395 - - .122 . S.Fund 23,69,06 .. .. 5,00
Pollachi-Podanur- Road over bridge in lieu of level crossing No. 122
with subway( ) EBR(Dep) 23,69,06
396 -- - 141 . S.Fund 25,45,02 .. .. 5,00
Erode-Coimbatore-Podanur- Road over bridge in lieu of level crossing
No. 141 with subway( ) EBR(Dep) 25,45,02
397 - - .56 . S.Fund 29,31,84 .. .. 5,00
Arakkonam-Renigunta- Road over bridge in lieu of level crossing No.
56 with subway( ) EBR(Dep) 29,31,84
398 - - - .213
. S.Fund 15,99,37 .. .. 5,00
Ernakulam-Kottayam-Kayankulam- Addl. Road over bridge near ROB
No.213A( ) EBR(Dep) 15,99,37
399 - - .4 . S.Fund 24,22,37 .. .. 5,00
Coimbatore-Mettupalayam- Road over bridge in lieu of level crossing
No. 4 with subway( ) EBR(Dep) 24,22,37
400 - - 28 . S.Fund 28,62,27 .. .. 5,00 Chennai Central-Arakkonam- Road over bridge in lieu of level crossing
No. 28 with subway( ) EBR(Dep) 28,62,27
401 - - - .135
. S.Fund 26,01,63 .. .. 5,00
Erode-Coimbatore-Podanur- Road over bridge in lieu of level crossing
No. 135 with subway( ) EBR(Dep) 26,01,63
402 - - - .137
. S.Fund 26,67,67 .. .. 5,00
Erode-Coimbatore-Podanur- Road over bridge in lieu of level crossing
No. 137 with subway( ) EBR(Dep) 26,67,67
403 - - 61
. S.Fund 25,20,96 .. .. 5,00
Karunagapalli-Sasthankotta- Road over bridge in lieu of level crossing
Top Related