Equipment Manufacturer
350-2063
350-2063
Equipment Manufacturer
350-2063
350-2063
0.5 1.0
05'
Meters2.0 3.0
10'
36"
0,92M
48"
1,22M
TRANSFER
STATION
W/ STEP
90° GLIDE
SLIDE
BLOCK
CLIMBER
TWIST-N-SHOUT
SLIDE
ROCK
CLIMBER
28'-11"
[8.82M]
26'-5"
[8.06M]
6'-2"
[1.88M]
6'-2"
[1.88M]
6'-2"
[1.88M]
6'-3"
[1.91M]
6'-3"
[1.90M]
6'-2"
[1.88M]
PIPEWALL
W/ LOWER
TELESCOPE (deck)
ADA DRIVER
PANEL
(ground)
ADA
STAIR
POST
MOUNT
BELL
6'-2"
[1.89M]
6'-3"
[1.90M]
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 5
3
5
2
2
2
2
2
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
350-
2063
CA
TA
LO
G P
RE
-D
ES
IG
N
350-2063 1/4"=1'-0"
M. MERTZ
02-DEC-19
16'7'' x 14'1'' x 8'6''5,05M x 4,29M x 2,59M
28'11" x 26'5"8,82M x 8,06M
532 SqFt.49,42 SqM.
85'9"26,14M
4 Ft.1,22M
24 2-5
11
0.5 1.0
05'
Meters2.0 3.0
10'
36"
0,92M
48"
1,22M
28'-11"
[8.82M]
26'-5"
[8.06M]
6'-2"
[1.88M]
6'-2"
[1.88M]
6'-2"
[1.88M]
6'-3"
[1.91M]
6'-3"
[1.90M]
6'-2"
[1.88M]
6'-2"
[1.89M]
6'-3"
[1.90M]
5
6
7
8
9
10
11
12
13
14
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 5
3
5
2
2
2
2
2
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
350-
2063
CA
TA
LO
G P
RE
-D
ES
IG
N
350-2063 1/4"=1'-0"
M. MERTZ
02-DEC-19
16'7'' x 14'1'' x 8'6''5,05M x 4,29M x 2,59M
28'11" x 26'5"8,82M x 8,06M
532 SqFt.49,42 SqM.
85'9"26,14M
4 Ft.1,22M
24 2-5
11
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(112"
(144"
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
1
3
6
"
1
3
6
"
1
2
4
"
1
2
4
"
TRANSFER
STATION
W/ STEP
90° GLIDE
SLIDE
BLOCK
CLIMBER
TWIST-N-SHOUT
SLIDE
ROCK
CLIMBER
ADA
STAIR
36"36"15"
14"
11"
17"
37"
18"
16"
19"
41"
16"
32"
18"
37"
64"
21"
13"
128"
133"
149"
36"
36"
48"
36"
8"
47"
121"
1
3
6
"
1
3
6
"
1
2
4
"
1
2
4
"
15"
10"
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
350-
2063
CA
TA
LO
G P
RE
-D
ES
IG
N
350-2063 1/4"=1'-0"
M. MERTZ
02-DEC-19
Posts
ZZCH0018 41 3.5in OD x 124in STEEL POST W/RIVETED CAP
ZZCH0028 42 3.5in OD x 136in STEEL POST W/ RIVETED CAP
Decks & Kick Plates
ZZCH0616 13 SQUARE COATED DECK ASSEMBLY
ZZCH0636 14 DOUBLE SLIDE COATED DECK ASSEMBLY
ADA Items
ZZCH2006 15 TRANSFER STATION (36in DECK)
ZZUN2019 16 APPROACH STEP FOR TRANSFER STATION
Slides
ZZCH2727 17 TWIST AND SHOUT (48in DECK)
ZZCH3129 18 90 DEGREE GLIDE SLIDE (36in DECK)
Activity Panels
ZZCH4357 19 PIPEWALL WITH LOWER TELESCOPE
ZZCH4406 110 ACCESSIBLE DRIVING PANEL
Climbers
ZZCH7087 111 CLIMBING SQUARES BLOCK CLIMBER (36in)
ZZCH7439 112 ROCK CLIMBER (48in DECK)
Audible Activities
ZZCH4556 113 7in BELL (POST MOUNT)
Stairs and Ladders
ZZCH9168 114 12in ACCESS STEPPED PLATFORM (DECK TO DECK)
Additional Tool & Maintenance Kits
ZZUN1471 115 INSTALLER HARDWARE KIT
ZZUN9910 116 SURFACING WARNING LABEL KIT
ZZUN9930 117 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZXX0678 118 LABEL KIT- COMPOSITE STRUCTURE - ASTM
ZZXXGNGUID 119 GENERAL INSTALLERS GUIDE
Part No. Description
Design Number: 350-2063 - Bill Of Material
350-2063
Ref.No. Quantity
Wednesday, April 29, 2020 Page of1 1 Playworld.com
CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP
4 155.64 215 0 4.00 0.50 0
CertifiedZZCH00282 3.5in OD x 136in STEEL POST W/ RIVETED CAP
4 174.04 234 0 4.00 0.50 0
CertifiedZZCH06163 SQUARE COATED DECK ASSEMBLY 1 54.86 174 3 1.00 0.00 0
CertifiedZZCH06364 DOUBLE SLIDE COATED DECK ASSEMBLY1 63.86 185 3 1.00 0.00 0
CertifiedZZCH20065 TRANSFER STATION (36in DECK) 1 145.80 308 2 2.00 0.09 0
CertifiedZZUN20196 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZCH27277 TWIST AND SHOUT (48in DECK)1 183.86 656 4 3.00 0.06 1
CertifiedZZCH31298 90 DEGREE GLIDE SLIDE (36in DECK)1 96.73 418 2 2.00 0.03 1
CertifiedZZCH43579 PIPEWALL WITH LOWER TELESCOPE1 32.11 118 1 0.50 0.00 1
CertifiedZZCH440610 ACCESSIBLE DRIVING PANEL 1 24.07 202 0 0.50 0.00 0
CertifiedZZCH708711 CLIMBING SQUARES BLOCK CLIMBER (36in)1 129.12 437 2 4.00 0.12 1
CertifiedZZCH743912 ROCK CLIMBER (48in DECK) 1 136.38 555 3 2.00 0.03 1
CertifiedZZCH455613 7in BELL (POST MOUNT) 1 4.61 41 1 0.25 0.00 1
CertifiedZZCH916814 12in ACCESS STEPPED PLATFORM (DECK TO DECK)
1 70.28 277 1 2.00 0.00 0
N/AZZUN147115 INSTALLER HARDWARE KIT 1 57
CertifiedZZUN991016 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993017 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
N/AZZXX067818 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0
N/AZZXXGNGUID19 GENERAL INSTALLERS GUIDE 1 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-2063 - Compliance and Technical Data
350-2063
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
150 309 4,038 23 27.58 1.371,307.28 6Totals:
4 Metric Tons139 Kg68 Kg588.28 Kg 1.04 m3
Wednesday, April 29, 2020 Page of1 2 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-2063 - Compliance and Technical Data
350-2063
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-2063, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Wednesday, April 29, 2020 Page of2 2 Playworld.com
Top Related