LOCUS PLAN & TITLE SHEETDATE:
AJA PROJECT NO.
ARNOLD JACOBSON ASSOCIATES, INC.153 ANDOVER STREET, SUITE 101 DANVERS, MA 01923
phone: (781) 935-2500 fax: (781) 935-2519
16 MASON AVENUE, SUITE 5 NORTH ATTLEBORO, MA 02760RENOVATION/IMPROVEMENT PROJECT
A-06-12-2019
PEABODY MUNICIPAL LIGHT PLANT
17-AJA21
LIST OF DRAWINGS
ARCHITECTURAL
A-0 LOCUS PLAN & TITLE SHEETA-1 FIRST FLOOR DEMOLITION & PROPOSED FLOOR PLANSA-2 SECOND FLOOR DEMOLITION & PROPOSED FLOOR PLANSA-3 LARGE SCALE PLANS & DETAILSA-4 AUDITORIUM PLANS & DETAILSA-5 FLOOR FINISHESA-6 VESTIBULE PLANS, ELEVATIONS & INTERIOR ELEVATIONSA-7 INTERIOR ELEVATIONSA-8 REFLECTED CEILING PLANSA-9 REFLECTED CEILING PLANSA-10 VESTIBULE REPAIR DETAILS, PHOTOS & NOTES
ELECTRICAL
E-1 ELECTRICAL LEGEND, NOTES, SCHEDULES AND DETAILSE-2 ELECTRICAL EXISTING FIRST FLOOR PART PLANE-3 ELECTRICAL EXISTING SECOND FLOOR PART PLANE-4 ELECTRICAL PROPOSED FIRST FLOOR PART PLANE-5 ELECTRICAL PROPOSED SECOND FLOOR PART PLAN
201 WARREN STREET, EXT.PEABODY, MA 01960
NOTE #1:ALL WORK SHALL COMPLY WITH THE COMMONWEALTH OF MASSCHUSETTS STATE BUILDING CODE, THE REQUIREMENTS OF THE CITY OF PEABODY, THE OCCUPATIONAL AND HEALTH STANDARDS AND ALL OTHER APPLICABLE REGULATIONS, LAWS, ORDINANCES ETC. GOVERNING THE WORK.
NOTE #2:DRAWN INFORMATION IS TAKEN FROM EXISTING CONDITIONS AND RANDOM FIELD MEASUREMENTS AND IS PROVIDED ONLY TO ASSIST THE CONTRACTOR IN ESTABLISHING THE SCOPE OF WORK.
NOTE #3:ALL EXISTING CONDITIONS AND PLAN AND DETAIL DIMENSIONS SHOULD BE VERIFIED IN THE FIELD PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL DEVIATIONS IN THE EXISTING CONDITIONS, DIMENSIONS AND LOCATIONS ETC. BEFORE PROCEEDING WITH AFFECTED PART OF THE WORK.
NOTE #4:DO NOT SCALE THESE DRAWINGS FOR QUANTITIES, LENGTHS, SIZES, AREAS, CLEARANCES ETC.
NOTE #5:IT IS NOT INTENDED THAT THESE DRAWINGS SHOW EVERY CUT, CONDITION ETC. OF THIS SYSTEM.
NEW WALLS
EXISTING WALLS TO BE REMOVED
EXISTING WALLS TO REMAIN DETAIL NO.
BUILDING SECTION
DRAWING NO.
1A - 4
DRAWING NO.
DETAIL NO.
DETAIL SECTION
NOTE #6:SITE SHALL BE LEFT CLEAN AT THE END OF EACH WORKING DAY. ALL DEBRIS SHALL BE PICKED UP AND PLACED IN CONTAINERS, CONSTRUCTION QUALITY BAGS, DUMPSTER OR OTHER ACCEPTABLE MEANS.
NOTE #7:ALL DEMOLITION AND CONSTRUCTION DEBRIS SHALL BE PROPERLY DISPOSED OF DURING THE EXTENT OF THE WORK, AND THE SITE SHALL BE LEFT COMPLETELY CLEAN AND FREE OF DEBRIS AT THE END OF THE CONTRACT. ALL DEBRIS SHALL BE PROPERLY DISPOSED OF.
NOTE #8:THE CONTRACTOR SHALL TEMPORARILY DISCONNECT AND REMOVE ALL EXISTING SERVICES THAT INTERFERE WITH THE PROPER INSTALLATION OF THE NEW CONSTRUCTION. CONTRACTOR IS RESPONSIBLE TO NOTIFY THE ARCHITECT/OWNER OF THESE SERVICES BEFORE DISCONNECTION. REINSTALL AND RECONNECT ALL TEMPORARILY DISCONNECTED AND REMOVED ITEMS TO THE SATISFACTION OF THE OWNER.
NOTE #9:ALL EXISTING AREAS DISTURBED OR DAMAGED AS A RESULT OF THE NEW CONSTRUCTION ARE TO BE PATCHED OR REPLACED TO MATCH EXISTING AND /OR NEW ADJACENT SURFACES.
NOTE #10:ALL MATERIALS AND NOTES REFER TO NEW MATERIALS UNLESS OTHERWISE NOTED OR INDICATED AS EXISTING.
1A - 4
UP
UP
UP
DNDN
UP
UP
UP
ASSIST. MANAGER
JR. ACCT.
CLERICAL
MANAGER
METER DEPT.
CUSTODIANMAILCUSTOMER 3CUSTOMER 1 CUSTOMER 2
RECEPTION
ELEC. EQUIPMENT
WOMEN MEN
W. LOCKER M. LOCKER
LOBBY
COMMISIONER STOR.AUDITORIUM
LUNCH
TRASH
CONF.
STAIR 2 SUPERINTENDENT
SUPERVISOR
SUPERVISOR
SUPERVISOR
CLERKVESTIBULE
CASHIER
EXISTING PROJECTION BOOTH TO BE REMOVED
COMPLETE
ALL FLOOR FINISHES TO BE REMOVED FROM AUDITORIUM COMPLETE
EXISTING SLIDING GLASS DOORS TO BE REMOVED COMPLETE
EXISTING RECEPTION DESK TO BE REMOVED
COMPLETE
8' -
0"
10' - 0"
BUILD TEMPORARY PLATFORM; TO BE USED AS TEMPORARY RECEPTION DURING LOBBY WORK
TO BECOME TEMPORARY CASHIER DURING CONSTRUCTION
BUILD NEW TEMPORARY WALL DURING CONSTRUCTION (2X4 WOOD STUDS W/ MINERAL WOOL & PLYWOOD BOTH SIDES
12' -
8"
3' -
6"
2' - 2" AUTOMATIC POWER DOOR OPERATOR
CUSTOMER DESK 1
CUSTOMER DESK 2
RECEPTIONDESK
WALL TO BE RAISED TO NEW LEVEL
PROVIDE NEW COMPACTED FILL TO NEW LEVEL; NEW 4" CONCRETE SLAB W/ WELDED WIRE MESH
A-33
A-31
A-41
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/8" = 1'-0"
06/1
1/19
6:4
5:11
PM
A-1FIRST FLOOR DEMOLITION & PROPOSED FLOOR PLANS
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
PAK
1/8" = 1'-0"1 EXISTING FIRST FLOOR PLAN1/8" = 1'-0"2 PROPOSED FIRST FLOOR PLAN
WORK IN AUDITORIUM PART OF ALTERNATE NO. 1
DN
DN
DN
DN
MANAGER ASSIST. MANAGER CONFERENCE SYST. MANAGER
MECH. ROOM
COMPUTER
PRINTER
MENWOMEN
OFFICECONFERENCE
OFFICE
OFFICEGEN. OFFICE
CHIEF ENGR.
STAIR 2
CENT. COMM.
ELEV.
OFFICE
COPY
14' - 0"
22' -
4"
16' -
11"
16' - 11"
28' -
9"
9' -
8"
13' - 11"
12' - 2"
12' - 9"
7' - 10" 19' - 6"
27' - 4"
14' - 9"25
' - 1
1"
3' -
3"
15' -
9"
A-3 8
B1 B2
B3
B4
B5
OFFICE201
OFFICE202
OFFICE203
CUBICLE #1
CUBICLE #2
CUBICLE #3 CUBICLE #4 CUBICLE #5
CUBICLE #6 CUBICLE #7 CUBICLE #8
CUBICLE #9 CUBICLE #10
CUBICLE #11
MANAGER204
FILE SYSTEMSERVICE COUNTER & WINDOW
A
25' -
11"
7' - 10" 19' - 6"
22' -
8"
15' -
5"
12' - 7"
16' - 11"
10' -
7"
57' - 8"
13' - 0" 16' - 0" 15' - 1"
12' - 4"
11' -
4"
16' -
11"
11' - 2"
9' -
8"
29' - 10"
1 1
1
1
1
1
CONFERENCE205
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/8" = 1'-0"
06/1
1/19
6:4
5:13
PM
A-2SECOND FLOOR DEMOLITION & PROPOSED FLOOR PLANS
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
PAK
1/8" = 1'-0"1 EXISTING SECOND FLOOR PLAN1/8" = 1'-0"2 PROPOSED SECOND FLOOR PLAN
AUTOMATIC POWER DOOR BUTTON
CUSTOMER DESK 1
CUSTOMER DESK 2
A2
A3
A4A5
4A-3
2' - 2" 2' - 2"
3' -
11"
3' -
11"
2' - 3"
1' -
6"
CUSTOMER HIGH COUNTER
HARDWOOD EDGE BAND
WALL BELOW
9' - 8" 9' - 8"
8' -
3" RECEPTION
DESK
SECURITY GLASS
SECURITY DOOR
A1
3A-3
9' -
5"
A-3 7
1' - 6"1' -
0"
7"
1"
1' - 1"
7' -
0"
2' -
6"3' -
0"
4"1' -
2"
1"
6"
1"
10"
4' -
0"
3' -
6"
1"
1' - 2"
1' - 6"
4' -
0"
1
3-5/8" METAL STUDS @ 16" O.C.
5/8" BLUEBOARD W/SKIM COAT PLASTER
7' -
0"
3' - 0"
5' - 6"
2' - 0"
2' -
2"2'
- 2"
2' -
2"
6' -
10"
2"2"
2"2"
2" 2" 2"
6"2'
- 6"
6" 6"
DOOR NO. B1, B2, B3, B4 & B5SEE DWG. A-2 FOR LOCATIONDOOR NO. B1, B2, B3, B4 & B5 TO HAVE HARDWARE SET #1
3' - 0"
2"
6"2'
- 6"
6" 6"
DOOR NO. A1, A2, A3, A4 & A5SEE ABOVE FOR LOCATION;DOOR NO. A1, A3, A4, & A5 TO HAVE HARDWARE SET #1, DOOR NO. A2 TO HAVE HARDWARE SET #2
2"
BIRCH VENEER-STAINED
1" SILVER METALIC ACCENT STRIPS
TOE KICK-PAINTED BLACK
R 10"
TRANSACTION OPENING
SECURITY GLASS
3' -
0"
3' -
6"
SOFFIT ABOVE WITH RECESSED LIGHTING
PMLP SEAL
3A-3
3' -
0"
4' -
0"
8' - 0"
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
As indicated
06/1
1/19
6:4
5:14
PM
A-3LARGE SCALE PLANS & DETAILS
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
Author
1/2" = 1'-0"1 PLAN @ CUSTOMER SERVICE
1/2" = 1'-0"2 PLAN @ RECEPTION DESK
1 1/2" = 1'-0"3 RECEPTION DESK1 1/2" = 1'-0"4 SERVICE COUNTER
1 1/2" = 1'-0"5 WALL TYPES1/2" = 1'-0"6 DOOR & SIDELIGHT
1/2" = 1'-0"7 ELEVATION @ RECEPTION DESK
1/2" = 1'-0"8 SLDING SERVICE WINDOW
WALL & DOOR TO BE RAISED TO NEW LEVEL
FILL AREA & POUR NEW 4" SLAB
REMOVE ALL CARPET FLOOR FINISHES INCLUDING VINYL COVE BASE
3A-4
2A-4
3A-4 EXISTING GWB SHOWN
DOTTED TO BE REMOVED AS SHOWN
EXISTING CONCRETE CONSTRUCTION TO
REMAIN
NEW
GW
B T
O M
ATC
H
1' -
0"
EXISTING GWB TO REMAIN
ADJUST EXISTING METAL STUDS AS NECESSARY TO ACCOMMODATE NEW CONSTRUCTION - ADD NEW BOTTOM TRACK AS NEEDED
NEW 4" CONCRETE SLAB WITH WWF
4"
NEW 8" COMPCATED CRUSHED STONE
NEW COMPACTED FILL
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
As indicated
06/1
1/19
6:4
5:15
PM
A-4AUDITORIUM PLANS & DETAILS
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
Author
1/4" = 1'-0"1 AUDITORIUM FLOOR PLAN
WALL MOUNTED ITEMSALL WALL MOUNTED DEVICES SUCH AS CLOCKS, OUTLETS, SWITCHES, RECEPTACLES, WALL MOUNTED LIGHTING & EMERGENCY LIGHTING, IN AREA WHERE THE FLOOR IS TO BE FILLED, SHALL BE RAISED TO CODE STANDARDS - SEE ELECTRICAL PLANS.
1 1/2" = 1'-0"2 WALL BASE @ AUDITORIUM FLOOR-EXISTING1 1/2" = 1'-0"3 WALL BASE @ AUDITORIUM FLOOR-NEW
ALTERNATE NO. 1
DN
B1 B2
B3
B4
B5
OFFICE201
OFFICE202
OFFICE203
CUBICLE #1
CUBICLE #2
CUBICLE #3 CUBICLE #4 CUBICLE #5
CUBICLE #6 CUBICLE #7 CUBICLE #8
CUBICLE #9 CUBICLE #10
CUBICLE #11
MANAGER204
FILE SYSTEM -BY PMLP
SERVICE COUNTER & WINDOW
A25' -
11"
7' - 10" 19' - 6"
22' -
8"
15' -
5"
12' - 7"
16' - 11"
10' -
7"
57' - 8"
13' - 0" 16' - 0" 15' - 1"
12' - 4"
11' -
4"
16' -
11"
11' - 2"
9' -
8"
29' - 10"
OFFICE COMPARTMENTS-BY
PMLP
10' -
1"10
' -
7"
9' - 8" 10' - 0"
NEW CARPET
NEW CARPET
NEW CARPET
A-3 8NEW CARPET
CONFERENCE205
NEW CARPET
NEW CARPET
CUSTOMER DESK 1
CUSTOMER DESK 2
RECEPTIONDESK
NEW CERAMIC TILE ACCENT BAND
ACCENT CERAMIC TILE TRANSITION PIECE
16' - 4"
5' -
11"
9' - 8" 9' - 8" 4' - 0"
24' - 2"
12' -
8"
7' - 10"
4' -
5"
4' -
1"
7' - 7"
1' -
5"
1' - 5"
8' -
8"
4' -
0"
19' -
8"
5' - 0"
EXISTING CERAMIC TILE
13' -
8"
7' - 8"
NEW TRAFFIC CARPET
30' - 7"
38' -
0"
2' -
11"
5' - 0" 20' - 7" 5' - 0"
7' -
7"
4' -
3"
23' -
3"
4' -
10"
5' - 0"
6' - 0"
LUXURY VINYL TILE
CARPET
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
3/16" = 1'-0"
06/1
1/19
6:4
5:21
PM
A-5FLOOR FINISHES
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
Author
3/16" = 1'-0"1 ENGINEERING DEPARTMENT FLOOR PLAN
3/16" = 1'-0"2 FLOOR FINISHES @ CUSTOMER SERVICE & RECEPTION
3/16" = 1'-0"3 FLOOR FINISHES @ AUDITORIUM
ALTERNATE NO. 1
DN
CL
VIEW FROM BREAKOUT SIDEDOORS WILL BREAK OUT FROM ANY POSITION
SECTION
PLAN VIEW
SMOKESEALS
SMOKESEALS
17' -
7"
2' - 5"
2' - 5"
2' -
5"
17' - 6"
EXISTING METAL PANELS TO BE REPLACED WITH NEW
7' - 3"13
' -
5"
17' - 5"
16' -
11"
CLEAN & RE-CAULK ALL GLASS TO FRAME CONNECTIONS
11' - 5"
8' -
8"
7' -
8"
10' -
5"
CLEAN ALL EXISTING CAULKED JONTS & RE-SEAL
(SEE DRAWING A-9)
CLEAN ALL EXISTING CAULKED JONTS & RE-SEAL (SEE
DRAWING A-9)
CLEAN & RE-CAULK ALL GLASS TO FRAME
CONNECTIONS
4' -
9"
7' -
8"
3' -
0"
4' -
8"
CLEAN & RE-CAULK ALL JOINTS BETWEEN GLASS
PANELS, MULLIONS & ALUMINUM FRAME
EXISTING TILE TO REMAIN
EXISTING METAL PANELS TO BE REPLACED WITH NEW
CLEAN & RE-CAULK ALL JOINTS BETWEEN MASONRY, VESTIBULE & METAL PANELS ALONG BUILDING FACE
GLAZING PANEL
F.F.L.
GLAZING PANEL
GLAZING PANEL
7' -
0"
3' -
6"
4 12
"
FRAME
DEPTH
114
4
BREAK OUT / COVER SIDE
1 34
"
JAMB
44
B
DD
PIVOT
POINT
SMOKE SCREEN TO FLOOR
BREAKOUT SIDE
SMOKE SEALS
SMOKE SEALS
4' -
9"
4' -
8"
EXISTING GASKETING TO BE REMOVED & REPLACED
WITH NEW
EXISTING TILE TO REMAIN
EXISTING METAL PANELS TO BE
REPLACED WITH NEW
EXISTING METAL PANELS TO BE REPLACED WITH NEW3' - 4"
13' - 11"
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
As indicated
06/1
1/19
6:4
5:26
PM
A-6VESTIBULE PLANS, ELEVATIONS & INTERIOR ELEVATIONS
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
Author
1/4" = 1'-0"1 PLAN @ MAIN ENTRANCE1/4" = 1'-0"2 ROOF PLAN @ MAIN VESTIBULE
1/4" = 1'-0"3 PLAN @ EMPLOYEE VESTIBULE1/4" = 1'-0"4 ROOF PLAN @ EMPLOYEE VESTIBULE
1/4" = 1'-0"5 SIDE ELEVATION @ MAIN ENTRANCE
1/4" = 1'-0"6 SLIDING DOOR
1" = 1'-0"7 SLIDING DOOR PLAN DETAILS3/4" = 1'-0"8 SLIDING DOOR SECTION DETAILS
1/2" = 1'-0"9 MAIN VESTIBULE CROSS-SECTION
UP UP
1
4
3
2
SHADED REGIONS ARE GLASS
EXISTING DRYWALL SURFACE TO BE RE-
PAINTED
EXISTING REVEAL TO BE RE-PAINTED
20
' -
6"
EXISTING SLIDING DOORS TO BE REPLACED (2 PAIRS)
STOREFRONT GLASS
EXISTING DRYWALL SURFACE TO BE RE-
PAINTED
20
' -
6"
8' -
6"
3' -
6"
14' -
11"
8' -
6"
27' - 11"
11' - 6"
7' - 3"1' - 6" 1' - 6"
8' -
6"
25' - 4"
STOREFRONT GLASS
EXISTING DRYWALL SURFACE TO BE RE-PAINTED
20
' -
6"
14' -
11"
8' -
6"
27' - 11"
11' - 6"
EXISTING STAIR DRYWALL SURFACE TO BE RE-PAINTED
1
2
3
4
5
6
7
89
10
11
SHADED REGIONS ARE GLASS
EXISTING DRYWALL SURFACE TO BE RE-
PAINTED
EXISTING REVEAL TO BE RE-PAINTED
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
As indicated
06/1
1/19
6:4
5:42
PM
A-7INTERIOR ELEVATIONS
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
Author
3/32" = 1'-0"5 ELEVATION KEY PLAN
1/4" = 1'-0"1 ELEVATION 1
1/4" = 1'-0"4 ELEVATION 4
1/4" = 1'-0"3 ELEVATION 2
3/32" = 1'-0"6 PHOTO KEY PLAN - VESTIBULE
1/4" = 1'-0"2 ELEVATION 3
PHOTO NO. 1 PHOTO NO. 2 PHOTO NO. 3 PHOTO NO. 4 PHOTO NO. 5 PHOTO NO. 6 PHOTO NO. 7 PHOTO NO. 8 PHOTO NO. 9 PHOTO NO. 10 PHOTO NO. 11
UP
DN
CUSTOMER DESK 1
CUSTOMER DESK 2
RECEPTIONDESK
OPEN TO ABOVE
EXISTING ACT CEILING, INSTALL NEW LIGHT FIXTURES-SEE ELECTRICAL DRAWINGS. ALL OTHER CEILING MOUNTED FIXTURES I.E. SPEAKERS, SPRINKLERS ETC. TO BE RESET.
EXISTING GWB CEILING/SOFFITS TO BE
PREPARED & PAINTED
NEW ACT CEILING - RESET ALL LIGHT FIXTURES,
DIFFUSERS, SPRINKLER HEADS, SPEAKERS ETC.
6' - 1"
31' -
8"
2' - 0"
EQ
UAL
EQ
UAL
D
D
S
S
CEILING IN THIS AREA TO REMAIN - INSTALL NEW LIGHT
FIXTURES. SEE ELECTRICAL DRAWINGS
NEW ACT CEILING - RESET ALL LIGHT FIXTURES, DIFFUSERS, SPRINKLER HEADS, SPEAKERS ETC.
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/4" = 1'-0"
06/1
1/19
6:4
5:43
PM
A-8REFLECTED CEILING PLANS
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
Author
1/4" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN1/4" = 1'-0"2 SECOND FLOOR REFLECTED CEILING PLAN
S
D
CEILING LEGEND
2 X 2 RECESSED LIGHT FIXTURE
RECESSED CAN LIGHT FIXTURE
SPRINKLER HEAD
HVAC DIFFUSER
SPEAKER
SMOKE OR HEAT DETECTOR
HVAC RETURN AIR
DN
S S
S S
NEW ACT CEILING - RESET ALL LIGHT FIXTURES, DIFFUSERS, SPRINKLER HEADS, SPEAKERS ETC. WORK TO BE PERFORMED BY LICENSED TRADES
NEW ACT CEILING - RESET ALL LIGHT FIXTURES, DIFFUSERS, SPRINKLER HEADS, SPEAKERS ETC. WORK TO BE PERFORMED BY LICENSED TRADES
S
NEW ACT CEILING - RESET ALL LIGHT FIXTURES, DIFFUSERS, SPRINKLER
HEADS, SPEAKERS ETC.
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
1/4" = 1'-0"
06/1
1/19
6:4
5:43
PM
A-9REFLECTED CEILING PLANS
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
Author
1/4" = 1'-0"1 ENGINEERING REFLECTED CEILING PLAN
1/4" = 1'-0"2 NEW OFFICE REFLECTED CEILING PLAN
S
D
CEILING LEGEND
2 X 2 OR 2 x 4 RECESSED LIGHT FIXTURE
RECESSED CAN LIGHT FIXTURE
SPRINKLER HEAD
HVAC DIFFUSER
SPEAKER
SMOKE OR HEAT DETECTOR
HVAC RETURN AIR
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
ARN
OLD
JAC
OBS
ON
ASS
OC
IATE
S, IN
C. A
RC
HIT
ECTS
153
AND
OVE
R S
TREE
T, S
UIT
E 10
1, D
ANVE
RS,
MA
0192
3
(7
81) 9
35-2
500
06/1
1/19
6:4
5:44
PM
A-10VESTIBULE REPAIR DETAILS, PHOTOS & NOTES
17-AJA21
RENO
VATIO
N/IM
PR
OV
EM
ENT P
RO
JECT
PEAB
OD
Y M
UNIC
IPAL L
IGHT P
LANT
6-12-2019
AuthorMAIN VESTIBULE PHOTO - (MV1) PHOTO (MV2)
PHOTO (MV3) PHOTO (MV4)
PHOTO (MV5)
PHOTO (MV6)
EMPLOYEE VESTIBULE PHOTO - (EV1) PHOTO (EV2)
PHOTO (EV3) PHOTO (EV4)
PHOTO (EV5) PHOTO (EV6)
PHOTO (EV7)
CLEAN & RE-CAULK ALL JOINTS AT PANELS &
STOREFRONT
CLEAN & RE-CAULK ALL JOINTS BETWEEN
BUILDING PANELS & COVERED VESTIBULE
ROOF
CLEAN & RE-CAULK ALL JOINTS BETWEEN GLASS
PANELS, MULLIONS & ALUMINUM FRAME
REMOVE ALL PREVIOUS CAULKING & SEALANT & APPLY NEW
ALL JOINTS BETWEEN ALUMINUM FRAME & PANELS ETC. TO BE RE-CAULKED
ALL EXISTING METAL FLUSH PANELS TO BE REMOVED & REPLACED WITH NEW
NOTE:ALL EXISTING METAL FLUSH PANELS TO BE REMOVED & REPLACED WITH NEW AT BOTH MAIN VESTIBULE & EMPLOYEE VESTIBULE
ALL PANELS JOINTS AT ENTRANCE CANOPY TO BE CLEANED & RE-CAULKED
ALL JOINTS BETWEEN ALUMINUM FRAME & PANELS ETC. TO BE RE-CAULKED
ALL JOINTS BETWEEN PANELS & CANOPY FRAMING TO BE CLEANED OUT & RE-CAULKED
ALL PANELS TO BE PREPARED & PAINTED
EXISTING GUTTER DAMN AT JUNCTION TO BUILDING SHALL BE REMOVED & RECONSTRUCTED -ALL SIDES AT BOTH VESTIBULE LOCATIONS
REMOVE ALL PREVIOUS CAULKING & SEALANT & APPLY NEW
CLEAN & RE-CAULK ALL JOINTS AT PANELS &
STOREFRONT
CLEAN & RE-CAULK ALL JOINTS BETWEEN
BUILDING PANELS & COVERED VESTIBULE
ROOF
CLEAN & RE-CAULK ALL JOINTS BETWEEN MASONRY, VESTIBULE & METAL PANELS
CLEAN & RE-CAULK ALL JOINTS BETWEEN MASONRY, VESTIBULE & METAL PANELS
RE-CAULK ALONG INTERIOR SURFACE OF STOREFRONT, MASONRY & FLOOR
RE-CAULK ALONG EXTERIOR SURFACE
OF STOREFRONT, MASONRY & SLAB
CLEAN & RE-CAULK ALONG ADJOINING SURFACES OF STROREFRONT FRAME &
MASONRY
CLEAN & RE-CAULK ALONG EXISTING FLASHING REGLET
REMOVE ALL PREVIOUS CAULKING & SEALANT &
APPLY NEW
EXISTING CAULIKNG JOINTS ALONG FLASHING AT MASONRY TO BE CLEANED & RE-SEALED
ALL EXISTING METAL FLUSH PANELS TO BE REMOVED & REPLACED WITH NEW
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
AR
NO
LD
JA
CO
BS
ON
A
SS
OC
IA
TE
S, IN
C. A
RC
HIT
EC
TS
15
3 A
ND
OV
ER
S
TR
EE
T, S
UIT
E 1
01
, D
AN
VE
RS
, M
A 0
19
23
(7
81
)9
35
-2
50
0
17-AJA21
6-12-2019
CWN
E-1
NONE
UP
UP
DN
DN
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
AR
NO
LD
JA
CO
BS
ON
A
SS
OC
IA
TE
S, IN
C. A
RC
HIT
EC
TS
15
3 A
ND
OV
ER
S
TR
EE
T, S
UIT
E 1
01
, D
AN
VE
RS
, M
A 0
19
23
(7
81
)9
35
-2
50
0
17-AJA21
6-12-2019
CWN
E-2
AS SHOWN
DN
DN
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
AR
NO
LD
JA
CO
BS
ON
A
SS
OC
IA
TE
S, IN
C. A
RC
HIT
EC
TS
15
3 A
ND
OV
ER
S
TR
EE
T, S
UIT
E 1
01
, D
AN
VE
RS
, M
A 0
19
23
(7
81
)9
35
-2
50
0
17-AJA21
6-12-2019
CWN
E-3
AS SHOWN
UP
UP
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
AR
NO
LD
JA
CO
BS
ON
A
SS
OC
IA
TE
S, IN
C. A
RC
HIT
EC
TS
15
3 A
ND
OV
ER
S
TR
EE
T, S
UIT
E 1
01
, D
AN
VE
RS
, M
A 0
19
23
(7
81
)9
35
-2
50
0
17-AJA21
6-12-2019
CWN
E-4
AS SHOWN
DN
DN
SCALE:
PROJECT #:
DATE:
DRAWN BY:
REVISIONS:
AR
NO
LD
JA
CO
BS
ON
A
SS
OC
IA
TE
S, IN
C. A
RC
HIT
EC
TS
15
3 A
ND
OV
ER
S
TR
EE
T, S
UIT
E 1
01
, D
AN
VE
RS
, M
A 0
19
23
(7
81
)9
35
-2
50
0
17-AJA21
6-12-2019
CWN
E-5
AS SHOWN
Top Related