BALANCE POINT CONTROL BVEquipment Specification Sheet
600K HWO/SNUBBING UNIT
Operational activities:• Removalandinstallationofalltypesofcompletionandcasing.• PackerSetting/milling.• Underbalanceoperations/Snubbing.• Milling/Drilling/Welldeepening/Casingdrilling.• WellCleanOut.• FishingOperations.• RemovalandInstallationsofLiners.• RemedialOperations.• WellHeadRe-configurations.• InstallationandremovalofESPPumpingSystems.
Advantages:• Highcapacity.• SmallFootprint.• Flexible.• Mobile.• ExcellentCost/Qualityratio.• Multi-functional.
Long Service record• The600kUnitiswidelyusedbySnubbingServiceCompanies
aroundtheworldandisfamousforitsreliabilityandmobility.
Operational area• AllEuropeanUnionCountriesandUSA.
(Othercountriesonrequest).
Transport• The600kcanbedisassembledineasytransportablesections
withaweightlessthan10t.
1/6
BALANCE POINT CONTROL BVEquipment Specification Sheet
BOP Change out & Well Head re-configurations• BalancePointControlhasdesignedspecialsupportframes
whichmakesitpossibletochangeoutBOP’sandperformmodificationstotheWellHeadwithoutdisassemblingthe600kUnit.ThesesystemsarealsoveryusefulduringWellHeadrepairsandre-configurations.
Custom Specific Solutions• AspartoftheJobplanning,aRig-UpConfigurationwillbe
selected,whichoptimizesoperationalperformance.Thiscustomerspecificapproachensuresoptimalresultsduringeachoperation.
Rig-Up Time1. TheRig-Uptimevariesbasedontheconfigurationandthe
typeofoperationbetween12and36hours.
Pipe Handling • The600kUnitisequippedwithaflexibleandreliablePipe
HandlingSystembasedontheGinPole-LayDownWinchprinciple.LargeflexibilityallowsvariablePipeDecklocations,easyhandlingofalltypesoftubularandchangingRig-Upconfigurationswithoutmodifications.
• TheGinPolecontainstwoCounterBalanceWinchesbothratedat1,5mTon.
2/6
BALANCE POINT CONTROL BVEquipment Specification Sheet
Figure1:600kUnit
BOP Change out & Well Head re-configurations• BalancePointControlhasdesignedspecialsupportframes
whichmakesitpossibletochangeoutBOP’sandperformmodificationstotheWellHeadwithoutdisassemblingthe600kUnit.ThesesystemsarealsoveryusefulduringWellHeadrepairsandre-configurations.
Auxiliary Equipment • Dependentfromthescopeofworkthefollowingequipmentmaybeneeded:
» DataAcquisitionSystem(DAS-System).» HydraulicPowerPack.» WellControlEquipment
(Blow-outpreventers,Flow-lines,Choke,etc.).» MudPump.» BOPRemoteControlUnit.» OfficeContainer.» ToolContainer.» GuyWireContainer.» Substructuresasperclientspecifications.
3/6
BALANCE POINT CONTROL BVEquipment Specification Sheet
600kSnubbinginUK(LiveWell) 600kHWOinGermany(DeadWell)
600kSnubbinginGermany(LiveWell) 600konagas-cavernredevelopmentproject
4/6
BALANCE POINT CONTROL BVEquipment Specification Sheet
Figure3:600khandlingCasinginUK
5/6
BALANCE POINT CONTROL BVEquipment Specification Sheet
Figure4:600kincombinationwithCoiltubinginUK
6/6