ABOUTNTPCLIMITED
Formally known as National Thermal
PowerCorporationLimited.
Itisamongtheworldslargestandmost
efficientpowergenerationcompanies.
In Forbes list of Worlds 500 Largest
Companies for the year 2007, NTPCoccupies411thplace.
NTPC has installed capacity of 29,394
MW.
8/22/2019 23066542 NTPC Training Presentation
3/26
ABOUTNTPCLIMITEDItas
15coalbasedpowerstations(23,395
MW),
7 gas based power stations (3,955MW)and
4 power stations in JointVentures
(1,794MW).
8/22/2019 23066542 NTPC Training Presentation
4/26
PowerPlant(alsoreferredtoasGenerating
Station or Power Station) is an industrial
facilityforthegenerationofelectricpower.
ABOUTPOWERPLANT
At Power Plants, generators are used as
rotating machine that converts mechanical
energy into electrical energy by creating
relativemotionbetweenamagneticfieldandaconductor.
8/22/2019 23066542 NTPC Training Presentation
5/26
ABOUTBADARPURTHERMALPOWERSTATIONThe BadarpurThermal PowerStation has five
unitsof Steam
Turbine-Driven
Generators,whichhasatotal
capacityof
705MW.
A top view of Badarpur
Thermal Power Station,
Badarpur, NewDelhi
8/22/2019 23066542 NTPC Training Presentation
6/26
Sr.No.
1.
2.
Capacity
210MW
95MW
No.ofGenerators
2
3
Total
TotalCapacity
420MW
285MW
705MW
ABOUTBADARPURTHERMALPOWERSTATIONThefuelbeingusedisCoal,whichissupplied
fromtheJhariaCoalFieldinJharkhand.
WatersupplyisgivenfromtheAgraCanal.
Table: Capacity of Badarpur Thermal Power Station, New Delhi
8/22/2019 23066542 NTPC Training Presentation
7/26
THERMALPOWERPLANTInaThermalPowerPlant,oneofcoal,oilor
natural gas is used to heat the boiler to
convertthewaterintosteam.
Thesteamisusedtoturnaturbine,whichis
connectedtoagenerator.
When the turbine turns, electricity isgenerated and given as output by the
generator, which goes to the high tension
transformer then supplied to the consumers
throughhigh-voltagepowerlines.
8/22/2019 23066542 NTPC Training Presentation
8/26
THERMALPOWERPLANT
8/22/2019 23066542 NTPC Training Presentation
9/26
OPERATIONOFCOAL--FIREDPOWERPLANT
8/22/2019 23066542 NTPC Training Presentation
10/26
Therearebasicallythreemainunitsof
athermalpowerplant:
THERMALPOWERPLANT
1. SteamGeneratororBoiler
2. SteamTurbine
3. ElectricGenerator
8/22/2019 23066542 NTPC Training Presentation
11/26
Aboilerorsteamgeneratorisadeviceused
to create steamby applying heat energy to
water.
STEAMGENERATORORBOILER
Itisarectangularfurnaceabout50ft(15m)
onasideand130ft(40m)tall.
Itswallsaremadeofawebofhighpressuresteel tubes about 2.3 inches (60 mm) in
diameter.
8/22/2019 23066542 NTPC Training Presentation
12/26
Pulverizedcoalisair-blownintothefurnacefromfuelnozzlesatthefourcornersanditrapidlyburns,formingalargefireballatthe
center.
STEAMGENERATORORBOILER
Thethermalradiationofthefireballheatsthewaterthatcirculatesthroughtheboilertubes
neartheboilerperimeter.
The water circulation rate in theboiler isthree to four times the throughput and is
typicallydrivenbypumps.
8/22/2019 23066542 NTPC Training Presentation
13/26
STEAMGENERATORORBOILER
SchematicDiagramofaSteamGeneratororBoiler
8/22/2019 23066542 NTPC Training Presentation
14/26
STEAMGENERATORORBOILER
Asthewaterintheboilercirculatesitabsorbsheat and changes into steam at 700F o370C.
Itisseparatedfromthewaterinsideadrumatthetopofthefurnace.
The saturated steam is introduced intosuperheatpendanttubes.
Herethesteamissuperheatedto1,000For540Ctoprepareitfortheturbine.
8/22/2019 23066542 NTPC Training Presentation
15/26
STEAMTURBINESteam turbines are used to drive thegenerators,whichproduceelectricity.
The turbines are driven by steam
generated in 'Boilers' or 'SteamGenerators.
Energy in the steam after it leaves theboilerisconvertedintorotationalenergyasitpassesthroughtheturbine.
8/22/2019 23066542 NTPC Training Presentation
16/26
STEAMTURBINEThe turbine normally consists of threestages with each stage consisting of astationary blade (or nozzle) and arotatingblade.
8/22/2019 23066542 NTPC Training Presentation
17/26
STEAMTURBINEStationaryblades convert thepotentialenergy of the steam (temperature andpressure) into kinetic energy (velocity)and direct the flow onto the rotating
blades.
The rotatingblades convert the kinetic
energy into forces, causedbypressuredrop,whichresultsintherotationoftheturbineshaft.
8/22/2019 23066542 NTPC Training Presentation
18/26
STEAMTURBINEThe turbine shaft is connected to agenerator,whichproducestheelectricalenergy.
Therotationalspeedis3000rpm.
8/22/2019 23066542 NTPC Training Presentation
19/26
TURBINEGENERATORThe generators are used to convertmechanicalpower, delivered from theshaft of the turbine, into electricalpower.
8/22/2019 23066542 NTPC Training Presentation
20/26
TURBINEGENERATORThemechanicalenergyfromtheturbineisconvertedbymeansa
rotatingmagneticfield
producedbydirectcurrentinthecopperwindingoftherotororfield,
which generates three-phase alternating currentsandvoltagesinthecopperwindingofthestator(armature).
The stator winding is connected toterminals,whichareinturnconnectedtothepower system for delivery of theoutputpowertothesystem.
8/22/2019 23066542 NTPC Training Presentation
21/26
TURBINEGENERATORAtBadarpurThermalPowerStation,
2-pole,
3000rpm,
50Hzgeneratorsareused
of capacities 210 MW and95MW.
A95MWTurbine
Generatorat
BadarpurThermal
PowerStation,
ewDelhi
8/22/2019 23066542 NTPC Training Presentation
22/26
TRANSFORMERS
Step-UptheVoltagefrom
10.5kVto220kVfor95MWGenerators.
15.75kVto220kVfor210MWGenerators.
220kV output is transmitted to theswitchyardforfurthertransmission.
8/22/2019 23066542 NTPC Training Presentation
23/26
COALHANDLINGDIVISIONTheprocessingofcoalbeforeitisfiredto the furnace, comes under the coalhandlingdivisionofthepowerplant.
The Coal Handling Division of BTPShasthefollowingparts:
RailwayWagonTripler
Conveyor
CoalStorageGround
Separator
PulverizerorBowlMill
8/22/2019 23066542 NTPC Training Presentation
24/26
COALHANDLINGDIVISION
RailwayWagonTripler Conveyor
CoalStorageGround Separator
8/22/2019 23066542 NTPC Training Presentation
25/26
COALHANDLINGDIVISIONPulverizersareusedtocrushitintofinepoweredparticles.
Pulverizer
FiredtotheBoilerFurnaceforcombustion