AHMEDABAD MUNICIPAL CORPORATION

(SLUM NETWORKING PROJECT)

TENDER

FOR

CONSTRUCTION OF NEW BUILDING FOR NIGHT SHELTER SHELTER AT ODHAV TP–2, FP-9, Opp BHIKSHUKGRUH,

NR. SERVODAYA PARK SOCIETY , ODHAV

VOLUME-I (TECHNICAL BID) PART-II SPECIFICATION

Municipal Commissioner Ahmedabad Municipal Corporation. Sardar Patel Bhavan, Danapith, AHMEDABAD - 380 001

Page 2: 2-volume_I_part_II

2

Construction of new building Construction of new building for Night shelter at Odhav TP – 2,FP -9, Opp Bhiksukgruh,Nr Sarvodaya park

society, Odhav in Ahmedabad

GENERAL STANDARD TECHNICAL SPECIFICATIONS

(A) A printed Booklet for GENERAL TECHNICAL SPECIFICATION FOR BUILDING

WORKS. (B) A printed Booklet for VLOUME "B" LIST OF THE APPROVED PRODUCTS

SCHEDULE OF RATES (GOVT. OF GUJARAT, ROADS AND BUILDINGS DEPARTMENT, ELECTRICAL WING).

(C) A Printed Booklet for TENDER FOR ELECTRIC WORK for Roads and Building

Department Government of Gujarat.

The above may be referred of the printed booklets of PWD which may also be available from Gujarat Book Stores, Sector-21, Gandhinagar 382 021.

Note: 01. The work shall be carried out in accordance with the relevant specifications

contained in PWD Hand Book Vol. I & II with the correction slips from time to time or the latest addition.

02. The reference as indicated with page Nos. are as per the above referred Booklets

Sr. No. of the Item

in the Schedule

-B of Tender

Description of items Sr. No. of the applicable specifications

1 Excavation for foundation General Technical Specification for building work Booklet (Technical Specification for building work is attached with tender documents in references) Item No. 4.00 (a) p.21+ It 4.001(A) p. 25

2 Filling in Plinth with sand - do - Item No 4.24 P.28 3 Filling in foundation and plinth with murrum

or selected soil - do - Item No 4.004 P.28

4 Providing and injecting Chemical emulsions for pre-construction anti-termite & Fungal treatment

As per separate attached sheet

5 Providing and laying machine mixed plain cement concrete of M10(1:3:6)

- do - Item No 5.3.14(A) P. 30

6 Providing and laying in position reinforced cement concrete confirming to grade M25 / M20 of IS-456,2000

a For Foundation Footings in M25 - do - Item No 5.8.3(A) P.40 b For Columns and Pedestal at All floors in M25 - do - Item No 5.8.3 (D) P.40 c For Slabs at All levels M20 up to 150 mm

Thick - do - Item No 5.8.2.(C) P.39

Page 3: 2-volume_I_part_II

3

Sr. No. of the Item

in the Schedule

-B of Tender

Description of items Sr. No. of the applicable specifications

d For Beams / breackates at all Levels in M20 - do - Item No 5.8.2.(C) P.39 e For Coping as per detail in M20 - do - Item No 5.8.2.(C) P.39 f For in staircase with steps / Kadi Tappa, waist

slab and landing at any height and level as directed In M20

- do - Item No 5.8.2.(E) + (C) P.39

g For Lintels at All level as per design in M20 - do - Item No 5.8.2.(C) P.39 h For any Type of Chajja at all levels in M20 - do - Item No 5.8.2.(C) P.39

7 Providing TMT bar reinforcement for R.C.C. work

As per separate attached sheet

8 Brick work in (1:6) a foundation and plinth - do - Item No 6.13(B) P. 44 b For Ground - do - Item No 6.19(B) P. 46 c For First floor - do - Item No 6.19(B) P. 46 d For Terrace - do - Item No 6.20 P. 46

9 Brick work in Partition (1:4) a For Ground - do - Item No 6.30 I (B) P. 46 b For First floor - do - Item No 6.30 I (A) P. 46 c For Terrace - do - Item No 6.33 I (B) P. 47,48

10 15 mm thick Single coat "Mala" plaster (1:4) - do - Item No 17.58 II P. 105 ,Thi of plaster is 15mm instead of 10mm

11 20 mm thick double coat "Mala" plaster OR "sand face(Tippani)" plaster

- do - Item No 17.95 P. 107

12 Providing and applying 10 mm thk internal Single Coat Mala cement plaster in 1:4

- do - Item No 17.58 II P. 105

13 15 mm thick cement water proofing plaster to slabs / Sunk portion

- do - Item No 17.58 II P.105 +17.69+17.70 P.106, Thi of plaster is 15mm instead of 10mm

14 Providing & laying China mosaic flooring As per separate attached sheet 15 water proofing treatment on the slab/toilet

sunk/Mosaic Surface. As per separate attached sheet

16 Providing and fixiing M.S. Fan clamps type 1 of 16 mm dia

- do - Item No 21.8 P. 134

17 Providing & laying 25mm thick hand cut and machine polished green kotah stone flooring & scarting

- do - Item No 14.43 (A) P. 86

18 Providing and laying polished Kota stone slab 25 mm. thick in riser of steps, dado and pillars laid on 10 mm. thick cement mortar 1:3

- do - Item No 14.44 P. 87

19 18mm thick kesariyaji Green marble As per separate attached sheet 20 Providing & laying Floor/ dado( 'Bajaj ' or

'Swastik ' or 'Nitco' or 'Johnson' or equivelent brand make") of glazed tiles of 6mm thick

- do - Item No 14.29 P.84 ,14.32 P.84 ,Glazed tiles as per BOQ

21 Providing wood work in frames of doors, windows clear story windows and other similar work, wrought, framed and fixed in position

- do - Item No 10.1 (A ) P. 58

22 Providing & fixing ISI water proof 35 mm thick flush door shutter

As per separate attached sheet

Page 4: 2-volume_I_part_II

4

Sr. No. of the Item

in the Schedule

-B of Tender

Description of items Sr. No. of the applicable specifications

23 Providing and fixing FRP frame size 125x65mm and 35mm thick FRP shutter

As per separate attached sheet

24 Providing, fabricating and fixing aluminum doors, windows and ventilators with sections (IS 733 and IS 1825), 60 microns pure polyester coated, 25 microns color neutered anodized (IS 1868), of grade AC 25

As per separate attached sheet

25 Providing and fixing sheet glass, tinted glass selected quality, modi guard, saintgoibain, fixing in alluminum window, lovers, vision panel

As per separate attached sheet

26 Finishing wall with water proofing cement paint on an undecorated wall surfaces

- do - Item No 18.51 P. 119

27 Providing and applying synthetic enamel paint - do - Item No 19.77 +19.59(B) P. 125,124

28 White washing - do - Item No 18.11 P. 110 29 Providing and fixing boards / sheets as

specified below including cutting to required size and shape , fixing with aluminum glazing clips or triangular beading including screws, putty etc., complete, Using 12mm thick flat pressed three layered wood based melamine faced pre laminated particle board bonded with Phenol formaldehyde with a decorate laminate of same colour on both sides - NOVOPAN PLT / BHUTAN BOARD - Exterior grade or equivalent.

As per separate attached sheet

30 Providing & Fixing CI (Footrest) Step in concrete in under ground tank, Sump, Over head Tank

- do - Item No 24.13 P.159

31 Providing, making, fixing & anchoring of reinforcing bars or dowels or rebar including drilling the holes, fixing the bars and grout the bar with Hilty Hit -HY150

As per separate attached sheet

32 Providing and laying Name plate of different Size on S.S.316 grade,18 gauge moulded edges plate

As per separate attached sheet

33 Providing & fixing Floor mounting European Closet

As per separate attached sheet

34 Providing & fixing Wash basin with single hole for pillar Cock with C.I. or M.S. brackets

As per separate attached sheet

35 Providing & fixing white vitreous Flat back urinal of size 440x315x265mm with Flushing System

As per separate attached sheet

36 Providing and fixing, Stainless steel sink As per separate attached sheet 37 Providing & fixing in position 15 mm C.P.

brass pressmatic bibcock of best quality As per separate attached sheet

Page 5: 2-volume_I_part_II

5

Sr. No. of the Item

in the Schedule

-B of Tender

Description of items Sr. No. of the applicable specifications

38 Providing & fixing in position 15 mm C.P. brass bibcocks of best quality (For common toilet area)

- do - Item No 23.92 (A) (1) P. 150 except that the bibcock shall be as per BOQ

39 Providing & fixing of Master cock, with 32 mm Dia., with wall flange & lever Knob, cutting and making good the wall where required.

As per separate attached sheet

40 Providing fixing, testing and commissioning of SWR UPVC PIPE TYPE-B (6 kg. cm. sq.)

- do - Item 23.8 P.144 (Except that the pipe shall be of SWR UPVC PIPE TYPE-B (6 kg. cm. sq.)

41 Providing, fixing and testing centrifugally P.V.C.(Nahni Trap; Muli Foor Trap) 'P' or 'S' trap

- do - Item No 23.87 P.146 (except that the trap shall be of PVC)

42 Providing, laying and fixing U PVC - Schedule 80 pipes & Fittings with solvent weld socket joints

- do - Item 23.8 P.144 (except that the pipe shall be U PVC sch-80 pipes)

43 Providing, laying and Fixing Heavy duty (to ASTM D2846) CPVC PIPE SDR 13.5 pipes

- do - Item 23.8 P.144 (except that the pipe shall be Fixing Heavy duty (to ASTM D2846) CPVC PIPE SDR 13.5 pipes)

44 Supply, installation, testing and commissioning of gunmetal, male or female threaded isolation control valve (Ball Valve), confirming to IS 778, PN 1.0, with necessary specials, unions, nipple etc., to complete the job.

As per separate attached sheet

45 Supplying, installing, testing and commissioning of centrifugal submersible monoset pumps

As per separate attached sheet

46 Providing and fixing PVC Pipe ISI marked brand as per IS:13592-1992, type B ring fitted complete with PVC Fittings conforms to IS: 14735-99 & fittings dimensions as per DIN 19531 & DIN 19534, Rubber ring conforms to IS:5382 & clamps & hinges including cutting and making good the walls & ceiling for waste pipes, connections

- do - Item 23.8 P.144 (except that the pipe shall be PVC pipes as per BOQ)

47 Providing & fixing salt glazed stone ware pipes as per IS:15328 along with the trench length up to 1.5 m depth

-do - Item 24.1 (A + B) P.155

48 Providing and fixing PVC Pipe ISI marked brand as per IS:13592-1992, type A ring fitted complete with PVC Fittings conforms to IS: 14735-99 & fittings Rain water pipe

- do - Item 23.8 P.144 (except that the pipe shall be PVC pipes as per BOQ)

49 Providing and fixing, salt glazed stoneware gully trap

-Item 24.19 (I) P.156 (RCC Cover instead of C I Cover)

Page 6: 2-volume_I_part_II

6

Sr. No. of the Item

in the Schedule

-B of Tender

Description of items Sr. No. of the applicable specifications

50 Constructing water tight brick masonry Chamber with grating first class bricks in cement mortar 1:4 with FRC heavy duty catch pit cover

- do – Item 24.44(I) + (II) P.163 Except P/F P/F FRC H D cover instead of C I Cover

51 Constg. Manhole with R.C.C. top slab in 1 : 2 : 4 mix

- do – Item 24.27 P.167 Except P/F P/F FRC H D cover instead of C I Cover

52 Percolation well of 150 mm ( 6") dia As per separate attached sheet ELECTRICAL WORKS

53 Item no 53 to 137 Specification for electrical works general requirements and specification of earthing as per the Booklet shall apply. (General Standard Technical Specifications for Electrical work is attached with the tender documents)

Separate sheet of detailed specification Item No. 4. Providing and injecting Chemical emulsions for pre-construction anti-termite & Fungal treatment and creating continuous chemical barrier under and all around the columns pits, wall trenches, basement excavation, top surface of plinth filling, junctions of wall & floors, along the external perimeter of building, Expansion joints, over the top surface of the consolidated earth on which plinth protection is to be laid, surrounding pipes and conduits etc. complete. in first stage of work, & furniture, & necessary floors in second stage of construction work in accordance with IS:6313 ( Part-II) with using Chloropyriphos Emulsifiable concentrate 1.00%. ( IS.: 8944-1978), Lindens 1.00% ( IS.: 632), Imidacloprid 0.075% with relevant IS: code ( Rates are Incl. proposed Furniture & Plinth area of the building at ground floor level shall Only. be measured.). Anti –termite specification Chemicals used during treatment Imidacloprid 30.5 % SC Cloropyriphose 20 % EC Providing & injecting emulisifiable concentrate lmidacloprid 30.5 SC with (0.075%) concentration chemical emulsion by Avitus India Pest Management Pvt. Ltd. for anti –termite & Fungal treatment & creating chemical barrier under & around the column pits, wall trenches, basement, excavation, top surface of plinth filling junction of wall & floor along the external perimeter of the building expansion joints surrounding of pipes conduits etc, in the first stage of work and using Chloropyriphos Emulsifiable concentrate 1.00%. ( IS.: 8944-1978) for wooden fixed furniture ( Wooden frames and doors). Complete plinth area of the building shall be measured in square mtr on the basis of basement area of the building. METHOD OF TREATMENT FOR TERMITE CONTROL AVITUS INDIA PEST MANAGEMENT PVT. LTD. is using a New Generation Insecticide for Termite Control that contains IMIDACLOPRID as active ingredient. It is an appropriate insecticide for the control of Termites in building and premises, which can be used both for PRE & POST construction treatments. Mode of Action We create a non – detectable treated zone that function not as a repellent barrier, but as a “killing

Page 7: 2-volume_I_part_II

7

field” whose effects may be transmissible to other Termites and leads to eradication of the colony. It acts by interfering with the transmission in the nervous system and resulting in their death. We are injecting concentrated Chemical Emulsion for Anti – Termite treatment for creating chemical barrier under & around column pits, wall trenches, basement, excavation, top surface of plinth filling junction of wall and floor along external perimeter of the building, expansion joints, surrounding of pipes conduits etc. PRE CONSTRUCTION TREATMENT

1. Bottom surface and side pits up to a height of 30 cm will be treated @ 05(Five) Ltr. Chemical Emulsion per Sq. Mtr. of surface area.

2. Back fill earth in immediate contact with the foundation structure will be treated @ 7.5 Ltr.

per Sq. Mtr. of the vertical surface of substructure of each side.

3. Treatment of RCC foundations: Treatment should start at depth of 50 cm below ground level @ 7.5 Ltr. per Sq. Mtr.

4. Treatment of top surface of plinth filling: The top surface of the earth consolidated within

plinths wall shall be treated with Chemical Emulsion @ 05(Five) Ltr. per Sq. Mtr. of the surface before the sand bed or sub grade is laid.

5. Soil treatment along external perimeter of building: Earth along the external walls of the

building should be treated at an interval of 15 cm and to a depth of 30 cm exposing the wall surface. Chemical Emulsion will be poured along the wall @ 7.5 Ltr. per Sq. Mtr of vertical surface.

POST CONSTRUCTION TREATMENT The treatment comprises of drilling holes at the wall and floor junction level and filling it after pumping in sufficient quantity of chemical. This ensures a continuous chemical barrier for termites to make an entry and protect the treated structure. 1. Treatment to wall and floor junction:

Holes of diameter 12 mm (1/2" approx.) are drilled at approximately 30 cm (12 inches) intervals along the inner junction of wall and floor in the entire premise. Water based chemical will be injected under pressure into these holes, to create a barrier against termite.

2. Treatment to soil under floor:

If the subject premises on the ground floor and if cracks are noticed on the floor because of construction joints, expansion joints or shrinkage, the soil below floor needs to treated. Holes of 12 mm (1/2" approx.) dia 30 cm apart will be drilled along the cracks and water based chemical will be injected under pressure into these holes.

3. Treatment to wooden fixtures:

Holes of diameter 12 mm (1/2" approx.) will be drilled at the base of wooden works such as window frames; door frames etc. inset in the flooring and chemical will be injected. A oil based chemical will be sprayed on all the wooden work infested by termites within the premise.

4. Treatment to termite tubes:

Visible shelter mud tubes will be removed and the infested area treated with Water base chemical.

5. All the drilled holes will be sealed and made good using cement

Page 8: 2-volume_I_part_II

8

In the case Soil Treatment along External Perimeter of a Building is done as:

Item No. 7. Providing TMT bar reinforcement for RCC work including cutting, bending, binding and placing in position complete for all floor.

MOST specification section 1600 shall be followed with relevant provision of respective IRC/IS specification as well as IRC 21 2000 and IS 1786 The payment shall be made on MT. basis for completed work. Unit rate including cost of all materials, labour, tools, plants, equipment machinery and cutting, bending, binding, & placing in position required to complete the job for all the floor levels. Item No. 14. Providing & laying broken china mosaic flooring over terrace & stair cabin terrace using 12 to 20mm of glazed tiles pieces (one or more colour as directed by engineer - in charge) to be laid over reqd thi (min 20mm) of CM (1:3) beding for maintaining proper slope at terrace to plain or sloped surface & to be tempered to bring mortar up to surface with using white cement & colour pigment : incl. rounding with necessary vata at corner / junction & extending them to walls up to 100mm including curing etc. with cleaning the surface with water & oxalic acid using 1 Kg per 1 bag of water proofing material The relevant specification of Item No. 14.29, P-84 of GTS book shall be followed except that broken glaze or ceramic tiles pieces are to be used. The broken pieces shall be of approved color, size and manufacturer and the floor shall not be polished but cleaned with water and mild oxalic acid. Item shall be paid on sqm basis for complete finished work.(Only plan area shall be measured) Item No.15. Providing and laying water proofing treatment on the slab/toilet sunk/Mosaic Surface. The Treatment includes cleaning the surface, making 'V' groove of cracks, sealing the groves with Polysiloxana Polymer bound material, laying reinforce fiber cloth with three coats of Poly-Acrylic eastern latex coatings with cement in 1:2:78 proportion. (For Toilet sunk portion) • The chemicals used in water proofing are as under. • Polysiloxane polymer bound sealant of std. make as approved by Engineer in charge. • Specific gravity 1.o, Tensile strength 1.5 Mpa., Flexibility+25 % • Acrylic modifier based on poly acrylic Easter latex of std make., Viscosity at 30C--35-40

CPS, Specific gravity at 30-- 1.01- 1.02, • Gray Cement. • The material shall be excellent adhesion- bonds to porous and non porous surface. • The material shall be having properties resistance to the effect of long term weathering &

durable in all climate conditions including UV attack. • It shall be flexible with thermal expansion similar tiles.

The whole mosaic tile surface shall be cleaned properly. After cleaning the surface, all the tile joints shall be cut electrically operated machine cutter in to "V" grove to the width 3-5mm. Bound sealant having excellent properties of adhesion & imperviousness of std. make as approved by engineer in charge shall be filled in proportion of 1.28 kg / 10 smt as per good engineering practice and direction in all the tiles groove. After filling groove by sealant the application of first coat of acrylic modifier coating based on polyacrylic Easter latex mixed with cement (in proportion of 1 litter of the acrylic modifier to 2.78 kg of cement ) shall be done thoroughly & properly. After it dries second coat over the surface shall be applied properly as per direction .The treatment is the cured for

Page 9: 2-volume_I_part_II

9

3-4 days and ponds test is conducted. The coating converts in to flexible & impact resistant matrix.

Item No.19.

Providing and fixing 18mm thick kesariyaji Green marble( approved by Architect) gang saw cut mirror polished (premoulded and prepolished) machine cut for Doors &window sills, Doors & Window Jams, (One Piece) as and similar locations of required size of approved shade, colour and texture laid over 20mm thick base cement mortar 1:4 (1 cement : 4 coarse sand) with joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing moulding and polishing to edge to give high gloss finish etc. complete at all levels.The rate includes rounding, champhering and mirror polishing of edges, facias of kesariyagi green marble, including necessary bonding adhesive like Araldite or equivalent.

Providing and fixing thick kesariyajiGreen marble ( approved by Architect) slab of 20 mm thick (Uniform Thickness), machine cut edges in sill and jambs /shelves (in single piece) as per detail, including, making zaries in brick wall and fixing with cement mortar (1:4) etc., Finishing and polishing with all respect, etc. complete.

MODE OF MEASUREMENT: Dimensions is computed in square meter, rounded to two places of decimal

Item No.22. Providing & fixing ISI water proof 35 mm thick flush door shutter solid core of block board construction with frame of 1st class hard wood with cross band and plywood face panels and fixing of 1mm thk approved laminates on both faces of shutter approved by architects or consultants of any colour with bonding agent including nailse, fevicol, M.S. black Oxodised 125mx30mm( Heavy Duty) butt hinges with necessary screws including Brass fasteners & fixtures approved make( Like handles, brass tower bolt , brass door stopper /baby latch, brass screws etc) , nails, moulding, architrievs patti / border as per design approved by architect/ consultants or as per directed by Clerk - of - work etc complete for all lifts level & any height IMS.

The solid core type flush door shutter shall be decorative or non decorative type as specified in the

drawing. The size of the shutter shall be specified in drawing or as directed. Thickness of shutter shall be 35mm with 1mm thick decorative lamination sheet both side of shutter. Colour and design of lamination sheet shall be finalize by Architect / Consultant or as specified in drawing or as directed. The timber species for core shall be used as per I.S. 2202 – ( Part-I) 1980. The timber shall be free from decay and insect attack. Knots and knot holes less than half the width of cross – section of the members in which they occur may be permitted. Pitch pockets, pitch streaks and harmless pin holes shall be permissible except in the exposed edge of the core members. The Commercial plywood, cross- bands shall conform to I.S. 303-1275.

The face panel of the shutters shall be formed by gluing by hot press process on both faces of the

core with ether plywood or cross-bands and face veneers or wooden Ghana teak wood Patti.

The al edges of the door shutters shall be square. The shutters shall be free from twist or warp in its plane. Both faces of the shutter shall be papered with 1mm thick lamination as directed.

THE SHUTTER SHALL BE TESTED FOR 1) End immersion test: The test shall be carried out as per I.S. 2202 (part –I) 1980. There shall be no delamination at the end of the test.

Page 10: 2-volume_I_part_II

10

2) Knife test: The face panel when tasted in accordance with I.S. 1659-1979 shall pass the test. 3) Glue adhesion test: The flush door shall be tested for glue adhesive test in

accordance with I.S. 2202(part –I) 1980. The shutters shall be considered to have passed the test if no delamination occurs in the glue lines in the plywood and if no single delamination more than 80mm. in length and more than 3mm. in depth has occurred in the assembly glue lines between the plywood face and the style rail. Delamination at the corner shall be measured continuously around the corner. Delamination at the knots, knot holes and other permissible wood defects shall not be considered in assessing the sample.

The tolerances in size of solid core type flush door shall be as:

In normal thickness _+ 1.2 mm In Normal height _+ 3.0 mm

The thickness of the shutter shall be uniform throughout with a permissible variation of not more than 0.8 mm. when measured at any two points.

MODE OF MEASUREMENT:

Dimensions is computed in square meter, rounded to two places of decimal Item No-23 Providing and fixing FRP frame size 125x65mm and 35mm thick FRP shutter with wood grain raised panel design finish shutter having extra reinforcement on side and edges and in GEL coat finish. The core of shutter is to be filled up with injected fiber extinguishing grade polyurathane foam done in situ along with embedded wooden pieces for stiffening and also for taking hinges and fixtures. The whole FRP frame and shuter is to be waterproof , weatherproof, termiteproof and resistance to mild acid/ Alkali resistance including S.S. hinges with necessary screws and alluminium fixturesand fastening.(Product should have 3-years performance guarantee)

Material 35 mm. thick shutter in depressed panel design shall be having 1.5 to 2mm. Thickness fire extinguishing grade F.R.P. skin, Sandwich panel of 4mm. Plywood and embedded wooden pieces for stiffing as well as holding hinges and fixture, all molded into a one piece shutter, Core material shall be injected fire extinguishing grade rigid polyurethane foam done in situ having density 32 to 36 Kg. /m3 compressive strength 1.8 to 2 Kg./Cm2 flexural strength 3.5 to 4.5 Kg. Cm2. Whole shutter shall be weather proof, water proof, termite proof and mild Acid / Alkali resistance. As well as same material for frame section of detailed size. Shutter 35 mm. thick depressed panels F.R.P. shutter shall be join less, It shall be straight and smooth and of standard shape finish in jell coat. All necessary fixture and fastening shall be fixing where wooden pieces are provided. Workman ship Shutter shall be fixed in true line, level and proper manner having 2.0 to 3.0 mm. ply that is Air space for smooth and easy working three S.S. hinges shall be fixed properly with necessary screws. Fixtures and fastening. All others fixture likes aluminum Aldrops - tadi / Baby latch - handles shall be fix with shutter in usual manner. Tolerance

Page 11: 2-volume_I_part_II

11

1.5 mm. tolerance will be allowed in thickness of shutter Mode of measurement and payment Rate of shutter & Frame includes the cost of Aluminum fixtures and Fastening with necessary Screws for fixing in position and payment shall be made on a unit of Smt. Basis. Item No-24 Providing, fabricating and fixing aluminum doors, windows and ventilators with sections (IS 733 and IS 1825), 60 microns pure polyester coated, 25 microns color neutered anodized (IS 1868), of grade AC 25, fixed with raw plugs and screws / fixing clips / expansion hold fasteners and filling gaps with PVC / Neoprene felt along with aluminum snap beadings, CP brass/stainless steel screws for glazing / paneling complete (cost of glazing / paneling not included) (payment will be made for weight of aluminum used in the work). Fixed portion. Aluminium Two/Three track window, Fix glass window open able Casement window (Z section) & ventilation, as per architect design including all labour, all material at any level, lilt & leads.

MATERIALS: (1) Approved door, windows, and ventilator sections as per drawing using 'Jindal'

Aluminum Sections. (2) Fixtures and fastenings including handles, stoppers, aluminum safety grills of

approved design, locking arrangement, rubber and felt gaskets for stopping leakage of water and air. PROCEDURE:

Aluminum door, windows, and ventilator s should be prepared from selected 'Jindal' sturdy aluminum sections for outer frame as well as shutter frame, as per drawing. The frame shall be fixed to the jams and sill with appropriate Rubber Gasket to prevent any leakage of water. The shutters shall be fitted to framing with appropriate hinges fixed by riveting. A felt gasket be fixed between the shutters for preventing leakage of air from the room.

Approved Anodized aluminum handles, adjuster stoppers and locking mechanism be used. Aluminum safety grills of approved design are fixed to the window frame by riveting.

INCLUSIONS: Cost of All aluminum sections, screws, fasteners and all labour for making and fixing are

included. Labour for removal of old frame, if any, is included.

MODE OF MEASUREMENT: Measurement of lengths of all Aluminum sections in outer window frame and shutter

frame are recorded, weight is computed from standard section-weights. Weight of all fixtures, fastenings, screws, handles, hinges, adjuster stoppers, panels etc. are excluded. No increase be permitted due to anodizing. Payment is done by weight computed up to two decimals in kg. Glass/wooden panels are paid separately. Item no-25 Providing and fixing sheet glass, tinted glass selected quality, modi guard, saintgoibain, fixing in alluminum window, lovers, vision panel, etc.

All glass shall be best quality, free from specks, bubbles, smokes, veins, air holes blisters and other defect. The kind of glass to be used shall be mentioned in the item or specification or in special provisions or sawn in detailed drawings. Thickness of glass panels shall be uniform. The specifications of different kind of glass are as under. :

Page 12: 2-volume_I_part_II

12

Sheet Glass. :-

1. In absence of any specified thickness or weight in the item or detailed specification of the item of work, sheet glass shall be weighing 7.5 K.G. /Sq.m. For a panels up to 600 mm. X 600mm.

2. For panels larger than 600mm. X 600 mm. & upto 800mm. X 800mm. the glass weighing not less than 8.75 K.g./Sq.m. shall be used. For bigger panels up to 900mm. X 900mm. the glass weighing not less than 11.25 K.g./Sq.m. shall be used.

3. Sheet glass shall be patent flattened glass of best quality and for glazing & framing purpose shall conform to I.S.1761-1960. Sheet glass of the specified color, style, shape & design shall be used, if shown in detailed drawing or so specified. For important buildings and for panels with any dimension over 900mm. plate glass of specified thickness shall be used.

Plate Glass: - When plate glass is specified, it shall be ‘Polished patent plate Glass’ of best quality. It shall have both the surface ground flat and parallel & polished obtain clear undisturbed vision and reflection. The plate glass shall be of thickness mentioned in the item or as sawn in detailed drawing or as specified. In absence of any specified thickness, the thickness of plat glass to be supplied 6mm. and a tolerance of 0.20 mm. shall be admissible. Clear dimensions of glass rounded off to nearest centimeter are recorded and area computed in square meters, rounded to 2 places of decimal.

Item no-29 Providing and fixing boards / sheets as specified below including cutting to required size and shape, fixing with aluminum glazing clips or triangular beading including screws, putty etc., complete, Using 12mm thick flat pressed three layered wood based melamine faced prelaminated particle board bonded with Phenol formaldehyde with a decorate laminate of same colour on both sides - NOVOPAN PLT / BHUTAN BOARD - Exterior grade or equivalent. The density of particle boards should be medium. These boards are manufactured from particles of agro waste and wood. The material is blended with adhesives and formed into solid panels with the help of heat, moisture, pressure etc. The particle boards are flat pressed with single, three or multi layers. Both surfaces of the boards are sanded to get a smooth finish. Adhesives: Adhesives are used for bonding. They are BWP(Boiling Water Proof) type synthetic resin. Thickness and Tolerance: The thickness of the particle boards should be between 6mm to 40mm. Tolerance in thickness is +5% for boards having 25 mm thickness. Tolerance in thickness is +2.5% for boards having thickness above 25mm. The thickness of every board should be uniform. Testing: One sample of every 100 sq m is taken and tested. If the total requirement of particle boards in a work is less than 30 sq m, no testing is required.

All the tested samples should meet the requirements of physical and mechanical properties of particle boards.

Page 13: 2-volume_I_part_II

13

Item no-31 Providing, making, fixing & anchoring of reinforcing bars or dowels or rebar including drilling the holes, fixing the bars and grout the bar with Hilty Hit -HY150 grouting chemical ,all labours, all tools &plants, necessary scaffolding, etc but excluding the reinforcement steel completed for all lead & lift as per directed by clerk of works or Structural consultants or Architect. For all lift, levels and Leads.

MATERIALS: Use adhesive - Hilti HIT- HY-150, 2-component Epoxy Mortar in Capsule (Foil Pack) form.

PROCEDURE: Clean the surface of existing concrete, accurately mark the positions of holes for anchor bars

and drill holes of appropriate diameter and depth. Clean the holes with special round wire-brush of appropriate diameter and remove fine dust from the hole with the help of blow-out pump. For 8 and 10 mm dia. bars, prepare a putty of epoxy mortar as per the directions of the supplier and fill the same in the hole. Insert the end of the bar in the hole gradually and allow the mortar to set.

In case of bars of diameter 12 and above, use appropriate adhesive specified by the supplier in

the foil pack, after cleaning the holes as above. Insert the bar gradually in the hole, puncturing the foil to permit spreading of adhesive in the hole and on the surface of the bar. These operations should be done under guidance and supervision of trained applicator of the Company.

Remove excess adhesive oozing out of the hole and wipe the bar clean before lapping another

bar for reinforcement and/or before concreting.

INCLUSIONS: All materials associated with the adhesive inclusive of all equipment for drilling, cleaning the

holes etc, and labour for application including supervision by trained applicator are included.

MODE OF MEASUREMENT: Measurements are taken in Numbers of Anchored bars of different diameters.

Item no-32 Providing and laying Name plate of different Size on S.S.316 grade,18 gauge moulded edges plate with engravings alpha bate latter of size 4" with filling radium - black colour in letters, with fixture fastening etc. Complete. as per detail & directed by consultant / engineer in charge. Materials Stainless Steel plats 18 guage. Workmanship Cutting, hosting, edge molding or bending & any other works should be completed by C.N.C. automotive laser printer or cutter formatter incl. Scanning or drafting as per details. Mode of Measurements The measurement for payment shall be per sq. cm. of sign board in position. The unit rate includes the cost of materials, labor tools, drilling of holes, riveting or welding, fixing, curing, lettering, painting as directed by Engineer-in-charge. Item No-33 Providing & fixing Floor mounting European Closet Suit P/S-Trap white with PVC pan connector, Jet spray, pvc connection, 15mm concealed cock, seat & lid (heavy duty) C.P. brass hinges, including all internal fittings complete with rubber buffers, C.P. nuts, bolts, etc with 25mm Concealed flush cock & making good the wall and floor.

Page 14: 2-volume_I_part_II

14

European W.C. of glazed vitreous china shall be wash down, single or double symphonic type, floor or wall mounted set, flushed by means of flush valve as specified in Bill of Quantities. Flush pipe / bend shall be connected to the W.C. by means of suitable rubber adopter. Wall hung W.C. shall be supported by C.I. floor mounted chair. Each W.C. seat cover shall be so fixed that it remains absolutely stationary in vertical position without falling down on the W.C. Seat cover shall be of white solid plastic, elongated open front with heavy duty hinges. Exposed fixture trims shall be Chrome plated, and trims of similar function shall be by the same manufacturer. Flush valves shall be of the best approved quality procurable with C.P. control valve and C.P. flush pipe. The flush pipe/bend shall be connected to the WC by means of a suitable rubber adopter. Alternatively if flushing cistern to be used shall conform to the requirements of IS: 774-1971. High level cisterns shall be of cast iron unless otherwise specified. Low level cistern shall be of the same material as the water closet or as instructed by the Owner/Architect/ Consultant. The cisterns shall be mosquito proof & shall fulfill the requirements of the local Authority. The levels of the WC should be checked by placing sprit level on the W.C. W.C. should be tested on completion of fixing by putting small paper balls and flushing out. If all the paper balls are not flushed out. The fixing will have to be rectified / re-aligned. The rate shall be for a unit of one number Item No-34 Providing and fixing, best Indian make, white glazed vitreous chinaware wash hand basin of Hindware -mario or as approved by the Architect, of white colored, with single or double hole for pillar tap, comprising of : a) White glazed vitreous chinaware wash basin, with supporting MS or C.I. brackets. b) 1 no. 40 or 32 mm C.P. cast brass bottle trap with extension piece to wall, wall flange with rubber adopter for waste connection and one waste coupling. c) 1 no. heavy quality C.P. brass angular stop cock, 15 mm size. d) 1 no. 15 mm n.b. heavy quality C.P. brass inlet connection with unions at end. The supporting bracket shall be painted with 3 coats of approved paint of approved shade. A) Wash Basin: Hindware Mario-10087 or Equi.550 X 400mm 1.0 Materials: 1.1 The wash basin, the C.P. brass pillar tap, the C.P. brass bottle trap, the C.P. brass

angular stop cock and inlet connection shall conform relevant specifications of plumbing materials. The bracket shall conform to IS: 775. All materials shall be of 1st quality, of recommended make or equivalent, as approved by the Architect and Engineer-in-charge.

2.0 Workmanship: 2.1 The wash basin shall be fixed on the wall or counter, as and where directed. The wash

basin shall be supported on a pair of MS or C.I. brackets fixed in CM 1:3 (1 cement: 3 sand). The brackets shall conform to IS : 775-1962. The wall plaster on the rear shall be cut to rest the top edge of the wash basin. After fixing the basin, plaster shall be made good and surface finished to match with the existing one.

Page 15: 2-volume_I_part_II

15

2.2 The bracket shall be painted with 3 coats of approved ready-mixed paint of approved shade.

2.3 The C.P. brass bottle trap and union shall be connected to 40 or 32 mm dia. waste

pipe, which shall be suitably bent towards the wall. It shall discharge into an open drain leading to a gully trap or direct into the gully-trap on the ground floor and shall be connected to a waste pipe through a floor trap on the upper floors. C.P. brass bottle trap and union may not be provided where the surface drain or a floor trap is placed directly under the basin and the waste is discharged into it vertically down.

2.4 The height of the front edge of the wash basin from the floor level shall be 80 cm or as

specified in the drawing 2.5 The necessary inlet, outlet connections and fittings such as pillar cocks or sensor tap,

C.P. brass waste coupling, waste pipe, stop cock, bottle trap chain with rubber plug, etc. shall be fixed.

3.0 Mode of Measurements and Payment: 3.1 The rate includes cost of all labour, materials, tools and plant, etc. required For satisfactory completion of this item as specified. 3.2 The rate shall be for a unit of one number

Item No-35 Providing & fixing white vitreous flat back urinal of size 440x315x265mm with Flushing System with matching Urinal in one sleek, compact unit. C.I. hangers and 32mm dia cast bottle trap and pipe to wall with C.P. flange complete including urinal valve auto closing system with built in control cock including cutting and making good the walls and floors wherever required. URINAL: HINDWARE OR EQU. WHITE-60001 Angular stop cock with extension pipe spreader complete WASTE COUPLING: HINDWARE OR EQU. : No F850002(FULL THREAD) 1.0 Materials: 1.1 The white vitreous chinaware flat back wall hung urinal of specified size shall

conform to relevant specification of plumbing material. C.P. brass heavy quality spreader and C.P. brass waste coupling shall be of approved quality. The C.I. bracket shall conform to IS: 775. All materials shall be of the best quality, of recommended make or equivalent, as approved by the Architect and Engineer-in-charge.

2.0 Workmanship: 2.1 The urinal shall be fixed in position by using wooden plugs and screws and shall be at a

height of 65 cm, from the floor level to the top of the lip of urinal, unless otherwise directed. The wooden plugs shall be 50 mm x 50 mm at base tapering to 38 mm x 38 mm at top and 50 mm in length and shall be fixed in wall in CM 1:3: (1 cement : 3 coarse sand). The urinal shall be connected to 32 mm dia. flexible P.V.C. pipe, which shall discharge into the channel or floor trap. The connection between the urinal, waste coupling and waste pipe shall be made by means of putty or white, clear safe do mixed

Page 16: 2-volume_I_part_II

16

with chopped hemp. Necessary connecting C.P. brass pipe between stop cock and spreader along with necessary connection shall be provided for flushing the urinal.

3.0 Mode of Measurements and Payment: 3.1 The rate includes cost of all labour, materials, tools and plants, etc. required for

satisfactory completion of this item. 3.2 The rate shall be for a unit of one number.

Item No-36 Providing and fixing, Stainless steel sink, ( Nirali / Carysil Make ) single bowl, of approved make, as recommended or equivalent, of size 950 x 510 x 230 mm, comprising of : a) Stainless steel sink supported on MS or C.I. brackets. b) 40 mm n.b. C.P. brass waste coupling with rubber plug and C.P. chain. c) PVC waste pipe 40 or 32 mm dia., 1 for each sink up to top of trap.

1.0 Materials: 1.1 Stainless steel sink, 40 mm C.P. brass waste coupling with rubber plug and chain

shall conform to relevant specification of plumbing material. 2.0 Workmanship: 2.1 The S.S. kitchen sink shall be supported on a pair of MS or C.I. brackets, fixed

in CM 1:3 (1 cement: 3 coarse sand). The MS or C.I. brackets shall conform to IS: 775. The wall plaster on the rear shall be cut to rest the top edge of the sink, over it. After fixing the sink, the plaster shall be made good and the surface finished to match with the existing one.

2.2 The C.P. brass trap and union shall be connected to 40 mm dia. nominal bore

waste pipe (as per drawing), which shall be suitably bent towards the wall. It shall discharge into a `P' trap leading to a gully-trap or direct into the gully trap on the ground floor and shall be connected to a waste pipe through a floor trap on the upper floors. C.P. brass trap and union may not be provided where surface drain or a floor trap is placed directly under the sink and the waste is discharged to it vertically down.

2.3 The height of the front edge of the sink from the floor level shall be 80 cm or as

shown in drawings. 3.0 Mode of Measurements and Payment: 3.1 The rate includes cost of all labour, materials tools and plant and other

equipment required for satisfactory completion of this item, as described in item. 3.2 The rate shall be for a unit of one number.

Page 17: 2-volume_I_part_II

17

Item No-37 Providing & fixing in position 15 mm C.P. brass pressmatic bibcock of best quality (For Drinking water fountain area) 1.0 Materials: 1.1 15 mm dia. C.P. brass screw down shall conform to IS: 781, as per relevant

specification of plumbing materials. The push type tap shall be of 1st quality, of jaguar as recommended, or equivalent make, or as approved by Architect and Engineer-in-charge.

2.0 Workmanship: 2.1 The screw down push type tap, 15 mm dia. as specified above shall be fixed as

directed. The threaded portion shall be smeared with white or red lead and provided with a few turns of fine spun yarn round the screwed end of the pipe and if necessary, the joint shall be done with teflon tape. The push type tap shall be than screwed and fixed to, in a water tight position.

3.0 Mode of Measurements and Payment: 3.1 The rate shall includes cost of all labour, materials, tools and plant, etc. required

for satisfactory completion of this item. 3.2 The rate shall be for a unit of one number.

Item No-44 Supply, installation, testing and commissioning of gunmetal, male or female threaded isolation control valve (Ball Valve), confirming to IS 778, PN 1.0, , with screwed ends, 20 kg/m2, on GI or White PVC lines with necessary specials, unions, nipple etc., to complete the job. (For external work) 1.0 Materials: 1.1 The gun metal gate full way wheel valve of specified dia. shall conform to IS:

778 and relevant specifications of plumbing materials. All material shall be of 1st quality of recommended make or equivalent, as approved by the Architect and Engineer-in-charge

2.0 Workmanship: 2.1 The gun metal gate valve shall be fully cleared of all foreign matter, before

fixing. The fixing of valve shall be done by applying locktite 55 or Teflon tape on Male screwed ends. The jointing shall be leak proof. A union shall be provided near each GM valve, stopcock or check valve.

3.0 Mode of Measurements and Payment: 3.1 The rate includes all labour, materials, tools and plant, etc. required for

satisfactory completion of this item.

Page 18: 2-volume_I_part_II

18

3.2 The rate shall be for a unit of one number

Item No-45 Supplying, installing, testing and commissioning of centrifugal submersible monoset pumps with S.S. casing, Bronze impeller, SS Shaft and driven by 415 V AC, 3 phase, 50HZ., motor running at 2900 rpm speed, of best Indian make vertical single/multi stage centrifugal electric motor driven pump sets (with 50 % efficiency), to handle 80 LPM of clean cold water against 35 M total head, motor (not more than 2.0 H.P.) and shall be supplied with all accessories viz., strainer, base plate, coupling, lift hook, chain, starter panel, cabling up to panel, earthing ,and delivery pipes & valves etc., complete. Vertical Submersible Pumps, MOC SS 304 (U.G.Tank to O.H. tank). 1.0 Materials: 1.1 Pump set shall be of recommended make or equivalent, as approved by the

Architect and Engineer-in-charge. General output requirement of LPM at required head shall be as specified in the respective line item in Bills of quantities. Motor to work on three phase 50 cycles, 440 volts AC power supply. All electrical work shall be carried out as per relevant electrical specification.

2.0 Workmanship: 2.1 The pump of recommended make or equivalent shall be supplied erected and

commissioned at site as per the instruction given by the Architect and Engineer-in-charge. D.O.L. starter is connected with starter pump. Earthing of pump shall be done.

3.0 Mode of Measurements and Payment: 3.1 The rate includes cost of all labour, material, tools and plants etc. required for

satisfactory completion, testing and commissioning of this item as described above.

3.2 The rate shall be for a unit of one number.

Item No-52 Boring and sinking of percolation well having 350 mm diameter of bore well with 150 mm dia, MS casing pipe as per specification with approved system as approved by the Consultant and Engineer-in-charge complete and clearing the site on completion of depths from: 1) 60 m. 1.0 General

1.1 All work shall be done as per standard engineering practice in a systematic

manner in accordance with a programme prepared in consultation with the Employer/Consultant.

1.2 The contractor shall make his own arrangement at his own cost for supply of water and power at site required for the work as also for storing materials, watch and ward etc.

Page 19: 2-volume_I_part_II

19

1.3 If required, contractor has to obtain necessary sanction for Sinking Tube

wells from the concerned Authorities including payment of fees to them. Statutory fees paid by the contractor shall be reimbursed by the client on submission of necessary documents.

1.4 Drilling will be done in all soils including rock, gravel and sand. If required, the

boring will be carried down to a depth of 240 m. If at any depth, further drilling becomes impracticable; the bore will be abandoned and paid for as specified, provided that the failure is due to reason other than the fault or negligence on the part of the Contractor.

1.5 The Contractor shall prepare and maintain the following records carefully and

accurately at the site during the period of construction and hand them over to the Employer/Consultant at the time of handing over the tube well:

(a) Records of strata encountered at various levels (b) Daily progress of boring (c) Details of water bearing strata

1.6 Air Compressor of suitable capacity for the work shall be arranged for by the

Contractor at his own cost for developing and testing of the well. 2.0 Material and workmanship 2.1 Site Clearance: The Contractor shall at his own cost clean the site of any trees,

growth, grass and rubbish to enable him to execute the work in proper manner. On successful completion of the work the Contractor shall clean the site for all surplus material, equipment and accessories.

2.2 Requirement: The yield for the well shall be approximately 200 liters/min by

compressor. 2.3 Type of Well : Tube well shall be sunk with direct/reverse circulation or any

approved method with 35 cm diameter M.S. well pipes and 15 cm diameter strainers, gravel packed.

2.4 Boring: Boring shall be 350 mm diameter to a maximum depth of 240 meters.

The depth may be increased or decreased as per actual site conditions. Sub-Soil water shall not be tapped. Boring shall be done by a hydraulic direct/reverse rotary mud flush drilling machine (rig) mounted on a truck.

2.5 Well Pipes: Well pipes shall be 150 mm diameter M.S. pipe conforming to IS:

3589 having thickness 6.35 mm. A bail plug with hook shall be provided at the bottom. Length of pipe is measured without MS strip. Casing pipe should be rust free; bitumen solution should be coated on the outer surface.

2.6 Strainers: A low carbon galvanized screen with 1.0/1.5 mm slots strainer-pipe is

recommended. The size of the strainer will be designed to suit the size of water bearing coarse sand, in the midst of which the strainer is to be lowered and fixed.

Page 20: 2-volume_I_part_II

20

2.7 Verticality: Well assembly shall be truly vertical as per the latest Indian Standard.

2.8 Gravel Packing : Annular space between the strainer and naked bore hole shall

be packed up with pea-shape gravel (3 mm to 6 mm size), such that shrouding shall be done up to a height of 6 m. from the top of strainer and to a depth of 3 m. below the strainer. The remaining annular space shall be packed with puddle clay.

Payment shall be made only for gravel shrouding. No payment will, however, be made for puddle clay/clay ball packing and the rates shall be deemed to be inclusive of the same.

2.9 Development: The well shall be developed by an over pumping unit or an air compressor to make the tube well water completely sand free. After the installation of pump set the tube well water shall remain sand free after a trial run of 8 hours a day for one month. The Contractor shall have to ensure complete sand free water supply from the tube well.

2.10 Yield Test: This test is to establish the yield of aquifer and to decide capacity of

the pump. A pump of higher capacity, preferably double, is to be installed temporarily with V-notch chamber and should run on constant discharge rate and water level measured at very close interval time during initial stage of pumping. After 4 hrs of continuous running of pump, the same shall be stopped and water level noted at close intervals as the recouping process continues until water level again attains the original static level. This should be continued till this status is achieved.

2.11 Data: The contractor shall provide necessary data regarding yield and

depression. 2.12 Water Tests: The Contractor shall get the water tested for its quality by an

approved Private or Government Health Laboratory. Bacteriological and Chemical tests shall be conducted at any intermediate level and also after the development of well as directed by the employer/consultant. The tests reports shall be submitted to the employer.

2.13 Soil Samples: Samples of each stratum shall be taken at every 3 M or often if

the strata change. The samples shall be carefully indexed and preserved at site for inspection by the Consultant and the Engineer-in-charge.

2.14 Strata Chart: A strata chart in a standard tube well form shall be maintained at

the site and shall give the following information:

a. Description and depth of strata. b. Aquifers at which strainer pipes have been placed. c. Position of joints in strainers and/or blind pipes. d. Rate of progress of drilling. e. Full particulars of final test. Four copies of strata charts, yield and water supply quality tests shall be handed

over to the employer on completion of the well.

Page 21: 2-volume_I_part_II

21

2.15 Failure: In case of failure during boring process and rejection of the tube well/bore no payment will be made to the Contractor for the work.

3.0 Mode of Measurement and Payment: 1.0 Rates quoted shall be for complete items and inclusive of all equipment, labour,

scaffolding, tackles, etc., required to do a complete job.

1.1 Rates shall be inclusive of all taxes, e.g. VAT, Excise Duty, surcharge etc.

1.2 Rates for above items shall be inclusive of all accessories, threading sockets and labour for extraction of boring, casing pipes, and lowering tube well assembly and providing proper grip to the assembly to keep it in position without any settlement.

1.3 No payment will, however, be made for puddle clay packing and the rates shall

be deemed to be inclusive of the same.

1.4 In case of failure to obtain water or water in required quantity, the Contractor shall only be paid for Labour rate for boring as per length or bore actually done at site. No other claims shall be entertained by the Employer.

1.5 The payment shall be for a unit of one number.

SR NO. ITEM APPROVED MAKE 1 Anti Termite Avitus India Pest Management Pvt. Ltd. 2 Cement Ambuja/Ultra-Tech/Sanghi/Jk-Laxmi 3 Steel Tata, Sail, Vizag, Electro-Therm, National,

Gujarat Nre Cock 4 Floor Tiles Marbito/Asian/Simpolo 5. Wall Tiles Bajaj/ Euro Or Equivalent 6 Flush Doors Century/Green Wood/Mayur. 7 Laminate Sundek/Marinolam/Bloom. 8 All Furniture Harware Godrej/Kich/Dorset 9 Aluminum Jindal/Hindalco/Banco. 10 Adhesive Fevicol, Century. 11 Glass Asai / Saint Gobain/ Modi Quard 12 Paver Block-Kerbing Alcock/Alto Or Equivalent 13 FRP Doors Everest Or Equivalent 14 Construction

Chemicals Cico/Fare Mate /Fosroc/Contech

15 Texture Heritage/ Sherwin Williams 16 Paint Asian/Berger/Nerolac

Page 22: 2-volume_I_part_II

22

SECTION - VII

LIST OF APPROVED MAKE

All Material used shall be FIA & BIS approved.

Plumbing items Make list.

SR.NO. ITEM APPROVED MAKE

1 UPVC PIPE & MOULDED FITTING FINOLEX / SUPREME / PRINCE / ASTRAL / KISAN

(For Rain Water Down Take Pipe Terrace To Gr.Fl.)

2 SWR TYPE-B PIPES & SWR RING FIT FITTING FINOLEX / SUPREME / PRINCE / ASTRAL / KISAN

(For Soil & Waste Water Pipe.)

3 PVC GULLY TRAP & TRAPS FINOLEX / SUPREME / PRINCE / ASTRAL / KISAN

4 C.I.COVERS, NECO / BHARAT / KALPESH

5 SW PIPES (For Under Groung Drainage Line.). GIRCO / TIRUMALA / RAJULA

6 RCC HUME PIPES(For Under Groung Drainage Line).

INDIAN HUME PIPE / PRANALI

7 CPVC( SDR 13.50) PIPES FOR DOMESTIC & FLUSHING WATER PIPE EXTERNAL SUPPLY

ASTRAL OR EQUIVALENT

8 SOLVENT WELD PIPE WHITE PIPE & FITTINGS.(DOMESTIC & FLUSHING WATER SUPPLY)EXTERNAL SUPPLY

ASTRAL OR EQUIVALENT

9 MULTILAYER COMPOSITE PIPE & COMPOSITE FITTINGS.

KITEC OR EQUIVALENT

10 METAL TO METAL & METAL TO PVC THREAD JOINTS

CHAMPION/LOCKTITE-55

11 BALL VALVES AUDCO / LEADER / ZOLOTO

12 WHEEL VALVES LEADER / ZOLOTO

13 DCV/NRV R.B. /LEADER /

15 ASBESTOSE YARN OR. CHAMPION/CAPTAIN

16 NITRIAL FOAM TUBE LAYING WITH BOPP TAPE AND COVERED TO PVC PIPE PROTACTION.

SUPERLOAN/THERMAFLEX

Page 23: 2-volume_I_part_II

23

17 BATH FIXTURES JAQUAR OR EQUIVALENT

18 SANITARY FIXTURE PARRYWARE/CERA /HINDWARE

19 TAR SHALIBIND / TIKIBOND-BS

20 PUMPS KIRLOSKAR/ GRUNDFOSS/

21 R.O. PLANT ION EXCHANGE / THERMAX

22 PUMPS GRUNDFOSS/ KIRLOSKAR

23 MOTOR KIRLOSKAR / CROMPTON / GEC / SIEMENS

24 STARTER SIEMENS / L&T

25 PRESSURE GAUGE BELLS / H GURU

ELECTRICAL MATERIAL SPECIFICATION

SUMMARY PAGE

I. Electrical Works

A. Material Specification

Section - 1 E-1 HT Gang Operated Device(-NA-) -

Section - 2 E-2 HT Vaccum Circuit Breaker(-NA-) -

Section - 3 E-3 Unitised Sub Station(-NA-) -

Section – 4 E-4 Bus Duct(-NA-) -

Section - 5 E-5 Substation & Auxiliary Installation

Section - 6 E-6 D.G . Set(-NA-) -

Section - 7 E-7 MV Switchgear(-NA-) -

Section - 8 E-8 Distribution Board(-NA-) -

Section - 9 E-9 Cable Trench(-NA-) -

Page 24: 2-volume_I_part_II

24

Section -10 E-10 &11 MV Cabling & Termination

Section- 11 E-12 Cable Tray (-NA-)

Section-12 E-13 Track/Trushing Lighting System(-NA-)-

Section-13 E-14 Internal Wiring

Section-14 E-15 Light Fixture and Fans (-NA-) -

Section-15 E-16 Earthing

Section-16 E-17 Telephone & Data Distribution

Section-17 E-18 Miscellaneous

Section-18 E-19 External Lighting -

Section-19 E-20 Television System

Section-20 E-21 Fire Alarm & Smoke Detection stystem (-NA-)

Section-21 E-22 Lighting Automation System (-NA-) -

Section-22 E-23 CCTV System (-NA-)

Section-23 E-24 Acess Control System(-NA-)

Section-24 E-25 PA System(-NA-)

Section-25 E-26 UPS (-NA-) -

B Special Condition for Testing

C Applicable Standards

Page 25: 2-volume_I_part_II

25

ELECTRICAL MATERIAL SPECIFICATION

E – 5 SUBSTATION & AUXILIARIES INSTALLATION 5.1 Scope : The specification covers H. T. cable laying and H. T. joints of outdoor type and

certain safety materials required to be kept in the substation for the safety purposes.

5.2 HIGH VOLTAGE XLPE CABLE 5.2.1 H. V. Cable type 3 core cable circular standard Copper conductors, XLPE extruded dielectric,

copper tape screened and PVC over sheathed. The cables will be constructed with steel wire armour.

Cables shall be capable of operating at a sustained conductor temperature of 90 C

and suitable for a maximum conductor short- circuit temperature of 250 C. This specification gives the requirement of cable. However, it is the

responsibility of the contractor to obtain clients approval before the purchase of cable.

5.2.2 REFERENCE CODES & STANDARDS IS-8130-1984 - Conductors of Insulated Cables. IEC-228 - Conductors of Insulated cables. IEC-230 - Impulse Tests on cables and their accessories.

IEC-502 - Extruded Solid Dielectric-Insulated Power Cables for rated voltage from 1 KV up to 30 KV.

IEC-540 - Test Methods for Insulation and Sheaths of Electric cables and chords.

IEC-229 - Test on Cable over sheaths which have a special protective functions and are applied by extrusion.

IEC-287 - Calculation of continuous current rating of cables (100% load factor).

IS-708(part-II) - Cross linked polyethylene insulated PVC sheathed cable for voltage from 3.3 KV upto 33 KV.

IS-5831-1984 - PVC insulation & sheath for electrical cables. IS-3975 - Mild steel wires / strips and tapes for armouring of

cables. IEC-885(2)-1987 - Electrical test methods for electric cables part-II

partial discharge test. IS-10810 - Methods of test for cables.

IEC-811 - Common test methods for insulating and sheathing materials of electric cables.

IEC-230 - Impulse test on cables & other accessories. IEC-859 - Cable termination for gas insulated switchgear.

Page 26: 2-volume_I_part_II

26

5.2.3 OPERATING CONDITIONS Electric System - System Voltage 11.0 KV RMS - Frequency 50 Hz. - Short Circuit current 14.1 AND 17.39 KA for 1 Second. Environment - Ground Temperature 45° C - Ambient Air temperature 55° C - Atmospheric Conditions Dry and dusty 5.2.4 CONSTRUCTION a) Conductors The conductors shall be of circular stranded Copper to IEC- 228. Sizes shall be

from 3x50 mm2 upto 3x400 mm2. Final cable sizes shall be approved by Client. The conductors shall be compacted stranded circular. It shall be clean, reasonably uniform in size & shape smooth & free from harmful defects. Any other form of conductor may also be accepted if in line with modern trends.

b) Semi conducting barrier tape / tapes The semi conducting barrier tape/tapes shall be provided over the conductors. c) Conductor Screen The conductor screen shall consists of an extruded layer of thermosetting

semi-conducting compound which shall be extruded simultaneously with the core insulation.

d) Insulation The insulation shall be super clean XLPE compound applied by extrusion and

vulcanized to form a compact homogeneous body. e) Insulation Screen Each insulation have an insulation screen in two parts consisting of (I) A water barrier tape/ Non-metallic semi conducting sellable tape part and a

metallic screen part (ii) The non-metallic part shall be directly applied upon the insulation of each

core and may consist of an impregnated butylnylon tape or a similar approved material or, an extruded semi-conducting material extruded simultaneously with the conductor screen and insulation (triple extrusion).

The semi-conductor shall be readily strippable and must not be bonded in such a manner that it has to be shaved or scraped to remove.

The metallic part shall consist of a copper tape helical applied with a 30 %

overlap. Over the water barrier tape/ blocking tape. A binder tape of copper shall be applied over the copper wire metallic screen.

f) Laying Up

Page 27: 2-volume_I_part_II

27

The cores shall be identified on the non-metallic part of the insulation screen by legible printing on the length of each conductor or, by the inclusion of a marker tape.

The cores shall be laid up with a right-hand direction of lay. Binder tape /Moisture barrier During lay up, a suitable open spiral binder may be applied, at the manufacturers

discretion, before the application of an extruded inner covering. g) Fillers Fillers shall be polypropeline. h) Inner Covering /Sheath The inner covering shall be extruded over the laid up cores to form a compact

and circular bedding for the metallic layer. i) Metallic Layer The metallic layer shall be round galvanized steel wire. j) Outer sheath The outer sheath, black colored PVC polyethylene for the operating temperature

of the cable shall be provided over the armour as specified in relevant standards by extrusion process.

k) Cable Marking - Embossing of outer sheath : The PVC outer sheath shall be legibly embossed with the legend : "ELECTRIC

CABLE 3300/11000 VOLT" The letter and figures shall be raised and shall consist of upright block

characters. The maximum size of the characters shall be 13 mm and the minimum size 15 % of the cable circumference or 3 mm whichever be the greater. The gap between the end of one set of embossed characters as above and the beginning of the next shall not exceed 150 mm.

- Identification of Manufacturer & year of manufacture. An identification of the manufacturer and indication of the year of manufacture

shall be embossed at regular intervals on the PVC outer sheath. This shall not affect the spacing between repetitions of the legend as given above.

5.2.5 Sealing and Drumming After tests at the manufacturers works, both ends of the cable shall be sealed to

prevent the ingress of moisture during transportation and storage. Cable shall be supplied in lengths of 500 meters on non- returnable drums of

sufficiently sturdy construction. The spindle hole shall be 110 mm minimum diameter. Each drum shall bear on the outside flange, legibly and indelibly in the English

language, a distinguishing number, the manufacturer's name and particulars of the cable, i.e. Voltage, length, conductor size, cable type, insulation type and

Page 28: 2-volume_I_part_II

28

gross weight shall also be clearly visible. The direction for rolling shall be indicated by an arrow.

e.g. Manufacturer's Name : 3.3/11 K.V. 3 x 185 mm2 Aluminum XLPE drum Number. 5.2.6 TESTING Type tests and Routine tests shall be carried out in accordance with the relevant

IEC standards/IS. 5.3 H. V. CABLE TERMINATION The cable joints shall be suitable for the outdoor application with EPDM

(ethylene Propylene Diene Monomer) Rubber Components. The joint should impair optimum combination of both impulse strength of the termination and field grading at the outer semi conducting screen edge. There should not be formation of air pockets in the joints and also formation of cavities should be avoided. Creepage should be approximately 4 cm/KV. The joint should have flame retardant properties and should be easily re-opened. The joint should confirm to IS 13573.

5.4 M. S. Chequared Plates : The plates shall be as specified in the item and shall have 3 coats of anti

corrosive paint. The plates shall not be brittle and shall take normal weights. 5.5 Safety Equipments (Rubber mats, rubber gloves, First aid kit, Sign boards,

Sand Buckets, Fire Extinguishers etc.)

The Danger notice labels shall be made on indestructible non deteriorating material

with lettering engraved in red, black, white background except where otherwise

specified. The letters shall be atleast of 12 MM and shall be of radium sticker type so

as to be visible in the night time also.

Rubber mats, Rubber gloves, boots shall confirm to the safety equipments standard and shall with ISI approval.

Sand Buckets and Fire extinguishers shall be as per the fire safety norms and

shall be operated as specified in the item. Emergency lights shall be with maintenance free rechargeable batteries.

Page 29: 2-volume_I_part_II

29

E – 10 & 11 MEDIUM VOLTAGE CABLING AND CABLE TERMINATION 10.1 Scope : The scope consists of Supply, laying, tesing and commissioning of L.T. XLPE

Cable and its termination. 10.2 Standards : AS PER SCHEDULE OF INDIAN STANDARDS; ATTACHED IN THE

DOCUMENT 10.3 Cables : A) All cables shall be 1100 Volt grade XLPE insulated, sheathed with or without

steel armoring as specified and with an outer PVC protective sheath. Cables shall have high conductivity stranded aluminum or copper conductors and cores colour coded to the Indian Standards. All cables laid up to load should be without any joint.

B) All cables shall be new without any kind or visible damage. The manufacturers

name, insulating material, conductor size and voltage class shall be marked on the surface of the cable at every 600 mm centers.

10.4 Cable joints and termination : A) Connectors :

Cable terminations shall be made with copper/Aluminum Heavy duty long nack

copper crimping lugs only crimped type solderless lugs for all aluminum cables and

stud type terminals. For copper cables copper crimped solderless lugs shall be used.

Crimping shall be done with the help of hydraulically operated crimping tool.

All cable lugs should be long neck type only.

B) Cable Glands : Cable glands shall be of heavy duty brass single compression type as specified.

Generally single compression type cable glands shall be used for indoor protected locations and double compression type shall be used for outdoor locations. Glands for classified hazardous areas shall be CMRS approved.

C) Ferrules : Ferrules shall be of self sticking type and shall be employed to designate the

various cores of the control cable by the terminal numbers to which the cores are connected, for ease in identification and maintenance.

D) Cable joints : Kit type joint shall be done and filled with insulating compund. The joint should

be for 1.1 KV grade insulation.

Page 30: 2-volume_I_part_II

30

10.5 HEAT / FIRE RESISTANT COATING OF CABLE

Supply and application of intumescent based coating on cables/ cable tray

using CP 678 firestop cable coating of HILTI India Pvt Ltd,along the

horizontal runs at every 6 mtr for 1 mtr and full length in case of vertical runs

.The coating shall have a density in the range of 1.2 to 1.4 Kg/ L. The coating

shall be non-toxic, asbestos and halogen free and shall have good mechanical

strength. The coating shall comply with IEC 332 part 3 (1992).

. Cable coating should be Hilti make cat No CP678 or equivalent.

E-12 CABLE TRAY

12.1 Perforated type cable tray

The cable tray shall be fabricated out of slotted/ perforated MS sheets as channel sections, single or double bended. The channel sections shall be supplied in convenient lengths and assembled at site to the desired lengths. These may be galvanized or painted as specified. Alternatively, where specified, the cable tray may be fabricated by two angle irons of 50mmx50x6mm as two longitudinal members, with cross bracings between them by 50mmx5mm flats welded/bolted to the angles at 1 m spacing . 2mm thick MS perforated sheet shall be suitably welded/bolted to the base as well as on the two sides.

12.1.1 The jointing between the sections shall be made with coupler plates of the same material and thickness as the channel section. Two coupler plates, each of minimum 200mm length, shall be bolted on each of the two sides of the channel section with 8mm dia round headed bolts, nuts and washers. In order to maintain proper earth continuity bond, the paint on the contact surfaces between the coupler and cable tray shall be scraped and removed before the installation.

12.1.2 The maximum permissible uniformly distributed load for various all the

cables trays and for different supported span are given in Table IV. The sizes shall be specified considering the same.

12.1.3 The width of the cables tray shall be chosen so as to accommodate all the

cables In one tier, plus 30 to 50% additional width for future expansion. This additional width shall be minimum 100mm. The overall width of one cable tray shall be limited to 800mm.

12.1.4 Factory fabricated bends, reducers, tee / cross junction. Etc shall be

provided as per good engineering practice. The radius of bends, junctions etc. shall be less than the minimum permissible radius of bending of the largest size of cable to be carried by the cable tray.

Page 31: 2-volume_I_part_II

31

12.1.5 The cable tray shall be suspended from the ceiling slab with the help of 10 mm dia MS round or 25 mm x 5 mm flats at specified spacing ( based on table III ) Flat type suspenders may be used for channels up to 450 mm width bolted to cable trays. Round suspenders shall be threaded and bolted to the cable trays or to independent support angle 50 mm x 50 mm x 5mm at the bottom and as specified These shall be grouted to the ceiling slab at the other and through an effective means, as approved by the Engineer – in – charge, to take the weight of the cable tray with the cables.

12.1.6 The entire tray ( except in the case of galvanized type ) and the suspenders

shall be painted with two coats of red oxide primer paint after removing the dirt and rust, and finished with two coats of spray paint of approved make synthetic enamel paint.

12.1.7 The cable tray shall be bonded to the earth Terminal of the switch bonds at

ends. 12.1.8 The cable tray shall be measured on unit length basis, along the center line

of the cable tray, including bends, reducers, tees, cross joints, etc, and paid for accordingly.

12.2 Ladder type cable tray 12.2.1 The ladder type of cable tray shall be fabricated of double bended

channel section longitudinal members with single bended channel section rungs of cross members welded to the base of the longitudinal members at a center to center spacing of 250 cm.

12.2.2 Alternatively, where specified, leader type cable trays may be fabricated out of 50 mm x 50 mm x 6mm ( minimum ) angle iron for longitudinal members, and 30 mm x 30 mm x 6 mm flat for rungs.

E – 14 INTERNAL WIRING 14.1 Scope : The scope covers Supply, laying, testing and commissioning of Wires, PVC

pipes , Switches, Sockets and accessories. 14.2 Standards : AS PER SCHEDULE OF INDIAN STANDARDS, ATTACHED IN THE

DOCUMENT 14.3 Rigid and Flexible conduits : A) All conduits shall be rigid PVC pipe having minimum wall thickness of medium

gauge 1.6 to 1.8 approved by F.I.A. & I.S.I. and shall confirm to IS 9537. a) Up to 38 mm. diameter - minimum 1.8 mm. wall thickness. b) Above 40 mm. diameter - minimum 2.2 mm. wall thickness.

Page 32: 2-volume_I_part_II

32

B) Flexible conduits shall be formed from a continuous length of spirally wound interlocked steel strip with a fused zinc coating on both sides. The conduit shall be terminated in brass adapters.

14.4 Accessories :

A) PVC conduit fittings such as bends, elbows, reducers, chase nipples, split couplings, plugs etc. shall be specifically designed and manufactured for their particular application. All conduit fittings shall conform to IS:2667-1964 and IS:3857-1966. All fitting associated with galvanized conduit shall also be galvanized.

14.5 Wires : A) All wires shall be single core multi-strand/ flexible copper or single strand

Copper FRLS type PVC insulated as per IS:694 and shall be 660 V\1100 V grade.

B) All wires shall be colour coded as follows : Phase Colour of wire R Red Y Yellow B Blue N Black Earth Green (insulated) Control (If any) Grey All off wires Same as Phase wire 14.6 Switches & Sockets : A) Switches shall be moulded plate type flush piano type with silver-coated

contacts. Sockets shall be 3 pin with switch and plate type cover. Combination of multiple switch units and sockets should be used to minimize the switch boxes. All screws shall be brass – chromium plated and shall be counter sunk type with half round head or flat headed.

B) For heavy duty, metal clad sockets with M.C.B/ Isolator mounted in a

galvanized steel box shall be provided. E – 16 EARTHING 16.1 SCOPE OF WORK : The scope of work shall cover supply, laying, installation, connecting, testing and

commissioning of: 16.1.1 copper/galvanized/ aluminum Earthing station. 16.1.2 Earthing G.I./Aluminum/copper strips from earthing station to equi-potential bar. 16.1.3 Earthing G.I./ Aluminum/ copper strips/ wires from equi-potential bar to lay feeder

mains and circuit to connect power panels, DBs, switchboards etc.

Page 33: 2-volume_I_part_II

33

16.1.4 Bonding of Non-current carrying parts, and metallic parts of the electrical installation. 16.1.5 Provide inter connection between all earth pits of same type. 16.2 STANDARDS 16.2.1 The following standards and rules shall be applicable: 1) IS: 3043 - 1966 Code of practice for Earthing. 2) Indian Electricity Act and Rules 16.2.2 All codes and standards mean the latest. Where not specified otherwise the

installation shall generally follow the Indian Standard Code of Practice or the British Standard Codes of Practice in absence of Indian standard.

16.3 GENERAL All the noncurrent carrying metal parts of the electrical installation and mechanical

equipments shall be earthed properly. The metal conduits, trunking, cables armoured and sheath, electric panels boards, lighting fixtures, ceiling and exhaust fan and all other parts made of metal shall be bonded together and connected by means of specified earthing system.

An earth continuity conductor shall be installed with all the feeders and circuits and

shall be connected from the earth bar of the panel boards, to the conduit system, earth stud of the switch box, lighting fixture, earth pin of the socket outlets and to any metallic wall plates used. All the enclosures of motors shall be also connected to the earthing system.

16.4 TYPE OF EARTHING STATION 16.4.1 PLATE EARTHING STATIONS 16.4.1.1 The substation earthing shall be with copper / GI plate earthing station and

equipment earthing grid shall be with hot dip galvanized iron earthing station /Copper.

16.4.1.2 The plate electrode shall be 600 x 600 x 3.25 mm copper plate for substation

earthing and shall be of hot dip galvanized iron plate having dimensions 600 x 600 x 6.3 mm thick.

16.4.1.3 The earthing station shall be as shown on the drawing. 16.4.1.4 The earth resistance shall be maintained with suitable soil treatment as shown

in the drawing. 16.4.1.5 The resistance of each earth station should not exceed 4 ohms.

Page 34: 2-volume_I_part_II

34

16.4.1.6 The earth lead shall be connected to the earth plate through copper/brass bolts in case of copper earth plate and shall be hot dip galvanized iron for G.I. plate earth plate as shown on the drawing.

16.4.1.7 The earthing grid and the earthing conductors shall be of copper strip in case

of copper earth plate and hot dip galvanized iron strip in case of G.I. earth plate of size as mentioned on the drawing.

16.4.1.8 G.I. pipe with funnel with filter of approved quality shall be used for watering

the earthing electrodes \ stations. 16.4.1.9 The block masonry chamber with Cast Iron hinged cover of 300 x 300 mm

shall be provided for housing the funnel and the pipe for watering the earthing electrodes \ stations.

16.4.1.10 The hardware and other consumable for earthing installation shall be of

copper/brass in case of copper earth plate and shall be hot dip galvanized iron material in case of G.I. earth plate, as per details shown in the drawing .

16.5 INSTALLATION AND CONNECTION : 16.5.1 The plate \ pipe electrode, as far as practicable, shall be buried below permanent

moisture level but in no case not less than 2.5 M below finished ground level. 16.5.2 The plate \pipe electrode shall be kept clear of the building foundation and in no case,

it shall be nearer by less than 2 M from outer face of the respective building wall \ column.

16.5.3 The plate electrode shall be installed vertically and shall be surrounded with 150 mm.

thick layers of Charcoal dust and Salt mixture. 16.5.4 G.I. pipe for watering, shall run from top edge of the plate \ pipe electrode to the mid

level of block masonry chamber. 16.5.5 Top of the pipe shall be provided with G.I. funnel and screen for watering the earth \

ground through the pipe. 16.5.6 The funnel with screen over the G.I. pipe for watering to the earth shall be housed in

a block masonry chamber as shown in the drawing. 16.5.7 The masonry chamber shall be provided with a Cast Iron hinged cover resting over

the Cast Iron frame which shall be embedded in the block masonry. 16.5.8 Construction of the earthing station shall in general be as shown in the drawing and

shall conform to the requirement on earth electrodes mentioned in the latest edition of Indian Standard IS : 3043, Code of Practice for Earthing Installation.

16.5.9 The earth conductors ( Strips / Wires copper/ Hot dip G.I.) inside the building shall

properly be clamped / supported on the wall with Galvanized Iron clamps and Mild

Page 35: 2-volume_I_part_II

35

Steel Zinc Passivated screws \ bolts. The conductors outside the building shall be laid at least 600 mm. below the finished ground level.

16.5.10 The earth conductors shall either terminate on earthing socket provided on the

equipment or shall be fastened to the foundation bolt and / or on frames of the equipment. The earthing connection to equipment body shall be done after removing paint and other oily substances from the body and then properly be finished.

16.5.11 Over lapping of earth conductors during straight through in joints, where required,

shall be of minimum 75mm. long. 16.5.12 The earth conductors shall be in one length between the earthing grid and the

equipment to be earthed. 16.6 EARTH LEADS AND CONNECTIONS : 16.6.1 Earth lead shall be bare copper or galvanized steel as specified with sizes shown on

drawings. Copper lead shall have a phosphor content of not over 0.15 %. Galvanized steel buried in the ground shall be protected with bitumen and hessian wrap or polytene faced hessian and bitumen coating. At road crossing necessary hume pipes shall be laid. Earth lead run on surface of wall or ceiling shall be fixed on saddles so that strip is at least 8 mm away from the wall surface.

16.6.2 The complete earthing system shall be mechanically and electrically bonded to

provide an independent return path to the earth source. 16.7 EQUIPMENT EARTHING : All apparatus and equipment transmitting or utilizing power shall be earthed in the

following manner. Copper/G.I. earth strips/wires shall be used unless other wise indicated in the Schedule B.

16.8 POWER TRANSMISSION APPARATUS 16.8.1 Metallic conduit shall not be accepted as an earth continuity conductor. A separate

insulated / bare earth continuity conductor of size 50 % of the phase conductor subject to the minimum and maximum shall be provided.

Copper Aluminum G.I. Minimum (sq mm) 2.5 4.0 6 Maximum (sq mm) 75 100 200 The earth continuity conductor be drawn inside the conduit shall be insulated. 16.8.2 Non metallic conduit shall have an insulated earth continuity conductor of the same

size as for metallic conduit. All metal junction and switch boxes shall have an inside earth stud to which the earth conductor shall be connected. The earth conduct or shall be distinctly colored (Green or Green/Yellow) for easy identification.

Page 36: 2-volume_I_part_II

36

16.8.3 Armoured cable shall be earthed by two distinct earth connections to the armouring at both the ends and the size of connection being as for the metallic conduit.

16.8.4 In the case of unarmoured cable, an earth continuity conductor shall either be run

outside along with the cable or should form a separate insulated core of the cable. 16.8.5 Three phase power panel and distribution boards shall have two distinct earth

connections of the size correlated to the incoming cable size. In case of single phase DB's a single earth connection is adequate.

16.9 UTILIZING EQUIPMENT : 16.9.1 Three phase motors and other three phase apparatus shall have two distinct earth

connections of the size equal to 50% of the connecting cable subject to the following: Copper Aluminum G.I. Minimum(sqmm) 6.5 10 20 Maximum(sqmm) 75 100 200 16.9.2 For single phase motors and apparatus, the single earth connection shall be provided

of the above size. For all light fittings and fans a single earth connection with 1.5 sqmm copper or equivalent size shall be provided.

16.9.3 All street light poles shall have an earth stud and shall be connected to the cable

armouring using 6.5 sqmm copper or equivalent unless shown otherwise. For street lighting poles planted in ground, 2.4 M long 10 SWG bare copper wire shall be coiled and buried with every fourth pole in addition to connection to cable armouring.

16.9.4 An equipment earthing grid shall be established as shown in the drawing. All earth

connections to all panels, DB's and equipment shall be connected to the nearest point of the earthing grid.

16.10 TEST : 16.10.1 The entire earthing installation shall be tested as per requirements of Indian Standard

Specification IS : 3043. 16.1.2 The following earth resistance values shall be measured with an approved earth

meager and recorded. 1) Each earthing station 2) Earthing system as a whole 3) Earth continuity conductors 16.10.3 Earth conductor resistance for each earthed equipment shall be measured which shall

not exceed 1 Ohm in each case. This is responcibility of contractor to get the final value for resistance.

16.10.4 Measurements of earth resistance shall be carried out before earth connections are

made between the earth and the object to be earthed.

Page 37: 2-volume_I_part_II

37

16.10.5 All tests shall be carried out in presence of the consultant.. 16.11 METHOD OF MEASUREMENT : 16.11.1 Provision of earthing station complete with excavation, plate, earth lead upto

chamber, earth link in the chamber, electrode, GI watering pipe, Salt, Charcoal, soil treatment to achieve the earth resistance less than 4 ohm, masonry chamber with cast iron cover etc. shall be treated as one unit of measurement.

16.11.2 The following items of work shall be measured and paid per unit length covering the

cost of the earth wires/strips, clamps, labour etc. a) main equipment earthing grid and connection to the earthing stations. b) Connection to the power panels, DB etc. 16.11.3 The cost of earthing the following items shall become part of the cost of the item

itself and no separate payment for earthing shall be made. a) Light fittings - form part of installation of the light fitting. b) Conduit wiring, cabling - should form part of the wiring or cabling. c) Street lighting - should form part of the street light poles. 16.12 Lightning Arrestor SCOPE :-

This specification covers the requirement of supply, installation, testing and commissioning of lightning protection system

1. General a) The Advanced Lightning Protection system shall include components as

follow: air-termination(s), mechanical support(s), down-conductor(s), performance recording equipment(s) (optional) and a low impedance grounding system.

b) Installation procedures of the entire lightning protection system shall be governed by the IS: 2309, the IEC 61024, NFC17-102, UNE-21186 and UNE-EN-50164-1 standard. The manufacturer of the air-termination shall provide designs and instructions for the installation as per the former standards.

c) Prior to the installation of the system, a risk assessment survey shall be conducted to determine: the level of protection required for the structure (according to standards) and the adapted solution and design to be chosen.

d) The Advanced lightning protection system shall be mounted adequately rated for wind shear loading. Guying kits shall be provided as appropriate to local environmental conditions, or based on mast arrangement selected.

e) Each air terminal must be connected to the earth termination system by at least one-down-conductor. Two down-conductors are required when a) The

Page 38: 2-volume_I_part_II

38

horizontal projection of the conductor is larger than its vertical projection, b) When the structure is higher than 28m.

2. Air termination

a) Manufacturing process of the air-terminal shall be ISO: 9001 certified b) The air terminal shall have been tested in a High-Voltage laboratory with a

standardized waveform: 8/20µs or 10/350µs. c) The protection area of the air-terminal shall be determined using an acceptable

method given in the following standards IS: 2309, IEC62-305 (Rolling Sphere Method), and NFC17-102 (Early Strimer Emission).

d) The air terminal shall be made of non-corrosive materials. It shall be equipped with a central rod made of copper, copper alloy or stainless steel.

e) The rod and the air-terminal tip shall have a conductive cross-sectional area larger than 120mm².

f) Lightning Air Terminal - Configured as a Spheroid which is comprised of separate electrically isolated 4panels surrounding an Earthened Central Finial. The upper section of the central finial shall be rated to withstand 200KA. The Insulation material used to electrically isolate the panels shall be comprised of base polymer which provides high Ozone & UV resistance with a di-electric strength of 24-38KV/mm & ESE terminal shall withstand a minimum Switching Impulse Voltage of 500KV tested as per NFC 17-102 & IEC Test Standard - IEC60-1:1989.The air-terminal shall guarantee a full electrical continuity between the tip and the down-conductor.

g) The air-terminal shall be able to support a 200kA current or more. h) No external power supply shall be required. i) The air-terminal shall be active only during a storm. j) The air-terminal shall ensure the emission of a streamer (ionisation of the air

around the tip) when a lightning strike is occurring in the protection area claimed.

k) The intensity and potential of the streamer shall be controlled by the air-terminal to ensure sufficient values (above 10A and 2000V) so it can develop properly and intercept the lightning.

l) The air terminal shall emit a streamer only when a lightning strike is occurring (provoking lightning strikes can induce surges).

m) Performances of the air-terminal shall not be affected by extreme climatic conditions

3. Air termination support

a) The air terminal support shall consist of a minimal 5 meters Galvanized steel (GI), Powder Coated or steel elevation pole with a minimal diameter of 50 mm. The mast having arrengment for fixing of air terminal on the top.

Page 39: 2-volume_I_part_II

39

b) The air termination support shall be fixed securely on the structure to enable the air termination and mast system to withstand maximum locally recorded wind velocities. Guy wires might be necessary to secure the system properly.

4. Down-conductor a) Down-conductors consist of strips, braided cables or round sections. b) Materials to be used: insulated multi-strand copper (recommended) suitable

for 1.1KV insulation. c) Minimal cross-sectional area must be 70mm² d) Down conductors shall be routed to the earth termination as direct as possible.

Sharp bends and upward sections (40cm max with a 45° slope max are acceptable) are to be avoided.

e) Down conductors shall be attached on the basis of three fixing per metre f) Down conductors shall eventually be protected against the risk of impact by

installing sleeves up to height of 2m above ground level g) The down conductors shall be directly connected to the base of the air

terminal and to the earth termination system by the mean of a test clamp.

5. Earth Termination

a) One earth termination system is to be provided for each down-conductor b) Resistance value should be 10 ohms or less (5 ohms or less when the structure

contents sensitive materials). Minumum Resistance should be achieved by using earth enhancing compound and these compound should hold and absorb the moisture for long life and does not required regular recharging of earthing system.

c) Material to be used: Bare or tin-plated copper (recommended), or stainless steel.

d) Bonding of the earth termination to the electrical earth of the building, to metallic parts of the building, to the structural reinforcing steel of the building and to arriving services is strongly recommended.

6. Performance recording equipment (optional)

a) Each protection system shall be supplied with a lightning strike recorder. b) The lightning flash counter shall register a strike for every discharge where

the peak current exceeds 1500A c) The lightning flash counter shall have been tested and certified in a high-

voltage laboratory with a 8/20µs or 10/350 µs waveform. d) The lightning flash counter shall be installed directly on the down-conductor

and as per the manufacturer instructions

Page 40: 2-volume_I_part_II

40

7. Earthing of Air Terminal :- a) Air terminal shall be connected to Maintenance free earthing b) Maintenance free Earthing shall be based on copper bonded earth rod

minimum copper bonding of 150 micron. e) Suitable quantity shall be used of Back fill compound (Moisture Holder) as

recommended by manufacturer and these earth enhancing compound should hold and absorb the moisture for long life and does not required regular recharging of earthing system.

c) Each earth pit shall be covered with using CI Cover of 12” X 12’ of GI with 6/7 mm thick.

8. Test Joint

a) Each Down conductor shall be incorporated a Test Joint, which allows disconnecting the earth electrode and thus allows to measuring its resistivity. The test joibt shall be mounted 2 meter above the ground.

9. Maintenance a) As per the standards (IS: 2309, IEC 62-305 and NFC 17-102), the lightning

protection system shall be inspected at least every 2 years. b) A visual inspection shall be performed to make sure that: a) No extension or

modification of the protected structure calls for the installation of additional lightning protective measures, b) the electrical continuity of visible conductors is correct, c) all components fasteners and mechanical protectors are in good condition, d) no parts have been weakened by corrosion

c) Measure of the earth termination resistance shall be realized to ensure it is still below 10 ohms (or 5 ohms)

d) Air termination system shall be checked to ensure a) It is still properly connected to the down conductor(s), b) The tip has not melt, c) The system is still in operating conditions d) It is still properly installed on the support and it can withstand high wind velocities (relatively to the local conditions).

E-17 Telephone Distribution 17.1.0 Scope : 17.1.1 The scope of work shall cover supply, installation, commissioning and testing of i) Telephone cables ii) Telephone Tag Blocks iii) Telephone wiring in conduits 17.1.2 The telephone exchange and the hand sets shall be supplied by the clients.

Page 41: 2-volume_I_part_II

41

17.2 Conduits : 17.2.1 Conduits shall be as given below : The conduit shall generally be as specified under section `Internal Wiring’. 17.3 Cables and Wires : 17.3.1 The type of cables and the services shall be as follows : i) Indoor Multi pair, PVC insulated sheathed armored and sheathed. ii) Inside Twin core PVC insulated with conduit twisted cores. 17.3.2 All multi core cables and wires shall be of tinned copper conductor of not less

than 0.5 mm dia and shall be colour coded twisted pairs with rip cord. 17.3.3 The conductor resistance shall be less than 150 ohms per KM and the insulation

resistance between the conductors not less than 50 megohms and the nominal capacitance of about 0.1 micro farad per kilometer.

17.3.4 Cables laid under ground or locations subject to dampness and flooding shall be

filled with polyethylene compound and shall have sufficient protection against moisture and water ingress.

17.3.5 All armoring shall be of galvanized steel wires and protected against corrosion

by an outer sheath of PVC in the case of indoor cables and polyethylene in the case of outdoor cables. Outer sheathing must be fire retarding and anti-termite.

17.3.6 All unarmoured single core cables and inner sheath of armored cables shall be

provided with rip cord. 17.3.7 All single pair cables for final extension to the telephone outlet box shall be

unarmoured tinned copper conductors of not less than 0.6 mm. diameter and shall be drawn in conduits. All telephone outlets shall consist of 2 A 2 pair polythene connector in G.I box with 6 mm perspex cover with beveled edges and chromium plated brass hardware.

17.4 Tag blocks : 17.4.1 The telephone tag blocks shall be suitable for the multi core telephone cables and

shall have two terminal blocks, cross connect type. All incoming and outgoing cables shall be terminated on separate terminal blocks and termination shall be silver soldered. The cross connecting jumpers shall be insulated wires of same diameter and screw connected.

17.4.2 The tag blocks shall be mounted inside fabricated sheet steel boxes with

removable hinged covers and shall be fully accessible. The enclosure shall be painted with 2 coats of red oxide and stove enameled.

Page 42: 2-volume_I_part_II

42

17.5 Installation : 17.5.1 The installation of conduits shall generally be as specified under section

`CONDUIT WIRING'. 17.5.2 All cables shall be on cable racks and neatly stitched together. 17.5.3 The connection at the tag blocks shall be silver soldered so as to achieve

minimum contact resistance. 17.5.4 The final branch connections with single pair cables in conduits and the

maximum number of cables in each conduit shall be as follows : Conduit diameter Max. No. of cables Inch / mm. 3/4" / 20 2 Nos. single pair 1" / 25 6 Nos. single pair 1¼" / 32 12 Nos. single pair 1½" / 40 18 Nos. single pair 17.6 Mode of measurement : 17.6.1 The main telephone cables shall include supply and laying of multi pair cables

on ceiling/wall/on cable trays/racks including all supports and shall be measured and paid on running length basis. Cable trays/racks shall be paid for separately.

17.6.2 The multi pair tag blocks shall consist of two telephone connectors strips,

jumpered interconnections silver soldered enclosure etc. and shall be measured and paid as one unit.

17.6.3 The conduit wiring for telephone shall include single pair 0.6 diameter cable in

heavy duty rigid, PVC conduits and shall include junction boxes, pull boxes, 2 pair 2 A connector in GI box, perspex cover etc. and shall from one point.

E-18 Miscellaneous (Fire Stop system Material) 18.1 Scope : 18.1.1 The scope of work covers the supply, installation and testing of Fire Stopper as

specified in BOQ. 18.2 Standards : As per Applicable standard Specification of Fire stopper material suppler.

All installation of Anchor fastener has been approved by Hilti Technical staff

and certified the same.

18.3 Material :

a) Fire Resistant Mortar

Page 43: 2-volume_I_part_II

43

fire resistant, cement based mortar with thermal insulating properties from

admixed perlite CP 636 of HILTI India Pvt Ltd or Equvalrent .The product

shall be tested for withstanding Zone 4 earthquake when tested in accordance

with acceleration time history waveform VERTEQII as per IEC 60068 and

Telcordia Technologies GR-63-Core 2006-03. The product shall be age tested

for 30 years as per Dafstb and DIBT standards. The product shall be tested and

approved by third party agencies such as UL, FM and LPCB. The product shall

bear the UL and FM approval logo on the packing.

b) Fire Stop System

Providing & Supplying Passive Firestop system using HILTI Mineral wool

board along with CP 670 coating of 1 mm DFT and CP 606 Firestop filler or

Equivalent system. Fire barrier coating of 1 mm thickness should be apply on

Mineral wood board (density min. 150 kg/cu. meter) and fill the remaining gap

around entrants with suitable filler of depth same as mineral wool panel

thickness to provide 2 hour fire rating on solid structure (wall- min. 80 mm,

floor- min. 150 mm thickness) when subject to test conditions of BS 476: part

20:1987 and after age testing to DafStb guidelines. Cables and cable tray

should be coated with above same coating up to minimum length of 300 mm to

prevent spread of fire. Fire barrier coating and filler should be approved to

international test standard like BS 476 and tested by FM, LPC, BRE, and

WFRC. For wall opening the Board system should be used on both sides of the

wall and for floor opening it should be used only on one side.

c) Fire Stop System

Providing and supplying versatile intumescent expanding foam CP 620 of

HILTI India Pvt Ltd.The product shall be tested for withstanding Zone 4

earthquake when tested in accordance with acceleration time history waveform

VERTEQII as per IEC 60068 and Telcordia Technologies GR-63-Core 2006-

03. The product shall be age tested for 30 years as per Dafstb and DIBT

standards. The product shall provide water tightness when tested for W rating

as per UL standards and shall be tested for providing a sound insualtion of 50

when tested in accordance with ASTM E 90. The product shall be tested and

approved by third party agencies such as UL, FM and LPCB. The product shall

bear the UL and FM approval logo on the packing.

Page 44: 2-volume_I_part_II

44

18.4 Mode of measurement : As specified in BOQ. E-20 Television Distribution 20.1 Scope : 20.1.1 The scope of work shall cover supply, installation, commissioning and testing of i) Television cables ii) Television Splitters iii) Television wiring in conduits 20.1.2 The Television exchange and the hand sets shall be supplied by the clients. 20.2 Conduits : 20.2.1 Conduits shall be as given below : The conduit shall generally be as specified under section `INTERNAL

WIRING’. 20.3 Wires & Splitters : 20.3.1 The type of cables and the services shall be as specified in the BOQ : 20.4 Installation : 20.4.1 The installation of conduits shall generally be as specified under section

`CONDUIT WIRING'. 20.4.2 All cables shall be on cable racks and neatly stitched together. 20.4.3 The connection at the spiller/junction boxes shall be made with end sockets as to

achieve minimum contact resistance. 20.4.4 The final branch connections with single cables in conduits and the maximum

number of cables in each conduit shall be as follows : Conduit diameter Max. No. of cables Inch / mm. 3/4"/ 20 1 no RG 6 / 11 1" / 25 2/3 nos. RG 6 /11 1¼"/ 32 6 Nos. RG 6 /11 20.5 Mode of measurement : 20.5.1 The main Television cables shall include supply and laying of RG 6 / 11 cables

on ceiling/wall/on cable trays/racks including all supports and shall be measured and paid on running length basis. Cable trays/racks shall be paid for separately.

Page 45: 2-volume_I_part_II

45

20.5.2 The multi way spillers shall consist of Television connectors sockets, jumpered interconnections silver soldered enclosure etc. and shall be measured and paid as one unit.

B. SPECIAL CONDITION FOR TESTING (CONTRACTOR TO READ THIS CAREFULLY) 1.0 SCOPE : Contractor should have to take all necessary testing/ random testing of

equipments and component prior to supply as per the guidelines / rules / sampling method etc. of IS at manufacturing works or other standard lab in presence of SMC representative & consultant as witness testing. Any deviation in parameters which is not as per IS is not accepted and clent reserve the rights to reject the same at any stage of the project.

APPLICABLE STANDARDS

Sr. No. IS No. Description 1) IS:2026-1977 : Distributing transformers & fittings. IS 3639 Fittings and acc. For P.T. 2) IS:7886 IS:660 : Installation of Transformer. 3) IS:2516-1972 : Specification for AC circuit breakers. 4) IS:335 : Insulating oil for Transformers & switch gear. 5) IS:2705 CT for measuring and protection. 6) IS:3155 : Voltage (Potential) Transformers. 7) IS:3236 Part II : Voltage Transformer. 8) IS:373 : Busbar arrangement and marking. 9) IS:2099 : Bushing 10) IS:5621 : Large Hollow Porcelains 11) IS:2544 : Insulators 12) IS:2629 & 2633 : Hot Dip Galvanizing 13) IS:3842 : Relays. 14) IS:1248-1958 : Meters (measuring). 15) IS:3072-1975 : Installation of Switch gears. 16) IS:692 : HV cable. 17) IS:1255 : Installation of HV cables and jointing. 18) IS:3043 : Code of practice for earthing. 19) IS:4047-1977 : HD Air breaker, Switch gears and fuses for

Voltage not exceeding 1000 Volts.

Page 46: 2-volume_I_part_II

46

20) IS:8106-1966 : Selection, installation and maintenance of

fuses upto 650 Volts. 21) IS:4237-1967 : General requirements for switch gear and

control gear for voltage not exceeding 1000 Volts.

22) IS:2607-1976 : Air-break isolators for Voltage not exceeding

1000 Volts. 23) IS:8623-1977 : Factory built assemblies of switch gears and

control gears for voltage upto and including 1000 Volts A.C. and 1200 Volts D.C.

24) IS:375-1963 : Marking and arrangement of switch gear

busbars main connectors and auxiliary wiring. 25) IS:2147-1962 : Cubical Boards. 26) IS:8084-1972 : Insulated conductor rating. 27) IS:2675-1983 : Enclosed distribution fuse boards and cutouts

for Voltage not exceeding 1000 Volts. 28) IS:8828-1978 : Miniature Circuit Breaker. 29) IS:9926-1981 : Fuse wire used in re-wearable type electric

fuses upto 650 Volts. 30) IS:1554 (Part I) : PVC insulated electric cables Heavy duty. 31) IS:3961 (Part II) : Recommended current rating for cables. 32) IS:2982 : Copper conductor in insulated cables and

cores. 33) IS:8130 : Conductor for insulated electric cables and

flexible ords. 34) :3975 : Mild steel wires, strips and tapes for

armouring cables. 35) IS:5831 : PVC insulation and sheath of electric cables. 36) IS:1753 : Aluminum conductor for insulated cables. 37) IS:4288 : PVC insulated and PVC sheathed solid

aluminium conductor cables of voltage rating not exceeding 1100 volts.

38) IS:961 : Recommended current rating for Cable. 39) S:732 : Code of practice for electrical wiring

installation system Voltage not exceeding 650 Volts.

40) IS:1646 : Code of practice for fire safety of Buildings

(general) electrical installation.

Page 47: 2-volume_I_part_II

47

41) IS:1653 : Rigid steel conduits for electrical wiring. 42) IS:2667 : Fittings for rigid steel conduits for electrical

wiring. 43) IS:3480 : Flexible steel conduit for electrical wiring. 44) IS:3837 : Accessories for rigid steel conduits for

electrical wiring. 45) IS:694 : PVC insulated cables (wires). 46) IS:2509 : Rigid non-metallic conduits for electrical

wiring. 47) IS:6946 : Flexible (playable) nonmetallic conduits for

electrical installation. 48) IS:1293 : Three pin plugs and sockets. 49) IS:8180 : Conductors for insulated electrical cables and

flexible codes. 50) IS:9537-1980 : Specification for conduit for electrical

installation. 51) IS:3419 : Accessories for non-metallic conduits for

electrical wiring. 52) IS:3854 : Switches. 53) IS:6538 : Plugs. 54) IS:2834-1954 : Shunt Capacitors for power systems. 55) IS:2208 : HRC cartridge fuse and links up to 660 volts. 56) IS:1913-1969 : General and safety requirement for lighting

fittings. 57) IS:2944-1981 : Code of practice for lighting public thorough

fares. 58) IS:3528 : Waterproof electric lighting fittings. 59) IS:3553-1966 : Water tight electric lighting fitting. 60) IS:1239-1958 : Mild Steel tubular and other wrought steel pipe

fitting. 63) IS:2149-1970 : Luminaries for street light. 64) IS:9224 : HRC fuses having rupturing capacity of 90

KA. 65) IS:2312-1967 : Exhaust Fan. 66) IS:374-1979 : Class I Ceiling Fan.

Page 48: 2-volume_I_part_II

48

NOTE : All codes and standards means the latest where not specified otherwise the installation shall generally follow the Indian Standard codes of practice or relevant British Standard Codes of Practice in the absence of corresponding Indian Standards.

PLEASE FOLLOW : a. Indian Electricity Act of 1910 and rules issued there under revised up to date. b. Regulations for electrical equipment in building issued by The Bombay

Regional Council of insurance Association of India.